36C10F18R0473 00002 S02. EL602 - LIGHTING CONTROL SCHEDULE.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10F18R0473-00002014.pdf | ||
| 36C10F18R0473-00002013.pdf | ||
| 36C10F18R0473-00002008.docx | DOCX document | |
| 36C10F18R0473-00002011.pdf | ||
| 36C10F18R0473-00002015.pdf | ||
| 36C10F18R0473-00002010.pdf | ||
| 36C10F18R0473-00002012.pdf | ||
| Drawings_vol_1_Set_3_file.pdf | ||
| Drawings_vol_2_Set_1_file.pdf | ||
| Drawings_vol_1_Set_1_file.pdf | ||
| Drawings_vol_2_Set_3_file.pdf | ||
| Drawings_vol_2_Set_2_file.pdf | ||
| Drawings_vol_1_Set_2_file.pdf | ||
| 36C10F18R0473-025.pdf | ||
| 36C10F18R0473-020.docx | DOCX document | |
| 36C10F18R0473-024.pdf | ||
| 36C10F18R0473-023.pdf | ||
| 36C10F18R0473-021.pdf | ||
| 36C10F18R0473-022.pdf | ||
| 36C10F18R0473-003.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM B1A105C MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PH-ON PH-OFF TC-ON TC-OFF SWEEP NOTES
R1 aa CENTRAL CORRIDOR 86PHB1-4 X X X
R3 bb SPARE [2]
R5 cc SPARE [2]
R7 dd SPARE [2]
R9 ee SPARE [2]
R11 ff SPARE [2]
R13 gg SPARE [2]
R15 hh EXTERIOR LIGHTS AT LEVEL 4 86DPH41-1. X X [3]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCP86B1
[2] PROVIDE SPARE RELAY FOR FUTURE NORMAL LOADS. PROVIDE JUNCTION BOX AND
CONDUIT TO ACCESSIBLE CEILING SPACE.
[3] CONTROL ONLY THE EXTERIOR LIGHTS ON THIS CIRCUIT VIA THIS RELAY.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM B1A105C MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PH-ON PH-OFF TC-ON TC-OFF SWEEP NOTES
R2 jj SPARE [2]
R4 kk SPARE [2]
R6 ll SPARE [2]
R8 mm SPARE [2]
R10 nn SPARE [2]
R12 pp EXTERIOR RAMP LIGHT LS86PHB1-1 X X [2]
R14 qq CENTRAL STAIRS LS86PHB1-1 X X X [1]
R16 rr CENTRAL CORRIDOR LS86PHB1-1 X X X [1]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCPE86B1
[2] PROVIDE SPARE RELAY FOR FUTURE EMERGENCY LOADS. PROVIDE JUNCTION BOX
AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 1E103 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R1 aa NORTH COORIDOR 86DPH11-6 X X X
R3 bb NORTH CHECK-IN 86DPH11-6 X X X
R5 cc SOUTH COORIDOR 86PPH11-5 X X X
R7 dd CENTRAL COORIDOR 86PPH11-5 X X X
R9 ee SPARE [2]
R11 ff SPARE [2]
R13 gg SPARE [2]
R15 hh SPARE [2]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCP8611
[2] PROVIDE SPARE RELAY FOR FUTURE NORMAL LOADS. PROVIDE JUNCTION
BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 1E103 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R2 jj SPARE [2]
R4 kk SPARE [2]
R6 ll NORTH COORIDOR LS86PH11-3 X X X [1]
R8 mm NORTH STAIRS LS86PH11-3 X X X [1]
R10 nn CENTRAL STAIRS LS86PH11-3 X X X [1]
R12 pp CENTRAL COORIDOR LS86PH11-3 X X X [1]
R14 qq SOUTH COORIDOR LS86PH11-1 X X X [1]
R16 rr SOUTH COORIDOR LS86PH11-1 X X X [1]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCPE8611
[2] PROVIDE SPARE RELAY FOR FUTURE EMERGENCY LOADS. PROVIDE
JUNCTION BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 2E101 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R1 aa NORTH CORRIDOR 86DPH21-5 X X X
R3 bb CENTRAL CORRIDOR 86DPH21-5 X X X
R5 cc SOUTH CORRIDOR 86DPH21-5 X X X
R7 dd SPARE [2]
R9 ee SPARE [2]
R11 ff SPARE [2]
R13 gg SPARE [2]
R15 hh SPARE [2]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCP8621
[2] PROVIDE SPARE RELAY FOR FUTURE NORMAL LOADS. PROVIDE JUNCTION
BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 2E101 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R2 jj SPARE [2]
R4 kk SPARE [2]
R6 ll SOUTH CORRIDOR LS86PH21-2 X X X [1]
R8 mm SOUTH STAIRS LS86PH21-2 X X X [1]
R10 nn CENTRAL CORRIDOR LS86PH21-2 X X X [1]
R12 pp CENTRAL STAIRS LS86PH21-2 X X X [1]
R14 qq NORTH CORRIDOR LS86PH21-2 X X X [1]
R16 rr NORTH STAIRS LS86PH21-2 X X X [1]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCPE8621
[2] PROVIDE SPARE RELAY FOR FUTURE EMERGENCY LOADS. PROVIDE
JUNCTION BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 3E102 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R1 aa CENTRAL/SOUTH CORRIDOR 86DPH31-6 X X X
R3 bb SPARE [2]
R5 cc SPARE [2]
R7 dd SPARE [2]
R9 ee SPARE [2]
R11 ff SPARE [2]
R13 gg SPARE [2]
R15 hh SPARE [2]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCP8631
[2] PROVIDE SPARE RELAY FOR FUTURE NORMAL LOADS. PROVIDE JUNCTION
BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
MOUNTING: SURFACE
LOCATION: ELECTRICAL ROOM 3E102 MANUFACTURER: PER SPECIFICATION.
ON/OFF CONTROL PROGRAMMING
RELAY TAG DESCRIPTION CIRCUIT LS OS PHOTO TC-ON TC-OFF SWEEP NOTES
R2 jj SPARE [2]
R4 kk SPARE [2]
R6 ll SPARE [2]
R8 mm SPARE [2]
R10 nn SPARE [2]
R12 pp CENTRAL STAIRS LS86PH31-3 X X X [1]
R14 qq CENTRAL/SOUTH CORRIDOR LS86PH31-3 X X X [1]
R16 rr SOUTH STAIRS LS86PH31-3 X X X [1]
GENERAL: NOTES:
A. LS (LOC.) - LOCAL SWITCH IN ROOM AS INDICATED. [1] POWER FIXTURES TO FULL BRIGHTNESS IN THE EVENT OF EMERGENCY
B. OS - ON/OFF CONTROL VIA OCCUPANCY SENSOR
C. PHOTO - CONTROL VIA PHOTOCELL
D. TC-ON/TC-OFF - ON/OFF CONTROL VIA SYSTEM TIME CLOCK
E. SWEEP - SWEEP CIRCUIT OFF THROUGHOUT UNOCCUPIED HOURS.
COORDINATE START TIME AND FREQUENCY OF SWEEP WITH
OWNER.
F. PROVIDE BARRIER BETWEEN LOW-VOLTAGE, NORMAL, AND
EMERGENCY SECTIONS.
RELAY PANEL SCHEDULE
LCPE8631
[2] PROVIDE SPARE RELAY FOR FUTURE EMERGENCY LOADS. PROVIDE
JUNCTION BOX AND CONDUIT TO ACCESSIBLE CEILING SPACE.
D
ERETSIG
E R
46689 R E
E
NI
GNELANOI
SS
E
F
O R
P
N O
T G
N I
HSAW
F
O
E T
A T
SJ
A M
E S
R. SAT
T E M
E N G I N E E R I N G
I N T E R F A C E
TEL
FAX
PROJECT
CONTACT
www.interfaceengineering.com
100 SW Main St.
Suite 1600 Portland, OR 97204
503.382.2266
503.382.2262
CONSULTANTS: ARCHITECT/ENGINEERS:
Drawing Title
Approved: Project Director
Project Title
Location
Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
Office of Construction and Facilities Management
2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F th re e i n c h e s o n e fo o t o n e a n d o n e h a lf i n c h e s o n e fo o t o n e i n c h o n e fo o t th re e q u a rt e rs i n c h o n e fo o t th re h a lf i n c h o n e fo o t th re e e ig h th s i n c h o n e fo o t 0 o n e q u a rt e r in c h o n e fo o t 0 o n e e ig h th i n c h o n e fo o t
16400 Southcenter Parkway Suite 504 Tukwila, Washington 98188 253-236-5842 www.kanemanthey.com
NOT FOR CONSTRUCTION
FULLY SPRINKLERED
PRELIM
INARYJim Sattem
2011-0513
77 Wainwright Drive
Renovate Building 86; Jonathan M.
Wainwright Memorial VA Medical Center
687-400
JRS LAH
Issue Date EL602
LIGHTING CONTROL SCHEDULE
Richard Benney
Building 86
Walla Walla, Washington 99362
SUBMITTAL
Revisions Issues Date
GENERAL SHEET NOTES