SCBI_Renew_Vet_Hospital_RFIs_ pg 1_5.pdf
PDF 321 KB Posted
- Attached to
- 33330225RF0010019 Renew Veterinary Hospital at Smithsonian Conservation Biology Institute (SCBI)
- Solicitation number
- 33330225RF0010019
- Issued by
-
Smithsonian Institution
About this file
This document is a Request for Information (RFI) for the Smithsonian Conservation Biology Institute (SCBI) Renew Veterinary Hospital project. The RFI contains 85 questions and responses covering various aspects of the project, including technical specifications, construction requirements, equipment details, and administrative clarifications. Key details include a project duration of 730 days, with a construction award anticipated by September 30, 2025, and a proposal due date of May 28, 2025, at 3:00 PM EST.
Significant RFI topics include crane specifications for Rooms C108 and D107, clarification on utility services, testing and commissioning responsibilities, wage scales, temporary facilities, equipment installation, and various technical and logistical questions about the renovation project. The RFI addresses topics such as Davis-Bacon wage rates, project phasing, equipment procurement, and specific technical requirements for electrical, mechanical, and architectural elements of the veterinary hospital renovation.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Confidential
RFI #
Drawing/Spec
Category Question Column1 Response Date In
1 Solicitation
Please provide the wage scale. Refer to current Davis Bacon minimum required wage rates posted to Sam.gov for this project on
4/23/25.
4/15/2025
2 Spec 01 Please provide the liquidated damages. Liquidated damages will not be a part of this contract.
4/21/2025
3a Spec 41-2213 /
Drawing A-113
Spec Section 41 2213 GANTRY CRANES says the Section
Includes “Ceiling-mounted bridge cranes and ceiling-mounted monorail cranes” but under Part 2 Products lists it as a GANTRY
CRANE (which comes with a free-standing portable floor-frame).
The Model CMP (2000 LB Capacity) by Spanco that you list is a
“Ceiling-Mounted Workstation Bridge Cranes” that uses two runway beams. Please confirm that the Ceiling-Mounted Bridge
Crane is what we should provide at Room C108 Pathology Lab as shown on dwg A113 Ceiling Plan? Assuming the Crane for
Room C108 Pathology Lab should be a Ceiling-Mounted Bridge
Crane as described above, we need to know the following information:
(a) should the Bridge crane run the 18’ length of the W12x19 beams and function as a bridge crane?
(b) Are all 3 functions required: Travel, Trolley, and Hoisting?
(c) What functions need to be manual and what functions should be electric?
(d) Should all movements be variable speed?
(e) Should this crane be used for a clean application such as food grade crane to avoid contaminants?
(f) Should we provide a Pendant control and/or remote control?
(g) What are the Power requirements? 460VAC 3-Phase +
Ground, or something else?
Pending 4/22/2025
3b Spec 41-2213 /
Drawing S-104
It appears there is also a crane to be provided in Room D107
Central Stall per Note 16 on Struct dwg S-104-MP which says
“NEW LARGE ANIMAL HOIST SYSTEM TO BE SUSPENDED
FROM EXISTING LIFT FRAMING. HOIST AND ATTACHMENT
BY PROVIDER. MAXIMUM POINT LOAD ON EXISTING BEAM
= 2000LB”. Assuming that a second hoist system is required for
Room D107, we need to know the following information:
(1) Should the crane run on only one of the two beams shown, like a monorail crane?
(2) What if anything goes on the second beam?
(3) Shall this crane have variable speed for hoist and trolley?
(4) Should trolley be manual or electric?
(5) Should we provide a Pendant control and/or remote control?
(6) What are the Power requirements? 460VAC 3-Phase +
Ground, or something else?
Pending 4/22/2025
4 SI Policy
Executive Order (EO) 14603 indicates that all federal projects valued at $35 million and above will require a project labor agreement (PLA) unless a federal contracting agency expressly grants an exception. As the expected project value is under this limit, please confirm a project labor agreement will not be required on this project.
Confirmed 4/24/2025
5 Solicitation
Please confirm the due date of the proposal. Page 3 of the RFP notes a due date of 5/28/25 at 3:00pm, while page 142 of the
RFP notes a due date of 5/20/25 at 3:00pm.
28MAY2025 @ 3pm 4/24/2025
6 Specs
Please clarify if CAD files, or the project model can be shared for use in the RFP submission.
Confirmed - CAD and 3D BIM files (Revit format) will be provided via sam.gov 4/24/2025
7 Spec 01-9113.1.1A
Referencing the solicitation, the FUNDING INCREMENT portion lists “Testing and Commissioning” as a cost line item (Page 8).
Please define this line item as an independent commissioning consultant will be held by Smithsonian as outlined in specification section 01 9113, 1.1 A
The cost line item "Testing and Commissioning" as listed in the FUNDING INCREMENT document on page 8 of the solicitation is meant for Testing activities by the Contractor. Confirmed that SI will hire the same independent commissioning agent that has been involved throughout design to perform full commissioning services throughout the duration of construction and turnover.
4/24/2025
8 Solicitation Please confirm when RFIs are due. Page 3 says no later than
4/29/25 at 3pm while page 142 says 4/25/25 at 3pm.
29APR2025 @ 3pm 4/24/2025
9 Spec 01
The RFP says the project schedule is 730 days. Please provide any required intermediate milestones and advise if the phased occupancy has any required dates of completion.
Phase 1 must be fully completed before Phase 2 can start.
4/24/2025
10 Spec 01-3200 Please confirm a cost loaded schedule is required per 1.3.B of specification section 013200.
Confirmed 4/24/2025
11 Drawing
Confirm that WB-3 is the intended finish for C-103 room. This is inconsistent with the typical floor and base finish patterns provided.
The wall base for C-103 is WB-5 as it needs to match the C-132 Corridor.
4/24/2025
12 Spec 01 Please confirm the Contractor can reserve the right to finish early.
Confirmed 4/24/2025
13 Solicitation
Referencing the solicitation, Section H, 52.236-14 Availability and Use of Utility Services please confirm utility consumption on the project will be by The Government.
Utility costs will be borne by the government. 4/24/2025
14 Spec 01 Please confirm if there is a designated location for Contractor field office or any restrictions on that location.
Confirmed designated location has been determined. See attachment.
4/24/2025
333302-25RF-0010019 SCBI Renew Vet Hospital B&N RFIs
REQUEST FOR INFORMATION
2070108 Renew SCBI Vet Hospital SCBI, RFIs Page 1
Drawing/Spec
Category Question Column1 Response Date In
333302-25RF-0010019 SCBI Renew Vet Hospital B&N RFIs
REQUEST FOR INFORMATION
15 Spec 01
Please advise on the location of onsite contractor parking and lay down areas.
There will be 2 designated parking areas within the
SCBI campus in walking proximity of project site.
Lay down areas have been determined. See attachment.
4/24/2025
16 Spec 01
Please verify taxes are to be included in the bid amount. The Smithsonian Institution is a 501(c)(3) non-profit organization. This means it is recognized by the
Internal Revenue Service as a tax-exempt educational organization. The prime contractor should make every effort to procure material for the project using the tax-exempt status.
4/24/2025
17 Spec 01-3233.1.3.D
Please verify the “Data Capture (Laser Scan) requirement per specification section 013233.1.3.D is applicable to this project and costs should be carried for the services. If required, please clarify this requirement is for building/in-wall/ceiling installations and does not include site work. Please clarify the scope and timing of scans.
Pending 4/24/2025
18 Spec 01-5000
Building on temporary utilities noted in Specification Section 01
5000, please verify usage fees of temporary utilities including gas, water, electricity, discharge are NOT to be included in the bid, and are by Smithsonian.
Refer to RFI response # 13. 4/24/2025
Drawings (listed in
RFI) / Spec 03-
2100.1.5.C
In several locations, including 032100, 1.5, C, it references the owner providing testing and inspection services. Please verify all geotechnical and testing and inspection services are by
Smithsonian. All testing and verification services required within the contract documents are by Contractor. Per sheet S001, Section VI.: TESTING AND INSPECTION, we are to include testing on:
(1) FOUNDATION & EARTHWORK: soil bearing capacities and compaction densities
(2) REINFORCING: yield and ultimate strengths for reinforcing
(3) CONCRETE: slump tests and strength tests for Concrete
(4) STRUCTURAL STEEL: yield and ultimate strengths for structural steel
(5) MASONRY: masonry prism tests
If there are additional testing services required, please list them.
Pending 4/24/2025
20 Spec 01-3100
Specification section 013100 lists the permits to be provided by the contractor. Please verify no additional permits will be required by the contractor.
Confirmed no additional permits required. 4/24/2025
21 Spec 31-2000 / Report
Specification 312000 – Earth Moving references a Geotechnical
Report in several locations. This report does not appear to be present in the bid documents. Please provide.
After reviewing the spec section listed, the A/E could not find a reference to a geotechnical report. A geotechnical report is not required do to the interior nature of the project. Please confirm the spec section number so that it can be removed and reissued.
4/24/2025
22 Spec 01
The Davis Bacon wage rates provided as part of the solicitation do not include power equipment operators (excavator, bulldozer, skid steer, loader, roller, paver, backhoe, sweeper, etc.) or truck drivers (off road truck, on road truck, water truck, tri-axel truck, low boy, etc.). Please provide operator rates for use on the proposal.
Updated document to be posted. 4/24/2025
23 Spec 01 Please advise if there are scheduled length activity requirements for the CPM schedule.
Please do not exceed 30 days per activity. 4/24/2025
24 Spec 01
Please confirm if there are any special liability insurance considerations/limits that should be taken into account by contractors as this is a 24/7 emergency medical facility.
See Clause 52.228-S0015R Contractor's Liability
Insurance (Jun 2000) 4/24/2025
25 Drawing A-607-SH Please confirm the differences between SRC and SRC-1 on the finish schedule (Sheet A607-SH).
SRC = SRC-1 and SLC = SLC-1 4/24/2025
Drawings S-002 & E-
The notes on drawings S-002 and E-100 note a landscaping set.
Please provide the landscaping set as it is not provided in the bid package.
Pending 4/24/2025
27 Solicitation
Please advise if there is an expected construction start date.
The RFP notes a duration of 730 days from the notice to proceed, but does not note when this is expected to be.
Construction award is anticipated by September 30, 2025 with NTP to follow once insurance and bonds are submitted by the awarded Contractor.
4/24/2025
28 Spec
Please confirm if there is a window/glass scope for this project.
A specifications section was provided by it is not found on the documents.
The glazing spec covers glass for doors and storefronts as well as window films.
• Door C117B is a door with a half lite
• Door B111 is a door with a full lite and two sidelites
(storefront system spec references the glazing spec).
• The new exterior Door 100 from building 303 has a half lite.
• We also have bird strike film being applied. See notes A67 & A68.
4/24/2025
2070108 Renew SCBI Vet Hospital SCBI, RFIs Page 2
Drawing/Spec
Category Question Column1 Response Date In
333302-25RF-0010019 SCBI Renew Vet Hospital B&N RFIs
REQUEST FOR INFORMATION
29 Spec 01
Please confirm if there are any decibel level considerations to be taken for construction work as this facility is to remain open.
Pending 4/24/2025
30 Drawings/Specs Please confirm if there is any existing signage to be demo’d and replaced.
Pending 4/24/2025
31 Spec 01
As this is a 24/7 medical facility, please advise of any processes to halt/suspend construction work should there be an emergency situation/operation. Please also advise on the process of claims for any lost time resulting from such a case.
Pending 4/24/2025
32 Spec 01
Please advise on if there are any special deliveries to the facility that would be made daily that should be taken into account during construction activities.
SI COTR will coordinate all SI deliveries with GC to minimize impact to construction activities.
4/24/2025
33 Spec 01
Please advise on if there will be any construction access through any of the phase 1 areas once phase 2&3 is initiated.
No - unless demonstrably required, which would need sufficient notice to and coordination with SI vet staff.
4/24/2025
34 Report
Please provide a hazmat report. One has not been found within the bid package.
A/E team provided final ACM Survey Sept 2024.
ACM locations are noted on the demo plans with a hatch. See AD102DP.
4/24/2025
35 Spec 41-2213.6.2.2.A
Specification Section 41 2213.6 Section 2.2A states that the basis of design of the gantry cranes (large animal hoist) is to be
“Model CMP by Spano.” Drawing QL601 lists the large animal hoists (E15 and E16) to be Dayton 2GXH3 models. Please clarify which model is to be used.
Pending 4/24/2025
36 Solicitation
Following issuance of the bid drawings and the recent site walk, we are requesting an extension on bid RFI's to allow bidders and the general subcontractor community additional time to digest the drawings and provide and accurate proposal. Please clarify if an extension can be granted.
RFIs were due no later than April 29, 2025 at 3pm
EST and will be responded to by May 9th. While
RFIs will be accepted after April 29, 2025, there is no gurantee responses will be available prior to the proposal due date of May 28, 2025.
4/24/2025
Drawings A-407-EP and C-111-A
The door sizes listed on Sheet A 606 SH do not match the door sizes listed on Sheet A 407 EP. For example, Door C111A is shown on the plan with the width being 4’-6”, whereas it is shown as 4’-10” 1/2 on the schedule. This applies to other doors. Please advise on which measurements to follow.
Pending 4/24/2025
38 Drawing QL-601
Please confirm that the furnishing of all equipment listed as
“PURCHASED BY OWNER” on the QL601 equipment schedule is not the responsibility if the Contractor and if Contractor is responsible to install?
The "Furnishings / Installation Responsibilities" column on the Equipment Schedule found on sheet
QL-601-SH clearly identifies which entity is responsible to purchase the items and which entity is responsible to install the items.
4/24/2025
39 Drawing QL-601
The Incubator listed as E06 on the QL601 schedule says that the manufacturer and model is “TO MATCH EXISTING,” but no model or manufacturer is provided. Please specify what type of incubator is to be provided.
Pending 4/24/2025
40 Drawing QL-601
Please advise if a third arm with a monitor is to be provided in addition to the 2 heads and camera arms for the surgical light listed as E21 on the schedule on QL601.
Pending 4/24/2025
41 Spec 01
Please confirm the Project Superintendent may serve as the designated Quality Control Manager and Site Safety Manager.
This is acceptable as long as the superintendent has the proper background for the supplemental positions and receives the support to accomplish the required tasks.
4/25/2025
42 Solicitation
Please confirm the proposal’s submission deadline. Section A of solicitation references May 20, 2025, while other sections reference May 28, 2025 at 3:00PM EST.
See response to RFI No. 5 above. 4/25/2025
43 Solicitation
Refer to page solicitation section L.29,2.C. In an effort to maintain competition and best value for the Government, please confirm whether the Prime Contractor may list multiple subcontractors for a single trade in the “Plan of Accomplishment” section.
The prime may list no more than three (3) proposed subcontractors for each trade.
4/25/2025
44 Solicitation Wage Scale Document is missing from attachments. Please provide.
See response to RFI No. 1 above. 4/25/2025
45 Spec 01 Please confirm that a bid bond is not needed. Bid Bond is not required 4/29/2025
46 Solicitation Is this a Buy American project? Correct 4/29/2025
47 Solicitation Could we get a 2 week extension on RFIs to be submitted? See response to RFI No. 36 above. 4/29/2025
48 FAR Clause 52.229-3 Due to the current situation with Tariffs will this FAR clause be included in the contract for this project?
Yes 4/29/2025
Spec 01, Paragraph
36, Sanitary Facilities
This paragraph states both that the GC will need to provide temporary sanitary facilities and that a public restroom will be available for use of the construction personnel. Which of these is correct and will the awarded GC have to provide temporary restroom facilities for this project?
The public restroom referenced will be demo'd in phase 2, therefore GC will need to provide temporary restroom facilities for the duration of this project.
4/29/2025
Spec 01, Temporary
Field Office
Will Smithsonian provide office space for the temporary field office, or will the awarded GC need to provide a temporary trailer for the field office?
GC will need to provide a temporary trailer for field office.
4/29/2025
Drawing C-101-XP –
Storage Sheds
This drawing shows 2 storage sheds that are to be removed under a separate contract. Are these sheds on concrete slabs that need to be removed under this contract, or will the slabs be removed under a separate contract?
The 2 storage sheds references are not on individual slabs or curbs that need to be demo' d.
Currently sitting on either existing asphalt or concrete pavement which will be demo' d to make way for new exterior yard slab.
4/29/2025
Drawing S-504-T, Detail 6E – Typical
Repair in Brick
Masonry
Where is this detail required as it is not indicated in the Project
Documents? If this is required, can we be provided with a quantity of these repairs to include in our proposal?
Pending 4/29/2025
2070108 Renew SCBI Vet Hospital SCBI, RFIs Page 3
Drawing/Spec
Category Question Column1 Response Date In
333302-25RF-0010019 SCBI Renew Vet Hospital B&N RFIs
REQUEST FOR INFORMATION
Drawing A-112-CP, Keynote A55
This keynote states to replace damaged ACT as needed. What percentage of the existing acoustical ceiling tiles should be included in our proposal for replacement?
Pending 4/29/2025
54 Drawing A-201-EL
This drawing has a general note that states to “Patch and repair existing stucco as needed” but has no indication of how much repair is required. Please provide the quantity or percentage of the existing stucco that should be repaired in our proposal?
15%, outside of areas effected by construction. 4/29/2025
Drawing A-531-DT, Detail 5J, Recessed
TV
Where is this detail to be used. It is not called out anywhere on the documents?
This in one location as noted in Detail 5J and 4E/A
405 EP.
4/29/2025
Drawing A-541-DT, Detail 4A, Typical IV
Track
Where are these to be located and how many are required as they are not identified on the Drawings?
There are two IV tracks as shown on the reflected ceiling plans on A-112CP and A-113CP in the
Surgical Room B107 and Treatment Room B105.
4/29/2025
Drawing A-602-SH, Elevations 4D & 7D, Plexi-glass on wire mesh partitions
On Elevations 4D & 7D/A-602 SH it noted plexi-glass in two locations. Is this plexi-glass to be installed only where shown or on those two wire mesh partitions completely?
Only on those panels noted. 4/29/2025
Drawing A-607-SH, APC-1 / Spec 095113, Paragraph 2.3
Per the Interior Finishes Abbreviation Key on Drawing A-607 SH
APC-1 is to be an Armstrong Product as the Basis of Design.
Specification Section 095113 Paragraph 2.3 does not list any
Armstrong products for APC-1. Which Armstrong product is the
Basis of Design for APC-1?
Pending 4/29/2025
Drawing MD-203-RD /
Spec 13
There is a note on the Roof Top demolition Plan that states “RX
Cold Storage Compressor by Div. 13”. There are no Division 13 specifications in the Project Documents. Please provide guidance on the removal of this item.
Pending 4/29/2025
60 Drawing MD-202-RD
For the above referenced compressor there is no indication on
Drawing MD-202 Phase 2 Mechanical Piping Plan for the removal of any piping associated with this compressor. Please provide guidance on where any piping from this compressor is located and it required removal?
Pending 4/29/2025
Drawing MD-302-FP, HVAV Piping
Demolition Phase 3
This Drawing indicates the remove of piping and an existing
AHU-3 in the Phase 1 area to be removed but is not indicated on the Phase 1 mechanical demolition plan. Is this work part of
Phase 1 or to be performed in Phase 3?
AHU-3 is a temporary unit provided during Phase 1
(refer to M-104FP) that shall be demolished or salvaged during Phase 3 demo. Coordinate salvage of AHU with COTR. Refer to response for RFI 63.
4/29/2025
Drawing M-601-SH, Existing AHU Units
The existing Roof demolition plans do not show the existing
AHU’s being removed but the new HVAC equipment Schedule on M-601 SH indicates all new AHU’s. Please clarify if the existing AHU’s are to be removed and replaced with new units?
Ensure that the demo scope per phase is reviewed.
AHU-1, AHU-2, AHU-3, AHU-4, HP-1, and the energy recovery ventilator are demolished during
Phase 2 (MD-201FP/MD-203RO).
4/29/2025
Drawings C-107-SP and C-107-SP, Exterior 8’ x 14” Cooler
Drawing C-107 SP indicates a new 8’ x 14” Exterior Cooler in the same location as AHU-3 indicated on Drawing M-104 FP. Is the new cooler or AHU-3 to be installed in this location? If it is AHU-
3 where is the new cooler to be installed?
As AHU-3 will be demolished or salvaged during
Phase 3 demo, there will not be a conflict. Refer to note A62 on drawing A-103FP. Coordinate salvage of AHU with COTR. Refer to response for RFI 61.
4/29/2025
Drawing X-XXX-XX, Walk In Cooler E04 &
E05
These items are to be purchased by the Smithsonian and installed by the contractor. To avoid any warranty issues with who these are purchased from, we can get an installation quote from the supplier.
Pending 4/29/2025
Drawing C-102-XP, Propane Tank
We are to remove this noted Propane Tank from Drawing C-102
XP. Who is responsible for the removal of any propane that is in this propane tank? If the contractor is responsible for the removal of the propane, how much exists in this tank?
Pending 4/29/2025
Drawings X-XXX-XX, Concrete Paving under new exterior canopy
The demolition of the existing concrete at the new canopy location is shown to be performed under Phase 2, but the new concrete work is shown to be performed under Phase 1. Is this work to be performed under Phase 1 or Phase 2 of the site work?
Phase 1 must include the Dstalls, the temporary surgical suite and the building 303 swing space.
Phase 2 includes all remaining work including that of the new canopy. Sequence of work completed in phase 2 is at the discretion of the contractor.
4/29/2025
Specs 270500 and
271500, Telecommunications cabling
Regarding specification 270500 and 271500
Telecommunications cabling solution requirements, please confirm a Panduit Cat6A cabling solution is an approved equal of Commscope/Belden as has been used on other Smithsonian projects?
Pending 4/29/2025
Spec 271500, Quality
Assurance
Regarding specification 271500 Quality Assurance, please confirm industry experience of 5+ years in lieu of BICSI Level 2 certification is acceptable for Installation Supervision?
Pending 4/29/2025
Spec 01, page 25, 21.5.1
Page 25 states that “The CQC Representative shall be a graduate engineer or architect with a minimum of seven (7) years of construction experience on projects similar to this one, including three (3) years' experience in Quality Control.” Would the government consider revising the requirements for the CQC
Representative to remove the requirement for a degree?
A graduate engineer or architect is not required as a
CQC Representative.
4/29/2025
2070108 Renew SCBI Vet Hospital SCBI, RFIs Page 4
Drawing/Spec
Category Question Column1 Response Date In
333302-25RF-0010019 SCBI Renew Vet Hospital B&N RFIs
REQUEST FOR INFORMATION
70 Spec 01
RFP, Page 146, Resumes, states that “NOTE: the CQC
Representative and the Safety Coordinator may be the same individual, if that individual meets the requirements for both roles as outlined in Division 01000.” Specs Vol 1, Page 134, states that 1.8.B.1, “Project quality control manager may also serve as the Project superintendent.” Specs Vol. 1, Page 23-24, 21.3 states that “The CQC Representative shall be appointed by a letter addressed to him/her and signed by an officer of the firm and shall not be the same individual as, or be subordinate to, the job superintendent or project manager.” Please clarify whether the QCM and SSHO can be a dual hatted role or if the
QCM and Superintendent can be a dual hatted role.
A qualified individual may perform all 3 roles. 4/29/2025
71 Solicitation
RFP, Page 147, states that “Projects should demonstrate experience working in an operating rural campus.” Please clarify what the definition of “rural campus” is in this context.
Rural campus references a countryside setting near small town with wilderness areas. Experience working in any operating campus is also acceptable.
4/29/2025
72 Solicitation
RFP, Page 147, states to “Provide three projects of similar size and complexity where the Offeror was the Prime Contractor.”
Can offerors submit past projects that were performed under a
Joint Venture?
Joint venture projects can be used as experience when accompanied by a thorough explanation of the contractor's role in the project.
4/29/2025
73 Solicitation
RFP, page 144. L.29.1.B states to “Provide a Coordination
Management Plan addressing…work during peak and off-peak visitor seasons.” Due to the nature of the SCBI campus, could you clarify when the peak and off-peak visitor seasons are for the SCBI campus?
Delete this requirement. 4/29/2025
74 Spec 01, Staging Will the Smithsonian provide a warehouse for storing the long lead equipment, i.e. air handling units, transformers?
No 4/29/2025
75 Solicitation Please provide the Davis Bacon Wage Determination
VA2050168.
See response to RFI No. 1 above. 4/30/2025
76 Drawing X-XXX-XX
LIN1 Marmoleum Sheet T3232 Horse Roan 6’7”…that is contradictory. The number T3232 means Tile , though the plan clearly says sheet goods which requires heat welding. Please advise.
Horse Roan is also available as a sheet format with the product number #3232 4/30/2025
77 Drawing X-XXX-XX The only hardware that appears to be specified are Medeco cylinders. Is this truly an open Hardware spec?
Pending 4/30/2025
78 Spec 01 Are there any Owner-required Subcontractors? No 4/30/2025
79 Solicitation
How strict in the Owner going to be when it comes to the bid form are they going to require that our pricing be broken down into Material, Labor and Equipment Subs are not going to provide that unless we tell them NOW that their pricing won’t be accepted unless it is broken down accordingly
Contractor to provide cost per division. Material and labor breakdowns are not required.
4/30/2025
80 Drawing A-402-EP
Please confirm that the new exterior yard cages (Yard 1A, 1B &
2) including the secondary enclosure, are BY OTHERS, not part of this contract, as indicated on sheet A402EP Pending 4/30/2025
81 Drawing C-107-SP
Please confirm concrete pavement depths on C107SP.
Pending 4/30/2025
82 Drawing C-107-SP
C107, please confirm concrete pavement depth on the south and if it is all concrete pavement or if there are sidewalks. Pending 4/30/2025
Drawings B-111 &
C101-A
Please provide the door hardware sets for doors B111 and
C101A Pending 4/30/2025
Drawings D103A &
D106A
In specification section 087100.3.7, Doors D103A and D106A are both called out to receive door hardware set, HW8.
However, on drawing sheet A-606-SH, Door D103A is listed under hardware set 1.0 and door D106A is listed under set 2.0., neither of which include a mag lock. Please advise on if a mag lock is required at these door locations.
Yes as mentioned in the door hardware spec, these secure sliding doors shall have a mag lock in addition to operating hardware indicated on the drawings.
4/30/2025
85 Drawing A-602-SH
Please provide hardware sets for the cage doors on drawing sheet A-602-SH.
All wire mesh particians are delegated design including doors, remote actuators, and additional hardware.
4/30/2025
2070108 Renew SCBI Vet Hospital SCBI, RFIs Page 5
File details come from the government source that posted it. Updated .