Drawings_vol_2_Set_1_file.pdf
PDF 13 MB Posted
- Attached to
- Major Construction Project Seismic Renovate Building 86 Federal contract opportunity
- Solicitation number
- 36C10F18R0473
About this file
Drawings_vol_2_Set_1_file.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10F18R0473-00002010.pdf | ||
| 36C10F18R0473-00002012.pdf | ||
| 36C10F18R0473-00002014.pdf | ||
| 36C10F18R0473-00002013.pdf | ||
| 36C10F18R0473-00002008.docx | DOCX document | |
| 36C10F18R0473-00002011.pdf | ||
| 36C10F18R0473-00002015.pdf | ||
| 36C10F18R0473-00002009.pdf | ||
| Drawings_vol_1_Set_1_file.pdf | ||
| Drawings_vol_2_Set_3_file.pdf | ||
| Drawings_vol_2_Set_2_file.pdf | ||
| Drawings_vol_1_Set_2_file.pdf | ||
| Drawings_vol_1_Set_3_file.pdf | ||
| 36C10F18R0473-023.pdf | ||
| 36C10F18R0473-021.pdf | ||
| 36C10F18R0473-022.pdf | ||
| 36C10F18R0473-025.pdf | ||
| 36C10F18R0473-020.docx | DOCX document | |
| 36C10F18R0473-024.pdf | ||
| 36C10F18R0473-003.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
STAIR 1
2A101
FITTING
2B105
ELEC
2B101
CORRIDOR
2A106
SEMI-PRIVATE
TREATMENT
2A102
CORRIDOR
2A100
PURCHASING
AGENT/ ORTHOTIC
LABORATORY
OFFICE
2B106
CONSULT
2B107
CHIEF
2A109
SOILED STORAGE
2B102
FA
FA
15 15
ELEV LOBBY
2B103
STORAGE
2A104
NOPQRR.4
3.8
5.2
2.2
5.8
1.2
SX.6X.8 X.4 V UX
2.3
1.8
2.5
W
ROOF BELOW
PATIENT
DIAGNOSTIC
TREATMENT
CONSULTATION
2A108
TYP
FIRE SHUTTER
FSD
FSD
FSD
FSD
FSD
FSD
UPDN
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
6"
6"
6"
6"
16400 Southcenter Parkway Suite 504 Tukwila, Washington 98188 253-236-5842 www.kanemanthey.com
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
KEY PLAN
77 Wainwright Drive
Renovate Building 86; Jonathan M.
Wainwright Memorial VA Medical Center
687-400
01/22/2016
FA121
Building 86
Walla Walla, Washington 99362
SUBMITTAL
1/4" = 1'-0"1 LEVEL 2 FIRE ALARM PLAN (NORTH)
SHEET KEYNOTES
FIRE ALARM ADDRESSABLE OUTPUT MODULE TO RELEASE FIRE SHUTTER.1
Revisions Issues Date Schematic Design SD2 Resubmittal 07/24/2012 Design Development DD1 11/13/2012
DD1 VACO SUBMITTAL 03/22/2013
DESIGN DEVELOPMENT DD2 09/30/2013
Design Development DD2 Resubmittal 02/17/2014
DOOR HOLD OPEN INTEGRAL TO DOOR HARDWARE DEVICE. COORDINATE ROUGH-IN WITH VENDOR.
STAIR 1
2A101
FITTING
2B105
ELEC
2B101
CORRIDOR
2A106
SEMI-PRIVATE
TREATMENT
2A102
PURCHASING
AGENT/ ORTHOTIC
LABORATORY
OFFICE
2B106
CONSULT
2B107
CHIEF
2A109
SOILED STORAGE
2B102
FD-A
P-505
P-418
P-418
P-418
ELEV LOBBY
2B103
ELEV 1
2B104
P-505
P-418
P-528
P-503
FD-A
P-703
P-103
P-414
FD-A
P-418
FD-A
FD-A
P-508
P-508
P-508
P-508
P-508
STORAGE
2A104
4" W DN
4"W DN
DW
DW
2" DCW, 2" DHW &
3/4" DHWR UP
DW
RWL
4"
DWV
4" W DN
3" RD-1, 2235SF
3" OFD-1
NOPQRR.4
3.8
5.2
2.2
5.8
1.2
SX.6X.8 X.4 V UX
2.3
1.8
2.5
W
2"
2"
2" V
3/4"
1"
2" 2"
4"
3/ 4"
3/ 4"
2" V
2"
2"
2"
2" V
3" V UP
2"
1"
1 1/2"
AP
2"
DWV
2A
SHWS
FS-A
FS-A
2" V DN
2" V
1/2"
1"
2" V
4"
FS-A
RD-1
OFD-1 3/4"
4"
RWL
3" V
3" V UP
2"
2"
4" 2"
3" W DN
3/4" 3/4"
3/4" DHW & DCW
CAPPED OFF FOR
FUTURE
4"
2"
3" V UP
P-508
2"
2" W DN
2" V UP
FD-B
1"
2" V UP
4" W DN
4"
2"
P-508
3/ 4"
2"
2"
1/ 2"
1 1/4" 2"
3/4"
1/
4"
1" 2"
2"
1/2"
3"
3"
2"
BV SET @
GPM
BV SET @ 1.5 GPM
2"
SLEEVE
2"V DN
3"VTR
CD CD
3/4" UP TO
FCU
3/4" CD SPILL INTO
SERVICE SINK
UPDN
CA
CA
CA
CA
CA
CA
CA
3/ 4"
3/4" CA FIELD COORDINATE
48"
48"
36"
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
6"
6"
6"
6"
16400 Southcenter Parkway Suite 504 Tukwila, Washington 98188 253-236-5842 www.kanemanthey.com
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
KEY PLAN
77 Wainwright Drive
Renovate Building 86; Jonathan M.
Wainwright Memorial VA Medical Center
687-400
01/22/2016
PL121
Building 86
Walla Walla, Washington 99362
SUBMITTAL
1/4" = 1'-0"1 LEVEL 2 PLUMBING PLAN (NORTH)
GENERAL SHEET NOTES
A. EXISTING PIPING SYSTEMS SHALL BE RE-ROUTED OR MAINTAINED IN
OPERATION DURING PHASE I, 2 & 3 REMODEL. REFER TO DRAWING PD100
THROUGH PD130 FOR DETAILS.
FF ELEV = 104'-6"
Revisions Issues Date Schematic Design SD2 Resubmittal 07/24/2012 Design Development DD1 11/13/2012
DD1 VACO SUBMITTAL 03/22/2013
DESIGN DEVELOPMENT DD2 09/30/2013
Design Development DD2 Resubmittal 02/17/2014
SHEET KEYNOTES
1 PROVIDE PLASTER TRAP AT THIS LOCATION.
B
FP
B
FP
BFP
C O
R R
ID
O
R 3B
HIGH LEVEL
DISINFECTION
3B111
PREP
3B114D
CORRIDOR
3B100
ELEV 1
3B104
CORRIDOR
3A100
STAIR 1
3A107
P
L1
P
L1
FD-A
P-503A
P-703
P-103A
P-414
FD-A
FD-A
FD-A
P-418
P-505
P-418
P-707
P-528
3" V UP
BV SET @
1.5 GPM
P-508
DW
RWL
OPQRR.4
3.8
5.2
2.2
5.8
1.2
S
X.4
V U
X
2.3
1.8
2.5
W
3" RWL
3" OFD
1 1/2" DCW DN
1/2" DHW DN
3/4" DHWR, 2"DHW
& 2" DCW RISERS DN
3" V DN 11
3" OD
3" VTR
DWV
2" V FROM
BELOW
S3185CART WASH
23/4" ROS &
ROR FROM
ABOVE
DWV
2A
3" VTR
50940
4" V UP DWV
3" V FROM
BELOW
SHWS
AP FOR
AP FOR
FD-B
STERILIZER
WASHER/
DISINFECTOR
002 STERILIZER
FS-A
FS-A
FS-A
RD-1
OFD-1
RWL
2"
3"
2"
OFD-1
RD-1 1 1/4"
AP
1 1/4"
1 1/4"
1"
2" 2"
2"
3/4"
3/4"
4"W DN
2" 2" 3/4"
3/4"P-508
P-508
2"
2"
2" 2"
2" 2"
3/4" P-508
2"
3/4"
P-508
P-508
N P
2"
1-1/4"
3/4" CA
1- 1/
4"
NP
3/4"
1-1/4"
1- 1/
2"
1/2" 1/2"
3/4"
3/4"
3/ 4"
C A
1-1/2"
1-1/2"
1-1/2" 3/4"
SOV'S IN VERTICAL
BRANCH RISE
3/ 4"
3/ 4"
2" 2"
2" 2"
1-1/2" DCW & 3/4" DHW DN.
SOV'S IN VERTICAL DROPS
2" 2"
SOV'S IN
VERTICAL DROPS
2"
1-1/4"
2" 2"
2"
2"
3"
3/4" CA FROM
ABOVE
2"
1 1/2"
2"
3"2"
2"
SPILL INTO SINK
CD
CD
C D
SHWS
FS-A2"
DN
1 1/2"
3" RD
3" OFD-1
650 SF
PQRR.4
-1.1 yy
SV U
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
6"
6"
6"
6"
16400 Southcenter Parkway Suite 504 Tukwila, Washington 98188 253-236-5842 www.kanemanthey.com
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
KEY PLAN
77 Wainwright Drive
Renovate Building 86; Jonathan M.
Wainwright Memorial VA Medical Center
687-400
01/22/2016
PL131
Building 86
Walla Walla, Washington 99362
SUBMITTAL
1/4" = 1'-0"1 LEVEL 3 PLUMBING PLAN (NORTH)
SHEET KEYNOTES
1 PROVIDE ACCESS PANEL FOR MAINTENANCE ACCESS TO VALVING, TYPICAL.
2 FOR DETAILS OF VALVING AT STERILIZERS AND DISINFECTORS, SEE
DETAILS 3/PL501 AND 4/PL501.
GENERAL SHEET NOTES
A. EXISTING PIPING SYSTEMS SERVING RADIOLOGY SHALL BE RE-ROUTED OR
MAINTAINED IN OPERATION DURING PHASE I AND PHASE 2 REMODEL.
REFER TO DRAWING PD100 THROUGH PD130 FOR DETAILS.
FF ELEV = 116'-0"
3 PROVIDE CW & HW @ 24" A.F.F. FOR ULTRA SONIC CLEANER.
Revisions Issues Date Schematic Design SD2 Resubmittal 07/24/2012 Design Development DD1 11/13/2012
DD1 VACO SUBMITTAL 03/22/2013
DESIGN DEVELOPMENT DD2 09/30/2013
Design Development DD2 Resubmittal 02/17/2014
4 3/4" CA DOWN TO PROSTHETICS, FIELD COORDINATE SERVICE TO SECOND
FLOOR AREA..
BASEMENT LEVEL
BFP
BFP
1/2"
SA
1/ 2"
1/ 2"
DRAIN
VALVE
4"
P-802
2 1/2"
2 1/2"
4"1"
1"
AIR GAP FITTING, ROUTE LINE TO
NEAREST FD
4"
NEW 4" DCW
SUPPLY TO
BLDG
T
MAINTAIN 1/4"SLOPE
PER SHAPE
CONTROL
PANEL
24V CONTROL
LINE
LINE VOLTAGE
POWER
SUPPLY
ATTIC/ROOF
128'-3"
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
LINE
VOLTAGE
DRAIN
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
1-1/2" SHWR
1-1/4" SHWS
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
SOLAR
PANEL
3/4" SHWR
1" S
H W
R
1" SHWR
HOUSEKEEPING PAD
3/ 4"
S H
W S
BV
1/
4" S
H W
S
3/4" SHWS
1-1/2" SHWS
1-1/2" SHWR
NC NC
1-1/2" SHWS
1-1/2" SHWR
T&P RELIEF
TUBE BUNDLE
(TYP)
T&P RELIEF
CONTROL
PANEL (TYP)
BV SET
@ 6 GPM
T
T
T
D D
REFER TO HVAC
FOR CONT.(TYP)
STEAM CONTROL
VALVE (TYP)
2"
2-1/2"
2-1/2" 2-1/2"
1"
1- 1/
4"
2- 1/
2"
2" 1"
3" DHW TO BLDG SYSTEM
3" DCW
1-1/2" DHWR, 19 GPM
T
T
24 VOLT
CONTROL
LINE
1-1/2"
1-1/2"
BV
BV
1-1/2"
AIR
WATER
SIGHT
GLASS
ASSEMBLY
SHRADER
AIR VALVE
TYPICAL
HEAT
TRAP
SOLAR COLLECTOR PANEL RACK B 8 SOLAR COLLECTOR
PANELS
RACK A
4 SOLAR COLLECTOR
PANELS
RACK C 8 SOLAR COLLECTOR
PANELS
1"
1"
1 1/4"
HOUSEKEEPING
PAD
HOUSEKEEPING PAD
BASEMENT
84.5'
NO NO
NO
NC NC
NO NO
NO NO
NO
NO
1- 1/
2"
V1
V7
NO
2-1/2"
V2 V6
NO
NO
V9 V5
2-1/2"
NO
V8
V3
1- 1/
2"
NO NO
NO
NO
NO NO
V4
2-1/2"
120 V
2-1/2"
BFP
D
NO
1 1/4"1 1/4"
1 1/2"
BFP
SA
3/ 4"
1" 3/ 4"
D
TO FS-A
53185 CART WASH
FC FC
REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
1" 1"
50940
SA-A
1"
WASHER/
DISINFECTOR
FC
FLEXIBLE CONNECTOR
PROVIDE FOR 2"
MOVEMENT, MIN, TYPICAL
FC
1 1/4" NPHW
SA-A
DRAIN
VALVE
1"
FC
1"
FC
SA-B
STERILIZER
SA-B
DRAIN
VALVE
STERILIZER
1 1/4" HW
1 1/2"
NPCW
1 1/4" NPCW
1" CW 2" CW
1" NPCW
2" NPCW
1"
AIR GAP
FITTING
P-802
1"ROS
ROR
3/ 4"
3/ 4"
OIL FREE AIR COMPRESSOR
4" HOUSEKEEPING PAD
FC
FC
FC
FC
FC
SET PRV @ 80
PSI
SET PRV @ 90
PSI
1/2"
SET PRV @ 100
PSI
53185 CART WASH
50940 WASHER
DISINFECTOR
001 STEAM
STERILIZER
002 STEAM
STERILIZER
SET PRV @ 80
PSI
3/4" CA
1/2"
3/ 4"
BFP
125#
FLEXIBLE CONNECTION
PROVIDE FOR 2"
MOVEMENT, MIN, TYPICAL
HOUSEKEEPING
PAD
TO OUTLETS IN 2A108 1/2"
CA AT CONNECTIONS
3/4" CA
3/4" CA
S E
T P
R V
S
P I
SOLAR VALVE SCHEDULE
VALVE
MARK NO NC NO NC
V-1 X X V-2 X X V-3 X X V-4 X X V-5 X X V-6 X X V-7 X X V-8 X X V-9 X X
NORMAL OPERATION MAINTENANCE
Drawing Title
Approved: Project Director
Project Title
Location
Issue Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
6"
6"
6"
6"
16400 Southcenter Parkway Suite 504 Tukwila, Washington 98188 253-236-5842 www.kanemanthey.com
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
77 Wainwright Drive
Renovate Building 86; Jonathan M.
Wainwright Memorial VA Medical Center
687-400
01/22/2016
PL501
Building 86
Walla Walla, Washington 99362
SUBMITTAL
NO SCALE2 DOMESTIC WATER HEADER
NO SCALE1 SOLAR THERMAL DIAGRAM
NO SCALE4
WATER CONNECTIONS FOR STERILIZERS &
WASHER/DISINFECTOR
NO SCALE3 COMPRESSED AIR/RO WATER SCHEMATIC
Revisions Issues Date Schematic Design SD2 Resubmittal 07/24/2012 Design Development DD1 11/13/2012
DD1 VACO SUBMITTAL 03/22/2013
DESIGN DEVELOPMENT DD2 09/30/2013
Design Development DD2 Resubmittal 02/17/2014
File details come from the government source that posted it.