This document appears to be a lighting plan for the second floor of a federal government construction project. It includes a detailed floor plan with the layout and specifications for lighting fixtures, controls, and associated electrical work. Key details include:

The lighting plan is for the "Construct National Telehealth Hub, Boise VAMC" project. It specifies the type, quantity, and placement of various lighting fixtures, occupancy sensors, switching controls, and other electrical components for the second floor. The plan includes numerous keyed notes providing installation instructions and requirements. This appears to be a construction document intended for an electrical subcontractor working on this federal government facility project.

View the file

Other files

File Type Posted
2nd floor floorplan.pdf PDF
36C10D24Q0188 0003.docx DOCX document
E2.0L_ FIRST FLOOR LIGHTING PLAN Rev.0 markup.pdf PDF
As-builts First Floor.pdf PDF
Maintenance Milestone Schedule.docx DOCX document
36C10D24Q0188 0002.docx DOCX document
36C10D24Q0188 0001.docx DOCX document
PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
36C10D24Q0188.docx DOCX document
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

'L4' T

75-112.5KVA

'H4'

'T4' 'L4B'

DN

DN

3 5 7 9 11 15 17 19 21 23 25

F

E

D

C

B

A 2

2.5 CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

TEAM

CONSULT

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

TEAM

CONSULT

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

CONSULT

ROOM

TEAM

CONSULT

256B

TEAM

CONSULT

256A

CONSULT

ROOM

CONSULT

ROOM

OFFICE-VISN

OFFICE-VISN

OFFICE-VISN

OFFICE-NLO

OFFICE-NLO

OFFICE-NLO

OFFICE-NLO

TEAM

CONFERENCE

TEAM

CONFERENCE

TEAM

CONFERENCE

STORAGE

MOTHER

/ FAMILY

R+D /

EXAM

LARGE

TRAINING

ROOM

STORAGE

204B

STORAGE

204C

SMALL

TRAINING

ROOM

204A

OFFICE-NLO

ADA

RESTROOM

RESTROOM

STAFF

BREAK

ROOM

SCHEDULERS

CORRIDOR

HAC

CLOSET

ELECTRICAL

ROOM

IT

CLOSET

MENS

RESTROOM

210A

WOMENS

RESTROOM

210B

BREAKOUT

SPACE

CORRIDOR

STAIR 2

ST2

RECEPTION/WAITING

AREA

ENTRY

LOBBY

PRIVACY

SPACE

202B

PRIVACY

SPACE

202C

STAIR 1

ST1

H2

J

J

J

J

J

J

J

J

J

J

J

J

D D D

D

D DD

D

D

D D

D

D3

C2

C2

C2

C2

D

F3

D D

D

D

DD

D

D

F2

D D

D

B

A

A A

A

C

C3

C3

C

C

C3

C

C3

C

C2 C2

C C C

C

D D

D D D

G G

G

C C C

B B

B

B B

C

C

C

C

C

C

C

C

C

C

C

C

C C C C C

C C C C C C C C C

CCCCCCC C

C

H

H

HH

H2 H2

C2

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A

A A A A A A A A A A A A A A A

A A A A A

A

A A A A A A A A A A A A A A A

C C C

A AA A A A A A A A A A A A A A A A A A A A

D3

D3DDDDDDD

D B

B

B

B

B

B

D D

A A A A A A A A A A A A A A A A A A A

A

A

A

A

A

A

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

JJJJJJ

JJJJJJJJJJJ

JJJJJJJJJJJ

J

LVD

LV D

M

VSVS

M

LV

LV

H4-14

VS D

H4-10,12

J

J

J

J

J

J J

J

J

J

J

J

VS D

VS D

VS D

VS D

VS D

VSD

VSD

VSD

VSD

VSD

VSD

OC OC

J J

H4-18

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

VS

D

J J J J J J J J J J

H4-8

J J J

J J

VS

D

H4-6

H4-4 H4-2

J J

VS

D

J

J

J

J

J

J

J

J

H4-13 8 12

J J J J J J

J

J J J J J J

J J J J

OC

OC

J VS

VS

J

JJ

H4-9 8 12

H4-16

H4-20

H4-3

8 12JJ

VS

VS

J J

H4-1 8 12

H4-15

3 3

7 7 7 7 7 7 7 7 7 7

7 777

7 7

77777777777

7 7

7 7 7 7 7

7 7

77777777

X

X

X

X

X

H4-5,7 8 12

D

B

D3

D3

D3 D3 D3 D3

D3

D3

D D D

H

H

VS

D

VS

D

VS

VS

NL2

NL

NL

NL

NL 2

JJJJ

JJJJJJJJJJ

J

JJJJJJJJ

JJJJJ

J

JJJJJ

1313131313131313

1313131313

1313131313131313131313

JJJJJJJJJJ

13131313131313131313

JJJ

131313

D2D2

D3 D3 D3 D

D3 D3 D3 D3

D3 D3

D3 D3

D3 D3

D3 D3

D3 D3

D3 D3

D3 D3

D3 D3

D3

D3 D3 D3 D3 D3

D3

D3D3D3D3

D3 C2

D3D3D3

D3

D3

D3

D3

D

C3

C3

C2

X

VS

C2

C2

X

C2

X

X

X 1

X

1X

X1

X

X 1

X 1

X

X

X

1 FURNISH AND INSTALL ADDITIONAL UNSWITCHED LEG OF LIGHTING

CIRCUIT FOR CONNECTION TO EXIT SIGNS.

2 FIXTURE TO OPERATE AS A NIGHT LIGHT, CONNECT TO UNSWITCHED LEG

OF LIGHTING CIRCUIT.

3 1-POLE, LINE VOLTAGE, PIR SWITCH MOUNTED OCCUPANCY SENSOR,

LEVITON NO. ODS15-IDW OR PRE-BID APPROVED EQUAL. SEE WIRING

DETAIL ON E3.0.

4 FURNISH AND INSTALL LOW VOLTAGE 0-10V DIMMER. DIMMER SHALL BE

CONNECTED TO VACANCY SENSOR IN ROOM AND SHALL BE SAME

MANUFACTURER AS SENSOR.

5 PROVIDE AND INSTALL LOW VOLTAGE DIGITAL SWITCHING STATION. SEE

FIXTURE SCHEDULE AND LIGHTING CONTROL PANEL SCHEDULE ON

SCHEDULE SHEET FOR ADDITIONAL INFORMATION. PROVIDE FACE PLATES

AS REQUIRED.

6 FURNISH AND INSTALL CONTROL CONDUCTORS FROM LOW VOLTAGE

SWITCHING STATION TO LIGHTING CONTROL PANEL.

7 1-POLE, LINE VOLTAGE, PIR SWITCH MOUNTED VACANCY SENSOR, WITH

0-10V DIMMING. VACANCY SENSOR TO BE SET TO MANUAL 'ON'/AUTO 'OFF'

CONTROL AND DIMMING ADJUSTABILITY.

8 PROVIDE ADDITIONAL UNSWITCHED LEG FOR CONNECTION TO

EMERGENCY BATTERY PACKS. CARRY UNSWITCHED LEG THROUGH

RACEWAY SYSTEM TO EGRESS FIXTURE FOR CONTINUOUS POWER TO

BATTERY.

9 1-POLE, LINE VOLTAGE, PIR SWITCH MOUNTED VACANCY SENSOR,

LEVITON NO. ODS15-TDW OR PRE-BID APPROVED EQUAL. VACANCY

SENSOR TO BE SET TO MANUAL 'ON'/AUTO 'OFF' CONTROL.

10 LOW VOLTAGE, DUAL-TECHNOLOGY CEILING MOUNTED VACANCY SENSOR

(360 DEG./1000 SQFT COVERAGE), LEVITON NO. OSC10-MOW. UTILIZE A

120/277 VOLT POWER PACK WITH (1) 20A RELAY, LEVITON NO. OSP20-RD4;

OR PRE-BID APPROVED EQUAL. VACANCY SENSOR TO PROVIDE MANUAL

'ON'/AUTO 'OFF' CONTROL VIA LOW VOLTAGE MOMENTARY SWITCH.

VACANCY SENSOR TO BE INSTALLED NO LESS THAN 6 FT FROM ANY HVAC

DIFFUSERS. SEE WIRING DETAIL ON E3.0.

11 PROVIDE AND INSTALL 120/277V SLAVE LIGHTING CONTROL PANEL. SEE

FIXTURE SCHEDULE AND LIGHTING CONTROL PANEL SCHEDULE ON

SCHEDULE SHEET FOR ADDITIONAL INFORMATION.

12 ROUTE CIRCUIT THROUGH LIGHTING CONTROL PANEL, SEE LIGHTING

CONTROL PANEL SCHEDULE ON SCHEDULE SHEETS FOR ADDITIONAL

INFORMATION.

13 SWITCH FOR CONTROL OF "IN USE" LIGHT ON EXTERIOR OF ROOM.

LOCATE "IN USE" LIGHT ABOVE DOOR FOR ROOM ASSOCIATED WITH LIGHT.

14 TO EXIT SIGN ON FIRST FLOOR. SEE SHEET E2.0L FOR ADDITIONAL

INFORMATION.

KEYED NOTES: #

GENERAL NOTES:

1 ALL EMERGENCY FIXTURES SHALL BE PROVIDED WITH AN EMERGENCY

BATTERY PACK AS SPECIFIED ON THE FIXTURE SCHEDULE AND THE

EMERGENCY FIXTURE SHALL BE PROVIDED WITH AND UNSWITCHED LEG

THAT SHALL BE CONNECTED TO THE EMERGENCY BATTERY PACK.

2 ALL OCCUPANCY SENSORS THAT ARE INTERCONNECTED WITH THE HVAC

CONTROL SYSTEM SHALL BE SET TO A MINIMUM OF 30 MINUTE DELAY.

3 ALL UNSWITCHED LEGS OF THE LIGHTING CIRCUIT SHALL BE ROUTED

THROUGH OCCUPANCY SENSOR PRIOR TO ROUTING THROUGH SNAP

SWITCHES TO PROVIDE UNSWITCHED POWER TO OCCUPANCY SENSOR

FOR OCCUPANT INITIATION OF SENSOR.

electricalengineeringcompany engineering 4 tomorrow

800 s. industry way, suite 350 meridian, idaho 83642 phone: 208.378.4450 fax: 208.378.4451 e2co project #:

world wide web: e2co.com

18237

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

JVS JVS/JB/DTLFULLY SPRINKLERED

Revisions: Date:

Approved:

CONSTRUCTION

DOCUMENTS

1001 Connecticut Avenue NW, Suite 704 Washington, DC 20036

(855) 521-1110 Mr. Gene Klow, AIA

Concourse Federal Group

08/16/2019

Construct National Telehealth Hub, Boise VAMC

531-323

347-1

444 W Fort Street, Boise, Idaho E2.1L

SECOND FLOOR LIGHTING PLAN

SCALE: 1/8" = 1'-0"

SECOND FLOOR LIGHTING PLAN

SHEET 130 OF 145

RFI 192

RFI 180

RFI 180

RFI 180

RFI 180

RFI 180

RFI 180

RFI 102

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S https://us02.procore.com//562949953469612/project/rfi/show/562949953821211 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953707539 https://us02.procore.com//562949953469612/project/rfi/show/562949953574189 https://us02.procore.com/562949953469612/project/drawing_areas/562949953455220/drawing_log/562949956771982 https://us02.procore.com/562949953469612/project/drawing_areas/562949953455220/drawing_log/562949956771982 https://us02.procore.com/562949953469612/project/drawing_areas/562949953455220/drawing_log/562949956771982 https://us02.procore.com/562949953469612/project/drawing_areas/562949953455220/drawing_log/562949956771982 https://us02.procore.com/562949953469612/project/drawing_areas/562949953455220/drawing_log/562949956772007 H4-4 is 277 V xfmd down to 120 V in ceiling

H4-2

Jared Typewritten Text s

Jared lightweight Concrete

Jared Cloud+

Jared Cloud+

SWITCH FOR ELECTRIC SHADES

Jared lightweight Concrete

Jared Cloud+

Jared Cloud+

SWITCH FOR ELECTRIC SHADES

Jared Typewritten Text s

Jared Pen

Jared Cloud+

Jared Cloud+

POWER ON CEILING

Jared Cloud+

Jared Cloud+

POWER ON CEILING

Jared Pen

File details come from the government source that posted it. Updated .