This document is Amendment 4 to Solicitation 33330224RT0010048 for the construction of the Bezos Learning Center (BLC) at the Smithsonian National Air and Space Museum (NASM) in Washington, DC.
The amendment provides the following key details:
- Attachments with responses to Step 2 Request for Information (RFI) questions 1-18.
- Notification of a site visit scheduled for May 23, 2024 at 11:00 am.
- A link to access the Schematic Design Revit model files.
- Revised requirements for identifying subcontractors in the technical proposal.
- Confirmation that a Project Labor Agreement is not required for this project.
- Revised due date of June 7, 2024 at 3:00 PM EST for submission of the Technical Proposal, Price Proposal, and Subcontracting Plan.
The overall solicitation is for a Construction Management at Risk (CMc) contract with a period of performance of approximately 36 months, including pre-construction and construction services. The estimated construction cost range is $72-$76 million. The NAICS code is 236220 with a size standard of $45 million in average annual receipts.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330224RT0010048
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
OCON
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
SMITHSONIAN INSTITUTION
220610105/14/20240004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/22/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The Solicitation Number cited above, to Construct Bezos Learning Center at the National
Air and Space Museum (NASM), located in Washington, DC, is hereby amended as follows:
A.1. Attached hereto and made part of this Amendment Four are the SI Responses to Step Two
RFI's for Questions Number 1 to 18.
A.2. A Site Visit has been scheduled for May 23, 2024, at 11:00 am. Starting point at the southwest corner of Jefferson Drive and 4th street. Please wear PPE to include vest, helmet, gloves, glasses, boots, and long pants. Extra PPE will not be offered on site.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Thomas Dempsey
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
33330224RT0010048/0004
PAGE
NAME OF OFFEROR OR CONTRACTOR
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
A.3. Link to Architectural model as part of the Schematic Design to download is available below:
https://www.dropbox.com/scl/fi/px7d0pqf6f15or8r otu40/2206101-A_BLC-LD-
R22_SD.rvt?rlkey=zft6pv8bkt5i8rmhsjftwo7az&dl=0
A.4. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.
B. Submission of Technical Proposal, Price Proposal and Subcontracting Plan by Friday, June 7, 2024, at 3:00 PM EST.
Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.
END OF AMENDMENT FOUR
Period of Performance: 01/22/2024 to 12/30/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
OF
https://www.dropbox.com/scl/fi/px7d0pqf6f15or8rotu40/2206101-A_BLC-LD-R22_SD.rvt?rlkey=zft6pv8bkt5i8rmhsjftwo7az&dl=0 https://www.dropbox.com/scl/fi/px7d0pqf6f15or8rotu40/2206101-A_BLC-LD-R22_SD.rvt?rlkey=zft6pv8bkt5i8rmhsjftwo7az&dl=0 https://www.dropbox.com/scl/fi/px7d0pqf6f15or8rotu40/2206101-A_BLC-LD-R22_SD.rvt?rlkey=zft6pv8bkt5i8rmhsjftwo7az&dl=0
Office of Planning Design & Construction
PROJECT:NASM: Construct Bezos Learning Center (SF Project # 2206101) STEP 2
LAST UPDATED: 5/14/2024
1 Executive Order (EO) 14603 indicates that all federal projects valued at $35 million and above will require a project labor agreement (PLA) unless a federal contracting agency expressly grants an exception.
During Step 1, SI indicated via RFI response that until further notice, a PLA is not required for the BLC project.
Please re-confirm if a project labor agreement will be required on this project.
Until further notice, PLA is not required.
2 The Division 1 specifications document includes a Table of Contents that does not appear to be applicable to this project. Please provide an updated Table of Contents to provide a better understanding of scopes that are applicable to this project but are not yet included in the drawings or narratives.
The design is currently in 35% design development, thus not all tables are available yet. A preliminary draft of the 35%DD submission is to be provided with the latest available information as of that time.
3 Please advise if a site visit can be scheduled for this project.
Thursday, 23MAY2024 at 11am.
Please meet on the southwest corner of Jefferson Drive and 4th street. Please wear PPE to include: vest, helmet, gloves, glasses, boots, and long pants. Extra PPE will not be offered on site.
4 Please advise if the laser scan files can be provided for the existing areas impacted by this project.
The most recently available laser scan information has been superseded by latest construction conditions. The current state of the BLC project site is that it is under active construction from the Revitalization project, thus all existing conditions info remains in a state of flux.
5 Please provide the Revit model files for the Schematic Design Documents for our use in preparing our technical proposal.
A Dropbox link is being provided to access the available files.
The Work Plan section of the technical proposal requires the contractor to identify one Subcontractor for each of the listed elements of work. It is too early in the preconstruction process to commit to a single subcontractor. Please confirm that we may list more than one potential subcontractor and please identify how many subcontractors may be listed per element of work.
Please refer to response to RFI 16.
7 Section 019113 states that the government will employ an independent commissioning consultant. Commissioning is currently listed as an element of work that we are to identify a subcontractor for. Please confirm that Commissioning should be removed from this list or clarify the contractor’s responsibility for hiring a commissioning agent.
SI-OPDC is in the process of soliciting a 3rd party commissioning agent (CxA) contractor. Whole-building commissioning is a project requirement, thus prospective contractors should identify relevant resources on the contractor's team who would be responsible for meeting Cx coordination and related requirements.
Note 13 on S111N refers to 1972 Structural drawings and 1986 Structural drawings for reference for the existing structure. Please provide these drawings.
The referenced drawings are not the latest available design drawings that apply to current conditions on site. The current state of the BLC project site is that it is under active construction from the Revitalization project, thus all existing conditions info remains in a state of flux.
9 Please provide copies of the existing building As-Builts from both 1982 and 1986 for all disciplines for reference (Arch, MEP, Civil, etc.). If available, please provide the documents used for the demolition of the east building.
It is understood that this request refers to 1972-1976 As-built documentation (rather than 1982) for the Main Building and 1986- 1988 As-built information for the demolished Restaurant Addition.
This documentation is not available.
10 Are drawings available that would indicate the depth of the 14' x 15' combined sewer tunnel?
The design is currently in 35% design development, thus not all basis-for-design information is available at this time.
There appears to be an existing cistern at the SE corner of the site per C106UP. Are there drawings that would detail this cistern? Would remedial work be required at the system to bring it up to current code and re-use it for this project?
The existing cistern being referenced has been installed during the ongoing Revitalization project, thus as-built information remains in progress.
A green roof is indicated at level 02. Is a green roof required at the upper roof area?
No, one is not being planned or designed.
A 26'x16' overhead coiling door is indicated at the ramp entrance at column line 14.5 on A011LD. This door shows on the door schedule.
On detail 4/A-030LD, another door is indicated in front of the coiling door as a high-speed fabric door. This door is not indicated in plan or on the door schedule. Is the intent to have two doors at this location?
Yes. The design is currently in 35% design development, and so not all schedules have been developed yet.
Are drawings available from the current NASM project that would depict the curtainwall and stone details in the area adjacent to the BLC that require demolition and modification? Reference sheet AD-100. Stone shop drawings and curtainwall shop drawings in addition to contract drawings are requested.
The current state of the BLC project site is that it is under active construction from the Revitalization project, thus all existing conditions info remains in a state of flux and as-built information remains in progress.
Please confirm that the Exhibit Fabrication Shop will be vacated during construction to allow for the structural modifications. Please also confirm that spaces inside the existing NASM adjacent to the work area will be vacated to permit the new work to be installed.
The Exhibit Fabrication Shop (Suite P29) is vacant and will remain vacant from occupants and their FF&E during the project. Lower Level spaces to the west of the project scope delineation/Loading Dock will be occupied and in service and the project's design development has been anticipating that.
Page 527 of the solicitation indicates that the work plan requires submission of the names of subcontractors to be utilized for elements listed following paragraph d. This requirement is generally applied to complete design-bid-build projects and not typical for early contractor involvement procurements. Given the current status of the design we expect the vendors who will be performing on this project to be decided closer to the final design completion and GMP establishment. Please confirm the listing requirement in section d work plan does not apply to this pursuit.
Replace this portion of paragraph (d) on p. 527: “Provide the name of subcontractors for each element of work listed below or indicate what work will be performed by the prime contractor. You will be expected to use the subcontractor listed for each element of work unless written approval for change is received from the Contracting Officer in accordance with the contract clause entitled SUBCONTRACTORS. Failure to indicate who will perform the work for each item below will result in lower scores during evaluation of the proposal. For each subcontractor listed below, list three references with customer contact, address, email address, and telephone number. If the contact cannot be reached by the Smithsonian Institution during the reference evaluation process, the proposal may be scored lower.” Add this to (d): “During the construction phase, the CMc will compete at least three qualified subcontractors for all work on the project. Provide a list of the major subcontractors for each element of work.”
Please advise if the design model may be made available for coordination of the site utilization plan. We are open to signing a release form if that is requested.
A Dropbox link is being provided to access the files available from the Schematic Submission. The design model includes only architectural information as of the Schematic phase of design.
Our previously submitted RFIs included a request for a site visit of the site and impacted areas of the museum/loading dock. This is important for the development of our technical proposal. Do you know if this will be able to be accommodated?
Please refer to response to RFI 3.