Construct Integrated BLC Concept Report.pdf
PDF 113 MB Posted
- Solicitation number
- 33330224RT0010048
- Issued by
-
Smithsonian Institution
About this file
This solicitation is for construction management at risk services for the Bezos Learning Center project at the Smithsonian National Air and Space Museum in Washington, DC. The selected contractor will provide pre-construction and construction phase services through a guaranteed maximum price agreement from September 2024 to May 2027, with an estimated construction cost between $72-76 million. The scope of work includes site work, foundations, superstructure, MEP systems, elevators, roofing, facade, food service and theater equipment. Firms must meet prequalification criteria and the technical proposal will be evaluated based on criteria in the RFP. The submission deadline is March 4, 2024, with contract award anticipated in August 2024 and construction to begin in early 2025 for completion by late 2027. The solicitation requires a minimum 40% small business subcontracting goal with specific allocation targets to various socioeconomic categories. Davis Bacon wage rates apply to the project managed by the Smithsonian Institution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .