333302-24RF-0010021 Revitalize Historic Core, Early Package 2-26 (EP 2-26)
Solicitation number
333302-24RF-0010021
Issued by

About this file

This document is a Solicitation for the Smithsonian Institution's Revitalize Historic Core, Early Package 2-26 (EP 2-26) project located at 1000 Jefferson Drive, SW, Washington, DC. The Smithsonian Institution is seeking offers for this Firm Fixed Price construction contract, with an estimated cost of more than $10 million. The project involves selective interior demolition, hazardous materials abatement, and preparation of the historic Smithsonian Castle building for limited public occupancy from May to October 2026. Key tasks include removing existing infrastructure and finishes from the 3rd and 4th floors, attic, east wing, towers, basement, and first floor, as well as installing temporary HVAC, fire alarm, and other systems. The contract performance period is 607 calendar days from the Notice to Proceed, which is expected to be issued on August 1, 2024. The solicitation is open to all businesses, with a NAICS code of 236220 and a $45 million size standard. Proposals are due by 3:00 PM on July 9, 2024, and must be submitted through Dropbox. A site visit is scheduled for May 23, 2024, and all questions are due by June 6, 2024.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

SMITHSONIAN INSTITUTION

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Christine Grant 202-633-7290

1x 05/09/2024

33330224RF0010021

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

0 607 calendar days and complete it within ________________ ________________ calendar days after receiving

Specifications

07/09/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The Smithsonian Institution is soliciting for Construction Services for the Smithsonian Institution Revitalize Historic Core, Early Package 2-26 project. The proposed contract listed here is unrestricted all responsible sources are encouraged to submit a proposal.

BACKGROUND

The Smithsonian Institution Building (the Castle) designed by James Renwick Jr. was completed in 1855 to house all of the Smithsonian programs and operations. As each successive Secretary redefined the Smithsonian's mission and managed its growth, the

Castle's interior spaces underwent many modifications. The Castle deserves special attention, not only because of its historic architectural and institutional significance, but also because it is the public's doorway to, and the symbol of, the

Smithsonian Institution.

The Smithsonian Institution Building, constructed of red Seneca stone, was listed by the Secretary of the Interior as a National Historic Landmark in 1965, and listed in the National Register of Historic Places in 1966. It is included within the National

Mall Historic District.

The project site is located on the National Mall, bounded by the Arts and Industries

Building on the East, the Freer Gallery on the West, Independence Avenue and the Continued ...

PAGES

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

OCON

MRC 1200

PO Box 37012 Washington DC 20013-7012

OCON

Thomas Dempsey

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

33330224RF0010021

Quadrangle Building and the Haupt Garden on the

South and Jefferson Drive on the North. The

National Mall, The Smithsonian Institution

Building and the Arts and Industries Building are all listed on the National Register of Historic

Places. An environmental impact statement ("EIS") consistent with the National Environmental Policy

Act ("NEPA") was approved in concept as part of the South Mall Master Plan.

The Smithsonian Institution is seeking offers for the Revitalize Historic Core, Early Package 2-26 project located at 1000 Jefferson Drive, SW, Washington, DC 20560, as described herein and in the Construction Documents.

All requirements the successful Offeror must meet concerning this project are set forth in detail in the Solicitation Documents included with this

Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Firm Fixed Price construction contract.

It shall be the responsibility of the contractor to immediately notify the Smithsonian Institution if the target dates and proposed work described herein adversely affect the Contractors Critical

Path Schedule for the final completion date of this project. Contractors may propose an alternate schedule that illustrates the completion of the project in advance of the completion date.

This Request for Proposal (RFP) is intended to provide all Offerors with sufficient information to enable them to prepare and submit offers for technical and cost review by the Smithsonian

Institution. Drawings and specifications are provided electronically as part of this solicitation. See Section J for complete list of documents, exhibits and other attachments.

This solicitation neither commits the Smithsonian

Institution to pay any proposal preparation costs, nor obligates the Smithsonian Institution to procure or contract for construction, or any other services. It shall not be construed as

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

33330224RF0010021

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

authorization to proceed with or be reimbursed for any of the costs for any of the work specified herein.

The Smithsonian Institution may cancel this RFP without prior notice.

TOUR OF THE SITE: Offerors may attend a tour of site on Thursday May 23, 2024, between the hours of 8:00AM - 2:00PM. Please email Christine Grant at grantCA@si.edu to schedule.

Offerors should decide to visit the site to familiarize themselves with the conditions as specified in the drawings and specifications.

Offerors are encouraged to inspect the site prior to submitting a proposal, as information concerning the site may be useful in preparing offers. Failure to visit the site will not constitute a basis for a claim for change in or differing the site conditions, when visiting the site would have provided the Offeror an opportunity to compare the physical site against the drawings and specifications.

Proposals are to be submitted to DropBox.com by Tuesday, July 9, 2024 by 3:00PM using the link:

https://www.dropbox.com/request/rB0mKv4jdvt7IY9FNqtP Cost and Technical Proposal must be submitted in separate files. If any pricing information is on the technical proposal, you will be disqualified.

QUESTIONS/CLARIFICATIONS:

It is desired that all questions/clarifications be sent in on the attached excel spreadsheet, sequentially numbered for example first questions

1, 2, 3, second set of questions 4, 5, 6, etc. to grantCA@si.edu . It is requested that all questions be sent in by Thursday June 6, 2024, no later than 3PM EST.

Table of Contents

B - Supplies or Services/Prices

C – Description/Specifications

D - Packaging and Marking

E - Inspection and Acceptance

F - Deliveries or Performance

G - Contract Administration Data

H - Special Contract Requirements

I - Contract Clauses

J - List of Documents, Exhibits and Other Attachments

K - Representations, Certifications, and Other Statements of Bidders

L - Instructions, Conditions, and Notices to Bidders

M - Evaluation Factors for Award

B - Supplies or Services/Prices

B.1. The Smithsonian Institution intends to award a firm fixed-price multi-year construction contract to the successful Contractor/Offeror.

B.2. The successful Contractor shall furnish all supervision, labor, materials, and equipment needed for the Revitalize Historic Core, Early Package 2-26 project as set forth in the following documents:

a. Specifications Volumes 1 and 2, Dated January 26, 2024

b. Construction Drawings Dated January 26, 2024

These drawings and specification are collectively referred to herein as the “Construction Documents.” All work shall be performed in strict accordance with the plans and specification as shown or as may be changed by modification issued by the Contracting Officer. No deviations are permitted unless a change notice is issued and approved by the Smithsonian Institution.

B.3. Pricing – The successful contractor/offeror shall identify all costs associated with the Revitalize Historic Core - SIB project, as set forth in the Construction Documents. Offerors are required to provide the Base Cost Proposal Submission as per the Base Cost Proposal Submission Form (Section J Attachment).

B.3.1. Base Cost Proposal Submission - Provide a comprehensive Bid Schedule for the the Revitalize Historic Core, Early Package 2-26 project. The format for the Base Cost Proposal Submission shall be the Construction Specifications Institute (CSI) divisions of work. Break down the Base Cost Proposal Submission into the CSI divisions listed in the attached form.

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 6/107

C – Description/Specifications

The Smithsonian Institution Building (the Castle) designed by James Renwick Jr. was completed in 1855 to house all of the Smithsonian programs and operations. As each successive Secretary redefined the Smithsonian’s mission and managed its growth, the Castle's interior spaces underwent many modifications.

The Castle deserves special attention, not only because of its historic architectural and institutional significance, but also because it is the public's doorway to, and the symbol of, the Smithsonian Institution.

The Smithsonian Institution Building, constructed of red Seneca stone, was listed by the Secretary of the Interior as a National Historic Landmark in 1965, and listed in the National Register of Historic Places in 1966. It is included within the National Mall Historic District.

The project site is located on the National Mall, bounded by the Arts and Industries Building on the East, the Freer Gallery on the West, Independence Avenue and the Quadrangle Building and the Haupt Garden on the South and Jefferson Drive on the North. The National Mall, The Smithsonian Institution Building and the Arts and Industries Building are all listed on the National Register of Historic Places. An environmental impact statement ("EIS") consistent with the National Environmental Policy Act ("NEPA") was approved in concept as part of the South Mall Master Plan.

The Smithsonian Institution is seeking offers for the Revitalize Historic Core, Early Package 2-26 project located at 1000 Jefferson Drive, SW, Washington, DC 20560, as described herein and in the Construction Documents. All requirements the successful Offeror must meet concerning this project are set forth in detail in the Solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Firm Fixed Price construction contract.

It shall be the responsibility of the contractor to immediately notify the Smithsonian Institution if the target dates and proposed work described herein adversely affect the Contractor’s Critical Path Schedule for the final completion date of this project. Contractors may propose an alternate schedule that illustrates the completion of the project in advance of the completion date.

This Request for Proposal (RFP) is intended to provide all Offerors with sufficient information to enable them to prepare and submit offers for technical and cost review by the Smithsonian Institution. Drawings and specifications are provided electronically as part of this solicitation. See Section J for complete list of documents, exhibits and other attachments.

This solicitation neither commits the Smithsonian Institution to pay any proposal preparation costs, nor obligates the Smithsonian Institution to procure or contract for construction, or any other services. It shall not be construed as authorization to proceed with or be reimbursed for any of the costs for any of the work specified herein.

Statement of work

The successful offeror shall provide all materials, equipment, labor and supervision necessary to complete the following work at the Smithsonian Institution, Revitalize Historic Core (RHC) – Smithsonian Institution Building, Early Package 2-26, 1000 Jefferson Drive, SW, Washington, DC 20560.

The Work includes, but is not limited to, all work specified in the Contract Documents and consists of drawings and specifications beginning with Division 1 – GENERAL REQUIREMENTS and ending with Division 33 – UTILITIES (with some sections omitted).

The purpose of the Revitalize Historic Core – Smithsonian Institution Building Early Package 2-26 project is to perform selective interior demolition, abatement of hazardous materials, and preparation of the building for limited public occupancy from May to October 2026.

Work under this project includes but is not limited to:

• Install protection for historic elements.

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 7/107

• 3rd & 4th Floors, Upper Main Hall, and Attic

• Remove existing 4th floor structure, partitions, ceilings, finishes & infrastructure, incl. hazmat.

• Remove 3rd Floor office partitions, ceilings, finishes & infrastructure, incl. hazmat.

• Remove existing equipment, infrastructure, and floor “structure” in Main Attic

• East Wing, East Range (Levels 1-4)

• Remove existing equipment, infrastructure in Attic.

• Remove non-structural ceilings, flooring, partitions, and finishes, incl. hazmat.

• Remove existing elevator, equipment.

• Install floor openings for new elevator and shafts.

• Towers (North Tower, Flag Tower, South Tower, Levels 2 and above)

• Remove existing equipment, infrastructure.

• Remove non-structural ceilings, flooring, partitions, and finishes, incl. hazmat.

• Remove hazardous materials in above spaces.

• Basement and First floor

• Remove Basement non-structural ceilings, flooring, partitions, and finishes, incl. hazmat.

• Remove existing First Floor Fan Coil Units (FCUs) and ¾” vertical piping from Basement.

• Remove Air Handler Unit(AHU) at the Basement for Commons.

• Retain majority of existing systems through 2026.

• Smithsonian Arts + Industries Building (AIB) (for continuity of operation)

• Install new electrical duct bank at the floor slab from vault outside NW Pavilion to Existing Main Electrical Room at the NW Court, incl. abatement in floor trench.

• Install, Connect & Activate steam piping from steam tunnel to AIB NW Pavilion Basement, incl.

limited minor abatement. of piping for connections.

• New work in Construction areas:

• Install temporary air handling units (conditioning during construction).

• Install temporary fire alarm system.

• Scope for Partial Occupancy in 2026:

• New Work in Upper Main Hall (Levels 3 and 4) and Attic O Install temporary air handling units for Level 1 spaces at Level 3, including outdoor air connections.

Reinstall (2) existing air handling units for Level 1 retail & cafe, relocate to Level 3 from Attic.

• New Work in Basement, First floor, Second Floor Install temporary 2-pipe fan coil unit and piping, controls.

Install temporary partitions at Commons walls (at removed display cases).

Install temporary air handling unit at Basement level for Commons.

Install new carpet in Great Hall, Schermer Hall, and Commons

Construction Schedule: Total period of performance allowed for construction is 607 calendar days from the Notice to Proceed. The 607 calendar days is based on a Notice to Proceed date of August 01, 2024. The period of performance will be directly impacted by date of contract award and issuance of Notice to Proceed.

Work must be completed by March 31, 2026.

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 8/107

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 9/107

D - Packaging and Marking

All questions/ inquiries or should include the following reference:

Solicitation# 333302-24RF-0010021 RHC EP-26 Project # 1999614 Company submitting question.

Key contact name and email address

It is desired that all questions/clarifications be sent in on the attached excel spreadsheet, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantCA@si.edu . It is requested that all questions be sent in by Thursday June 6, 2024, no later than 3PM EST. For instruction how to submit proposals refer to section L of this document.

Proposals are to be submitted to DropBox.com by Tuesday, July 9, 2024 by 3:00PM using the link:

https://www.dropbox.com/request/rB0mKv4jdvt7IY9FNqtP. Cost and Technical Proposal must be submitted in separate files. If any pricing information is on the technical proposal, you will be disqualified.

E - Inspection and Acceptance

52.246-12 - Inspection of Construction. (AUG 1996)

(a) Definition."Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not-

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph

(i) of this- section.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.

(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

https://www.dropbox.com/request/rB0mKv4jdvt7IY9FNqtP

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may-

(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or

(2) Terminate for default the Contractor’s right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.

52.246-S0038 Smithsonian Institution Inspection and Acceptance (Jun 2000) Inspection and acceptance may be made on a daily basis on work performed at the job site, by the Contracting Officers Technical Representative. All work shall be coordinated through the COTR for acceptance of work, payrolls and invoice(s).

52.246-S0039 Final Inspection and Tests (Jun 2000) The requirements of the Inspection of Construction clause prescribed in FAR 52.246-12, are supplemented to provide that the Contractor shall give the Contracting Officer at least 10 calendar days advance written notice of the date the work will be fully completed and ready for final inspection and tests. Final inspection and tests will be started within 10 calendar days from the date specified in the aforesaid notice unless the Contracting Officer determines that the work is not ready for final inspection and so informs the Contractor.

52.246-S0057 Inspection

(a) Upon proper notice and during normal working hours, the Smithsonian Institution reserves the right to perform any inspections and tests as deemed necessary to assure that the Contractor is performing in accordance with the terms and specifications as set forth herein.

(b) Inspection may be at the Contractor's place of business or at any location where work is being performed in conjunction with this contract.

(c) Inspection by the Smithsonian Institution shall not relieve the Contractor of responsibility for any or all quality control aspects during the life of the contract. This shall include quality control for items covered by this contract that may be subcontracted.

52.246-S0058 Acceptance

a) The supplies and services rendered under this contract will be accepted and approved by the Contracting Officer or a designated representative thereto. Such approval will indicate acceptability to the Smithsonian Institution of performance in accordance with the terms and conditions of this contract, and will be subject to applicable warranties. The Smithsonian Institution reserves the right to reject works not conforming to prescribed contract requirements.

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 10/107

b) Neither the Smithsonian Institution's reviews, approval, or acceptance of services and/or supplies, nor payment for any of the services or supplies required under this contract shall be construed to operate as a waiver of action arising out of the performance of this contract. Furthermore, the Contractor shall be and remain liable to the Smithsonian Institution in accordance with applicable law for all damages to the Smithsonian Institution caused by the Contractor's negligent performance of any of the supplies or services furnished under this contract.

c) Acceptance by the Smithsonian Institution does not relieve the Contractor of responsibility for correction of errors or omissions that may arise after such acceptance if the errors and omissions are clearly a fault in Contractor performance.

52.246-S5018 Inspection by Regulatory Agencies (Nov 2010) Work performed under this contract is subject to inspection by Regulatory agencies including, but not limited to, those described below:

a) Federal and State occupational health and safety officials

b) Department of Labor

c) D.C. Department of the Environment (DCRA) - Clean air and clean water act.

d) D.C. Health Department

e) Various utility company inspections as required.

F - Deliveries or Performance

52.211-S5022 Commencement, Prosecution, and Completion of Work (Jun 2010)

(a) Definitions.

1) The Contract Time is the period of time allotted in the Contract Documents for Final Completion of the Work as defined in this Construction Contract Clause, including authorized extensions thereto. The Contractor shall complete his Work within the Contract Time as stated in the SF 1442, or as modified.

2) The date of commencement of the Work is the date established in the Notice To Proceed issued by the C.O. Submission by the Contractor of its Performance and Payment Bonds, Preliminary Schedule and all Certificates of Insurance and their approval by the S.I. are conditions precedent to the issuance of the Notice to Proceed.

The Contractor shall not commence the Work or store materials or equipment on site until written Notice to Proceed is issued or until the Contractor otherwise receives the written consent of the C.O.

3) The date of Substantial Completion of the Work or designated portion thereof is the date certified by the COTR when the Work or a designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so the S.I. can fully occupy the Work or designated portion thereof for the use for which it is intended, with all of the Project's parts and systems operable as required by the Contract Documents. Only punch list work and any final cleaning beyond that needed for the S.I.'s full use may remain for Final Completion.

4) The date of Final Completion of the Work is the date certified by the COTR when the Work is totally complete, to include punch list work and final clean up, in accordance with the Contract Documents and the S.I. may fully occupy and fully utilize the Work for the use for which it is intended.

5) If a date or time of completion is included in the Contract, it shall be the Date of Final Completion as defined in this Construction Contract Clause, including authorized extensions thereto, unless otherwise provided.

6) The term Day as used in the Contract Documents shall mean calendar day unless otherwise specifically designated. All dates shall mean midnight of the indicated day

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 11/107 unless otherwise stipulated.

(b) Progress and Completion.

1) All time limits stated in the Contract Documents are of the essence of the Contract.

2) The Contractor shall prosecute the Work diligently to Final Completion.

(c) Delays and Extensions of Time.

1) The time during which the Contractor is delayed in the performance of the Work, by the acts or omissions of the S.I., the Architect, or their employees or agents, acts of God, unusually severe and abnormal climatic conditions, fires, floods, epidemics, quarantine restrictions, strikes, riots, civil commotion or freight embargoes, or other conditions beyond the Contractor's control and which the Contractor could not reasonably have foreseen and provided against, shall be added to the Contract Time;

provided, however, that no claim by the Contractor for an extension of time for delays will be considered unless made in compliance with the requirements of this Article and other provisions of the Contract Documents.

2) Neither the S.I., nor the Architect shall be obligated or liable to the Contractor for, and the Contractor hereby expressly waives any claims against the S.I. and the Architect on account of any indirect or direct damages, costs or expenses of any nature which the Contractor, Subcontractors, of Suppliers or any other person may incur as a result of any delays, interference, changes in sequence or the like, which are reasonable, foreseeable, contemplated, or avoidable by the Contractor, arising from or out of any act or omission of the S.I. of the Architect, or their agents, employees, consultants, separate contractors or any governmental representative, it being understood and agreed that the Contractor's sole and exclusive remedy in any such events shall be an extension of the Contract Time, but only as determined in accordance with the provisions of the Contract Documents.

3) The Contract Time shall be adjusted only for Change Orders pursuant to the Construction Contract Clause entitled "Changes", excusable delays pursuant to Construction Contract Clause entitled "Delays and Extensions of Time" and Construction Contract Clause entitled "Smithsonian Institution's Right to Stop or to Suspend the Work". In the event the Contractor requests an extension of the Contract Time, he shall furnish such justification and supporting evidence as the C.O. may deem necessary for a determination of whether the Contractor is entitled to an extension of time under the provisions of the Contract. The burden of proof to substantiate a claim for an extension of the Contract Time shall rest with the Contractor, including evidence that the cause was beyond his control. The C.O. shall base his findings of fact and decision on such justification and supporting evidence and shall advise the Contractor in writing thereof. If the C.O. finds that the Contractor is entitled to any extension of the Contract Time, the C.O.'s determination of the total number of days' extension shall be based upon the currently approved Progress Schedule and on all data relevant to the extension. Such data will be incorporated into the Progress Schedule in the form of a revision thereto, accomplished in a timely manner. The Contractor acknowledges and agrees that actual delays (due to said changes, suspensions of work or excusable delays) in activities which, according to the Progress Schedule, do not affect the Contract Time, do not have any effect upon the Contract Time and therefore will not be the basis for a change therein. The Contractor acknowledges and agrees that time extensions will be granted only to the extent that excusable delays exceed the available float in the Contractor's Progress Schedule.

4) Subject to other provisions of the Contract, the Contractor may be entitled to an extension of the Contract Time (but no increase in the Contract Price) for delays arising from unforeseeable causes beyond the control and without the fault or negligence of the Contractor, his Subcontractors or Suppliers as follows:

i. Labor disputes and strikes (including strikes affecting transportation), that do, in fact, directly and critically affect the progress of the Work; however, an extension of Contract time on account of an individual labor strike shall not exceed the number of days of said strike;

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 12/107

ii. Acts of God, tornado, fire, hurricane, blizzard, earthquake, typhoon, or flood that damage completed work or stored materials.

iii. Abnormal inclement weather; however, the Contract Time will not be extended due to normal inclement weather. The time for performance of this Contract, as stated in the Contract Documents, includes an allowance for calendar days, which may not be available for construction out-of-doors; for the purposes of the Contract, the Contractor agrees that said number of calendar days per month are to be considered as normal inclement weather. Unless the Contractor can substantiate to the satisfaction of the S.I. that there was greater than normal inclement weather considering the full term of the Contract Time using a ten year average of accumulated record mean values from climatological data compiled by the U.S. Department of Commerce, National Oceanic and Atmospheric Administration for the locale of the Project and that such alleged greater than normal inclement weather actually delayed the Work or portions thereof which had an effect upon the Contract Time, the Contractor shall not be entitled to an extension of time. If the total accumulated number of calendar days lost due to inclement weather, from the start of Work until Final Completion, exceeds the total accumulated number to be expected for the same period from the aforesaid climatological data, time for completion will be extended by the number of calendar days needed to include the excess number of calendar days lost.

iv. Acts of the public enemy, acts of the state, Federal or local government in its sovereign capacity, and acts of a separate contractor in the performance of its contract with the S.I. relating to the Project.

5) The Contractor shall not be entitled to and hereby expressly waives any extension of time resulting from any conditions or cause unless said claim for extensions of time is made in writing to the C.O. within seven (7) days of the first instance of delay.

Circumstances and activities leading to such claim shall be indicated or referenced in a daily field inspection report for the day(s) affected; otherwise, all such claims are waived by the Contractor. In every such written claim, the Contractor shall provide the following information:

i. Nature of the delay.

ii. Date (or anticipated date) of commencement of delay;

iii. Activities on the Progress Schedule affected by the delay, and/or new activities created by the delay and their relationship with existing activities;

iv. Identification of person(s) or organizations(s) or event(s) responsible for the delay;

v. Anticipated extent of the delay;

vi. Recommended action to avoid or minimize the delay.

(d) Responsibility for Completion.

1) The Contractor shall furnish such manpower, materials, facilities and equipment and shall work such hours, including night shifts, overtime operations and Sundays and holidays, as may be necessary to insure the progress and completion of the Work in accordance with the approved and currently updated Progress Schedule. If Work actually in place falls behind the currently updated and approved Progress Schedule and it becomes apparent from the current Progress Schedule that the Work will not be completed within the Contract Time, the Contractor agrees that he will, as necessary, take some or all of the following actions at no additional cost to the S.I., as required to eliminate substantially the backlog of the Work:

i. Increase manpower in quantities and crafts necessary

ii. Increase the number of work hours per shift, shifts per working day, working days per week, the amount of equipment, or any combination of the foregoing; and/or

iii. Re-schedule activities to achieve maximum practical concurrence.

2) The COTR may require the Contractor to submit a Recovery Schedule in accordance with the Supplementary Construction Contract Clause, demonstrating his program and proposed plan to make up the lag in scheduled progress and to ensure completion of the Work within the Contract Time. If the COTR finds the proposed plan not acceptable, he

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 13/107 may require the Contractor to submit a new plan. If the actions taken by the Contractor or the second plan proposed are not satisfactory, the COTR may require the contractor to take any of the actions set forth in this Construction Contract Clause without additional costs to the S.I., to make up the lag in scheduled progress.

3) Failure of the Contractor to comply substantially with the requirements of this Construction Contract Clause may be considered grounds for a determination by the S.I., pursuant to the Construction Contract Clause entitled "Default", that the Contractor is failing to prosecute the Work with the sufficient diligence to ensure its completion with the Contract Time.

52.211-13 Time Extensions (Sept 2000) Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered.

52.228-S0081 Period of Performance-Bonds & Insurance-Construction (JAN 2023) Contractor must submit approved Certificate of Insurance and 100% Performance Bond and 100% Payment Bond within ten (10) days of contract award.

52.236-S0036 Smithsonian Institution's Right to Stop or to Suspend the Work (Jun 2000)

(a) If the Contractor fails to correct defective Work as required by the Construction Contract Clause entitled "Correction of Work", or fails to carry out the Work or supply labor and materials in accordance with the Contract Documents, the C.O. by a written order may order the Contractor to stop the Work, or any portion thereof, without monetary compensation to the Contractor until the cause for such order has been eliminated.

(b) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the Work for such period of time as he may determine to be appropriate for the convenience of the S.I.

(c) If the performance of all or any part of the Work is, for an unreasonable period of time, suspended, delayed, or interrupted by the S.I. or its authorized representatives in the administration of this Contract, or by failure of any one of them to act within the time specified in this Contract (or if no time is specified, within a reasonable time), an adjustment shall be made for an increase in the actual time required for performance of the Work by the Contractor, due solely to such unreasonable suspension, delay, or interruption and the Contract modified in writing accordingly. However, no claim for an extension of time shall be made under this Construction Contract Clause for any suspension, delay, or interruption pursuant to this Construction Contract Clause, or for which claim is provided or excluded under any other provision of this Contract. No claim under this Construction Contract Clause shall be allowed for any claim for an extension of time required for performance, unless within twenty (20) days after the act or failure to act involved, the Contractor submits to the COTR a written statement setting forth, as then practicable, the extent of such claimed time extension and unless the claim for an extension of time is asserted in writing as soon as practicable after the termination of such suspension, delay, or interruption. No claim shall be made for direct or indirect costs incurred by Contractor as a result of the events described in this Construction Contract Clause, a time extension being the Contractor's sole remedy.

(d) A claim under this clause shall not be allowed (1) for any costs incurred more than twenty

(20) days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.

(e) In the event of a suspension of work or delay or interruption of work, the Contractor will and will cause his subcontractors to protect carefully his, and their materials and work against damage or injury from the weather and maintain completed and uncompleted portions of the work as

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 14/107 required by the Contract Documents. If, in the opinion of the COTR, any work or material shall have been damaged or injured by reason of failure on the part of the Contractor or any of his subcontractors to so protect same, such work and materials shall be removed and replaced at the expense of the Contractor.

(f) No claim by the Contractor for an equitable adjustment under the Construction Contract Clause entitled "Equitable Adjustments", shall be allowed if asserted after Final Payment under this Contract.

52.246-S0041 Additional Warranties and Guarantees (Jun 2000)

(a) The Contractor guarantees and warrants to the S.I. all work as follows:

1) That all materials and equipment furnished under this Contract will be new and the best of its respective kind unless otherwise specified.

2) That all Work will be first-class quality and free of omissions and faulty, poor quality, imperfect or defective material or workmanship;

3) That where no standard is specified for such workmanship or materials, they shall be the best of their respective kinds;

4) That the Work shall be entirely watertight and leakproof in accordance with all applicable industry customs and practices, and shall be free of shrinkage and settlement, (normal shrinkage inherent in the specified materials is acceptable);

5) That the Work, including but not limited to, mechanical and electrical machines, devices and equipment shall be fit and fully usable for its intended and specified purpose and shall operate satisfactorily with ordinary care;

6) That consistent with requirements of the Contract Documents the Work shall be installed and oriented in such a manner as to facilitate unrestricted access for the operation and maintenance of fixed equipment;

7) That the Work will be free of abnormal or unusual deterioration which occurs because of poor quality materials, workmanship or unsuitable storage.

(b) All work not conforming to guarantees and warranties specified in the Contract Documents, including substitutions not properly approved and authorized, may be considered defective. If required by the COTR, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by the provisions of the Construction Contract Clauses entitled "Uncovering of Work" and "Correction of Work".

(c) The warranties set forth in this Construction Contract Clause entitled "Additional Warranties and Guarantees" and elsewhere in the Contract Documents shall survive Final Completion of the Work under the Construction Contract Clause entitled "Payments and Completion".

(d) If, within one year after the Date of Final Completion of the Work or designated portion thereof or within one year after acceptance by the S.I. of designated equipment or within such longer period of time as may be prescribed by law or by the terms of any applicable special warranty required by the Contract Documents, any of the Work is found to be defective, not in accordance with the Contract Documents, or not in accordance with the guarantees and warranties specified in the Contract Documents, the Contractor shall correct it within five (5) working days, or such other period as mutually agreed, after receipt of a written notice from the COTR to do so.

(e) Any materials or other portions of the Work, installed, furnished or stored on site which are not of the character or quality required by the specifications, or are otherwise not acceptable to the COTR, shall be immediately removed and replaced by the Contractor to the satisfaction of the COTR, when notified to do so by the COTR.

(f) If the Contractor fails to correct defective or nonconforming Work as required by the Construction Contract Clause entitled "Correction of Work", or if the Contractor fails to remove defective or nonconforming Work from the site, as required by the Construction Contract Clause entitled "Uncovering of Work", the S.I. may elect to either correct such work in accordance with the Construction Contract Clause entitled "Smithsonian Institution's Right to Carry Out The Work", or remove and store materials and equipment at the expense of the Contractor.

(g) The Contractor shall bear the cost of making good all work of the S.I., separate contractors or others, destroyed or damaged by such correction or removal required under this Construction Contract Clause or the Construction Contract Clauses entitled "Uncovering of Work" and "Correction of Work", or elsewhere in the Contract Documents.

33330224RF0010021 Revitalize Historic Core, Early Package 2-26 project 15/107

SI-0080 Period of Performance-NTP The contract shall become effective upon execution of the contract and upon the Smithsonian Institution Contracting Officer's Notice to Proceed.

SI-0082 Period of Performance-Options Optional Services: Smithsonian Institution reserves the sole right to exercise option(s).

52.247-S0083 Delivery Point Coordinate with COTR as required.

G - Contract Administration Data

52.202-S0059 Contract Management (January 2023) Notwithstanding the Contractor's responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Smithsonian and the Contractor. The following individuals will be the Smithsonian points of contact during the performance of the contract.

52.202-S0060 Contracting Officer (January 2023) All contract administration will be effected by the Contracting Officer. Communications pertaining to contractual administrative matters will be addressed to the Contracting Officer. No changes in or deviation from the scope of work shall be effected without a written modification to the contract executed by the Contracting Officer authorizing such changes.

52.202-S0061 Contracting Officer's Technical Representative (COTR) (Apr 1988)

(a) The Contracting Officer's Technical Representative (COTR), or her authorized representative shall act for and on behalf of the Contracting Officer in the administration of any resultant contract with respect to:

1. Resolution of issues that may arise between the Contractor and the Smithsonian Institution in connection with such matters as acceptability of workmanship and other technical requirements;

2. Evaluation on an overall basis of the acceptability of workmanship and Contractor's compliance with technical requirements; and

3. The approval and acceptance of work performed under this contract.

(b) This delegation does not authorize the modification of any of the contract's provisions, terms or conditions. All authorities not herein delegated are reserved to the Contracting Officer.

(c) The Contractor shall make available such records, reports and facilities as may be required to carry out this assignment.

52.202-S0062 Authorities (January 2023) The Contractor is advised that only the Contracting Officer can change or modify the terms of this contract or take any other action which obligates the Smithsonian and then such action must be set forth in a formal modification to the Contract. The authority of the COTR is strictly limited to the specific duties set forth in her letter of appointment, a copy of which will be furnished the Contractor. Contractors who rely on direction from persons other than the Contracting Officer (or a COTR acting within the strict limits of his/her responsibilities as set forth in his/her letter of appointment) do so at their own risk and expense, as such actions do not bind the Smithsonian contractually. All questions concerning the authority of a Smithsonian employee to direct the Contractor contractually should be referred to the Contracting Officer.

52.213-S0094…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .