36C24120R0142 0002.docx

DOCX document 29 KB Posted

Attached to
Y1DA--Inpatient Ware Renovation 405-13-104
Solicitation number
36C24120R0142
Issued by

View the file

Other files

File Type Posted
36C24120R0142 0005.docx DOCX document
Nurse Call RFI Responses.docx DOCX document
408.08115.31.A104.pdf PDF
408.08115.31.A103.pdf PDF
S06 RFIs Responses from COR and AE.docx DOCX document
VA Hospital 7-16-2020.pdf.COPY.pdf PDF
36C24120R0142 0004.docx DOCX document
20200803-182827-VA_Hospital_Electric_Run_Checklist.pdf PDF
VAMC-WRJ Building 31 Drawing 31-AS-106-DA-5.pdf PDF
VAMC-WRJ Building 31 Drawing 31-AS-110-DA5-SKA-01.pdf PDF
VAMC-WRJ Building 31 Structural Drawings.pdf PDF
36C24120R0142 0003.docx DOCX document
Headwall Service Panels.pdf PDF
028211 Asbestos Abatement Rev-1.pdf PDF
IMG 6306 Above Patient Rm 192.pdf PDF
VAMC Project 405-13-109 DA-5 Drawings 04162018.pdf PDF
VAMC-WRJ Building 31 Nursing Unit 31-M-505-DA-5.pdf PDF
31-AS-105B ABATEMENT DIAGRAM LEVEL-1 Revision 1.pdf PDF
Building 31 Nursing Unit Patient Lift System Turn-Key Design-Build 08192020.pdf PDF
31-AS-110-DA4.pdf PDF
P07 Wages.pdf PDF
S04 Site Vist 2.pdf PDF
36C24120R0142 0001.docx DOCX document
Inpatient Ward Renovation RFIs as of 8-25-2020.docx DOCX document
S04 Site Vist 1.pdf PDF
S02 Drawings 05012019 1.pdf PDF
S02 SPEC Vol 1 May1 2019.pdf PDF
S02 SPEC Vol 2 May1 2019.pdf PDF
36C24120R0142 Solicitation.docx DOCX document
S02 Wage Determination.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 405-13-104 Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue Providence RI 02908 Department of Veterans Affairs VAMC Providence 830 Chalkstone Avenue Providence RI 02908 To all Offerors/Bidders

36C24120R0142 08-26-2020

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 12:00pm on 10/7/2020 See CONTINUATION Page X The above referenced solicitation as identified in block 9a for the inpatient unit renovation project at the White River Junction VA Medical Center is hereby amended to extend due date of proposals.

Another amendment will be issued at a later date to address pending RFIs.

Karla Rotondo Contracting Officer

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Provide all manpower, materials and supervision, and other resources necessary to accomplish renovations to the inpatient ward project of Building 31/Granite building in accordance with project drawings and specifications.

1.00
JB
__________________
__________________

Deduct Alternate No. 1: Delete Carpet CPT-1 & CPT-2 and Replace with 12”x12”x1/8” Standard Vinyl Composition Tile. See project drawings for distribution of CPT-1 & CPT-2. Assume standard vinyl composition tile equivalent to Armstrong Standard Exelon Imperial Texture with one (1) field color (approximately 70 percent of the total area) and three (3) accent colors (approximately 10 percent of the total area for each accent color). VCT distribution and patterns to be determined.

Period of Performance Reduction from Base Offer is 0 calendar days

1.00
JB
__________________
__________________

Deduct Alternate No. 2: Delete Patient Room Headwall Decorative Plastic Laminate Panels & Trim and Replace with Accent Paint Colors. Eliminate plastic laminate panels and divider trim at all patient room head wall locations. In lieu of plastic laminate panels in these locations assume the application of two (2) accent paint colors in a straight-sided rectangular pattern (TBD).

Reference the following elevations in the project drawings, but note that this deductive alternate is applicable to all headwall locations whether shown on the elevations or not shown:

6 / 31-AS-405; 5 & 14 / 31-AS-406; 5 / 31-AS-407; 3 & 12 / 31-AS-408; 9 / 31-AS-410;

6 & 11 / 31-AS-411; 1 & 2 / 31-AS-416; 1 & 2 / 31-ID-103

1.00
JB
__________________
__________________

Deduct Alternate No. 3: Delete Replacement of Exterior Windows. See project drawings for information relevant to the Base Scope of Work. Refer to (but not necessarily limited to) First Floor Demolition Plan 31-AS-106, First Floor Renovation Plan 31-AS-109 and details 5 & 8 / 31-AS-201 and 11 / 31-AS-601. Note that installation of the spray foam insulation remains in the Base Scope of Work. As a result, all window head and jamb returns will need to be patched and repaired and all window sills will need to be replaced to accommodate the deeper returns caused by the deeper wall section. The existing storm windows shall be removed by the contractor, saved for re-use and re-installed by the contractor at the new wall plane. The contractor shall set the storm window sashes in the closed position upon reinstallation and shall secure them closed in a neat manner acceptable to the VAMC.

Associated MEP Scope – Revise Radiant Ceiling Panel sizes for type RP-3 and RP-4 to be 24” wide nominal, 4 tube by 4’-0” long, rated for 1,556 BTUH at 170 AWT. See drawing 31-M-505-DA5. Refer to plan drawings for locations. Shift locations of proposed exhaust grilles in Toilet Rooms 128A and 137A to accommodate longer panel size.

1.00
JB
__________________
__________________

Deduct Alternate No. 4: Delete Pass-through Supply Storage Units. Every patient bedroom room as proposed, except Patient Room 116, incorporates a “pass-through” assembly that includes back-to-back supply cabinets installed above short swing doors. Delete the pass-through assembly, associated framed soffit and wing walls in their entirety and replace with standard framed wall construction as a continuation of the adjacent wall type in the same plane. Refer to First Floor Renovation Plan 31-AS-109 for general locations, Detail 6 / 31-AS-902, and the various enlarged room plans and interior elevations.

1.00
JB
__________________
__________________

Deduct Alternate No. 5: Delete Proposed Renovation Work in the Southwest Corner of the Project Area. (aka: Desk-80). See drawing 31-AS-109DA-5, Deductive Alternate DA-5 Southwest Corner Scope Removal (aka: Desk-80), for identification of the general area included in this deductive alternate. The scope reduction shall include elimination of all general demolition and construction work within the affected area including, but not limited to, General Conditions, Overhead, Profit, general and targeted demolition, all work in the ceiling space below the affected area, and reconstruction of the space pursuant to the corresponding construction drawings. Some of the specific trades affected include hazardous materials abatement, finishes and construction material removal, exterior window replacement, exterior wall insulation, acoustical insulation, metal framing, wallboard, doors, door frames, door hardware, finish materials, finished ceilings, casework & trim, and wall protection.

The scope modifications for the mechanical, plumbing, fire protection, lighting, electrical & special systems trades shall be as follows and the general contractor shall be responsible for related construction access and restorative activities (e.g.: existing ceiling limited removal and replacement)

GRAND TOTAL