36C10F18R0473-020.docx

DOCX document 205 KB Posted

Attached to
Major Construction Project Seismic Renovate Building 86 Federal contract opportunity
Solicitation number
36C10F18R0473
Issued by
Department of Veterans Affairs Headquarters

About this file

36C10F18R0473 36C10F18R0473_2.docx

View the file

Other files for this federal contract opportunity

Other files attached to Major Construction Project Seismic Renovate Building 86, newest first.
File Type Posted
36C10F18R0473-00002014.pdf PDF
36C10F18R0473-00002013.pdf PDF
36C10F18R0473-00002010.pdf PDF
36C10F18R0473-00002012.pdf PDF
36C10F18R0473-00002008.docx DOCX document
36C10F18R0473-00002011.pdf PDF
36C10F18R0473-00002015.pdf PDF
36C10F18R0473-00002009.pdf PDF
Drawings_vol_2_Set_1_file.pdf PDF
Drawings_vol_1_Set_1_file.pdf PDF
Drawings_vol_1_Set_3_file.pdf PDF
Drawings_vol_2_Set_3_file.pdf PDF
Drawings_vol_2_Set_2_file.pdf PDF
Drawings_vol_1_Set_2_file.pdf PDF
36C10F18R0473-025.pdf PDF
36C10F18R0473-024.pdf PDF
36C10F18R0473-023.pdf PDF
36C10F18R0473-021.pdf PDF
36C10F18R0473-022.pdf PDF
36C10F18R0473-003.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F18R0473

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

0f 99 36C10F18R0473 X 05- -2018 687-400 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 400 Mare Island Way, Suite 100 Vallejo CA 94590

"SEE BLOCK 7"

Ashok Singh 707 562 8287 Project No.: 687 - 400 Project Title: Seismic Renovate, Asbestos and Lead Based Paint Abatement, and Historic Preservation of Building 86 Project Location: VA, VISN 20, VA Medical Center, 77 Wainwright Drive, Walla Walla, Walla Walla County, WA, 99362.

This is a TWO-PHASE DESIGN-BUILD ACQUISITION issued in accordance with FAR Subpart 36.3. All qualified Offerors highly encouraged to submit for Phase I. After Phase I evaluation completion, selected Phase II Offerors will be notified with instructions for Phase II submission.

GENERAL DESCRIPTION: The Design Build Contractor shall provide all labor, materials, tools, equipment, transportation, supervision, technical expertise, permits, travel and all services deemed necessary for proper design-build service, abatement, construction, and historic preservation as required by the Scope of Work and other documents for this project This construction project shall be LEED Silver Certified or with LEED Silver standards incorporated in the design and accepted to prior approval before construction document production.

This is a Design-Build project, the project magnitude is between $10,000,000 and $20,000,000.

The approved NAICS Code is 236220 and Small Business Size Standard is $36.5 Million.

This Design-Build project is being solicited as a 100% TOTAL SMALL BUSINESS pursuant to the set-aside authority contained in 13 CFR 125 and FAR Part 19. If award cannot be made, the solicitation will be cancelled and the requirement resolicited.

Firms claiming SDVOSB and VOSB status shall provide such certification and eligibility proof with Phase I document.

Davis Bacon Wages apply.

A Pre-Proposal Conference and Site Visit has been scheduled at the VAMC address indicated above, see Solicitation Provision # 2.7, 52.236-7, Site Visit (Construction) (FEB 1995) ALTERNATE I (FEB 1995), for specific details.

Please submit all questions regarding the solicitation and supporting documentation in writing using the RFI submission requirement provided within this solicitation via email to Ashok.Singh@va.gov.

Phase-One RFIs will be accepted until May 16, 2018, 2:00 PM Pacific Standard Time (PST).

Phase I Proposals are due by May 31, 2018 2:00PM PST to the address listed in Block 7 of this form.

X X 52.211-10 X

2:00PM

05-31-2018 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

101F Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B1) 400 Mare Island Way, Suite 100 Vallejo CA 94590 Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin TX 78714-9971 Ashok K. Singh

CFM16L3-2699

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS6
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS38
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)38
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)38
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)38
2.4 52.228-1 BID GUARANTEE (SEP 1996)39
2.5 52.233-2 SERVICE OF PROTEST (SEP 2006)40
2.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)40
2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)41
2.8 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (JAN 2008)41
2.9 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION)41
2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)42
2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008)42
2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998)43
2.13 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)43
2.14 PARTNERING43
REPRESENTATIONS AND CERTIFICATIONS45
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)45
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)48
GENERAL CONDITIONS50
4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (OCT 2015)50
4.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)50
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)51
4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)52
4.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)52
4.6 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)52
4.7 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)52
4.8 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)54
4.9 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)54
4.10 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)56
4.11 SUPPLEMENTAL INSURANCE REQUIREMENTS56
4.12 52.236-4 PHYSICAL DATA (APR 1984)57
4.13 52.244-2 SUBCONTRACTS (OCT 2010)58
4.14 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)60
4.15 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008)63
4.16 VAAR 852.203-71 DISPLAY OF DEPARTMENT OF VETERAN AFFAIRS HOTLINE POSTER (DEC 1992)63
4.17 VAAR 852.211-74 LIQUIDATED DAMAGES (JAN 2008)63
4.18 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)64
4.19 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)64
4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)64
4.21 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)65
4.22 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) ALTERNATE I66
4.23 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)66
4.24 VAAR 852.236-76 CORRESPONDENCE (APR 1984)66
4.25 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)67
4.26 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)67
4.27 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)67
4.28 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984) ALTERNATE I (JUL 2002)67
4.29 VAAR 852.236-83 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS) (JUL 2002) ALTERNATE I (JUL 2002)68
4.30 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)72
4.31 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)72
4.32 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993)72
4.33 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)72
4.34 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) ALTERNATE I (JAN 2008)74
4.35 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)75
4.36 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)76
4.37 VAAR 852.246-75 WARRANTY FOR CONSTRUCTION--GUARANTEE PERIOD SERVICES (JAN 2008)76
4.38 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)77
4.39 SUBCONTRACTING COMMITMENTS--MONITORING AND COMPLIANCE (JUN 2011)77
4.40 MANDATORY WRITTEN DISCLOSURES78
4.41 IT CONTRACT SECURITY78
4.42 CONSTRUCTION WAGE RATE REQUIREMENTS...…………………………………..87
DESIGN BUILD SPECIFICATIONS96
4.42 GENDER96
4.43 CONTRACTOR'S COST BREAKDOWN96
4.44 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES96
4.45 OWNERSHIP OF ORIGINAL DOCUMENTS96
4.46 RETENTION OF REVIEW DOCUMENTS96
4.47 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION97
4.48 COORDINATION WITH MEDICAL CENTER97
4.49 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR97
ATTACHMENTS99
ATTACHMENT 1 - RELEASE OF CLAIMS99
Attached Document: Spec VOl 1…………………………………………………………………99
Attached Document: Specs vol 2…………………………………………………………………99
Attached Document: Specs vol 3………………………………………………………………….99
Attached Document: Drawings vol 1 Set 1 file…………………………………………………...99
Attached Document: Drawings vol 1 Set 2 file…………………………………………………..99
Attached Document: Drawings vol 1 Set 3 file…………………………………………………..99
Attached Document: Drawings vol 2 Set 1 file…………………………………………………..99
Attached Document: Drawings vol 2 Set 2 file…………………………………………………..99
Attached Document: Drawings vol 2 Set 3 file…………………………………………………..99
Attached Document: P07. Wage Determination Heavy Construction Walla Walla……………..99
Attached Document: SOW Historic Preservation Plan - Walla Walla…………………………..99

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

NOTICE TO PROPOSERS

THIS REQUEST FOR PROPOSAL IS ISSUED AS A TWO-PHASE DESIGN BUILD PROCUREMENT (REFERENCE FAR 36.3). THE TIME AND DATE SET FORTH WITHIN IS FOR RECEIPT OF PROPOSALS FOR PHASE I ONLY. PHASE II REQUEST FOR PROPOSAL WILL BE ISSUED ONLY TO THE SUCCESSFUL OFFERORS DETERMINED TO BE THE MOST HIGHLY QUALIFIED FROM PHASE I.

REQUEST FOR PROPOSAL NO.: 36C10F-18-R-0473

PHASE I PROPOSAL DUE DATE:May 31, 2018 2:00 PM
Pacific Time
PROJECT TITLE:Seismic Renovate Building 86
Project Number: 687-400Jonathan M. Wainwright MemorialVAMC (VAWWHCS), Walla Walla, WA.

ALL REQUEST FOR INFORMATION/INQUIRIES (RFI’s) CONCERNING THIS RFP MUST BE SUBMITTED IN WRITING VIA EMAIL TO THE BELOW ADDRESS AS INDICATED BELOW, AND MUST BE RECEIVED NO LATER THAN MAY 16, 2018 AT 2:00PM PST, IN ORDER TO PERMIT ADEQUATE TIME FOR THE GOVERNMENT TO RESPOND TO RFI’s.

YOU MAY SEND YOUR RFI’s TO, ON SUBJECT LINE: RFP No. PROJECT TITLE AND COMPANY NAME, VIA E-MAIL TO: ASHOK.SINGH@VA.GOV . It is recommended to use a read receipt for verification of RFI’s delivery confirmation.

YOUR PROPOSAL AND/OR OTHER CORRESPONDENCE REQUESTING INTERPRETATION AND/OR CLARIFICATION SHOULD BE ADDRESSED TO:

Office of Construction and Facilities Management - West Region
ATTN: ASHOK SINGH
400 Mare Island Way, Suite 100
Vallejo, CA. 94950

INFORMATION REGARDING BID GUARANTEE AND BONDS

(a) Offers / Price Proposals / Technical Proposals submission requirements materials consisting of drawings, specifications and contract forms may be obtained only at the FBO website electronically: WWW.FBO.GOV.

(b) Subcontractors, material firms and others interested in preparing subbids may obtain a list of organizations and interested Offerors / Prime Contractors at that same FBO website.

(c) A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(d) If the contract will exceed $100,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.

DESCRIPTION OF WORK: SEE BLOCK 10 OF SF 1442.

Cost Range: $10,000,000.00 to $20,000,000.00.

36C10F18R0473

SECTION 00 11 21.5

REQUEST FOR PROPOSAL TO DESIGN BUILD

SEIMIC RENOVATE BUILDING 86

PROJECT No. 687-400

VAMC WALLA WALLA, WA

A. PART I - GENERAL

A1. Scope
A. This Request for Proposal (RFP) is issued as Two-Phase Design-Build procurement(Reference FAR 36.3). Proposals will be evaluated in Phase I to determine which offerors willsubmitproposals for Phase II. A maximum number of five (5) offerors will proceed to Phase IIunless the contracting officer determines that a number greater than five (5) is in theGovernment’s interest and is consistent with the purposes and objectives of this two-phase design build project. Phase II RFP will be issued only to those successful offerors determined to be mosthighly qualified from Phase I. One firm fixed price contract will be awarded using competitivenegotiation.
B. This is a Design-Build project for renovation of Building 86 at the VAMC Walla Walla, WA.
The Design-Build Team (DBT) shall provide all labor, materials, tools, equipment, and design-build services necessary for design and construction of a project described herein as well as otherspecific tasks as further defined by this Request for Proposal (RFP).

The project will be comprised of the following stages: planning, design, historical analysis, historical curation and construction services. The DBT should be aware that before moving forward from one stage to another is necessary to complete and obtain the approval of the current stage from Project Manager.

The DBT shall provide design and construction services for the project described within this document. Such services include but are not limited to: surveys, assessments, technical studies, technical reports, analyses, permits, design, development of construction documents, technical expertise, labor, materials, tools, equipment and all services that are deemed necessaries for the proper design and construction of the project described herein.

Prior to begin with the design, the Design-Build Architect / Engineer (DB-A/E) shall perform a complete assessment of the scope area in order to be familiarized with the project and identify all design/ construction concerns, non-compliance issues and deficiencies that need to be addressed along with its respective solutions (proposed).

The DB-A/E who prepares the construction documents shall be a professional architect or engineer licensed in the State of Washington. The professional seal indicating such license shall appear on the final construction documents. The architect and/or engineer whose seal is shown in construction documents will be known as the Architect or Engineer of Record.

The consultant responsible for the historical analysis and curation shall meet the requirements of attachment “SOW Historic Preservation Plan”.

The DB-A/E must have a proved experience of at least five years (5 yrs.) in design and supervision of project of similar or major complexity to this one. The A/E shall certify the design compliance with all latest design standards, design manuals and national codes used by the VA, as well as all Federal and local Requirements and Regulations. The required stamp on construction documents (e.g. drawings, technical specifications) of the licensed architect or engineer of record will be considered as certification of such compliance.

Provide a calculation booklet including but not limited to: computations and sizing calculations for structural, electrical, mechanical, site, surveying, and any other designs calculations as required. For computerized calculations, submit complete and clear documentation of computer programs, interpretation of input/output, and description of program procedures. Provide assessment reports, technical specifications, list of submittals and quality tests, material specifications, and finishes samples among others to properly understand and discuss the intent of the design.

The project will be accomplished utilizing the VA Program Guide (PG-18-15), A/E Submission Instructions as well as the design guide. Historic analysis and curation shall meet the requirements stated in attachment A. An estimate of construction cost based on level of design detail will be required at each design phase. The selected firm shall design and construct within the government’s estimated cost for construction.

DELIVERABLES

Historic analysis and curation shall meet the requirements stated in attachment “SOW Historic Preservation Plan”.

The DB-A/E shall be responsible to submit multiple design review packages (Design Development, Construction Documents and Issue for Construction Documents). Each review package will be discussed, reviewed, commented, and approved or disapproved by the VA reviewer. At each review stage the DBT will perform a value engineering review. All hardcopy and electronic documents provided shall be in good and readable condition.

The design documents for each submission may include, but not limited to: assessment reports, drawings, technical specifications, design narrative/analysis, submittal list, cost opinion, material specifications, and finishes samples among others. A presentation meeting to review and resolve design issues will be held for each design review package submitted. The meeting will also include discussion of VA comments on functional relationships and technical peer review comments (by others). The meeting will be coordinated by the DBT, upon mutual consent between the contracting officer, VA project manager and DBT. The DBT shall prepare written minutes of all meeting with the Government concerning contractual and design matters. Copies of the minutes shall be furnished to the Contracting Officer and VA project manager within two calendar days of meeting. The DBT shall prepare written records of phone conversations addressing major design issues, and furnish a copy to the Contracting Officer and VA project manager within five calendar days. The DBT shall keep the Project Manager and Contracting Officer informed at all times of the status and progress of the design phase. The DBT shall include a textbox indicating date of submission, file name, and revision on all reports, studies, drawings and all other submission material. Refer to PG-18-15 for additional submittal requirements.

Design Development (75%)
The Design Development (DD) represents the submission of the seventy five percent (75%) of thedesign progress. The submittal of the DD shall be in accordance with the applicable requirements ofthedesign development submission of VA PG 18-15 and the review comments of the approved SDsubmission. Submission requirements are detailed at the following internet address:http://www.cfm.va.gov/TIL/. Other requirements are detailed hereon. The DD shall provide a well-organized design narrative, drawings, VA Master Construction Specifications (PG-18-1), and CostEstimate in accordance withManual for Preparing Cost Estimates and Related Documents for VAFacilities: http://www.cfm.va.gov/cost/.

VA Master Construction Specifications may not cover some of the project elements. It is the responsibility of the DB-A/E to develop specification sections (as necessary) to cover such project elements. New sections of specifications developed by the DB-A/E shall be in the same format as that used in VA Master Specifications. Within 30 calendar days after notice to proceed, submit two hardcopy appropriately labeled "design development" and electronic copy (CD- ROM) of the DD package for review and approval. Coordinate with the Contracting Officer and provide the verbal presentation. VA will return the design development review comments, 15 calendar days after the presentation.

Construction Documents (100%)
The Construction Documents (CD) represent the submission of the hundred percent (100%) of theDesign progress. The submittal of the CD shall be in accordance with the applicable requirements oftheconstruction documents submission of VA PG 18-15 and the review comments of the approvedDDsubmission. Submission requirements are detailed at the following internet address:http://www.cfm.va.gov/TIL/. Other requirements are detailed hereon.

The A/E shall submit the 100% design documents in accordance with this contract. Design narrative/analysis, construction drawings, renderings, technical specifications, construction phasing, submittal list, catalog cuts, equipment description, schedule of work and all related construction documents shall be completed, coordinated and ready for the final review and approval.

Within 20 calendar days after design development review comments, submit two hardcopy appropriately labeled "Construction Documents" and electronic copy (CD- ROM) of the CD package for review and approval. Coordinate with the Contracting Officer and provide a verbal presentation. VA will return the construction documents review comments 15 calendar days after the presentation.

A2. Definitions

A. Design-Build (DB) as defined by the Department of Veterans Affairs (VA) is the procurementby the VA, under one contract, with one firm or joint venture (JV) for both design and constructionservices for a specific project.
1. Contracting Officer: The services to be performed under this contract are subject to thegeneral supervision, direction, control and approval of the Contracting Officer.
2. Project Manager: The Contracting Officer's Representative (COR) responsible foradministeringdesign contracts authorized by the contracting officer.
3. Resident Engineer: The Contracting Officer's authorized representative at the construction site.When more than one Resident Engineer is assigned to a construction project one is designated asbeing in-charge and is called the "Senior Resident Engineer"(SRE). The SRE is responsible forprotecting the VA's interest in the execution of the construction contract work. His duties includesurveillance of all construction work to assure compliance with the contract documents,interpretation of the contract documents, approval of changed work, approval of all submittals,samples, shop drawings, etc. The SRE may issue change orders andmodifications to theContractor within the limitations set forth in his delegation of authority from the ContractingOfficer.
4. Design Build Contract: This term, as used herein, refers to the Contract(s) to perform the designand construction of the project.
5. Contractor: This term, as used herein, refers to the contractor under this contract or the DBT team.
6. AE: This term, as used herein, refers to the Architect-Engineer firm(s) that is a part of the DBteam, also referred to as DB- A/E.
7. RFP/AE: The firm(s) directly hired by the VA for the preparation of the RFP Documents and toprovide other technical assistance to the VA.

B. Source Selection Procedures

1. Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA), unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision; and support meaningful comparison and discrimination between and among competing proposals.

2. Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and subfactors specified in the solicitation. Evaluations may be conducted using any rating method or combination of methods, including color or adjectival ratings, numerical weights, and ordinal rankings. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.

3. Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1.

4. Tradeoff Source Selection: If tradeoffs are performed, the source selection records shall include an assessment of each offeror’s ability to accomplish the technical requirements; and a summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.

5. SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.

6. Source Selection for this procurement:

a. Phase I of this procurement will result in a narrowing of offerors to a maximum of five (5) firms in accordance with FAR 36.303-1 based on the following evaluation factors in descending order of importance, technical evaluation factors will include Design-Build Experience and Past Performance. Offerors will be evaluated in the following manner:

Phase I:

A. Design-Build Experience

1. Corporate Project Experience (Factor)

2. Technical/Management Approach (Factor)

3. Past Experience working as a Design-Build team (Factor)

B. Past Performance

1. Past Performance Questionnaires (Factor)

2. Safety Record (Factor)

b. Through an amendment to the Phase I solicitation, Phase I successful offers will be notified to submit the requirements for Phase II Technical and Price Proposals. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is as equal in importance to Phase II, Factor 4 – Price for proposal evaluation. The Phase I and Phase II technical evaluation factors, when combined, are approximately equal in importance to price. Phase II evaluation technical factors (Factors 1– 3) are listed below in descending order of importance:

Phase II:

1. Technical Solution

2. Construction Management:

Ability to Staff Project Management Approach Capability to Perform

3. Schedule

4. Price

c. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made in Phase II without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.

C. Tentative Schedule:

Request for proposal issued, Phase 1
05/09/2018
Request For Information (RFIs)
05/16/2018
Phase I Proposals submitted
05/31/2018
Determine Highly Qualified for Phase II (maximum of 5)
06/11/2018
Submit Phase II RFP & documents from competitive range offerors
06/18/2018
Phase II Proposals Submitted
06/22/2018
Contract award
06/29/2018
Notice to proceed
07/31/2018
Construction completion/final inspection/ custody receipt
07/30/2020

D. Schedule Objectives - The anticipated completion of this project is 730 days after “Notice to Proceed” (NTP). The proposed schedule may be shorter than this, see Phase II, Factor 3.

A3. Cost Range The anticipated cost range for this project is between $10,000,000 and $20,000,000.

A4. Pre-Proposal Conference (PHASE II ONLY) The Phase II pre-proposal conference will occur during in Phase II submission, at Jonathan M. Wainwright Memorial Center, Walla Walla, Washington. All Offerors, consultants, subcontractors, manufacturers and suppliers are encouraged to attend; time and date to be announced.

DO NOT SUBMIT PHASE-II WITH PHASE I ONLY THE MOST HIGHLY QUALIFIED OFFERORS WILL BE INVITED TO SUBMIT A PHASE II PROPOSAL.

A5. Selection Criteria A. General: Phase I Proposals will be evaluated to determine the most highly qualified offerors to advance to Phase II. A Responsibility determination will be made in accordance with FAR Part 9.1, Responsible Prospective Contractors. Phase II Proposals will be evaluated and award will be made on the basis of both price and technical considerations most advantageous to the VA as per FAR Part 15.101(a), Tradeoff, as the Government may consider award to other than the lowest priced offeror or other than the highest technically rated offeror if it is in the best interest of the Government.

B. Technical Evaluation Factors, PHASE I & PHASE II:

The basis of evaluation for the Phase I & Phase II technical evaluation factors is located within Part III, Section C with each evaluation factor. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is as equal in importance to Phase II, Factor 4 for proposal evaluation. Phase II evaluation technical factors (Factors 1 – 3) are in descending order of importance. The Phase I and Phase II technical evaluation factors, when combined, are approximately equal to price. Offerors are advised the Tradeoff process is determined to be in the best interest to the Government and award may be made to other than the lowest priced offeror or other than the highest technically rated offeror (Reference FAR 15.101-1).

C. Phase II Non-Technical Factor 4, Price

1. Phase II, Factor 4, Price: Offerors are advised the Tradeoff process (Reference FAR 15.101-1)is determined to be in the best interest of the Government and award may be made to otherthan the lowest priced offeror or other than the highest technically rated offeror.
a. The Government reserves the right to make price/technical trade-offs that are in the bestinterest and advantageous to the Government in accordance with FAR 15.101, Tradeoff.
b. Price will be evaluated on the basis of its reasonableness, and acceptability to theGovernment subject to availability of funds. Pricing shall be entered onto the Bid Schedulelocated within the SF1442.
c. Analysis will be performed using one or more of the following techniques to ensure a fairand reasonable price:
(a) Comparison of proposed prices received in response to the RFP.
(b) Comparison of proposed prices with the Independent Government Cost Estimate.
(c) Comparison of proposed prices with available historical information.
(d) Comparison of market survey results.

B. PART II - RESPONSIBILITIES

B1. VA Team A. The RFP development A/E team shall not be included as members of the offeror’s DB team. The VA will retain their RFP A/E team for the remainder of the project’s development for design and construction period review, and monitoring purposes.

B. The VA team is also comprised of VA Office of Construction & Facilities Management (CFM), Western Region located in Vallejo, CA, Resident Engineers (RE) who will be located at the construction site and VA medical center staff. The coordinator/manager of the VA team on site will be the RE, who will have Contracting Officer authority.

B2. Design-Build Team:

A. The DB team includes all J/V partners (if applicable), consultants and subcontractors to the one firm. The DB team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project.

B. The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the DB Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required time period (contract length).

C. PART III - PROPOSAL REQUIREMENTS

C1.General
A. Phase I proposals shall be based on solicitation documents issued for RFP SolicitationNumber 36C10F-18-R-0473. Proposals will be in the format stipulated in Section C3.

1. Phase I proposals shall be received BY 2:00 PM Pacific Time, May 24, 2018. Proposals that are received after this time shall be late and shall not be considered. There will be no public opening of the proposals.

2. Submit sealed proposals to:

a.US Postal Service Deliveries:
Ashok Singh, Contract Officer
Office of Construction and Facilities Management
Department of Veterans Affairs
400 Mare Island Way, Suite 100
Vallejo, CA 94590

b. Commercial Delivery Services / Hand Carry (Monday - Friday, 7:30 AM to 4:00 PM):

Ashok Singh, Contract Officer
Office of Construction and Facilities Management
Department of Veterans Affairs
400 Mare Island Way, Suite 100
Vallejo, CA 94590

3. Phase I will be evaluated for technical qualifications only. Offeror shall separately tab each section (see Section C3). Each section must therefore be labeled with the Offeror's organization, business address, and VA Project Number. Offerors shall affix their names and return addresses on their envelope/packaging. See Section C3 for submission requirements.

B. Phase II proposals shall be based on solicitation documents issued to the Phase I offerorsdetermined to be the most highly qualified. Proposals will be in the format stipulated in SectionC4.
1. The due date, time, and submission address of Phase II proposals will be given within the PhaseII RFP.
2.Phase II evaluation will request technical and price proposals. Offeror shall separately tab eachsection (See Section C4). See section C4 for submission requirements.

C2. Proposal Revisions (FAR 52.215-1) A. If determined to be necessary, proposal revisions may be requested from the offerors determined to be in the competitive range. The Contracting Officer will identify those offerors in accordance with the selection criteria identified in the request for proposal. Revised proposals will be due at a time and place to be determined.

B. Please be advised that the Government intends to evaluate Phase I & Phase II and award a contract from Phase II proposals without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

C3. PHASE I – TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

A. The Phase I proposal shall address the evaluation factors listed at A.5. Pay close attention to page limitations set within the technical factors as submission beyond the limit will not be accepted. Offeror is required to prepare and submit an original and five (5) copies plus CDs of the technical evaluation factors in a binder CLEARLY MARKED:

“PHASE I TECHNICAL PROPOSAL – DO NOT OPEN IN MAILROOM”.

Evaluation scores will be based, in order of importance, upon the criteria in Part I, A5,
provides a checklist that should be included in the front of the technical proposal.

PHASE I

REQUEST FOR QUALIFICATIONS (RFQ)

DO NOT SUBMIT PHASE-II WITH PHASE I ONLY THE MOST HIGHLY QUALIFIED OFFERORS WILL BE INVITED TO SUBMIT A PHASE II PROPOSAL.

All correspondence in conjunction with this solicitation should be directed to the Government’s Point of Contact (POC) Ashok Singh, Contracting Officer, Phone: (707) 562-8287, e-mail: ashok.singh@va.gov with the following in subject line: 36C10F-18-R-0473, Seismic Renovate Building 86, Walla Walla VAMC, Company Name.

“PHASE I TECHNICAL PROPOSAL SUBMISSION REQUIREMENT”

PHASE I, TECHNICAL PROPOSAL BINDER SUBMITTAL CHECKLIST

(One original and five copies and One CD)
Solicitation: 36C10F-18-R-0473
Project Title: Seismic Renovate Building 86, PROJECT No. 687-400
INTRO
PAGE
First page MUST clearly indicate:
Name and Address of Proposer
Business Arrangement (Joint Venture or Teaming Arrangements clearly identified)
Contact Name and Phone Number
Email Address
DUNS Number
CAGE Code
Tax Identification Number
TAB 1 Factor A.1, Corporate Project Experience (with supporting documentation per solicitation)
TAB 2 Factor A.2, Technical/Management Approach (with supporting documentation persolicitation)
TAB 3 Factor A.3, Past Experience working as a Design-Build team (with supporting documentationper solicitation)
TAB 4 Factor B.1, Past Performance Questionnaires Design-Build team
TAB 5 Factor B.2, Safety Record (with supporting documentation per solicitation)
TAB 6 CD of Technical Proposal (TABs 1 – 5 above)

The technical proposal shall not exceed 60 pages’ single side.

In addition to the paper copies identified above, the Offeror shall submit all proposal information in electronic format (CD). Text and graphics portions of the electronic copies shall be in a format readable by Microsoft (MS) Office 2000 or higher, MS Word 2000 or higher. Data submitted in spreadsheet format shall be readable by MS Office 2000 higher, MS Excel 2000 higher. Drawings shall be in PDF format. In case of conflict between the paper copy and the electronic copy of the proposals submitted, the paper copy shall take precedence.

Phase I, the evaluation factors in descending order of importance, technical evaluation factors will include Design-Build Experience and Past Performance. Offerors will be evaluated in the following manner:

A. Design-Build Experience

1. Corporate Project Experience (Factor)

2. Technical/Management Approach (Factor)

3. Past Experience working as a Design-Build team (Factor)

B. Past Performance

1. Past Performance Questionnaires (Factor)

2. Safety Record (Factor)

1. DESIGN-BUILD EXPERIENCE: This factor will be evaluated on the basis of Corporate Project Experience, Technical/Management Approach, and Past Experience Working as a Design-Build Team, in descending order of importance.

1.Corporate Project Experience - The Offeror will demonstrate corporate construction experiencewith a minimum of 3 projects in an operating healthcare environment, that are ongoing orcompleted within the last 5 years, and of similar size (square footage, dollar amount), scope(seismic renovation, healthcare) and complexity. Greater weight will be given to offeror’sexperience as a prime contractor rather than as a consultant. Provide the following information:
a)Project title, location and brief description including the building use (Medical Facility, etc.)and contracting method (e.g., design build, design bid construct, CM at risk).
b)Project owner, name, telephone number and email of owner’s contact person.
c)Project Prime Contractor and Major Subcontractors with name, telephone number and email ofcontact person(s).
d)Project Statistics including start and completion dates (original vs. actual) for construction; cost(original vs. actual) with brief explanation of what is included in the cost; square footage;foundation type; number of levels; and any letters of recommendation, performance evaluationsand/or awards received.
e)Key Personnel Project Experience (Specialized experience and technical competence). TheOfferor will demonstrate the relevant experience of the key personnel listed below. Note if oneindividual is proposed for more than one position listed.

I. Overall Project Manager II. Construction Project Manager III. Project Superintendent IV. Safety Manager V. Quality Control Manager VI. Architect to be registered in State of Washington VII. Engineers to be registered in State of Washington

Biographical data will include the following:

1. Name of individual.

1. Company employed by.

1. Company position title.

1. Years with the company.

1. Describe work experience with projects that were seismic projects or were medical facilities and the company (by name) they worked for when involved in the project

1. An indication of which (if any) projects submitted under Corporate Experience (above) the individual participated in and what the individuals responsibility was for that project.

1. An indication of which other individuals submitted under Project Personnel Experience this individual has worked with and the project they worked on together, noting if that project has been submitted under Corporate Experience (above).

1. Position that the individual will hold in regard to this contract/project team, description of duties and what percentage of the individual’s time would be committed to the project during both the design and construction phases.

· Describe job related educational experience including copies of degrees, certificates, business license and work related license issued by State of Washington.

2.Technical/Management Approach – The three sub-factors are equal in importance.
a)Project Delivery Philosophy – Include expectation statements concerning elements forsuccessful Partnering, communication, and Conflict Resolution for past Design-Build project.
b)Project Organizational Chart and Narrative – Include all team members submitted under KeyPersonnel Project Experience above as well as any other management staff proposed.Organizational chart should indicate for each management staff assigned to the project: theindividual’s location – on site or off site, and percentage of time dedicated to the project.Clearly describe the prime responsible firm (or firms if J/V) and individuals as well as the rolesand responsibilities of individuals proposed as consultants and sub-contractors. Provide a list ofall consultants and all proposed major subcontractors, including telephone number, address, andname of contact.
c)Company Quality Control Plan: Provide plan as a general guideline associated with ensuring aquality design is produced by your company in conformance with VA program requirements.
3.Past Experience working as a Design- Build team
Provide three specific examples of Design-Build approach to medical facility projectscompleted within the last five years of similar size and scope.

B. PAST PERFORMANCE: This factor will be evaluated on the basis of Past Performance Questionnaires completed and submitted by references of projects submitted under– Corporate Project Experience to determine client satisfaction, and the past safety record of prospective contractor. The Evaluation Team may consider past performance data from a wide variety of sources both inside and outside the Federal Government. Past Performance Questionnaires will be rated higher than the Safety Record.

1. Past Performance Questionnaires – The references are to submit completed questionnaires to the Contracting Officer by the due date and time for receipt of proposals. The questionnaires will be evaluated to determine client satisfaction, for elements including Cost Control, Quality Control, Effectiveness of Management, Timely Performance, and Compliance with Labor and Safety Standards. Provide a minimum of three (3) projects that are completed or approximately 90 percent complete. Include project name, location, initial design dollar funding limitation, final construction cost, and project point of contact with telephone number and email address. Projects should be from 2012 – present and include current client contacts, project due date, design completion date and final cost estimate compared to the contract award amount (note whether bid or negotiated). In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance and will receive a neutral rating.

1. Safety Record – The Offeror will provide documentation that specifies Contractor in question has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s)in the past 3 years and has an Experience Modification Rate (EMR) of equal to or less than 1.0.

Rating standards and definitions

The technical evaluation factors will be evaluated on an adjectival basis with the following adjectival ratings: Outstanding, Good, Acceptable, Marginal, Unacceptable (and Neutral for Past Performance).

Offerors are advised any strengths that are accepted by the government may be incorporated into the contract as the minimum performance requirement. "Deficiency" is a material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. "Weakness" means a flaw in the proposal that increases the risk of unsuccessful contract performance. A "significant weakness" in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance.

1. Phase I, Design-Build Experience, Corporate Project Experience, Factor 1,
Factor 1 consists of two subfactors: 1A, Project Experience and 1B, Personnel Experience. Theevaluation of subfactors 1A and 1B are of equal importance to the determination of Factor 1rating.
a. Phase I Subfactor 1A: Project Experience: