Maintenance Milestone Schedule.docx
DOCX document 22 KB Posted
- Attached to
- Z1AA--347-Boise RO Facility Maintenance Services Federal contract opportunity
- Solicitation number
- 36C10D24Q0188
- Issued by
- Department of Veterans Affairs
About this file
This document is a Maintenance Milestone Chart for the Boise VA Regional Office for the year 2024. It outlines the various maintenance tasks and their corresponding schedule for the facility. Key details include:
The maintenance tasks cover a wide range of activities such as quarterly preventative maintenance, building inspections, fire system testing, HVAC maintenance, water system maintenance, and lighting inspections. The tasks are scheduled throughout the year, with most occurring on a monthly, quarterly, or annual basis. Specific dates are provided for each task. The document also indicates when filter changes, salt additions, and other maintenance activities are required. This Maintenance Milestone Chart provides a comprehensive overview of the planned facility maintenance activities for the Boise VA Regional Office in 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| E2.0L_ FIRST FLOOR LIGHTING PLAN Rev.0 markup.pdf | ||
| As-builts First Floor.pdf | ||
| E2.1L_ SECOND FLOOR LIGHTING PLAN Rev.0 markup.pdf | ||
| 36C10D24Q0188 0003.docx | DOCX document | |
| 2nd floor floorplan.pdf | ||
| 36C10D24Q0188 0002.docx | DOCX document | |
| 36C10D24Q0188 0001.docx | DOCX document | |
| Wage Determination.pdf | ||
| PAST PERFORMANCE QUESTIONAIRE.docx | DOCX document | |
| 36C10D24Q0188.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Boise VA Regional Office Major Maintenance Milestone Chart Year:2024
| TASK NAME - SERVICE MONTH |
| JAN. |
| FEB |
| MAR |
| APR |
| MAY |
| JUNE |
| JULY |
| AUG |
| SEP |
| OCT |
| NOV |
| DEC |
RTU - 1 Quarterly PM
4-Mar
RTU - 2 Quarterly PM
4-Mar
| Inspect Building Finishes |
| 18-Jan |
| 26-Feb |
| 6-Mar |
| 3-Apr |
| 2-May |
| 3-Jun |
| Inspect Roof Drains/Heat Tape |
| 19-Jan |
| 26-Feb |
| 6-Mar |
| 3-Apr |
| 2-May |
| 3-Jun |
| Inspect Electrical Rooms |
| 19-Jan |
| 26-Feb |
| 11-Mar |
| 9-Apr |
| 2-May |
| 4-Jun |
Backflows Testing
11-Mar
| Monthly Fire Extinguisher |
| 19-Jan |
| 20-Feb |
| 14-Mar |
| 1-Apr |
| 7-May |
| 6-Jun |
Fire Extinguisher Recertification
Annual Fire Alarm Testing
Annual Fire Sprinkler Testing
Conduct PM On Geothermal
11-Mar
Conduct HVAC PM
Change HEPA Filter/Mail Room
| Inspect Water Chemical Levels |
| 25-Jan |
| 24-Feb |
| 21-Mar |
| 25-Apr |
| N/A |
Computer Room AC PM
N/A
Hot Water Heater Gas PM
6-Jun
Water Softener Maintenance
N/A
N/A
Humidification System PM
Fan, Centrifugal Maintenance
JASON
VAV and Filters Maintenance
22-Mar
| Emergency Lighting/Exit Signs Monthly |
| 23-Jan |
| 24-Feb |
| 22-Mar |
| 17-Apr |
| 23-May |
Emergency Lighting/Exit Signs Annual
| Emergency Lighting/Building Monthly |
| 23-Jan |
| 24-Feb |
| 25-Mar |
| 17-Apr |
| 23-May |
Emergency Lighting/Building Annual
Water Filter Maintenance/Breakroom hotwater line (1 filter)
25-Mar
Water Filter Maintenance/Breakroom coldwater line (2 filters)
25-Mar
Water Filter Maintenance/by restrooms in lobby
24-Apr
Water Filter Maintenance/employee hallway non-public area
24-Feb
24-Apr
Clean Light Fixtures
Added salt to water softener
Filter change not due on these PM's - Semi-Annual only.
File details come from the government source that posted it. Updated .