May 2023 Consolidation - Schedule of Line Items with QA - Updated 10-23-23.xlsx
XLSX spreadsheet 58 KB Posted
- Attached to
- 6525--May 2023 Consolidation - HTME with Extended Installation Services (includes Turnkey Services)
- Solicitation number
- 36A79723Q0007
About this file
This document outlines a federal solicitation for high-technology medical equipment (HTME) with extended installation services and turnkey services from the Department of Veterans Affairs National Acquisition Center. The solicitation seeks proposals for equipment, installation, and turnkey services across multiple VA medical centers, with requirements including digital radiography systems, CT scanners, MRI systems, cath lab equipment, and more. Response is due by May 2023, with award dates to follow. The solicitation includes specifications for various products and services required at each site, such as flooring, lighting, and other renovations. It also provides responses to questions from previous offerors to clarify requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Line Items
| VISN Short | HTME VISN | Station | Equip PO | TKY PO | Equipment Type | QTY | Site Visit POC | Site Visit Date | Site Visit Time |
| VISN 23 | VISN 23: VA Midwest Health Care Network | 499 DES MOINES, IA | 499B39000 | 636B33209 | XR URO | 1 | conner.feldotto@va.gov | 7/19/23 | 1pm CST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 516 ST PETERSBURG, FL | 516B30011 | 516B30016 | XR RAD | 1 | harry.ritter@va.gov | 7/31/23 | 10am-12pm EST |
| VISN 1 | VISN 1: VA New England Healthcare System | 523 W ROXBURY, MA | 523B31025 | 523B32015 | XR RAD | 1 | Neel.Patel@va.gov | 7/25/23 | 2pm - 3pm EST |
| VISN 10 | VISN 10: VA Healthcare System of Ohio | 553 DETROIT, MI | 553B30027 | 553B30028 | XR RF | 1 | James.Mohr@va.gov | 7/28/23 | 12pm - 4pm CST |
| VISN 2 | VISN 2: VA Healthcare Network Upstate New York | 561 EAST ORANGE, NJ | 561B30027 | 561B30028 | XR CT | 1 | Esteban.rivera@va.gov | 7/25/23 | 10am EST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 573 GAINESVILLE, FL | 573B35017 | 573B35021 | XR CT | 1 | matthew.gustafson@va.gov | 8/2/23 | 11am EST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 573 GAINESVILLE, FL | 573B35018 | 573B35022 | XR CT | 1 | matthew.gustafson@va.gov | 7/26/23 | 11am EST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 573 GAINESVILLE, FL | 573B35019 | 573B35020 | NM PET CT | 1 | matthew.gustafson@va.gov | 8/2/23 | 10am EST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 573 GAINESVILLE, FL | 573B35023 | 573B35026 | XR CT | 1 | matthew.gustafson@va.gov | 7/19/23 | 11am EST |
| VISN 8 | VISN 8: VA Sunshine Healthcare Network | 573 GAINESVILLE, FL | 573B35024 | 573B35025 | NM SPECT CT | 1 | matthew.gustafson@va.gov | 7/21/23 | 11am EST |
| VISN 16 | VISN 16: South Central VA Health Care Network | 580 HOUSTON, TX | 580B30021 | 580B30032 | XR RF | 1 | albert.perry@va.gov | 7/19/23 | 9am CST |
| VISN 16 | VISN 16: South Central VA Health Care Network | 580 HOUSTON, TX | 580B30030 | 580B30031 | XR URO | 1 | albert.perry@va.gov | 7/19/23 | 9am CST |
| VISN 16 | VISN 16: South Central VA Health Care Network | 586 JACKSON, MS | 586B30015 | 586B30018 | XR CATH LAB | 1 | Trevor.Langston@va.gov | 7/27/2023 & 7/28/2023 | 8am - 12pm CST |
| VISN 16 | VISN 16: South Central VA Health Care Network | 598 LITTLE ROCK, AR | 598B30001 | 598B30015 | XR CATH LAB | 1 | Rickey.sellers@va.gov | 7/19/23 | 9am CST |
| VISN 2 | VISN 2: VA Healthcare Network Upstate New York | 632 NORTHPORT, NY | 632B31015 | 632B31019 | XR LINAC | 1 | jeffrey.donahue@va.gov | 7/25/23 | 9am-2pm EST |
| VISN 2 | VISN 2: VA Healthcare Network Upstate New York | 632 NORTHPORT, NY | 632B31017 | 632B31018 | XR CT | 1 | jeffrey.donahue@va.gov | 7/25/23 | 9am-2pm EST |
| VISN 6 | VISN 6: VA Mid-Atlantic Health Care Network | 659 SALISBURY, NC | 659B39000 | 659B39009 | XR CT | 1 | Kayla.arkangel@va.gov | 7/19/23 & 7/25/23 | 11:30am - 1:30pm EST |
| VISN 6 | VISN 6: VA Mid-Atlantic Health Care Network | 659 SALISBURY, NC | 659B39006 | 659B39011 | XR MRI | 1 | Kayla.arkangel@va.gov | 8/2/23 | 2pm - 3:30pm EST |
| VISN 6 | VISN 6: VA Mid-Atlantic Health Care Network | 659 SALISBURY, NC | 659B39012 | 659B39010 | XR MRI | 1 | Kayla.arkangel@va.gov | 8/2/23 | 2pm - 3:30pm EST |
| VISN 20 | VISN 20: VA Northwest Network | 663 SEATTLE, WA | 663B32641 | 663B32640 | XR CT | 1 | justin.collins2@va.gov | 7/19/23 | 10am - 12pm PST |
| VISN 12 | VISN 12: VA Great Lakes Health Care System | 695 MILWAUKEE, WI | 695B38015 | 695B38017 | XR RF | 1 | Andrew.Yunker@va.gov | 7/19/23 | 10am EST |
| VISN 12 | VISN 12: VA Great Lakes Health Care System | 695 MILWAUKEE, WI | 695B38016 | 695B38018 | XR RAD | 1 | Andrew.Yunker@va.gov | 7/19/23 | 11am EST |
Sheet1
| Sort | VISN # | VISN | Station | Equipment Requisition Number | Turnkey Requisition Number | Equipment Questions | Turnkey Questions | GOVT Equipment Response | GOVT Turnkey Response |
| 4 | 1 | VISN 1 | 523 W ROXBURY, MA | 523B31025 | Do you prefer 17x17 at wallstand and/or table? | Is the existing control wall, item 16, a lead lined window? |
Theres currently no wall above the window, is one needed?
Are the current walls lead lined? If so will the current rating meet your requirements. If not what is your required rating?
Is the existing door lead lined and the proper rating?
Will any work be needed to be completed during afterhours?
Please confirm finishes that need replacement if imaging equipment scope doesn’t require it.
| 1. | Flooring |
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | ||
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | prefer your largest detector size offered | Yes existing window is lead lined. |
Wall above window is not needed.
New countertop area to include new lead lined window to match existing layout. Countertop to be solid surface Corian
Current walls are lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined walls accordingly. VA will complete a physicist report at the end to ensure compliance.
Current door is lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined door accordingly. VA will complete a physicist report at the end to ensure compliance.
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Yes finishes need replacement - New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with integral cove base. Flooring Tarkett iQ Optima, colors TBD (2 tone color - 1 tone under equipment and 1 tone for room) New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish. Color - TBD New Millwork - millwork by Midmark Corporation. New casework to match existing layout with solid surface Corian and integral backsplash.
Vendor to compliy with all Infection Control Measures of Medical Center.
5 2 VISN 2 561 EAST ORANGE, NJ 561B30027 Please update table height range to 43-99cm to allow full and fair competition and align with industry standards. As a part of the installation of CT system, the vendor requires site modifications to accommodate the function of the system, that are not provided by vendors and typically are either owner supplied or vendor supplied by a third party contractor.
To properly respond to the RFO, we must know if any of the following items that are not provided by the CT manufacturer are to be included within the response to the RFO, or if the VA is providing these items under separate contract or with their own forces, or are not considered required at this time.
| 1) | Architectural and/or Engineering services: The vendor provides drawings documenting the site specific installation requirements of their system. They do not reflect any other architectural/engineering changes nor do they provide licensed engineered calculation of the MEPFP (Mechanical/Electrical/Plumbing/Fire Protection) requirements | |||||
| a. | Does the owner require architectural drawings of the project, either for approvals and/or record purposes? | |||||
| b. | Does the owner require engineering design services and drawings to calculate the required cooling/heating and power requirements of the new system in comparison to existing conditions? | |||||
| 2) | Structural: | |||||
| a. | Are there any monitors, booms, injectors to be provided in order, that will require the installation of above ceiling strut to support this equipment? | |||||
| 3) | Finishes in Scan and Control Rooms: | |||||
| a. | Casework: | |||||
| i. | Is there need for any new manufactured storage cabinets? Is all existing casework to remain? | |||||
| ii. | Is there need for new Control Area countertops to support vendor equipment, or will existing be reused? | |||||
| b. | Flooring: Is there a need for new floor finishes? If yes, what material? | |||||
| i. | Note the removal of existing grout pad will require removal of existing finished flooring. Is this considered part of our scope? | |||||
| c. | Paint: | |||||
| i. | Is it within our scope to provide new paint finish to walls and ceilings and miscellaneous surfaces within the space? | |||||
| d. | Ceilings: | |||||
| i. | existing ceilings are acoustic ceiling tile and grid. CT installation does not require new ceilings. Are we to include installation of new ceilings as part of a finish upgrade, or should we keep the existing? | |||||
| 4) | Radiation Shielding: | |||||
| a. | Is there a record physicist report of these rooms showing appropriate shielding? | |||||
| b. | Is it in our scope to provide shielding design and verification? | |||||
| 5) | Sprinklers/Fire Protection | |||||
| a. | Note that existing sprinklers should not require any modification due to this installation. | |||||
| 6) | Plumbing | |||||
| a. | It has been expressed that existing medical gas outlets within the room are not currently connected to building systems, and require connection and certification. Please clarify this would fall within our scope. | |||||
| 7) | HVAC (Heating and Cooling): | |||||
| a. | Is it in our scope to provide appropriate cooling systems for the heat output of the equipment (dedicated split systems)? | |||||
| b. | If yes, are there records of existing air readings to determine the necessity for additional cooling? | |||||
| 8) | Electric | |||||
| a. | Provided Technical Spec requests a full system UPS be added. Please clarify the intent of this request. | |||||
| i. | A full system UPS will require a separate space outside our work area be designed to support such a system, with additional cooling and a new increased feeder. | |||||
| ii. | A smaller UPS may come with the equipment and not require additional space | |||||
| b. | System related electrical requirements requires replacement of the existing disconnect within the Scan Room. Is this in our scope? | |||||
| c. | System related electrical requires relocation of existing surface mounted and below grade conduits to route interconnecting wiring between the power cabinet, table, overhead tube, chest bucky, and control area. Is this in our scope? | |||||
| d. | Lighting may need to be modified if strut support modifications are required. | |||||
| i. | Is lighting relocation in our scope? | |||||
| ii. | Is the request to provide new lighting in the room, and is this in our scope? | |||||
| e. | Data lines | |||||
| i. | Are modifications to telephone and data lines within our scope? | Table Height Range updated. | See other answers related to this order. | |||
| 14 | 2 | VISN 2 | 632 NORTHPORT, NY | 632B31017 | Please verify the clinical need for ECG Coronary CCTA for an oncology department specific to this CT Simulator |
Please change acquisition monitor to 19” to allow full and fair competition.
Please verify if fluoroscopy is needed Interventional Capabilities
| 1. | Equipment | |
| a. | Lasers: are the existing lasers to remain and be re-used or is a new system being purchased in the vendor equipment quote and installed through the extended installation scope? | |
| b. | Gating: is a gating system to be part of the vendor equipment quote and the extended installation work scope? | |
| c. | Existing GE CT Simulator: when was the last tube change? | Extended Installation - Scope of Work Questions |
| 2. | Finishes |
Provide material specifications in the scan and control room work areas for the new work:
| a. | Floor tile |
| b. | Vinyl cove base |
| c. | Ceiling tiles |
| d. | Ceiling grid |
| e. | Plastic laminate for the counter and top (this is in control room only) |
3. Electrical / 480 volt equipment feeder assembly As observed on the walk through, the CT is currently fed from panel HLA / section 2.
| a. | Where is panel HLA / section 2 fed from, and what size breaker or switch is at this upstream source? |
| b. | Does panel HLA / section 2 have the capacity to support a 200 amp circuit breaker, which will be installed to feed the new full system UPS? |
| 4. | Electrical / UPS system |
| a. | Is it to be included or not: The technical specification item # 2/k calls for the inclusion of a UPS system that will provide full functionality of the CT system for ten minutes. |
The Request for Offers document (RFO) item 5.2.3 / 2 / vi states ‘ An Uninterrupted Power Source (UPS) is not specified unless required due to site specific characteristics. Vendor shall recommend (or not recommend) inclusion of an UPS depending on the results of their electrical power survey.
The vendors and the extended installation contractor do NOT have the ability to perform an electrical load study (which would be the basis of any recommendation) until after the project is awarded.
Please verify if the proposal scope should include a UPS system.
b. Where will the UPS be placed: The size will vary based on the manufacturer that the equipment vendor will supply, however the UPS assembly will be approximately 8’-6” wide and 6’-9” high.
Provide a floor plan mark up showing where this UPS could be placed and the room fit out with other needed items ( Other needed items like cooling system, and electrical disconnect switches).
| 5. | Fire Alarm |
| a. | Provide contact information for the building fire alarm vendor |
| 6. | Network connection |
| a. | For remote service, there will need to be connection to the local area network. Is this connectivity already in place in the work area? |
| b. | If not, please verify that the VA will provide the installation of cabling and hardware as needed to make this connection. |
| c. | OR, if this needs to be included in the extended installation provide a floor plan identifying the point of tie in for the low voltage cabling run. |
| 7. | HVAC / BMS |
| a. | Are the mechanical systems in the CT Simulator room connected to an existing BMS system? If so, please provide contact information for the BMS vendor. |
| 8. | Room shielding |
| a. | Provide a shielding report for the room to call out any upgrades or additions that will be needed to the existing shielding at the walls, doors, and or view window. |
Please note, that we will include in our extended installation proposal the work to patch existing shielding in the walls that is disturbed by the work of our proposal. No clinical need for ECG Coronary CCTA for an oncology department specific to this CT Simulator.
Acquisition monitor can be changed to 19”
| - fluoroscopy is not needed Interventional Capabilities | 1. | Can the VA provide material specifications in the scan and control room work areas for the new work: | |||||
| a. | Floor tile RESILIENT 18X18 LVT, MANUFACTURER: MANNINGTON COMMERCIAL, MFG NAME/NO: AMTICO SIGNATURE ABSTRACT LINEAR SHALE AROALA31 | ||||||
| b. | Vinyl cove base RUBBER BASE, 4” HEIGHT, MANUFACTURER: JOHNSONITE, MFG NAME/NO: MATCH EXISTING | ||||||
| c. | Ceiling tiles 24X24 LAY-IN PANEL WITH SQUARE EDGE, WHITE DURABRITE, MANUFACTURER: ARMSTRONG, MFG NAME/NO: HEALTHZONE OPTIMA 3216 | ||||||
| d. | Ceiling grid EXPOSED SUSPENSION SYSTEM, WHITE, MANUFACTURER:ARMSTRONG, MFG NAME/NO: 7/8” MAIN & SECONDARY CROSS RUNNERS | ||||||
| e. | Plastic laminate for the counter and top (control room only) SIMILAR TO EXISTING | ||||||
| 2. | Where is panel HLA / section 2 fed from, and what size breaker or switch is at this upstream source? BUILDING 200N, 400 AMP SOURCE FEEDS HLA-1 AND HLA-2 | ||||||
| 3. | Does panel HLA / section 2 have the capacity to support a 200 amp circuit breaker, which will be installed to feed the new full system UPS? YES IF REPLACING EXISTING 150 TO 200 AMP LOAD… NO IF THIS IS AN ADDIONAL 200 AMP LOAD… UPS IS NOT NECESSARY | ||||||
| 4. | Can the VA confirm if the technical specification item # 2/k calls for the inclusion of a UPS system that will provide full functionality of the CT system for ten minutes is to be included or not? UPS is not necessary since space requirements for the UPS placement is not available. | ||||||
| 5. | The vendors and the extended installation contractor do NOT have the ability to perform an electrical load study (which would be the basis of any recommendation) until after the project is awarded so can the VA please verify if the proposal scope should include a UPS system or not? UPS is not necessary since space requirements for the UPS placement is not available. | ||||||
| 6. | Can the VA please provide contact information for the building fire alarm vendor? CASEY SYSTEMS, JOHN PETERSON, 212-564-3960, JPETERSEN@CASEYSYSTEMS.COM | ||||||
| 7. | For remote service, can the VA confirm that connectivity is already in place in the work area? Yes already in place. | ||||||
| 8. | If not, can the VA please verify if they will provide the installation of cabling and hardware as needed to make this connection? SEE QUESTION #7 | ||||||
| 9. | Are the mechanical systems in the CT Simulator room connected to an existing BMS system, and if so, can the VA please provide contact information for the BMS vendor? YES, SYSTEM: JOHNSON CONTROLS, SERVICE CONTACT: AME INC., 973-884-4100, INFO@AME-INC.COM | ||||||
| 10. | Can the VA please provide a shielding report for the room to call out any upgrades or additions that will be needed to the existing shielding at the walls, doors, and or view window? WE DO NOT HAVE AN EXISTING REPORT | ||||||
| 11. | In the extended installation proposal, should we include the work to patch existing shielding in the walls that is disturbed by the work of our proposal? YES, MUST PATCH WHATEVER IS DISTURBED | ||||||
| 32 | 2 | VISN 2 | 632 NORTHPORT, NY | 632B31017 | 632B31018 | • Are the existing lasers to remain and be re-used or is a new system being purchased in the vendor equipment quote and installed through the extended installation scope? |
• Is a gating system to be part of the vendor equipment quote and the extended installation work scope?
• When was the last tube change on the existing GE CT Stimulator?
• Can the VA provide material specifications in the scan and control room work areas for the new work:
| a. | Floor tile |
| b. | Vinyl cove base |
| c. | Ceiling tiles |
| d. | Ceiling grid |
| e. | Plastic laminate for the counter and top (control room only) |
• Where is panel HLA / section 2 fed from, and what size breaker or switch is at this upstream source?
• Does panel HLA / section 2 have the capacity to support a 200 amp circuit breaker, which will be installed to feed the new full system UPS?
• Can the VA confirm if the technical specification item # 2/k calls for the inclusion of a UPS system that will provide full functionality of the CT system for ten minutes is to be included or not?
• The vendors and the extended installation contractor do NOT have the ability to perform an electrical load study (which would be the basis of any recommendation) until after the project is awarded so can the VA please verify if the proposal scope should include a UPS system or not?
• Where will the UPS be placed?
• Can the VA please provide a floor plan mark up showing where this UPS could be placed and the room fit out with other needed items e.g., cooling system, electrical disconnect switches, etc.?
• Can the VA please provide contact information for the building fire alarm vendor?
• For remote service, can the VA confirm that connectivity is already in place in the work area?
• If not, can the VA please verify if they will provide the installation of cabling and hardware as needed to make this connection?
• OR, if this needs to be included in the extended installation, can the VA please provide a floor plan identifying the point of tie in for the low voltage cabling run?
• Are the mechanical systems in the CT Simulator room connected to an existing BMS system, and if so, can the VA please provide contact information for the BMS vendor?
• Can the VA please provide a shielding report for the room to call out any upgrades or additions that will be needed to the existing shielding at the walls, doors, and or view window?
• In the extended installation proposal, should we include the work to patch existing shielding in the walls that is disturbed by the work of our proposal?
| 1. | Can the VA provide material specifications in the scan and control room work areas for the new work: | ||||||
| a. | Floor tile RESILIENT 18X18 LVT, MANUFACTURER: MANNINGTON COMMERCIAL, MFG NAME/NO: AMTICO SIGNATURE ABSTRACT LINEAR SHALE AROALA31 | ||||||
| b. | Vinyl cove base RUBBER BASE, 4” HEIGHT, MANUFACTURER: JOHNSONITE, MFG NAME/NO: MATCH EXISTING | ||||||
| c. | Ceiling tiles 24X24 LAY-IN PANEL WITH SQUARE EDGE, WHITE DURABRITE, MANUFACTURER: ARMSTRONG, MFG NAME/NO: HEALTHZONE OPTIMA 3216 | ||||||
| d. | Ceiling grid EXPOSED SUSPENSION SYSTEM, WHITE, MANUFACTURER:ARMSTRONG, MFG NAME/NO: 7/8” MAIN & SECONDARY CROSS RUNNERS | ||||||
| e. | Plastic laminate for the counter and top (control room only) SIMILAR TO EXISTING | ||||||
| 2. | Where is panel HLA / section 2 fed from, and what size breaker or switch is at this upstream source? BUILDING 200N, 400 AMP SOURCE FEEDS HLA-1 AND HLA-2 | ||||||
| 3. | Does panel HLA / section 2 have the capacity to support a 200 amp circuit breaker, which will be installed to feed the new full system UPS? YES IF REPLACING EXISTING 150 TO 200 AMP LOAD… NO IF THIS IS AN ADDIONAL 200 AMP LOAD… UPS IS NOT NECESSARY | ||||||
| 4. | Can the VA confirm if the technical specification item # 2/k calls for the inclusion of a UPS system that will provide full functionality of the CT system for ten minutes is to be included or not? UPS is not necessary since space requirements for the UPS placement is not available. | ||||||
| 5. | The vendors and the extended installation contractor do NOT have the ability to perform an electrical load study (which would be the basis of any recommendation) until after the project is awarded so can the VA please verify if the proposal scope should include a UPS system or not? UPS is not necessary since space requirements for the UPS placement is not available. | ||||||
| 6. | Can the VA please provide contact information for the building fire alarm vendor? CASEY SYSTEMS, JOHN PETERSON, 212-564-3960, JPETERSEN@CASEYSYSTEMS.COM | ||||||
| 7. | For remote service, can the VA confirm that connectivity is already in place in the work area? Yes already in place. | ||||||
| 8. | If not, can the VA please verify if they will provide the installation of cabling and hardware as needed to make this connection? SEE QUESTION #7 | ||||||
| 9. | Are the mechanical systems in the CT Simulator room connected to an existing BMS system, and if so, can the VA please provide contact information for the BMS vendor? YES, SYSTEM: JOHNSON CONTROLS, SERVICE CONTACT: AME INC., 973-884-4100, INFO@AME-INC.COM | ||||||
| 10. | Can the VA please provide a shielding report for the room to call out any upgrades or additions that will be needed to the existing shielding at the walls, doors, and or view window? WE DO NOT HAVE AN EXISTING REPORT | ||||||
| 11. | In the extended installation proposal, should we include the work to patch existing shielding in the walls that is disturbed by the work of our proposal? YES, MUST PATCH WHATEVER IS DISTURBED | ||||||
| 33 | 1 | VISN 1 | 523 W ROXBURY, MA | 523B31025 | 523B32015 | Can the VA please provide finishes and specifications in the Xray room and control area for the following: |
| a. | Floor tile | |
| b. | Vinyl cove base | |
| c. | Ceiling tiles | |
| d. | Ceiling grid | |
| e. | Lighting Fixture Specification if they are to be replaced with LED. | |
| New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with integral cove base. Flooring Tarkett iQ Optima, colors TBD (2 tone color - 1 tone under equipment and 1 tone for room) |
New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish. Color - TBD New Millwork - millwork by Midmark Corporation. New casework to match existing layout with solid surface Corian and integral backsplash.
Vendor to compliy with all Infection Control Measures of Medical Center.
| 34 | 2 | VISN 2 | 561 EAST ORANGE, NJ | 561B30027 | 561B30028 | o. | Can the VA please clarify the intent of Provided Technical Spec requests for a full system UPS to be added, as a full system UPS will require a separate space outside our work area be designed to support such a system, with additional cooling and a new increased feeder and a smaller UPS may come with the equipment and not require additional space? | • As the vendor provides drawings documenting the site specific installation requirements of their system which do not reflect any other architectural/engineering changes nor do they provide licensed engineered calculation of the MEPFP (Mechanical/Electrical/Plumbing/Fire Protection) requirements, | |
| a. | Does the owner require architectural drawings of the project, either for approvals and/or record purposes? | ||||||||
| b. | Does the owner require engineering design services and drawings to calculate the required cooling/heating and power requirements of the new system in comparison to existing conditions? | ||||||||
| c. | Are there any monitors, booms, injectors to be provided in order, that will require the installation of above ceiling strut to support this equipment? | ||||||||
| d. | Is there need for any new manufactured storage cabinets and is all existing casework to remain? | ||||||||
| e. | Is there need for new Control Area countertops to support vendor equipment, or will existing be reused? | ||||||||
| f. | Is there a need for new floor finishes, and if so, what material? | ||||||||
| g. | Is the removal of existing grout pad and existing finished flooring considered part of the scope? | ||||||||
| h. | Is it within our scope to provide new paint finish to walls and ceilings and miscellaneous surfaces within the space? |
i. Are we to include installation of new ceilings as part of a finish upgrade, or should we keep the existing?
| j. | Is there a record physicist report of these rooms showing appropriate shielding? |
| k. | Is it in our scope to provide shielding design and verification? |
| l. | It has been expressed that existing medical gas outlets within the room are not currently connected to building systems, and require connection and certification and so can the VA please clarify if this falls within the scope? |
| m. | Is it within the scope to provide appropriate cooling systems for the heat output of the equipment (dedicated split systems)? |
| n. | If yes, can the VA please provide records of existing air readings to determine the necessity for additional cooling? |
| p. | System related electrical requirements requires replacement of the existing disconnect within the Scan Room, so is this within the scope? |
| q. | System related electrical requires relocation of existing surface mounted and below grade conduits to route interconnecting wiring between the power cabinet, table, overhead tube, chest bucky, and control area, so is this within the scope? |
| r. | Lighting may need to be modified if strut support modifications are required, so is lighting relocation within the scope? |
| s. | Is the request to provide new lighting in the room, and is this within the scope? |
t. Are modifications to telephone and data lines within the scope?
u. Are there any modifications required to power outlets and/or fire alarm services?
a. Architectural drawings are not required.
B. Yes, this calculation is required.
C. answer pending equipment award D. casework and storage cabinets to be replaced via turnkey award
e. New Modern Countertops to be installed
f. yes new floor finishes will be required - type will be confirmed upon award
g. yes
h. yes
i. Keep existing ceiling is preferred but will need confirmation with Equipment OEM once the order is awarded
j. yes
k. No
l. Medical gases will be taken care of by facility - outside of Turnkey contract work
m. Yes, in accordance with awarded equipment vendor requirements and extended turnkey rubric non-segregable items.
n. Facility will provide more info upon award
o. guidance is to work with equipment OEM once equipment is awarded; plan for partial UPS
| 37 | 1 | VISN 1 | 523 W ROXBURY, MA | 523B31025 | In section 1, it states that there are two fixed detectors required but no wireless detectors. In section 2 it states that table holder and mobile holder for wireless detector are required. Please update tech specs to reflect accurate detector configuration desired. | tech spec updated to wireless detectors in Section 1 but we do require a quantity of 2 (1 each for wall and table) | |
| 38 | 1 | VISN 1 | 523 W ROXBURY, MA | 523B32015 | 1. Please provide VA's scope of work. |
2. Please confirm if A&E's are required?
3. Will cabinetry remain or be replaced with new? If VA wants new, please confirm same length and location?
4. Please confirm if all new LED lighting is required?
5. Please confirm if the VCT flooring shall be replaced with new seamless flooring? A&E not required - submittals on materials to be reviewed by COR. As-builts of layout to be provided by vendor at completion of project, if applicable.
New countertop area to include new lead lined window to match existing layout. Countertop to be solid surface Corian
Current walls are lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined walls accordingly. VA will complete a physicist report at the end to ensure compliance.
Current door is lead lined to meeting existing system requirements. If new system to be installed requires higher rating, the contractor will need to address the lead lined door accordingly. VA will complete a physicist report at the end to ensure compliance.
Plan to have demolition off hours in order to avoid any noise, vibration issues for other scan room.
Yes finishes need replacement - New flooring - sheet welded flooring in all suite rooms (Scan, Control & Equipment) with integral cove base. Flooring Tarkett iQ Optima, colors TBD (2 tone color - 1 tone under equipment and 1 tone for room) New ceiling grid - Armstrong Prelude XL Suspension Grid & Ultima High NRC Tiles New HVAC Diffusers and grills - match existing or provide acceptable equivalent New lights - 2x2 Lithonia Lighting Fixture (2BLT2 33L ADP EZ1 LP835 BAA) Paint - apply paint in three (3) coats; prime, body, and finish. Color - TBD New Millwork - millwork by Midmark Corporation. New casework to match existing layout with solid surface Corian and integral backsplash.
Vendor to compliy with all Infection Control Measures of Medical Center.
| 98 | 10 | VISN 10 | 553 DETROIT, MI | 553B30027/553B30028 - Detroit | Will seamless flooring be required per VA TIL guidelines? | Yes, seamless flooring will be required per VA TIL guidelines. | |
| 19 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38015 | Please remove or make optional: Wireless detector charging in table bucky to allow full and fair competition |
Please change Maximum lowest table height from floor from 26" to 33" to allow full and fair competition
Please change ability to tilt 90 degrees in both directions to 85 degrees to allow full and fair competition
Please change minimum in room monitor to 21.3" to allow full and fair competition
Please change minimum control room monitor to 21.3" to allow full and fair competition
| Please remove or make optional: Histogram based dose regulation | Please confirm finishes that need replacement if imaging equipment scope doesn’t require it. |
| 1. | Flooring |
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | |||||
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | Moved wireless detector charging in tabel bucky to added value as this is preferred. Changed maximum lowest table height to 33". Change table tilt to 85 degrees in both directions. Change minimum monitor sizes to 21". Moved histogram based dose regulation software to added value. | 1. New flooring is not required. Patch flooring as needed with a complimentary colored tile. 2. keep existing ceiling tiles, diffusers, lights. 3. Not required to paint the whole room/suite, just over patching. 2 coats of latex paint is fine. 4. Millwork is not needed. | |||
| 20 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38016 | Please confirm finishes that need replacement if imaging equipment scope doesn’t require it. | |
| 1. | Flooring | |||||
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | |||||||
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | 1. New flooring is not required. Patch flooring as needed with a complimentary colored tile. 2. keep existing ceiling tiles, diffusers, lights. 3. Not required to paint the whole room/suite, just over patching. 2 coats of latex paint is fine. 4. Millwork is not needed. | ||||||
| 22 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38015 | 695B38017 | • | In order to quote “patch and repair where disturbed by the work,” can the VA provide manufacturer info on existing paint colors, and floor covering? |
• If floor covering attic stock is not available, can a similar material in a contrasting color be used?
| • | Are “as-built” drawings available for existing infrastructure?: |
| o | Electrical – Especially any point to point above-ceiling, in-wall, and under-slab conduit and raceway, and to determine electrical feeder wire size and run length from 80amp breakers back to source |
| o | HVAC – Existing CFM and capacity |
| o | Structural – Especially existing floor slab thickness, and the existing Unistrut support structures in each room |
| A complimentary colored floor covering can be used if attic stock is not available. No additional drawings will be provided at this time. Distance between circuit breaker (1F017)and source (normal electrical room 1S019) is approximately 120' and electrical feed wire size is 4 #1/0 & 1 #1/0 GRD. Typical floor is 5" concrete slab. | |||||||
| 23 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38016 | 695B38018 | • | In order to quote “patch and repair where disturbed by the work,” can the VA provide manufacturer info on existing paint colors, and floor covering? |
• If floor covering attic stock is not available, can a similar material in a contrasting color be used?
| • | Are “as-built” drawings available for existing infrastructure?: | |||||||
| o | Electrical – Especially any point to point above-ceiling, in-wall, and under-slab conduit and raceway, and to determine electrical feeder wire size and run length from 80amp breakers back to source | |||||||
| o | HVAC – Existing CFM and capacity | |||||||
| o | Structural – Especially existing floor slab thickness, and the existing Unistrut support structures in each room | A complimentary colored floor covering can be used if attic stock is not available. No additional drawings will be provided at this time. Distance between source (emergency electrical room 1S018) and circuit breaker (1F015) is approximately 150' and Electrical feed wire size is 4 #1/0 & 1 #10 GRD. Typical floor is 5" concrete slab. | ||||||
| 52 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38015 | Tech Spec sheet states RF rm 1F014-GB, but Site Drawings shows RF rm 1F017-GB. Is the actual RF rm 1F017-GB? Site drawings show rm 1F014 as the CT suite. | Fluoro correct room # is 1F017-GB. | ||
| 76 | 12 | VISN 12 | 695 MILWAUKEE, WI | 695B38016 | 695B38018 | 1. Clarify that only the walls and floor that are affected will be repainted and floor patched. Does the facility have attic stock of the flooring or should we assume an accent color for the patch? |
2. Can the facility provide DWG drawings for the first floor, a full set would be helpful but architecturals at a minimum? We can make PDFs work if that is all that is available.
3. Can the facility provide the location and distance from the disconnects in the control room to the electrical closet that they are fed from? Possibly also wire size at the disconnect.
4. Each vendor will enter the patient table at a different location in the floor, will the facility accept a 1.5" sloped top surface mounted trough behind the table to the wall, the other option will require sawcutting the concrete floor and modifying existing trough.
5. To verify the strut's ability to support any new system would be verified by a structural engineer. Does the facility have a local engineer that they use for other projects that we can contact?
6. Are there any other 3rd party pieces of equipment being installed at this time that might need to have infrastructure added during the remodel?
7. We currently use Edgeguard containment panels, walk off mats, negative air HEPA filter machines and neg air monitoring devices for Infection control. Does the facility have any additional requirements and is edgeguard acceptable?
8. Assuming there will be a few weeks between rooms for install and training, is there storage space for our ICRA material and maybe a gang box between the 2 phases? If it is more than a month we would need to bring those items back to our shop.
9. Does the VA own this building or is it leased from a private contractor? Some landlords have additional requirements and non-government owned buildings are subject to city building code.
| 10. We are assuming the air exchanges required for the procedures completed in the rooms currently meet VA standards and no new procedure types are planned. Is that assumption correct? | 1. only the walls and floor that are affected will be repainted and floor patched. A complimentary colored floor covering can be used if attic stock is not available. 2. No additional drawings will be provided at this time. 3. Distance between source (emergency electrical room 1S018) and circuit breaker (x-ray 1F015) is approximately 150' and Electrical feed wire size is 4 #1/0 & 1 #10 GRD. Distance between circuit breaker (fluoro room 1F017)and source (normal electrical room 1S019) is approximately 120' and electrical feed wire size is 4 #1/0 & 1 #1/0 GRD 4. in floor trough preferred 5. RA Smith 6. no other equipment is being installed or planned at this time. 7. An infection control risk assessment will be performed after review of site-prep scope of work to identify required infection control measures. Edgeguard panels are acceptable. The control measures mentioned have been historically required. Additional measures may include but are not limited to minimizing, use of hepa vacs, minimizing time opening above ceiling and immediately resetting ceiling tiles/access panels, use of covered carts to move materials /waste through the building and cleaning cart wheels, ensuring worker clothing and footwear is clean and free of dust when leaving work area, use of shoe coverings, sealing doors, daily cleaning, sealing penetrations, fulshing potable water systems. 8. No. 9. Leased. 10. Existing air exchanges are accurate. | |||||
| 11 | 16 | VISN 16 | 580 HOUSTON, TX | 580B30021 | Please verify this obligation is in fact for a Digital Radiography system (not R&F) |
1b. Please clarify if you would in fact like 3 wireless detectors.
1b. Please clarify if you would like 3 detectors do you want all 3 to be 17x17 or would you like the third detector to be 10x12 or 14x17?
1b. If the Wall detector is wireless would you still like a 3rd detector quoted?
2c. Please change Minimum generator voltage rang (kV) from .3 to 40-150kV to align with industry standards
2d. Please change maximum radiographic mA exposure @ 100 kVp from 4s to 10-1000mA to align with industry standards
| 3j. Please remove minimum tilt of imaging surface (20 degrees) as this is a common R&F feature; not digital radiography. | Please confirm finishes that need replacement if imaging equipment scope doesn’t require it. |
| 1. | Flooring |
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | |
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | 1. This is for a general radiology digital radiography system. |
1b. A total of 3 detectors needed.
1b. One fixed wall detector that is 17x17 in and 2 wireless 17x17 in.
1b. The wall detector is fixed.
2c. Changes made to technical specification.
2d. Changes made to technical specification.
3j. Changes made to technical specification. 1a. Whole room, sheet vinyl 2a. Depends on how much tile will be impacted. Budget for full replacement.
2b. Keep existing diffusers unless they interfere with installation 2c. Keep existing unless required.
3a. Color to be chosen by interior design 4a. Countertops can be solid surface.
12 16 VISN 16 586 JACKSON, MS 586B30015 Please remove cradle table requirement to align with clinical needs
Please clarify if you are looking for a full or partial UPS. If full please supply siting/available space for Full UPS.
Please remove Data Migration from Philips to allow full and fair competition
Please change AW workstation monitor from 32" to 19" Please clarify if you are looking for a full or partial UPS. If full please supply siting/available space for Full UPS.
Please confirm finishes that need replacement if imaging equipment scope doesn’t require it.
| 1. | Flooring |
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | |
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | Tech specs updated |
Full UPS - Space will be in the new equipment room to be located in a part of the current control room.
Data migration from Philips will be removed from the Tech Specs.
The workstation monitor size will be changed to 19" (at least) as well. Cradle table requirement will be removed. Full UPS in the new proposed equipment storage area.
1a. We would like to replace all flooring, ceiling, paint, and millwork.
2a-c. The ceiling in the procedure room and control room must be hard ceilings for sterile storage. The equipment ancillary rooms that are ceiling tiles will need to be replced with the new VA standard - Armstrong ceiling tiles.
3a. Latex paint meets site requirement.
4a. Countertops solid surface. Flooring will be LVT.
13 16 VISN 16 598 LITTLE ROCK, AR 598B30001 1. Do they want us to include epoxy of welded sheet vinyl flooring throughout the suite?
2. Do they want us to include demoing the storage room wall (and relocating the sink) to enlarge the Procedure room?
3. Provide us with a scalable architectural floor plan of the entire Cath Lab suite.
4. Provide us with the capacity of the HVAC system serving the Procedure and Equipment rooms.
5. Provide us with an architectural plan and reflected ceiling plan of what the space below the Cath Lab is going to end up looking like (as we will have to access above those ceilings for electrical raceways and anchoring of the new imaging system).
6. Confirm if this is a Class 2 or Class 3 Cath Lab?
Please confirm finishes that need replacement if imaging equipment scope doesn’t require it.
| 1. | Flooring |
| a. | Please confirm if new flooring is wanted in all imaging suite rooms (Scan, Control, and Equipment). Sheet vinyl or LVT or other? |
| 2. | Ceiling |
| a. | Replace ceiling grid and/or tiles or keep existing? |
| b. | Replace HVAC diffusers/grilles or keep existing? |
| c. | Replace existing lights with new LED or keep existing? |
| 3. | Paint |
| a. | All rooms will get 2 coats of latex paint. Please confirm this meets site requirement. If not, please specify type of required paint. |
| 4. | Millwork | |
| a. | Replace all? If not please specify specific millwork in room(s) (Upper/lower cabinets, countertops, linen cabinets, etc.) that need replacing. Countertops plastic laminate or solid surface? | 1. Welded sheet vinyl flooring |
2. Yes
3. This cannot be provided at this time.
4. This cannot be provided at this time.
5. This cannot be provided at this time.
6. Class 2
1a. Lab, Floor Finish: Welded Seam Sheet Flooring (WSF), Base: Welded Seam Sheet Flooring (WSF) Control Room Floor Finish: Solid Vinyl Floor Tile (Luxury Vinyl Tile) (SVT) / Access Flooring (AF) Base: Resilient Base (RB) 2a. Replace according to the TIL.
2b. Replace 2c. 1.) Thirteen (13) Special Down Lights, Dimmable 2.) Eight (8) of 2’ x 2’ Fluorescent Light Fixture, Acrylic, Prismatic Lens with F32T8 lamps, 3500’K, CRI=70 (minimum) 3.) Provide Ballasts per Fixture for Desired Switching Configuration 4.) Lighting Level: 30/10 3a. Lab: Gypsum Wall Board System (GWB) Special Coating (SC) High-build glazed special coating that provides a hard washable surface finish.
2 coats meets the requirements.
4a. Replace all Millwork. The counters, according to the TIL, are to be made of solid surface materials which resist chipping and staining.
24 16 VISN 16 598 LITTLE ROCK, AR 598B30001 598B30015 • Can the VA provide specifications for flooring, e.g., epoxy or welded sheet vinyl flooring throughout the Rubric Equipment Suite?
• Does the station want to include removal of wall between procedure room and cath storage area that is part of the Rubric Equipment Suite.
• Can the VA provide a scalable architectural floor plan of the entire Cath Lab Rubric Equipment Suite?
• Can the VA provide the capacity, T&B report, and drawings of the HVAC system serving the Rubric Equipment Suite?
• Can the VA provide an architectural plan and reflected ceiling plan of what the space below the Cath Lab Rubric Equipment Suite (as we will have to access above those ceilings for electrical raceways and anchoring of the new imaging system)?
• Can the VA confirm if this is a Class 2 or Class 3 Cath Lab?
• Welded sheet vinyl flooring
• Yes
• Yes
• Yes
• Yes
• Class 2
| 25 | 16 | VISN 16 | 586 JACKSON, MS | 586B30015 | 586B30018 | Can the VA please clarify the room layout, as the site planning drawings identify the room space as “ LINAC” for a linear accelerator, which does not match with the room drawings/information that we have on file? | This is for a CATH Lab | |
| 28 | 16 | VISN 16 | 580 HOUSTON, TX | 580B30021 | 580B30031 | • Would the VA accept a fixed 17x17” detector instead of a wireless 17x17” detector in the table though a wireless 14x17” detector would still be provided as an additional detector? |
• Is the specification for “Minimum tube height from the floor when used with wall stand [in]” referring to the center beam of the X-ray tube?
• Would the VA still want Linear Tomography included, as it is not currently available in the DigitalDiagnost system in rooms 304 and 314 and would be a new feature? • A fixed 17x17 detector is required with an additional 2 wireless detectors.
• Minimum tube height from the floor is refering to the xray tube.
• Linear tomography has been put under added value.
31 16 VISN 16 586 JACKSON, MS 586B30015 586B30018 • Can the VA provide information for the current HVAC system serving the Rubric Equipment Suite including system capacities, VAV specifications, procedure room T&B report and mechanical drawings of systems serving the area?
• Can the VA cConfirm if this is a Class 2 procedure room?
| Offeror responsible for verifying existing conditions after award where additional drawings may be available | |||||
| 43 | 16 | VISN 16 | 586 JACKSON, MS | 586B30015 | Line 50, 52. Please clarify the system requested; Line 50 states Single plane and Line 52 refers to a Bi Plane motion-Lateral gantry park capability |
Line 54 Please clarify if rotational angiography/refers to 3D software is required
Line 67 Please clarify if Cradle motion on table is required or if a standard non tilting table is preferred.
Site Prep - Please clarify if RTLS (Centrak) device reinstalling will need to be included on the statement of work.
Site Prep - Please clarify if a hard ceiling is required in the control room.
Site Prep - Please clarify if visual fire alarms are required in the rooms.
Site Prep - Please clarify if a solution to the mobile AC unit will need to be included in the statement of work.
Site Prep - Please clarify if the machine mechanical room will remain in the current location or will it need to be relocated to the control room to open more space in the operating room. Tech specs updated RTLS (Centrak) device reinstalling will need to be included on the statement of work.
Hard ceiling is required in the control room.
Visual fire alarms - match existing.
Mobile AC unit - additional information needed. will have to address post award
Machine mechanical room will remain in the current location however, this is dependent on each offeror's solution due to differences in space requirements.
| 44 | 16 | VISN 16 | 598 LITTLE ROCK, AR | 598B30001 | The benchmark sets a requirement for a single-plane ceiling mounted cath lab, however, lines 27-29 refer to options for a Bi-Plane system. Please qualify the requirement. | Correct. The data in lines 27-29 should be ignored. | |
| 45 | 16 | VISN 16 | 598 LITTLE ROCK, AR | 598B30001 | 1. | Please clarify if an epoxy of welded sheet vinyl flooring throughout the suite should be provided. |
2. Please clarify if demoing the storage room wall and relocating the sink to enlarge the Procedure room should be provided.
3. Please provide the scalable architectural floor plan of the entire Cath Lab suite.
4. Please provide…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .