33330223RF0010026 Amendment 0002.pdf
PDF 9 MB Posted
- Solicitation number
- 33330223RF0010026
- Issued by
-
Smithsonian Institution
About this file
This Request for Proposal (RFP) solicits offers to replace air handling units (ACUs) serving collection storage spaces on the fourth and fifth floors of the Smithsonian Institution's National Museum of American History in Washington, DC. The scope of work includes removing existing ACUs from four mechanical equipment rooms and installing new air handling units (AHUs) to meet conservation standards for temperature and humidity control, along with providing temporary cooling systems throughout the construction period to maintain collection storage conditions. Offerors must demonstrate minimum qualifications, and technical and cost proposals will be evaluated per the criteria in the RFP. The fixed-price construction contract is estimated over $10 million, with a 570-calendar day period of performance from notice to proceed. Temporary cooling must be installed to support collection storage on the fifth floor from April 15 through October 31, 2024, utilizing rented or purchased rooftop units without freeze protection during that timeframe.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330223RF0010026
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
SMITHSONIAN INSTITUTION
2003112
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/05/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of Contracting Officer)(Signature of person authorized to sign)
Willard B. Powell
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The Solicitation Number cited above, to replace ACU's for Collections Storage on 4th and
5th at the Smithsonian Institution's National Museum of American History, located in Washington, DC, is hereby amended as follows:
A.1. Attached hereto and made part of this Amendment Two are
SI Responses to RFI’s for Questions Number 1-26.
Addendum No. 1
Pre-Bid Site Walk Attendance Sheet
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or as heretofore changed,10A, remains unchanged and in full force and effect .
3. EFFECTIVE DATE
07/02/2023
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
PAGE OF
(A) (B) (C) (D) (E) (F)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
REFERENCE NO. OF DOCUMENT BEING CONTINUED
33330223RF0010026/0002
A.2. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.
B. THE BID DUE DATE IS JULY 20, 2023, AT 3:00PM
EST.
Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.
END OF AMENDMENT TWO
June 30, 2023 QUESTION # DATE RECEIVED REFERENCE DOCUMENT QUESTION DATE RESPONDED A/E RESPONSE RESPONSE BY
1 20-Jun-23 DRAWING ED-101
1. Question: Detail 1/ED-101 references removal notes 1, 2, 3 and 4; however, there is only one (1) Note listed at the bottom of the page. Please provide the removal notes.
26-Jun-23
Notes were accidentally cut off sheet when floor plans were combined, they will be shown on an Addend or or Conform set. Removal notes should read: i) Contractor shall trace and verify all existing-to-be removed circuits source serving the air handler units prior to any work. ii) Completely remove 120V power, Lighting serving air handling unit to be removed. iii) Completely remove existing air handling unit feeder back to paneled. iv) Remove existing fire alarm duct mounted smoke detectors and fire smoke relays (FSR) to allow for mechanical air handling unit and ductwork replacement. Safe-off fire alarm circuits at nearest J-Box for re-connection to new air handling unit. See new work electrical drawings for new duct mounted smoke detectors and FSR locations and quantities.
2 20-Jun-23 RFP
2. Question: RFP Part III – Plan of Accomplishment and Contract Time, section a.-4)-E, requires a written narrative addressing the “Procurement and installation of precast concrete panels.” There does not appear to be any work related to precast concrete panels included in the Contract Documents. Please confirm that this shall read the “Procurement and installation of mechanical equipment”.
26-Jun-23 We can confirm there is no precast concrete work required for the project.
3 20-Jun-23 RFP
3. Question: RFP Part III – Plan of Accomplishment and Contract Time, section b. - Implementation Plan requests a detailed plan that will deliver a superior quality product in the “Doors, Frames and Hardware” work. There does not appear to be any work related to doors, frames and Hardware included in the Contract Documents. Please confirm that this portion of the Implementation Plan is not applicable and should not be included.
26-Jun-23 We can confirm that no permanent changes to doors frames and hardware are described in the contract documents.
4 20-Jun-23 RFP
4. Question: RFP Part III – Plan of Accomplishment and Contract Time, section b. - Implementation Plan requests a detailed plan that will deliver a superior quality product in the “Security” work.
There does not appear to be any work related to permanent security system modifications included in the Contract Documents.
Please clarify the intent of this portion of the implementation plan.
26-Jun-23 We can confirm that no permanent changes to the security system are intended.
5 20-Jun-23 RFP
5. Question: RFP Part IV – Comparable Experience requests comparable projects “completed or in progress during the past five
(4) years.” Please clarify if comparable projects shall be from the past four or five years.
26-Jun-23 We would recommend that SI require references and qualifications for all subcontractors.
Comparable Experience requests comparable projects “completed or in progress during the past five (5) years.”
PRE-BID RFI NMAH REPLACE ACUS FOR COLLECTION STORAGE ON 4TH AND 5TH FLOORS
PROJECT NUMBER 2003112
6 20-Jun-23 RFP
6. Question: Please clarify which subcontractors shall be listed as “Key Subcontractors” and need references provided. RFP Part V section B lists “Doors, Frames and Hardware,” “Security,” and “Commissioning” as three subcontractors that should be included as Key Subcontractors. There does not appear to be any scope in the project for Doors, Frames and Hardware or Security.
Additionally, according to specification 019113, Commissioning Consultant will be procured directly by Smithsonian and would not be a Subcontractor to the Contractor. Also in Part I of the RFP, bullet point 11 indicates that Mechanical and Electrical Subcontractors are key subcontractors but they are not listed in Part V section B.
26-Jun-23 Remove the following subcontractors from Part V Section B. Doors Frames and Hardware, Security and Commissioning. Add Mechanical Systems. Commissioning consultant will be contracted by Smithsonian.
7 20-Jun-23 DRAWING A-104
7. Question: A-104 notes to replace drywall and acoustic ceilings in some areas. Please provide an RCP showing the existing ceiling types.
26-Jun-23
The ceiling system below the proposed piping crossing the corridors is 2x4’ system with standard lay in tile. Contractor to assume replacement of all tiles in the work zone indicated on A104. Contractor to remove and stockpile tile and make efforts to re use tile and grid elements. All fire alarm, lighting, sprinkler, and other ceiling mounted systems is to remain operational and in place. Contractor to replace tiles at devices that are mounted through tile. These notes can be added in an addendum or conform set for the record
8 20-Jun-23 DRAWINGS
8. Question: The mechanical drawings show different colored ductwork. Please provide a schedule showing what the colors differentiate.
26-Jun-23 The colors are for reference only, they do not indicate new versus existing scope. Different colors represent different air handling units.
9 20-Jun-23 DRAWING M-403HP
9. Question: Detail 3/M-403HP shows a “new access platform for filter” but no details are shown for the platform. Please provide a detail showing design of the platform including materials, connections to structure, dimensions, etc.
26-Jun-23
Re new access platform for filter. Detail 3/M-403 will requires a new access platform (5’x5’) constructed of heavy duty galvanized open grating. The platform shall be 10’ above the mechanical room floor. Provide ladder with welded construction for access to platform from the floor. Provide railings at all platform edges. Platform shall be located to provide service access to filter. Platform will be added to plans in an addendum or conform set for the record. GC to submit construction details to architect for approval. The details and engineering of the platform shall be provided by a qualified miscellaneous metal contractor
10 26-Jun-23 RFP
10a. Question: RFP Part I Section E notes that the Completed Statement should contain no more than 50 pages 8.5x11. Section A of the same part notes that information should be compiled into 13 tabs. In regard to these requirements, please advise the following:
a) Can audited financial statements be included as attachments that do not count toward the page limit?
Yes
11 26-Jun-23 RFP
10b. Question: RFP Part I Section E notes that the Completed Statement should contain no more than 50 pages 8.5x11. Section A of the same part notes that information should be compiled into 13 tabs. In regard to these requirements, please advise the following:
b) Can a Milestone CPM Schedule be provided under Tab 5 with the full schedule provided in 11x17 format as an attachment that does not count against the page limit?
Submission is electronic therefore the page size should be formatted as such. Yes the full schedule can be submitted as an attachment.
12 26-Jun-23 RFP
10c. Question: RFP Part I Section E notes that the Completed Statement should contain no more than 50 pages 8.5x11. Section A of the same part notes that information should be compiled into 13 tabs. In regard to these requirements, please advise the following:
c) Do tabs count as pages and if so can the requested information be included on the tabs if the information requested can be conveyed in less than one page?
Tabs do not count as pages.
13 26-Jun-23 RFP
10d. Question: RFP Part I Section E notes that the Completed Statement should contain no more than 50 pages 8.5x11. Section A of the same part notes that information should be compiled into 13 tabs. In regard to these requirements, please advise the following:
d) Per Section I of the RFP, photographs of comparable projects are desirable but not required. Please advise if photographs of comparable projects can be provided as attachments that do not count towards the page limit.
This requirement is removed.
14 26-Jun-23 RFP
11. Question: Should the Small Business Subcontracting Plan be included in the cost or technical proposal? If technical, please advise which tab and if it can be included as an attachment that does not count toward the page count.
Subcontracting Plan – This can be included in the Technical Proposal as an attachment and will not count toward the page limit. This can be placed in Tab 8. Offerors must include information requested in Part V, Section B of the RFP and FAR Clauses 52.219-S0097 and 52.219-9 Small Business Subcontracting Plan.
15 26-Jun-23 RFP
12. Question: Does the Smithsonian require that the AIA A-305 form be submitted with the Offeror's proposal for this Solicitation?
If so, please advise if it should be part of the Cost or Technical proposal. If the Technical, please confirm it can be included as an attachment that does not count against the page limit.
AIA A-305 is not required.
16 26-Jun-23 RFP
13. Question: Should Offeror's Background be submitted under Tab 1 as indicated in Part I, section A-1-A of the RFP or should it be included in Tab 2 as indicated in Part II of the RFP?
The appropriate information should be completed for both. Information requested in Tab 3 and 4 should be included in the Technical Proposal. Information requested in Section K should be included in the Cost Proposal.
RomanoJ Line
RomanoJ Typewriter Photos cannot be submitted as an attachment.
Photos are included in the page count.
17 26-Jun-23 RFP
14. Question: Information requested in Tabs 3 & 4 of the technical proposal in the RFP appears to be the same information requested to be included in the cost proposal as “Section K” Please confirm that the information should be included in both the cost and technical proposals
Please provide page numbers in the RFP where this duplication occurs.
18 26-Jun-23 DRAWING A-105
15. Question: Per Drawing A-105, staging areas for rigging AHU components to the roof is provided on the south side of the penthouse equipment yard. Please provide a drawing showing the extent of existing below grade construction on the south side of the building that is beyond the main façade.
The staging of the AHUs in on the roof of the 5th floor for the new AHUs to be installed on the Penthouse Mech Rooms. PENTHOUSE LOGISTICS PLAN drawing A-105 LP is corresponds with the 5th floor roof plan and Penthouse Mech Rooms. Attached is revised drawing A-105 LP clarifying the staging areas. The crane for rigging the AHUs is on the driveway of Constitution Avenue on the north end of the Museum.
19 26-Jun-23 DRAWING A-5
16. Question: Please advise if it is permissible to set-up a crane on the north side of the building in the horseshoe drive in order to hoist material and equipment to the roof.
Yes, set-up of the Crane is on the driveway in from to the NMAH north façade.
20 26-Jun-23 SPEC 237323
17a. Question: Section 237323, Para. 2.1.5 states, "Factory testing shall include sound and air leakage testing to the requirements specified in this Section." a) No further requirements are outlined in the section. Please confirm that factory sound and air leakage testing is not required or provide testing requirements and acceptance criteria. Note that each of the units are required to ship knocked down into individual pieces/components in order to transport them to the spaces. Factory testing of knocked down units is highly uncommon and very expensive.
30-Jun-23
Sound testing is not required. Manufacturer shall submit calculated sound levels in the eight octave bands for transmission through casing walls and sound power levels at the inlet and discharge opening.
The unit manufacturer shall provide a factory deflection test on either AHU-PW-19 or AHU-PE-
20. Casing panel deflection shall not exceed L/240 at +/- 10” w.g. ‘L’ is defined as the maximum span length and L/X is the deflection at the panel midpoint.
The unit manufacturer shall provide a factory leak test on either AHU-PW-19 or AHU-PE-20 across the cabinet exterior walls. Casing leakage shall not exceed 0.5% of the design CFM at +/- 10” w.g. Sections that will be negative pressure shall be tested under negative pressure and section that will be positive pressure shall be tested under positive pressure.
21 26-Jun-23 SPEC 237323
17b. Question: Section 237323, Para. 2.1.5 states, "Factory testing shall include sound and air leakage testing to the requirements specified in this Section." b) If factory testing of the air handling units is required, will it be witnessed by representatives of the Owner? If so, how many? Is the air handling unit manufacturer expected to include travel and expenses for the witness(es)?
30-Jun-23
Yes, factory testing of the air handling units is required and shall be witnessed by the Smithsonian representatives.
Certified factory representative shall perform the following field inspection:
- Witness and record the functional performance testing of the air handling unit at a time and date to be determined by the contractor.
- Check installed unit casing for leakage during testing.
- Check rotation and balance of fan wheel.
- Prepare a written report on findings and recommended corrective actions.
22 26-Jun-23 Spec 237323
17c. Question: Section 237323, Para. 2.1.5 states, "Factory testing shall include sound and air leakage testing to the requirements specified in this Section." c) Is the air handling unit manufacturer required to leakage test the units in the field? If so, please provide testing requirements and acceptance criteria.
30-Jun-23 Field leakage testing is not required. Where air leakage is evident during field inspection, connections shall be corrected using factory recommended methods to resolve leakage.
UP
UP
DNDN
E
F
G
H'
H
G'
I'
I
I''
J
K
J'
5 76' 9 9' 1110 11A 12 12''' 13'' 14 14A 16 18 18' 20
A-302
A-302
PENTHOUSE
PH2608
STAIR
PH2000S1
PENTHOUSE
PH2606
STAIR
PH2000S2
PENTHOUSE
PH2605
212019188 9 10 11 12' 13 14 15 16 17
D
E
F
H
J
K
L
K'
11A 14A12 13'
J'
D'
12"
E'
C'
16'15' 18'17'10"
I'
20'10'9'
G
EXISTING CHAIN LINK FENCE
CONSTITUTION AVE (NORTH)
MADISON AVE (SOUTH)
TEMPORARILY DEMOUNT FENCE
COOLING TOWER AND EMERGENCY
GENERATOR PLATFORM APPROXIMATE
EXTENTS
SMOKE EVACUATION SYSTEM APPROXIMATE EXTENTS
RIG AHU COMPONENTS TO ROOF & PROVIDE 3/4"
MARINE GRADE PLYWOOD SHEETING ON ROOF
SURFACE FOR PROTECTION OF BALLASTED
MEMBRANE ROOFING DURING RIGGING PHASE
INDICATED BY HATCHED AREAS
TEMPORARILY DEMOUNT FENCE
DOGHOUSE
DOGHOUSE
DOGHOUSE DOGHOUSE DOGHOUSE
DOGHOUSE
DOGHOUSEDOGHOUSEDOGHOUSEDOGHOUSE
DOGHOUSE
SKYLIGHT
PENTHOUSE
8000400004000
1:200
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
OFEO PROJECT
NUMBER
DRAWING TITLE
WORKING STAFF
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
DRAWING TYPE
Annum Architects
40 Broad Street
Boston, MA 02109
617 338 3000
:2 :3
P M
REPLACE ACU’S FOR
COLLECT. STOR.ON 4TH
AND 5TH FLOORS
PENTHOUSE LOGISTICS PLAN
2003112
REPLACE ACU’S FOR COLLECT.
STOR.ON 4TH AND 5TH FLOORS
12/21/22 CONSTRUCTION DOCUMENTS
A L P
B Y
A p p ro v e r E n te r Is s u e
D a te
C O N S T R U C T
IO
N
D O C U M E N T S
NMAH
600 MARYLAND AVE SW,
WASHINGTON, DC 20002
NMAH
2003112
A-105LP
JM ERER/MF
SCALE =1 : 200A-105LP
1 PENTHOUSE OVERALL LOGISTICS PLAN
NO ELEVATOR
ACCESS THIS FLOOR
NO ELEVATOR
ACCESS THIS FLOOR
WORKZONE
PH2603
WORKZONE
PH2602
AHU-4CW-19
AHU-4CW-20
4 3 2
LOCATION OF TEMPORARY
AHU
LOCATION OF TEMPORARY
AHU
PATH FROM STAGING AREA TO PENTHOUSE
RFI 15 SKETCH 4TH AND 5TH FLOOR STORAGE HVAC ANNUM ARCHITECTS
2023/06/29 Page 1 of 1 lsmith Image lsmith Text Box
5 - ARIAL PHOTO
lsmith Rectangle lsmith Rectangle lsmith Callout
STAGING AREA
lsmith Callout
STAGING AREA
20-June-23
RFP
1. Question: Page 4 of the RFP, part A.1.A shows the Offeror’s Background as part of Tab no. 1. Page 7 shows this as Tab no. 2.
Page 7 should show Tab 1.
2. Question: Please confirm which tab should include Part II section J (List of Officers, Partners, and/or Owners).
Submit under Tab 1.
3. Question: Is there a worksheet for Tab 3- Suspension or Debarment, or is it Section K under Part II- Offeror’s Background (which states “Submit under Tab 4”)?
There is no worksheet. If the response is YES to section K, the details would be submitted under TAB 3. If the response is no, there will be no submission for TAB 3.
4. Question: Please confirm that Safety/EMR is Part V or VI, not IV.
Safety/EMR should be part V.
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
OFEO PROJECT
NUMBER
DRAWING TITLE
WORKING STAFF
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
DRAWING TYPE
Annum Architects 40 Broad Street Boston, MA 02109 617 338 3000
Altieri Sebor Wieber, LLC 31 Knight Street Norwalk, CT 06851 203 866 5538 171 Milk Street 3rd floor Boston, MA 02109 617 468 1000
: 5 :0 P M
REPLACE ACU’S FOR
COLLECT. STOR.ON 4TH
AND 5TH FLOORS
PANEL SCHEDULES
2003112
REPLACE ACU’S FOR COLLECT.
STOR.ON 4TH AND 5TH FLOORS
12/21/22 CONSTRUCTION DOCUMENTS
E D G
B Y A p p ro ve r E n te r Is su e D a te
C O N S
TR
U C
TI
O N
D O C U M E N
TS
NMAH
600 MARYLAND AVE SW,
WASHINGTON, DC 20002
NMAH
2003112
E-604DG
Author CheckerDesignerEX. 4D1EX. 4C1
EX. PHB1EX. PHBEX. PHA1
EX. 4DEX. 4CEX. 4BB
Notes:
TOTAL CURRENT: 394 A
TOTAL LOAD: 327.63 kVA
12 TEMP. ERC-4-5-3 3 400 A 225 A 173 A 144.00 PROVIDE NEW CIRCUIT...
11 TEMP. ERC-4-5-2 3 400 A 225 A 173 A 144.00 PROVIDE NEW CIRCUIT...
10 TEMPORARY UNIT 3 30 A 20 A 6 A 4.80 USE SPARE CIRCUIT BREAKER.
9 TEMPORARY ELECTRIC... 3 100 A 50 A 36 A 30.00 USE SPARE CIRCUIT BREAKER.
8 AHU-PE-20 3 30 A 15 A 6 A 4.83 USE SPARE CIRCUIT BREAKER.
7 SPARE 3 -- 20 A -- 0.00
6 PANEL EX. PHB VIA XFMR PHB 3 -- 20 A -- 0.00
5 SPARE 3 -- 20 A -- 0.00
4 RF-R4 3 -- 20 A -- 0.00
3 SPARE 3 -- 20 A -- 0.00
2 AC-4 3 -- 20 A -- 0.00
1 EX. MCC PHB 3 -- 100 A -- 0.00
CKT LOAD NAME # OF
POLES
FRAME
SIZE
TRIP
RATING
CURRENT
(AMPERE)
LOAD
(kVA) REMARKS
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS
OPTIONS:
MAIN: 400
MOUNTING: WIRE: BUS: 400
SUPPLY FROM: PHASE: 3 MAIN TYPE: MCB
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 22,000
DISTRIBUTION PANEL: EX. PHB1
1. USE SPARE CIRCUIT BREAKER FOR NEW CIRCUITS.
NOTES:
Total Connected Current (Amps): 47 A Total Connected Load (kVA): 39.01 kVA
Total VA 13 13 13
41 SPACE -- -- -- 0.00 0.00 -- -- -- SPACE 42
39 SPACE -- -- -- 0.00 0.00 -- -- -- SPACE 40
37 SPACE -- -- -- 0.00 0.00 -- -- -- SPACE 38
35 SPACE -- -- -- 0.00 0.00 36
33 SPACE -- -- -- 0.00 0.00 34
31 SPACE -- -- -- 0.00 0.00
3 50 EF-9
VFD EF-9
29 SPACE -- -- -- 0.00 0.00 30
27 SPACE -- -- -- 0.00 0.00 28
25 SPACE -- -- -- 0.00 0.00
3 30 Air Compressor
23 10.00 0.00 24
21 10.00 0.00 22
TEMPORARY
ELECTRIC HUMIDIFIER 4#6+1#10G-1"C 50 3
10.00 0.00
3 25 SPARE
17 0.00 1.60 18
15 0.00 1.60 16
AC-1 100 3
0.00 1.60
3 20 4#12+G-3/4"C TEMPORARY UNIT
11 0.00 1.40 12
9 0.00 1.40 10
Panel PHA (via XFMR PHA) 50 3
0.00 1.40
3 15 4#12+G-3/4"C AHU-PW-19
5 0.00 0.00 6
3 0.00 0.00 4
RF-R-1 50 3
0.00 0.00
3 20 MCC PHA
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P A B C P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: WIRES: BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE: MLO
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 22,000
PANELBOARD: EX. PHA1
1. PROVIDE NEW CIRCUIT BREAKER. MATCH CIRCUIT BREAKER TYPE WITH EXISTING.
Notes:
TOTAL CURRENT: 203 A
TOTAL LOAD: 168.72 kVA
24 TEMP. ERC-4-2-1 3 400 A 250 A 194 A 161.00 PROVIDE NEW CIRCUIT...
23 TEMP BLOWER 3 100 A 15 A 5 A 3.82 SEE NOTE 1
22 EF-4-W 3 -- 15 A -- 0.00
21 F2P-5 3 -- 30 A -- 0.00 20 F2P-6 3 -- 30 A -- 0.00
19 PNL EX. 4A VIA XF 3 -- 70 A -- 0.00
18 ACU-6 CKT 2 3 -- 80 A -- 0.00
17 RF5 3 -- 80 A -- 0.00
16 ACU-6 CKT 1 3 -- 150 A -- 0.00
15 RF6S 3 -- 150 A -- 0.00
14 AHU-4W-12 3 100 A 15 A 5 A 3.90 USE SPARE CIRCUIT BREAKER.
13 PRE HEAT ACU5 3 -- 15 A -- 0.00
12 PNL EX. 4A VIA XF 3 -- 70 A -- 0.00
11 ACU6-1 3 -- 80 A -- 0.00
10 RF-5 3 -- 80 A -- 0.00
9 ACU6-A 3 -- 150 A -- 0.00
8 EXISTING RF6S 3 -- 150 A -- 0.00
7 ACU-6 PREHEAT 3 -- 150 A -- 0.00
6 ACU-5 PREHEAT 3 -- 150 A -- 0.00
5 AC-5 CKT 2 3 -- 150 A -- 0.00
4 AC-5 CKT 1 3 -- 150 A -- 0.00
3 METER 3 -- 15 A -- 0.00
2 EF-2 3 -- 15 A -- 0.00
1 EX AHU-2 3 -- 15 A -- 0.00
CKT LOAD NAME # OF
POLES
FRAME
SIZE
TRIP
RATING
CURRENT
(AMPERE)
LOAD
(kVA) REMARKS
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS
OPTIONS:
MAIN: 800A
MOUNTING: WIRE: BUS: 800A
SUPPLY FROM: PHASE: 3 MAIN TYPE: MLO
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 22,000
DISTRIBUTION PANEL: DP-W4-M
1. USE SPARE CIRCUIT BREAKER FOR NEW CIRCUITS.
NOTES:
Total Connected Current (Amps): 2 A Total Connected Load (kVA): 0.72 kVA
Total VA 0 1 0
41 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 42
39 EX. LOAD 20 1 0.00 0.72 1 20 2#12-G-3/4" C. 120V CKT MECH... 40
37 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 38
35 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 36
33 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 34
31 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 32
29 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 30
27 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 28
25 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 26
23 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 24
21 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 22
19 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 20
17 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 18
15 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 16
13 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 14
11 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 12
9 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 10
7 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 8
5 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 6
3 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 4
1 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 2
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P PHASE A
(kVA)
PHASE B
(kVA)
PHASE C
(kVA) P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 120/208 Wye A.I.C. RATING: 65,000
PANELBOARD: 4A
EX. PHA
EX. 4A
NOTES:
Total Connected Current (Amps): 5 A
Total Connected Load (kVA): 1.96 kVA
Total VA 2 0 0 41 EX. LOAD 20 1 0.00 0.00 1 20 Spare 42
39 EX. LOAD 20 1 0.00 0.00 1 20 Spare 40
37 EX. LOAD 20 1 0.00 0.00 1 20 Spare 38
35 EX. LOAD 20 1 0.00 0.00 1 20 Spare 36
33 EX. LOAD 20 1 0.00 0.00 1 20 Spare 34
31 EX. LOAD 20 1 0.00 0.00 1 20 Spare 32
29 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 30
27 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 28
25 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 26
23 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 24
21 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 22
19 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 20
17 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 18
15 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 16
13 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 14
11 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 12
9 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 10
7 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 8
5 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 6
3 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 4
1 P-1, P-2 2#12+G-3/4"C 20 1 1.06 0.90 1 20 2#12+G-3/4"C 120V TO MECH EQUIP 2
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P PHASE A
(kVA)
PHASE B
(kVA)
PHASE C
(kVA) P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 208Y/120V A.I.C. RATING: 65,000
PANELBOARD: EX. 4BB
EXISTING TO REMAIN
1. USE SPARE CIRCUIT BREAKER FOR NEW CIRCUITS.
NOTES:
Total Connected Current (Amps): 18 A Total Connected Load (kVA): 6.57 kVA
Total VA 0 4 3 41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 EX. RECP 4502 20 1 0.00 2.75 18
15 EX. RECP 4503 20 1 0.00 2.75
2 35 3#10+G-3/4"C P-3, P-4
13 EX. RECP 4506 20 1 0.00 0.00 1 20 Spare 14
11 EX. WATER SOFTNER 20 1 0.00 0.00 1 20 LTG RM 4506, 4503 12
9 120V TO MECH EQUIP 2#12+G-3/4"C 20 1 1.08 0.00 1 20 LTG RM 4502 10
7 EX. CONTROL PW 20 1 0.00 0.00 1 20 Spare 8
5 EX. CONTROL PW 20 1 0.00 0.00 1 20 EX. WATER HEATER 6
3 EX. PENTHOUSE LTG 20 1 0.00 0.00 1 20 EX. PENTHOUSE LTG 4
1 EX. PENTHOUSE LTG 20 1 0.00 0.00 1 20 EX. PENTHOUSE LTG 2
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P PHASE A
(kVA)
PHASE B
(kVA)
PHASE C
(kVA) P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN: 100
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 208Y/120V A.I.C. RATING: 65,000
PANELBOARD: EX. 4C
EXISTING TO REMAIN
1. PROVIDE NEW CIRCUIT BREAKER FOR NEW CIRCUITS. MATCH BREAKER TYPE WITH EXISTING.
NOTES:
Total Connected Current (Amps): 1 A Total Connected Load (VA): 0.36 kVA
Total VA 0 0 0 41 Space -- -- -- 0.00 0.00 -- -- -- Space 42
39 Space -- -- -- 0.00 0.00 -- -- -- Space 40
37 Space -- -- -- 0.00 0.00 -- -- -- Space 38
35 Space -- -- -- 0.00 0.00 -- -- -- Space 36
33 Space -- -- -- 0.00 0.00 -- -- -- Space 34
31 Space -- -- -- 0.00 0.00 -- -- -- Space 32
29 0.00 0.00 30
FCUs 2#2+G-3/4" C. 20 2
0.00 0.00 2 20 2#2+G-3/4" C. FCUs
25 DED. RECP 4027 20 1 0.00 0.36 1 20 2#12+G-3/4"C 120V TO MECH EQUIP 26
23 DED. RECP 4027 20 1 0.00 0.00 24
21 RECP RM 4611 20 1 0.00 0.00 22
19 MECH RM RECP 20 1 0.00 0.00
3 40 220V CORD. WEST WALL
17 RECP RM 4611 20 1 0.00 0.00 1 20 LTG RM 4606 18
15 LTG RM 4611 20 1 0.00 0.00 1 20 RECP RM 4606 16
13 CONTROL CKT 20 1 0.00 0.00 1 20 RECP RM 4606 14
11 MECH RM RECP 20 1 0.00 0.00 1 20 LTG RM 4602 12
9 MECH RM RECP 20 1 0.00 0.00 1 20 RECP RM 4602 10
7 MECH RM LTG 20 1 0.00 0.00 1 20 LTG RM 4604 8
5 Space -- -- -- 0.00 0.00 6
3 Space -- -- -- 0.00 0.00 4
1 Space -- -- -- 0.00 0.00
3 100 MAIN
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P A B C P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 120/208 Wye A.I.C. RATING: 65,000
PANELBOARD: EX. 4D
EXISTING TO REMAINEXISTING TO REMAIN
NOTES:
Total Connected Current (Amps): 2 A
Total Connected Load (kVA): 0.72 kVA
Total VA 0 0 0
29 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 30
27 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 28
25 CT CNTRL 4A, 4B 20 1 0.00 0.00 1 20 CT WATER MAKEUP 26
23 CT CNTRL 3A, 3B 20 1 0.00 0.00 1 20 SIEMENS CNTRL PNL 24
21 CT CNTRL 1A, 1B, 1C 20 1 0.00 0.00 1 20 CT CNTRL 2A, 2B, 2C 22
19 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 20
17 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 18
15 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 16
13 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 14
11 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 12
9 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 10
7 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 8
5 TEMP. 120V TO MECH 2#12+G-3/4"C 20 1 0.36 0.00 1 20 EX. LOAD 6
3 120V TO MECH EQUIP 2#12+G-3/4"C 20 1 0.36 0.00 1 20 EX. LOAD 4
1 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 2
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P PHASE A
(kVA)
PHASE B
(kVA)
PHASE C
(kVA) P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 120/208 Wye A.I.C. RATING: 65,000
PANELBOARD: EX. PHA
1. USE SPARE CIRCUIT BREAKER FOR NEW CIRCUITS.
NOTES:
Total Connected Current (Amps): 2 A Total Connected Load (kVA): 0.72 kVA
Total VA 0 0 1
41 EX. LOAD 20 1 0.00 0.72 1 20 2#12+G-3/4"C 120V TO MECH EQUIP 42
39 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 40
37 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 38
35 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 36
33 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 34
31 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 32
29 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 30
27 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 28
25 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 26
23 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 24
21 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 22
19 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 20
17 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 18
15 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 16
13 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 14
11 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 12
9 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 10
7 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 8
5 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 6
3 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 4
1 EX. LOAD 20 1 0.00 0.00 1 20 EX. LOAD 2
CK
T LOAD DESCRIPTION WIRE SIZE
(AWG) TRIP P PHASE A
(kVA)
PHASE B
(kVA)
PHASE C
(kVA) P TRIP WIRE SIZE
(AWG) LOAD DESCRIPTION CK
T
No No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS SINGLE SECTION
OPTIONS: MAIN:
MOUNTING: SURFACE WIRES: 4 BUS:
SUPPLY FROM: PHASE: 3 MAIN TYPE:
LOCATION: VOLTS: 120/208 Wye A.I.C. RATING: 65,000
PANELBOARD: EX. PHB
EXISTING TO REMAIN EXISTING TO REMAINEXISTING TO REMAIN EXISTING TO REMAIN
EX. 4B1EX. DP-W4-M
Notes:
TOTAL CURRENT: 161 A
TOTAL LOAD: 134.25 kVA
16 TEMP. ERC-4-7-5 3 100 A 40 A 25 A 21.00 PROVIDE NEW CIRCUIT...
15 TEMP. ERC-4-7-4 3 100 A 40 A 25 A 21.00 PROVIDE NEW CIRCUIT...
14 TEMP. ERC-4-7-3 3 100 A 40 A 25 A 21.00 PROVIDE NEW CIRCUIT...
13 TEMP. ERC-4-7-6 3 100 A 40 A 25 A 21.00 PROVIDE NEW CIRCUIT...
12 TEMP. ERC-4-7-10 3 100 A 45 A 31 A 26.00 PROVIDE NEW CIRCUIT...
11 TEMP. ERC-4-7-9 3 100 A 40 A 25 A 21.00 PROVIDE NEW CIRCUIT...
10 R-13 3 -- 30 A -- 0.00
9 EX. 4D VIA XFMR 4D 3 -- 60 A -- 0.00
8 Spare 3 -- 50 A -- 0.00
7 ACC-1 3 -- 20 A -- 0.00
6 Spare 3 -- 50 A -- 0.00
5 AC-12 3 -- 100 A -- 0.00
4 AHU-4E-17 3 15 A 15 A 4 A 3.25 USE SPARE CIRCUIT BREAKER.
3 AC-13 3 -- 100 A -- 0.00
2 EX. MCC-4D 3 400 A 100 A 0 A 0.00
1 RF R-12 3 -- 50 A -- 0.00
CKT LOAD NAME # OF
POLES
FRAME
SIZE
TRIP
RATING
CURRENT
(AMPERE)
LOAD
(kVA) REMARKS
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS
OPTIONS:
MAIN: 400
MOUNTING: WIRE: BUS: 400
SUPPLY FROM: PHASE: 3 MAIN TYPE: MLO
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 22,000
DISTRIBUTION PANEL: EX. 4D1
Notes:
TOTAL CURRENT: 206 A
TOTAL LOAD: 170.96 kVA
16 TEMP. ERC-4-5-1 3 400 A 225 A 173 A 144.00 PROVIDE NEW CIRCUIT...
15 TEMP BLOWER COIL UNITS 3 400 A 15 A 9 A 7.65 USE SPARE CIRCUIT BREAKER.
14 TEMP BLOWER COIL UNITS 3 400 A 20 A 14 A 11.47 PROVIDE NEW CIRCUIT...
13 SPACE -- -- -- -- 0.00 --
12 SPARE 1 -- 20 A -- 0.00
11 SPACE -- -- -- -- 0.00 --
10 SPARE 3 -- 50 A -- 0.00
9 SPACE -- -- -- -- 0.00 --
8 SPARE 3 -- 50 A -- 0.00
7 REHEAT PNL 5TH FLR RM 5117 3 -- 100 A -- 0.00
6 AHU-4CE-16 3 100 A 15 A 4 A 3.18 PROVIDE NEW CIRCUIT...
5 RF AC-10 3 -- 50 A -- 0.00
4 AHU-4CE-15 3 100 A 15 A 6 A 4.66 PROVIDE NEW CIRCUIT...
3 RF AC-11 3 -- 50 A -- 0.00
2 MCC 4C 3 -- 100 A -- 0.00
1 PANEL EX. 4C VIA XFMR 4C 3 100 A 60 A 0 A 0.00
CKT LOAD NAME # OF
POLES
FRAME
SIZE
TRIP
RATING
CURRENT
(AMPERE)
LOAD
(kVA) REMARKS
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS
OPTIONS:
MAIN: 400
MOUNTING: WIRE: BUS: 400
SUPPLY FROM: PHASE: 3 MAIN TYPE: MCA
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 35,000
DISTRIBUTION PANEL: EX. 4C1
Notes:
TOTAL CURRENT: 366 A
TOTAL LOAD: 304.64 kVA
12 TEMP. ERC-4-4-1 3 400 A 200 A 143 A 119.00 PROVIDE NEW CIRCUIT...
11 TEMP BLOWER COIL UNITS 3 100 A 15 A 9 A 7.65 PROVIDE NEW CIRCUIT...
10 TEMP BLOWER COIL UNITS 3 100 A 15 A 9 A 7.65 PROVIDE NEW CIRCUIT...
9 AHU-4CW-14 3 100 A 15 A 2 A 1.89 USE SPARE CIRCUIT BREAKER.
8 AHU-4CW-13 3 100 A 25 A 9 A 7.46 USE SPARE CIRCUIT BREAKER.
7 EX. PUMP 1 AND PUMP2 3 -- 0 A -- 0.00
6 EX. RF R-7 3 -- 0 A -- 0.00
5 EX. RF AC-8 3 -- 0 A -- 0.00
4 TEMP. ERC-4-4-2 3 400 A 250 A 194 A 161.00 PROVIDE NEW CIRCUIT...
3 EX. 4B VIA XF 3 -- 70 A -- 0.00
2 EX. MCC-4-B 3 -- 100 A -- 0.00
1 EX. LOAD 3 -- 0 A -- 0.00
CKT LOAD NAME # OF
POLES
FRAME
SIZE
TRIP
RATING
CURRENT
(AMPERE)
LOAD
(kVA) REMARKS
No No No No
FEED THRU LUGS 600-KCM LUGS FLUSH MOUNT ISOLATED GROUND BUS
OPTIONS:
MAIN: 400A
MOUNTING: WIRE: BUS: 400A
SUPPLY FROM: PHASE: 3 MAIN TYPE: MLO
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 22,000
DISTRIBUTION PANEL: EX. 4B1
EXISTING TO REMAIN EXISTING TO REMAIN EXISTING TO REMAIN EXISTING TO REMAIN
1 6/20/23 Addendum 1
ChanVC Highlight
SQUARE ELBOW
DOUBLE
THICKNESS
VANES
BRANCH DUCT
SUPPLY TAP
X
X
12" MAX
AIRFLOW
12" MAX
X
AIRFLOW
BRANCH DUCT
RETURN TAP
AIRFLOW
R
R=W
W
SUPPLY SPLITRADIUS ELBOWCOIL OR REGISTER
R
R=W
W
WAIRFLOW
DUCT TAP TO
REHEAT COIL
OR REGISTER
VOLUME EXTRACTOR
WITH MANUAL
ADJUSTING LEVER
20DEG MAX
TRANSITION
12 X 8*
* DIMENSIONS DENOTE
CLEAR INSIDE DIMENSIONS
ACOUSTICAL
LINED DUCT
DUCT CONSTRUCTION DETAILS
NOTE: SPECIFICATIONS EXCEED
SMACNA STANDARDS IN
SOME INSTANCES.
SMACNA SHALL BE
CONSIDERED THE MINIMUM
STANDARD UNLESS
OTHERWISE NOTED
M-500DTM-500DT N.T.S.
X
DUCT SUPPORT DETAIL
2" MINIMUM
SHEET METAL SCREWS
6" O.C. MIN. OF TWO
BOLT & WASHER
BENT STRAP
EXPANSION
SHIELD
3/8" ROD ONLY
18 ga X 1" GALV.
METAL STRAP
INSERT & SPRING
LOADED NUT
C-CLAMP WITH
RETAINING CLIP SIDE
BEAM CLAMP
LOCKNUT
(TYPICAL)
3/8" ROD ONLY
BEAM CLAMP
GALVANIZED
THREADED ROD
GALVANIZED
SUPPORT
ANGLE
25" OR WIDEROPTIONAL FOR 30"
OR SMALLER
DUCT WIDTH ROD DIA. SUPPORT ANGLE OR
EQUIVALENT CHANNEL
MAXIMUM
SPACING
MAXIMUM
AREA*
8'-0" O.C.
6'-0" O.C.
6'-0" O.C.
4'-0" O.C.
4'-0" O.C.
4 SQ. FT.
10 SQ. FT.
10 SQ. FT.
3/8"
3/8"
1/2"
1/2"
1/2"
25" TO 30"
31" TO 42"
43" TO 60"
61" TO 84"
85" AND UP
* REDUCE SPACING TO NEXT SMALLER INTERVAL IF DUCT AREA EXCEEDS MAXIMUM
1 1/2" X 1 1/2" X 1/8"
1 1/2" X 1 1/2" X 1/8"
1 1/2" X 1 1/2" X 1/8"
2" X 2" X 1/4"
2" X 2" X 1/4"
M-500DTM-500DT N.T.S.
EXPANSION TANK DETAIL
* SECOND VALUE IS
ACCEPTANCE VOLUME
A B C
SIZE*
QUAN.
BACKFLOW PREVENTER
BY OTHER DIVISION
ISOLATION VALVE (TYP.)
GLOBE VALVE FOR
QUICK FILL
PRESSURE REDUCING
VALVE SET AT B PSI
TERMINATE ABOVE
FUNNEL DRAIN
DIAPHRAGM
TYPE EXPANSION
TANK
AIR ELIMINATORTERMINATE ABOVE
FUNNEL DRAIN
LINE SIZE
AIR SEPARATOR
TO PUMP
SUCTION
TERMINATE ABOVE
FUNNEL DRAIN
RELIEF VALVE SET
AT C PSI
A
M-500DTM-500DT N.T.S.
A
HWR
HWS
A
STRAINER
COMBINATION
BALANCE & FLOW VALVE
AIR VENT
TYPICAL
PRESSURE & TEMPERATURE
PORT (TYPICAL)
ISOLATION VALVE
BLOWDOWN VALVE
CONTROL VALVE
REDUCER
GPM A
HOSE END
BALL VALVE
UNION
(TYPICAL)
HOT WATER REHEAT COIL4
M-500DTM-500DT N.T.S.
2" and Smaller 2 1/2" and Larger
Fluids 150°F -250°F (15psi Steam) - 50' from Anchor Fluids greater than 250°F - 30' from Anchor
Fluids greater than 100°F 2" and Smaller 2 1/2" and Larger
Fluids less than 100°F 2" and Smaller 2 1/2" and Larger
12" RIGID
INSULATION
12" SHIELD
HANGER
PIPE
INSULATION
18" RIGID INSULATION
18" SHIELD
ROD
DOUBLE NUTS
AND WASHERS
12" RIGID
INSULATION
12" SHIELD
INSULATION INSERT
SADDLE
HANGER SCHEDULE
PIPE SIZE ROD SIZE MAX. SPACING
up to 1 1/4" up to 1 1/2" 1 1/2" & 2" 2 1/2" & 3"
4" & 5" 6"
8", 10", 12" 14" & 16"
18"
3/8" DIA.
3/8" DIA.
3/8" DIA.
1/2" DIA.
5/8" DIA.
3/4" DIA.
7/8" DIA.
1" DIA.
1 1/8" DIA.
8' Steel 6' Copper & Steel
10' 10' 10' 10' 10' 10' 10'
PIPE HANGER DETAIL7
M-500DTM-500DT N.T.S.
METAL DECK HANGER BOLTS CONCRETE DECK INSERTS
BEAM CLAMPS
SUPPLEMENTAL STEEL
WELDING PROCEDURE TO
BE SUBMITTED FOR REVIEW
INTERMEDIATE ATTACHMENT
ONE SIZE LARGER THAN
LARGEST HANGER ROD
END ATTACHMENT
TO BE SAME AS
LARGEST HANGER ROD
SQUARE STEEL WASHER TYP
BACK TO BACK STRUCTURAL SHAPES
WITH SPACERS WELDED AT 24" INTERVALS
TWO HANGER RODS MAXIMUM
BETWEEN STRUCTURE ATTACHMENTS
PIPE HANGER ATTACHMENT DETAIL6
M-500DTM-500DT N.T.S.
MANUAL & AUTOMATIC AIR VENTS8
M-500DTM-500DT N.T.S.
4 x PIPE
DIAMETER
10" MAX.
4 x PIPE
DIAMETER
10" MAX.
1/2" ISOLATION VALVE
REDUCER
INSULATION
MANUAL
HIGH POINT
IN SYSTEM
AUTOMATIC
AUTOMATIC AIR VENT
1/4" TYPE "L" COPPER TUBE
TO NEAREST SUITABLE DRAIN
CONVERTOR CONNECTIONS
HOT WATER
CONVERTOR
FULL SIZE OF
OUTLET
F&T TRAP
CONDENSATE RETURN
MAIN
FULL SIZE OF
INLET
HOT WATER SUPPLY
HOT WATER RETURN
THERMOMETER (TYP.)
TO DRAIN
RELIEF VALVE
12" MIN.
6" MIN.
DIRT POCKET WITH
CAP OR FLANGE
UNION (TYP.)
GLOBE OR PLUG VALVE
SAME SIZE
AS LARGER
CONTROL VALVE
STEAM
MAIN
STRAINER
CONTROL VALVE
ECCENTRIC REDUCER
ISOLATION VALVE
TYPICAL
A B
B
C A
M-500DTM-500DT N.T.S.
VACUUM BREAKER
BLOWDOWN
VALVE
END OF MAIN DRIP
PITCH DOWN
12" MIN.
6" MIN
UNION (TYP.)
DIRT POCKET WITH
CAP OR FLANGE
1/2" GLOBE VALVE
3/4" MINIMUM
GATE VALE (TYP.)
CONDENSATE RETURN MAIN
FOUR ELBOW
SWING JOINT
F&T TRAP
STRAINER WITH
BLOW DOWN VALVE
PITCH DOWN
STEAM MAIN
FULL SIZE
OF MAIN
M-500DTM-500DT N.T.S.
STEAM HUMIDIFIER DETAIL
FROM HUMIDIFIER
CONTROL VALVE
A
DISTRIBUTION MANIFOLDS A B
6" MIN.
10" MIN.
B
PROVIDE STAINLESS STEEL
BLANK OFF AROUND HUMIDIFIER
CONDENSATE TO COOLER
TEMPERATURE ACTUATED
VALVE
COLD WATER FROM
BACKFLOW PREVENTER
TEMPERATURE SENSOR
TEMPERED WATER
TO FLOOR DRAIN
VACUUM BREAKER
CONDENSATE COOLER
M-500DTM-500DT N.T.S.
UNFIRED STEAM GENERATOR16
M-500DTM-500DT N.T.S.
PP
P
P
LEVEL CONTROLLER
LOW PRESSURE
HUMIDIFICATION
STEAM (LPHS)
COLD WATER
PRIMARY STEAM
(H/MPS)
CONDENSATE RETURN
(H/MPR)
VENT TO ROOF
NOTES:
1. PIPING TO THE UPPER HEATER HEAD SHOULD BE PROVIDED WITH UNIONS OR FLANGES WHICH ARE LOCATED
BEYOND THE OUTSIDE DIAMETER OF THE HEAD TO PERMIT REMOVAL OF THE HEAD AND SHELL.
2. THE CONTROL VALVE SHOULD BE LOCATED 6" TO 12" ABOVE THE LOWER HEAD FLANGE. THE PIPING BETWEEN
THE VALVE AND HEATER CONNECTION SHOULD BE AS SHORT AS POSSIBLE.
3. REDUCERS, ON THE WATER INLET SIDE SHOULD BE LOCATED ADJACENT TO THE HEATER EXPANSION FITTINGS, ON THE WATER INLET SIDE, SHOULD BE LOCATED AS FAR AS POSSSIBLE FROM THE HEATER.
4. CONDENSATE RETURN PIPING SHOULD BE ARRANGED TO PERMIT THE CONDENSATE TO DRAIN FREELY.
5. DRAIN VALVE SHOULD BE PIPED DIRECTLY TO A FLOOR DRAIN. RELIEF VALVE SHOULD BE PIPED UP TO ROOF.
6. COLD WATER SUPPLY PRESSURE MUST BE GREATER THAN SECONDARY STEAM PRESSURE.
7. REFER TO PLANS FOR PIPE SIZES.
8. REFER TO PLANS FOR VENTING AND RELIEF PIPING DETAILS.
CHECK VALVE
STEAM TRAP
STRAINER W/
BLOWDOWN VALVE
ISOLATION VALVE
PRESSURE GAUGE
VACUUM BREAKER
CONTROL VALVE
DRAIN VALVE
RELIEF VALVE
UNION
DRAW THRU CONFIGURATION
1. H=UNIT STATIC PRESSURE IN INCHES
OF WATER PLUS 1 INCH.
2. L= 1/2 OF H.
BLOW THRU CONFIGURATION
1. H=1 INCH.
2. L=TOTAL STATIC PRESSURE IN INCHES
OF WATER PLUS 1 INCH.
DRAIN PAN
H (REFER TO NOTE 1)
L (REFER TO NOTE 2)
REFER TO NOTE 4
CONDENSATE DRAIN SHALL BE
A MINIMUM OF THE NIPPLE
SIZE ON THE DRAIN PAN
CLEAN OUT PLUG
PITCH DOWN
TOWARD DRAIN
CLEAN OUT PLUG
NOTES:
1. REFER TO PLANS AND SCHEDULES TO DETERMINE UNIT'S CONFIGURATION.
2. REFER TO SCHEDULES FOR UNIT'S TOTAL STATIC PRESSURE.
3. MANUALLY PRIME TRAPS PRIOR TO START-UP OF UNIT.
4. UNITS ABOVE CEILING: DRAIN PIPING SHALL BE INSULATED AND PIPED TO THE NEAREST
DRAIN (UNLESS OTHERWISE NOTED) WITH AN AIR GAP OF 2X THE CONDENSATE DRAIN SIZE.
UNITS ON ROOF: DRAIN PIPING SHALL BE HEAT TRACED, INSULATED AND PIPED TO ROOF
DRAIN, SPLASH BLOCK (BY THIS DIVISION) OR LOCATED INSIDE THE BUILDING.
UNITS INSIDE THE BUILDING: DRAIN SHALL BE PIPED TO THE NEAREST FLOOR DRAIN
(UNLESS OTHERWISE NOTED) WITH AN AIR GAP OF 2X THE CONDENSATE DRAIN SIZE.
COOLING COIL DRAIN TRAP DETAIL1
M-500DTM-500DT N.T.S.
F&T TRAP
0.0-4.0 3/4"
4.0-8.0 1"
8.0-16.0 1-1/4"
H-4W-12 1" 3/4"
H-4CW-13 1" 3/4"
H-4CW-14 1" 3/4"
H-4CE-15 1-1/4" 1"
H-4CE-16 1" 3/4"
H-4E-17 1" 3/4"
H-PW-19 1-1/4" 1"
UNIT NO.
H-PE-20 1-1/4" 1"
DIRT POCKET WITH
CAP OR FLANGE
12" MIN.
6" MIN
HOSE END
BALL VALVE
MANUAL BYPASS
TO EXISTING
HUMIDIFICATION
STEAM SYSTEM
2.0/1.0
ET-1 ET-2
2.0/1.0
1" 1" 30 30 75 75
TO BLOWDOWN SEPARATOR
CONDENSATE OUTLET
TO EXISTING LPR
1"=1"
1" 2"
1/8"=1' -0"
4' 8' 16'
1"=100' -0"
100' 200'
1/16"=1' -0"
8' 16' 32'
1"=50' -0"
50' 100'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
OFEO PROJECT
NUMBER
DRAWING TITLE
WORKING STAFF
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
DRAWING TYPE
Annum Architects 40 Broad Street Boston, MA 02109 617 338 3000
Altieri Sebor Wieber, LLC 31 Knight Street Norwalk, CT 06851 203 866 5538 171 Milk Street 3rd floor Boston, MA 02109 617 468 1000
: 3 :4 P M
REPLACE ACU’S FOR
COLLECT. STOR.ON 4TH
AND 5TH FLOORS
MECHANICAL DETAILS
2003112
REPLACE ACU’S FOR COLLECT.
STOR.ON 4TH AND 5TH FLOORS
12/21/22 CONSTRUCTION DOCUMENTS
M D T B Y A p p ro ve r E n te r Is su e D a te
C O N S
TR
U C
TI
O N
D O C U M E N
TS
NMAH
600 MARYLAND AVE SW,
WASHINGTON, DC 20002
NMAH
2003112
M-500DT
HY MFHY
PIPING ROOF PENETRATION12
M-500DTM-500DT N.T.S.
NOTES:
1. INSIDE CLEAR DIMENSIONS OF THE CURB SHALL BE:
-WIDTH: EQUAL TO THE O.D. OF THE LARGEST PIPE, INCLUDING INSULATION, PLUS 4" OF CLEARANCE.
MINIMUM WIDTH IS 12".
-LENGTH: EQUAL TO THE OVERALL WIDTH OF THE PIPING RACK AND INSULATION PLUS 4" OF CLEARANCE.
2. PROVIDE A MIN OF 2" CLEARANCE BETWEEN PIPE PENETRATIONS IN THE INSULATED METAL PANEL.
3. ROOF OPENINGS SHALL BE 4" SMALLER THAN THE INSIDE CURB DIMENSIONS IN BOTH DIRECTIONS. REFER TO
STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION REGARDING ROOF OPENING FRAMING.
4. EXTERIOR PIPE INSULATION AND JACKET SHALL EXTEND INTO THE PIPING ENCLOSURE. SEAL THE BUTT JOINT BETWEEN INTERIOR AND EXTERIOR INSULATION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
ADD INSULATION AT CAP
20 GAUGE ALUMINUM
WEATHERPROOF CAP/COUNTER
FLASHING SECURED TO CURB
ROOF MEMBRANE
ROOF INSULATION
ROOF. REFER TO
ARCHITECTURAL DWGS.
FOR ROOF DETAILS.
REFER TO NOTE #3.
PIPING THROUGH SIDE
OF CURB. SEAL WATERTIGHT.
INSULATED ALUMINUM ROOF CURB
TO MATCH ROOF INSULATION
R-VALUE WITH CANT STRIPS.
2" INSULATED METAL PANEL.
DRILLED FOR OPENINGS.
REFER TO NOTE#2.
PIPING AND
INSULATION.
WIDTH
REFER TO NOTE #1
WIDTH
REFER TO
NOTE #1
LENGTH
REFER TO NOTE #1
REFER TO NOTE #2
CURB
REFER TO NOTE #4
1/2"
PRESSURE
GAUGE
UNION
TYPICAL
HOSE END
GATE VALVE
TYPICAL
THERMOMETER
TYPICAL
AIR VENT
TYPICAL
CHILLED WATER COOLING COIL
CHS
CHR
ISOLATION
VALVE
TYPICAL
BLOWDOWN
VALVE
STRAINER
CONTROL VALVE
ECCENTRIC REDUCEER
UNION (TYPICAL)
COMBINATION BALANCE
& FLOW VALVE
A
UNIT NO.
CONN
A
M-500DTM-500DT N.T.S.
STACKED CHILLED WATER COOLING COIL
A B
UNIT NO.
CONNECTIONS
M-500DTM-500DT N.T.S.
BLOWDOWN SEPARATOR
4" VENT TO ROOF
1/2" STRAINER
TEMPERATURE REGULATOR VALVE
1"
BLOWDOWN
SEPARATOR
COLD WATER INLET
3 LEGS TYP.
BIMETAL
THERMOMETER
TEMPERATURE
SENSING
BULB
SLAB
PLUG VALVE
COLD WATER
SUPPLY LINE
1/2"
3"
FROM UNFIRED
STEAM GENERATOR
M-500DT M-500DT
3" DRAIN TO EXISTING
BLOWDOWN RECEPTOR
AHU-4CW-13 2-1/2"
AHU-4W-12 2"1"
AHU-4CW-14 1"3/4"
AHU-4CE-15 2"1"
AHU-4CE-16 1-1/2"1"
AHU-4E-17 2-1/2"1"
AHU-PW-19 2-1/2"2"
AHU-PE-20 2"2"
A B
UNIT NO.
CONNECTIONS
C-1 4" 3"
4" 3"C-2
C
2"
2"
1 6/20/23 Addendum #1
BALL VA.
UNION (TYP.)
CONTROL VALVE
SUPPLY AND ON EACH
PROVIDE ON COMMON
THERMOMETER TYPICAL
ECCENTRIC REDUCER
BRANCH RETURN
PRESSURE
BALL VALVE TYPICAL
HOSE END WITH
UNION
GAUGE
BALL
VA.
1/2"
VALVE (TYPICAL)
AUTOMATIC BALANCING
AIR VENT
BUTTERFLY OR
BALL VA. (TYPICAL)
HOSE END BALL VA
CHS
CHR
STRAINER
AIR VENT
TYPICAL
CONTROL VALVE
A
A
B
HOT WATER CONVERTOR
UNIT
NO LOCATION
SYSTEM
SERVED PSI LBS/HR TRAP CAP
SHELL SIDE
EWT LWT GPM FOULING PD
TUBE SIDE
MAKE/MODEL REMARKS
PUMPS
REMARKSMAKE/MODELTYPE
ELECTRICAL
RPMPHVOLTSHPBHP
MAX
FT
HEAD
TEMP
MAX
GPMFLUIDSERVED
SYSTEM
LOCATIONNO
UNIT
P-2 REHEAT COILSMECH RM 4000M2
P-1 WATERMECH RM 4000M2
P-3
HOT WATER COILS
UNIT NO LOCATION SERVES
CAP
MBH CFM EAT LAT VEL PD
AIR DATA
EWT LWT GPM PD
WATER DATA
SIZE ROW/FIN MAKE/MODEL REMARKS
HWC-4-2-1
HWC-4-4-1
HWC-4-4-2
MECH RM 4000M1 64 50 75 720 0.23 IN 130 110 6.36 7.06 FT 26x18 2 TRANE DTTB2340RM 4001FB
FPI
ROWS
PD
AIR
FPM
VELWATER DATA
GPMLWTEWT
AIR DATA
LATEATSMBH
TMBH
CURRENT CHILLED WATER COIL
UNIT NO LOCATION SERVES
MAX
CURRENT OA CFM
WHEEL
TYPE
FAN
TYPE
FAN
RPM
MAX
BHP W VOLTS PH RPM
ELECTRICAL
SUPPLY FAN SECTION
REMARKSMAKE/MODEL
AIR HANDLING UNIT SCHEDULE
CURRENT
AHU-4CE-15
AHU-4CE-16
22004TH FLOOR WEST 220MECH RM 4000M1 3 -2367 -AHU-4W-12 N/A 460 500
MAX13.8374.3 DB
62.5 WB
49.5 DB
49.0 WB -
AHU-4CW-13
INGENIA43.0 54.9PLENUM
FAN ARRAY
UNFIRED STEAM GENERATOR
UNIT
NO LOCATION
SYSTEM
SERVED PSI LBS/HR
STEAM INPUT STEAM OUTPUT
MAKE/MODEL REMARKSPSI LBS/HR
C-2 HW REHEAT COILS
C-1 HW REHEAT COILSMECH RM 4000M2
P-4
AHU-PE-20
AHU-4CW-14
AHU-4E-17
AHU-PW-19
MECH RM 4000M3
MECH RM 4000M3
MECH RM 4000M3
REHEAT COILS
REHEAT COILS
REHEAT COILS
5700 3 -4037 17.09 7457 (2)CDQ 460 619.1 (T)
295.0 (S) DESICCANT WHEEL
4000 3 -3332 - 460 25.15 -43.0 54.9
6900 3 -3071 - 460 43.37 -43.0 55.0
4500 3 -3980 - 460 28.28169.7 (T)
122.1 (S) 43.0 55.0
2700 3 -3272 - 460 16.9743.0 55.0
14,900 3 -2947 - 460 93.6543.0 54.9
12,000 3 -3112 - 460 75.4343.0 55.1
MECH RM 4000M2
MECH RM 4000M3
MECH RM 4000M3
MECH RM 4000M4
MECH RM PH2603
MECH RM PH2602
MECH RM 4000M2
USG-2 STEAMMECH RM 4000M3
USG-1 MECH RM 4000M2 STEAM 31445 25015 CEMLINE V45USG1018 -
37745 30015 -
360 0.05 IN 2.04 3.47 FT 33x9740RM 4000M7, 4107A, 4406, 4110
689 0.21 IN 6.09 6.54 FT 26x182240RM 4107
833 0.31 IN 8.49 4.56 FT 30x183125
675 0.23 IN 5.02 7.91 FT 32x121800
698 0.22 IN 6.01 5.68 FT 38x122210
592 0.22 IN 1.16 0.46 FT 10x9370
624 0.24 IN 1.20 0.49 FT 10x9390
588 0.20 IN 0.79 0.64 FT 10x6245
MECH RM 4000M2
MECH RM 4000M2
MECH RM 4000M3
MECH RM 4000M3
MECH RM 4000M3
MECH RM 4000M4
MECH RM 4000M4
MECH RM 4000M4
HWC-4-5-1
HWC-4-5-2
HWC-4-5-3
HWC-4-7-3
HWC-4-7-4
HWC-4-7-5
816 0.20 IN 0.96 0.54 FT 10x6340MECH RM 4000M4
MECH RM 4000M4
MECH RM 4000M4
HWC-4-7-6
HWC-4-7-9
HWC-4-7-10
CEMLINE V45USG1018
50 75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
75 130 110
MODEL
VSR200
AIR SEPARATOR
ITEM MANUFACTURER
SPIROTHERM 6.3"
DIAMETER
GPM
19"
HEIGHT
SIZE
REMARKS
AS-1
VSR200SPIROTHERM 6.3"19" -AS-2
SERVICE
EXPANSION TANK SCHEDULE
ITEM MODEL LOCATION
DIA.
VOLUME
ACCEPT.
HOT WATER
TYPE
INITIAL
PRESS.
FILL
SIZE
HEIGHT
REMARKSMAKE
BELL & GOSSETTET-1 DIAPHRAGMHFT-15 1.0 8"
(GAL.)
HOT WATERBELL & GOSSETTET-2 DIAPHRAGMHFT-15 1.0 8"12-5/8"
MECH RM 4000M2
MECH RM 4000M3
12 PSI
12 PSI
NOTES:
MANUFACTURERITEM MODEL
SIZE (INCHES)ENT AIR
STEAM HUMIDIFIER SCHEDULE
CFMLOCATION
DB°F DB°F%RH
LVG AIR
%RH PSIG
STEAM
WIDTH HEIGHT
LBS\HR
MAX.
ABSORB.
DISTANCE
1. PROVIDE DRAIN COOLER FOR EACH HUMIDIFIER.
2. REFER TO FLOW DIAGRAMS FOR QUANTITY.
DRI-STEEM ULTRA-SORB LV 7400 65 54 70 50 15 MATCH UNIT MATCH UNIT 27.64H-4W-12
H-4CW-13
H-4CW-14
H-4CE-15
H-4CE-16
DRI-STEEM ULTRA-SORB LV
DRI-STEEM ULTRA-SORB LV
DRI-STEEM ULTRA-SORB LV
DRI-STEEM ULTRA-SORB LV
MATCH UNIT MATCH UNIT
MATCH UNIT MATCH UNIT
MATCH UNIT MATCH UNIT
MATCH UNIT MATCH UNIT
6"
3. DISPERSION TUBES SHALL BE INSULATED TYPE.
H-4E-17 DRI-STEEM MATCH DUCT MATCH DUCT6500ULTRA-SORB LV
TSP ESP
6.5"
8.13"
5.5"
6.5"
6.0"
6.5"
6.5"
6.5"
3.0"
3.0"
2.5"
3.0"
3.0"
3.0"
3.5"
3.5"
N/A
N/A
N/A
N/A
N/A
N/A
NOTES: 1. PROVIDE CONDENSATE BLOWDOWN COOLER FOR EACH UNFIRED STEAM GENERATOR
H-PW-19 DRI-STEEM ULTRA-SORB LV MATCH UNIT MATCH UNIT15500
H-PE-20 DRI-STEEM MATCH DUCT MATCH DUCT17500ULTRA-SORB LV
AHU-4W-12
AHU-4CW-13
AHU-4CW-14
AHU-4CE-15
AHU-4CE-16
AHU-4E-17
AHU-PW-19
AHU-PE-20
6"
6"
6"
6"
6"
6"
6"
60 43
64 55
64 55
64 55
64 55
64 55
64 55
TRANE CDQ
INGENIA
INGENIA
INGENIA
INGENIA
INGENIA
INGENIA
PLENUM
FAN ARRAY
PLENUM
FAN ARRAY
PLENUM
FAN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .