DRAWING NO. DESCRIPTION
TITLE SHEET
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
SPECIFICATIONS
GENERAL SITE PLAN
MECHANICAL LEGENDS & ABBREVIATIONS
MECHANICAL NOTES & ABBREVIATIONS
FLOOR PLAN - PARKING 'C' LEVEL (8' ELEVATION) - MECHANICAL DEMOLITION
FLOOR PLAN - PARKING 'C' LEVEL (8' ELEVATION) - MECHANICAL NEW WORK
PARTIAL FLOOR PLAN - CHILLER PLANT - PARKING LEVEL 'C' - MECHANICAL DEMOLITION
PARTIAL FLOOR PLAN - PARKING 'C' LEVEL (8' ELEVATION) - MECHANICAL DEMOLITION
PARTIAL FLOOR PLAN - CHILLER PLANT - MECHANICAL NEW WORK - PARKING LEVEL 'C' (8' ELEVATION)
PARTIAL FLOOR PLAN - RIVER PUMP ROOM - MECHANICAL NEW WORK - PARKING LEVEL 'C' (8' ELEVATION)
PARTIAL FLOOR PLAN - PARKING LEVEL 'B' (17' ELEVATION) - MECHANICAL NEW WORK
PARTIAL FLOOR PLAN - PLAZA LEVEL (40' ELE.) - MECHANICAL NEW WORK
MECHANICAL DETAILS
MECHANICAL DETAILS & SCHEDULES
MECHANICAL CONTROL DIAGRAM
MECHANICAL CONTROLS
ELECTRICAL LEGEND, ABBREVIATIONS & PANEL SCHEDULES
FLOOR PLAN - PARKING 'B' LEVEL (17' ELEVATION) - ELECTRICAL NEW WORK
PARTIAL FLOOR PLAN - RIVER PUMP ROOM - ELECTRICAL NEW WORK - PARKING LEVEL 'C' (8' ELEVATION)
ELECTRICAL DETAILS & ELEVATIONS
ELECTRICAL ONE-LINE DIAGRAM
STRUCTURAL GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
PARTIAL FLOOR PLAN, SECTIONS & DETAILS
PARTIAL FLOOR PLAN, SECTIONS & DETAILS
PARTIAL FLOOR PLAN, SECTIONS & DETAILS
DETAILS
SHEET NO.
T-001
G-001
G-002
G-003
G-004
G-005
GS-001
M-001
M-002
M-101
M-201
M-401
M-402
M-403
M-404
M-405
M-406
M-501
M-502
M-601
M-602
E-001
E-201
E-401
E-501
E-502
S-001
S-101
S-102
S-103
S-201
27OF 31
28OF 31
TITLE SHEET
14904.010
2/08/2019
- 2/08/2019
FINAL SUBMISSION
FINAL SUBMISSION
A
B
2 3
C
D
1 2 3
4 5
4 5
PROJECT:
C
EBL ENGINEERS, LLC
MECHANICAL * ELECTRICAL * FIRE PROTECTION
8005 Harford Road, Baltimore, Maryland 21234-5701
D
The Professional Engineering Center e-mail ebl@eblengineers.com
(410) 668-8000 FAX (410) 668-8001
B
A
SHEET TITLE
CHECKED BY:
MARK
PROJECT NO:
DATE:
DRAWN BY:
ISSUE:
DATE DESCRIPTION
TH
E
JO
H
N F
. K
EN
N
ED
Y C
EN
TE
R fo r t he
P
ER
FO
R
M
IN
G A
R
TS
F .S
T, N
W W
A
SH
IN
G
TO
N
, D C
C O
N D
E N
S E
R
W
A T
E R
S
Y S
T E
M
R
E P
A I R
S
J F
K K
T
A S
K
SEAL:
T-001
PJP
JSR
G p r o je c ts .0 c a d d S u b m is si o n
F in a l\ .0
T .d w g
:2 :1
P M
JR
A
IT
H E L
AutoCAD SHX Text THE JOHN F. KENNEDY CENTER FOR THE PERFORMING ARTS 2700 F STREET NW WASHINGTON, DC 20566 CONDENSER WATER SYSTEM REPAIRS (JFK19K2006) (TASK #1) FINAL SUBMISSION FEBRUARY 8, 2019
AutoCAD SHX Text
DRAWING LIST
SECTION 01100 - GENERAL REQUIREMENTS
1. THE FOLLOWING DRAWINGS SHALL BE CONSIDERED BIDDING DOCUMENTS TO RELAY THE DESIGN INTENT TO THE INSTALLING
CONTRACTOR(S). THE CONTRACTOR(S) SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL SYSTEMS WHICH MEET THE INTENT OF
THE DOCUMENTS. THE CONTRACTOR(S) SHALL BE RESPONSIBLE FOR THE INSTALLATION AND COORDINATION OF THE SYSTEMS.
LIMITS OF WORK, INCLUSIONS, EXCLUSIONS, SUBSTITUTIONS AND DEVIATIONS SHALL BE CLEARLY DEFINED IN CONTRACTOR'S BID.
2. RELATED DOCUMENTS: THE GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL CONDITIONS, SUPPLEMENTARY
CONDITIONS AND GENERAL REQUIREMENTS APPLY TO THE WORK SPECIFIED AND ARE HEREBY MADE A PART OF THIS PROJECT.
3. SUMMARY OF WORK:
BASE BID PROJECT: THE PURPOSE OF THIS PROJECT IS TO PROVIDE THE KENNEDY CENTER THE ABILITY TO CONNECT RENTAL
COOLING TOWERS AND PUMPS TO THEIR EXISTING CHILLED WATER PLANT IN ORDER TO PERFORM MAINTENANCE AND REPAIRS ON
THE EXISTING RIVER WATER CONDENSER SYSTEM. WORK IS A MIX OF PERMANENT AUXILIARY CONDENSER WATER PIPING, POWER
AND EQUIPMENT AND RENTAL EQUIPMENT. THIS PROJECT ALSO INCLUDES MAINTENANCE AND REPAIR WORK TO THE EXISTING
RIVER WATER INTAKE TANKS, FOOT VALVES, PIPING AND FILTERING SYSTEMS. THIS PROJECT REQUIRES DEMOLITION, OF
EXISTING COMPONENTS, FURNISHING AND INSTALLING OF COMPLETE FUNCTIONING SYSTEMS, AND EACH ELEMENT THEREOF AS
SPECIFIED OR INDICATED ON DRAWINGS OR REASONABLY INFERRED; INCLUDING EVERY ARTICLE, DEVICE OR ACCESSORY
(WHETHER OR NOT SPECIFICALLY CALLED FOR BY ITEM) REASONABLY NECESSARY TO FACILITATE EACH SYSTEMS FUNCTIONING
AS INDICATED BY THE DESIGN AND EQUIPMENT SPECIFIED. SUMMARY OF WORK INCLUDES BUT IS NOT LIMITED TO THE
FOLLOWING:
A. PERMANENTLY INSTALLED AUXILIARY CONDENSER WATER PIPING, STRUCTURAL SUPPORTS, VALVES AND ACCESSORIES TO
ALLOW CONNECTION OF RENTAL COOLING TOWERS AND PUMPS TO THE FACILITY CHILLER PLANT.
B. DOMESTIC COLD WATER MAKE-UP PIPING, VALVES, ACCESSORIES AND WATER METER FROM THE BUILDING SOURCE SPECIFIED
TO THE POINT OF RENTAL COOLING TOWER CONNECTION HEADER .
C. PERMANENTLY INSTALLED ELECTRICAL CONDUCTORS, CONDUIT, DISCONNECTS AND ACCESSORIES FOR POWERING RENTAL
EQUIPMENT.
D. MODIFICATION AND EXPANSION OF THE EXISTING JOHNSON CONTROLS FACILITY EXPLORER (JCI FX) CHILLER PLANT DDC
CONTROL SYSTEM TO ALLOW SEMI-AUTOMATED CONTROL OF RENTAL EQUIPMENT AS SPECIFIED.
B. PROCUREMENT OF RENTAL COOLING TOWERS, PUMPS HOSES, ELECTRICAL CONDUCTORS AND ACCESSORIES NECESSARY TO
INTERCONNECT RENTAL EQUIPMENT TO BUILDING CONDENSER WATER PIPING AND ELECTRICAL POWER SOURCE AS
SPECIFIED HEREIN.
B.1. CONTRACTOR SHALL PROVIDE ALL LIFTING AND RIGGING FOR SETUP AND TEARDOWN OF RENTAL EQUIPMENT.
B.2. CONTRACTOR SHALL PROVIDE ALL CRIBBING NECESSARY FOR RENTAL EQUIPMENT LEVELING.
C. CONTRACTOR SHALL PROVIDE ALL TRAFFIC CONTROL MEASURES INCLUDING SUBMISSION OF TRAFFIC CONTROL PLANS, APPLICATION FOR PERMITS. ALL PERMIT FEES WILL BE PAID BY THE KENNEDY CENTER.
D. CLEANING INTERIOR BORE OF EXISTING 24" RIVER WATER SOURCED CONDENSER WATER SUPPLY AND RETURN MAINS IN THE
PIPE TRENCH BENEATH THE PARKING GARAGE FLOOR TO THE TOP OF THE VERTICAL RISERS IN THE CHILLER PLANT.
E. REMOVAL AND REPLACEMENT OF EXISTING CONCRETE TRENCH COVERS OVER CONDENSER WATER PIPING IN THE PARKING
GARAGE. GARAGE CLEARANCE IS LOW (6'-0").
E.1. CONTRACTOR SHALL PROVIDE BREAKOUT PRICING AT TIME OF BID FOR REPLACEMENT OF CONCRETE COVERS
DAMAGED AS A RESULT OF WORK FOR THIS PROJECT. PRICING SHALL BE PER PANEL.
F. CLEANING AND REPAIR OF ALL CHAMBERS IN THE RIVER WATER INTAKE TANK.
G. REMOVAL AND INSTALLATION OF RIVER WATER SOURCED CONDENSER WATER SYSTEM FOOT VALVES AND RISER PIPES.
H. MODIFICATION AND RECONFIGURATION OF 24"Ø RIVER WATER SOURCED CONDENSER WATER PIPING IN RIVER PUMP ROOM.
I. .
J. STRUCTURAL STEEL PIPE SUPPORTS FOR AUXILIARY CONDENSER WATER PIPING SYSTEM.
K. INSTALLATION OF SERVICE ACCESS PORTS, VALVES AND ACCESSORIES TO ACCOMMODATE FUTURE MAINTENANCE
INSPECTIONS.
L. LIFTING, RIGGING AND SCAFFOLDING NECESSARY TO PERFORM WORK SPECIFIED.
4. ADD ALTERNATE #1: PROVIDE ADD ALTERNATE PRICING FOR CONSTRUCTION OF A BISECTING WALL AND INSTALLATION OF SLUICE
VALVE IN THE EXISTING RIVER WATER DRAFT TANK. PROVIDE DRAFT TANKS SWEEP SYSTEM PIPING WITHIN THE TWO (2) SECTIONS
OF THE DRAFT TANK. THE PROJECT SHALL INCLUDE ALL PIPE FITTINGS AND ACCESSORIES AS SPECIFIED. NECESSARY PUMPS, PIPING, ACCESSORIES AND CONNECTIONS TO EXISTING RIVER WATER SYSTEM ARE EXCLUDED AND TO BE SPECIFIED AND
PROVIDED IN A FUTURE PROJECT.
5. ADD ALTERNATE #2: PROVIDE ADD ALTERNATE PRICING FOR REMOVAL AND REPLACEMENT OF TWO (2) EXISTING TRAVELING
SCREEN UNITS, TWO (2) BACKWASH PUMPS, PIPING, PIPELINE ACCESSORIES AND CONTROLS AS SPECIFIED.
6. ADD ALTERNATE #3: HIGH PRESSURE PIPELINE CLEANING OF RIVER WATER SOURCED CONDENSER WATER RETURN PIPING IN THE
RIVER PUMP ROOM FROM THE PIPE TRENCH THROUGH TO THE BUILDING EXIT. HIGH PRESSURE CLEANING OF CONDENSER WATER
PIPING IN THE CHILLER PLANT FROM THE MAIN 24" MAINS AS THEY TRANSITION FROM VERTICAL TO HORIZONTAL TRANSITIONS AT
THE CEILING AND ALL BRANCH PIPING TO CHILLERS-1, 2 3 & 4.
7. ADD ALTERNATE #4: PROVIDE AND INSTALL 24" WYE STRAINER, VALVES, STRAINER BYPASS AND 24" CS/CR PIPE ACCESS
MODIFICATIONS IN THE RIVER PUMP ROOM.
8. MEASUREMENTS AND LAYOUTS: THE DRAWINGS ARE INTENDED TO COVER THE LAYOUT AND DESIGN OF THE WORK AND ARE NOT
TO BE SCALED FOR EXACT MEASUREMENTS. WHERE SPECIFIC DETAIL AND DIMENSION FOR WORK ARE NOT SHOWN ON THE
DRAWINGS, THE CONTRACTOR SHALL TAKE MEASUREMENTS AND MAKE LAYOUTS AS REQUIRED FOR THE PROPER INSTALLATION
OF THE WORK IN COORDINATION WITH ALL OTHER WORK ON THE PROJECT.
9. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, LIFTING, RIGGING, SUPERVISION, PERMITS, PERMIT FEES, TRAFFIC CONTROL
PLANS, TRAFFIC CONTROL MEASURES, BARRICADES, SERVICES, ETC. NECESSARY FOR AND INCIDENTAL TO THE COMPLETE
INSTALLATION OF ALL WORK AND RELATED SYSTEMS AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, AND/OR REQUIRED TO
DELIVER TO THE OWNER A COMPLETE INSTALLATION READY FOR CONTINUOUS AND SATISFACTORY OPERATION. ALL ITEMS, SYSTEMS, ETC. NECESSARY OR REQUIRED TO MAKE THE INSTALLATION COMPLETE AND OPERABLE SHALL BE UNDERSTOOD AS
PART OF THE WORK. THE CONTRACTOR SHALL EXAMINE THE PREMISES PRIOR TO SUBMITTING HIS BID.
10. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS BEYOND THE GENERAL BUILDING PERMIT AND
INSPECTIONS. FURNISH ALL APPLICABLE CERTIFICATES.
11. ALL EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED BY THE CONTRACTOR FOR ONE (1) YEAR AFTER DATE OF ACCEPTANCE OR
AS NOTED. CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR AND EQUIPMENT REQUIRED FOR WARRANTY WORK AT NO
ADDITIONAL COST TO THE KENNEDY CENTER.
12. THE CONTRACTOR SHALL SUBMIT ELECTRONIC COPIES OF SUBMITTALS AND EQUIPMENT LISTS FOR ALL PRODUCTS FOR REVIEW
AND APPROVAL BY THE KENNEDY CENTER AND ENGINEER. SUBMITTALS SHALL INCLUDE CONTRACTOR AND SUB-CONTRACTOR'S
TRANSMITTAL INDICATING COMPLIANCE WITH SPECIFICATIONS, SPECIFIC PRODUCT INFORMATION, MODEL NUMBERS, CAPACITIES, MATERIALS, AND INCLUDED ACCESSORIES. SUBMITTALS RECEIVED WITHOUT TRANSMITTALS WILL BE REJECTED.
13. ALL MATERIALS AND EQUIPMENT SHALL BE PROPERLY AND EFFECTIVELY PROTECTED BY THE CONTRACTOR DURING THE
EXECUTION OF THE WORK.
14. WORK COVERED UNDER THE SPECIFICATIONS AND DRAWINGS SHALL BE PERFORMED IN STRICT ACCORDANCE WITH: STATE AND
LOCAL CODES, LATEST EDITION, APPROPRIATE STANDARDS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA); APPLICABLE
LOCAL CODES; AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI); AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM); AND
THE OCCUPATIONAL SAFETY & HEALTH ACT (OSHA).
15. THE CONTRACTOR SHALL HAVE COMPETENT SUPERVISION ON THE SITE AT ALL TIMES TO LAYOUT, CHECK, COORDINATE AND
SUPERVISE THE INSTALLATION OF ALL WORK AND BE RESPONSIBLE FOR THE ACCURACY THEREOF. HE SHALL PLAN THE
INSTALLATION OF ALL WORK, GIVING CONSIDERATION TO THE WORK OF OTHER TRADES, TO PREVENT INTERFERENCE.
16. THE CONTRACTOR SHALL CONNECT TO BUILDING UTILITIES AS SHOWN ON THE DRAWINGS.
17. ALL CUTTING OF WALLS, FLOORS, ROOFS, CEILINGS AND/OR PARTITIONS FOR THE PASSAGE OF CONDUITS, ETC., AND CLOSING UP
OF SUPERFLUOUS OPENINGS AROUND THEM IN CONNECTION WITH THE WORK UNDER THIS CONTRACT, INCLUDING THE REMOVAL
OF ALL DEBRIS CAUSED THEREBY, SHALL BE PERFORMED BY THE CONTRACTOR.
18. COORDINATE THE WORK TO MINIMIZE PENETRATION OF WATERPROOF CONSTRUCTION INCLUDING ROOFS, EXTERIOR WALLS AND
INTERIOR WATERPROOF CONSTRUCTION. WHERE SUCH PENETRATIONS ARE NECESSARY, PROVIDE ALL NECESSARY CURBS, SEWER, SHIELDS, FLASHINGS, PATE BOXES, FITTINGS AND CAULKING TO MAKE THE PENETRATIONS ABSOLUTELY WATERTIGHT.
19. THE CONTRACTOR SHALL PROVIDE NECESSARY EXCAVATION AND BACKFILL FOR THE INSTALLATION OF WORK.
20. ALL MATERIALS AND EQUIPMENT SHALL BE NEW, THE BEST OF THEIR RESPECTIVE KINDS AND SUITABLE FOR THE CONDITIONS AND
DUTIES IMPOSED ON THEM.
21. WHERE A CONTRACTOR PROPOSES TO USE AN ITEM OF EQUIPMENT OTHER THAN THAT SPECIFIED OR DETAILED ON THE
DRAWINGS, WHICH REQUIRES ANY REDESIGN OF THE STRUCTURE, PARTITIONS, FOUNDATIONS, PIPING, DUCTWORK, WIRING, OR
ANY OTHER PART OF THE MECHANICAL, ELECTRICAL, STRUCTURAL OR ARCHITECTURAL SYSTEMS OR LAYOUTS, ALL SUCH
REDESIGN, AND ALL NEW DRAWINGS PRODUCT SUBMITTALS, AND DETAILING REQUIRED THEREFORE SHALL, WITH THE APPROVAL
OF THE ENGINEER AND THE KENNEDY CENTER, SHALL BE PREPARED BY THE CONTRACTOR AT HIS OWN EXPENSE.
22. ALL SYSTEMS SHALL BE TESTED FOR THE PROPER INSTALLATION AND OPERATION.
23. DURING CONSTRUCTION THE CONTRACTOR SHALL MAINTAIN AN ACCURATE, UP TO DATE SET OF DRAWINGS. THE CONTRACTOR
SHALL PROVIDE THE KENNEDY CENTER, UPON COMPLETION AND ACCEPTANCE OF THE WORK, WITH A SET OF RED LINED AS-BUILT
DRAWINGS, CLEARLY SHOWING THE PATH OF THE UNDERGROUND SYSTEMS, LOCATIONS OF EQUIPMENT, AND ANY DIMENSIONAL
CHANGES.
24. ALL PIPING SHALL BE IDENTIFIED WITH COLORED PRE-ROLLED SEMI RIGID PLASTIC LABELS OR ADHESIVE BACKED PLASTIC LABELS
AS MANUFACTURED BY SETON "SET-MARK" SYSTEM MEETING THE LATEST ANSI A13.1 SPECIFICATION FOR BACKGROUND AND
LETTER COLOR. ALL VALVES SHALL BE TAGGED WAS SPECIFIED HEREIN.
25. ALL EQUIPMENT SHALL BE LABELED WITH ENGRAVED PHENOLIC ADHESIVE TAGS. TAGS SHALL HAVE BLACK FACE WITH WHITE
ENGRAVED LETTERING. LETTERS SHALL BE MINIMUM OF 1" TALL.
26. UPON COMPLETION OF ALL WORK, THE CONTRACTOR SHALL GENERATE OPERATION AND MAINTENANCE (O&M) MANUALS FOR ALL
EQUIPMENT AND SYSTEMS. MANUALS SHALL INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING CONTENT:
A. MANUALS SHALL INCLUDE FOR EACH PIECE OF EQUIPMENT:
A.1. OPERATION MANUALS.
A.2. MAINTENANCE MANUALS.
A.3. LUBRICATION CHART & SCHEDULE
A.4. FILTER TYPE, SIZE & QUANTITIES (WHERE APPLICABLE)
A.5. BELT MODEL & QUANTITIES (WHERE APPLICABLE)
A.6. PARTS LISTS.
A.7. WIRING DIAGRAMS (WHERE APPLICABLE)
A.8. INSTALLING CONTRACTOR'S CONTACT INFORMATION
A.9. MANUFACTURER'S REPRESENTATIVE CONTACT INFORMATION
B. PROVIDE FOR CONTROL SYSTEM:
B.1. OPERATIONS MANUALS
B.2. PARTS/COMPONENTS LISTS
B.3. WIRING DIAGRAMS AND SCHEMATICS
B.4. SEQUENCES OF OPERATION
B.5. INSTALLING CONTRACTOR'S CONTACT INFORMATION
B.6. MANUFACTURER'S REPRESENTATIVE CONTACT INFORMATION
C. VALVE CHART(S) AND PIPING DIAGRAM(S) LOCATING ALL TAGGED VALVES.
D. QUANTITY AND FORMAT:
D.1. PROVIDE ONE (1) COPY IN .PDF FORMAT. ELECTRONIC .PDF O&M MANUAL SHALL BE SEARCHABLE, TABBED AND
INCLUDE A TABLE OF CONTENTS WITH AUTOMATIC LINKS TO SPECIFIC PAGES/SECTIONS WITHIN THE FILE.
D.2. O&M DATA SHALL BE ORGANIZED BY SPECIFICATION SECTION. EACH SECTION SHALL BE SAVED AS AN INDIVIDUAL
.PDF FILE. EACH FILE SHALL BE INCLUDE THE SPECIFICATION NUMBER AND TITLE AS SPECIFIED HEREIN.
26. UPON COMPLETION OF ALL WORK, THE CONTRACTOR SHALL THOROUGHLY INSTRUCT THE OWNER'S REPRESENTATIVES IN THE
PROPER OPERATION AND MAINTENANCE OF ALL MECHANICAL EQUIPMENT AND SYSTEMS. INSTRUCTION/TRAINING SHALL BE FOR
NO LESS THAN TWO (2) EIGHT (8) HOUR DAYS AND INCLUDE WRITTEN COURSE DATA AND VIDEO RECORDING OF TRAINING.
SECTION 09900 - HIGH PRESSURE PIPELINE CLEANING
1. PIPING TO BE CLEANED SHALL BE VIDEO CAMERA INSPECTED ALONG ENTIRE ROUTE. INSPECTION SHALL INCLUDE HD VIDEO AND
HIGH RESOLUTION STILL IMAGERY OF HEAVY OCCLUSIONS, POTENTIAL DAMAGE OR DELAMINATION OF INTERIOR PIPE LINING.
VIDEO SHALL BE REVIEWED AND REPORT STATING FINDINGS AND IDENTIFYING POTENTIAL DAMAGE GENREATED AND SUBMITTED
FOR REVIEW BY THE KENNEDY CENTER. REPORT SHALL INCLUDE A FLOOR PLAN WITH LOCATION OF PROBLEM AREAS OR DAMAGE
WITH STILL IMAGES KEYED TO LOCATIONS.
2. HIGH PRESSURE PIPELINE CLEANING SHALL BE PERFORMED WITH AUTOMATED AND MANUALLY FED CLEANING APPARATUS.
WATER SHALL BE FED AT MINIMUM 4,000 PSIG TO ROTARY CLEANING HEAD EQUIPPED WITH FAN SPRAY NOZZLES. FINE POINT, FIXED NON-ROTATING OR CONCENTRATED SPRAY HEADS OR NOZZLES SHALL NOT BE ACCEPTABLE. CLEANING HEAD SHALL BE
CENTERED IN PIPE WITH A MULTI-ARM CARRIAGE EQUIPPED WITH WHEELS OR TRACKS. CLEANING SHALL PRODUCE A NEAR "WHITE
METAL" FINISH. WASTE WATER AND MATERIAL SHALL BE REMOVED FILTERED AND SOLIDS DISPOSED OF IN ACCORDANCE WITH
LOCAL AND FEDERAL REGULATIONS. AFTER FILTRATION TO MINIMUM 250 MICRONS, WASTE WATER MAY BE RE-CYCLED, RE-USED
FOR CLEANING.
3. UPON COMPLETION OF CLEANING PROCESS, ALL CONDENSER WATER PIPING SHALL BE RE-INSPECTED THROUGH HD VIDEO
INSPECTION TO INSURE NO CONTAMINANTS OR DEBRIS REMAIN IN THE PIPING. ANY SECTIONS OF PIPING FOUND CONTAINING
DEBRIS SHALL BE RE-CLEANED AND RE-INSPECTED. VIDEO INSPECTION SHALL BE SUMMARIZED IN A REPORT AND SUBMITTED FOR
REVIEW AND APPROVAL BY THE KENNEDY CENTER.
SECTION 15101 - PRESSURE TESTS
1. ALL PIPING SHALL BE TESTED AND PROVEN TIGHT PRIOR TO COVERING WITH INSULATION OR CONCEALING.
2. TEST PRESSURES SHALL BE 1
TIMES THE SYSTEM WORKING PRESSURE UNLESS OTHERWISE INDICATED. PRESSURE TESTS
SHALL NOT EXCEED MAXIMUM ALLOWABLE WORKING PRESSURE OF PIPING AND/OR SYSTEM COMPONENTS. TEST HYDRONIC
PIPING (HYDROSTATICALLY). TEST PRESSURE SHALL BE MAINTAINED FOR A MINIMUM OF EIGHT (8) HOURS, WITNESSED AND
APPROVED BY A GOVERNMENT REPRESENTATIVE AND INSTALLING CONTRACTOR. PROVIDE TEST REPORT DOCUMENT WITH
GOVERNMENT REPRESENTATIVE AND CONTRACTOR'S SIGNATURES.
3. HYDRONIC SYSTEMS SHALL BE TESTED, ADJUSTED AND BALANCED IN ACCORDANCE WITH THIS SPECIFICATION.
4. THE CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT TEST AND BALANCE AGENCY THAT SPECIALIZES IN AND
WHOSE BUSINESS IS LIMITED TO THE TESTING AND BALANCING. THE AGENCY SELECTED SHALL BE FULLY CERTIFIED BY THE
(AABC) ASSOCIATED AIR BALANCE COUNCIL OR (NEBB) NATIONAL ENVIRONMENTAL BALANCING BUREAU. THE AGENCY SHALL
SUBMIT QUALIFICATIONS TO THE KENNEDY CENTER FOR APPROVAL PRIOR TO COMMENCING ANY WORK ON THIS PROJECT.
5. BALANCING DATA SHALL BE RECORDED ON AABC STANDARD BALANCING FORMS FOR THE SPECIFIC SYSTEM/EQUIPMENT BEING
TESTED. BALANCING AGENCY SHALL SUBMIT REPORTS FOR REVIEW AND APPROVAL. FINAL REPORTS SHALL BE SIGNED BY THIS
CERTIFIED TEST AND BALANCE ENGINEER AND SHALL INCLUDE HIS OFFICIAL STAMP AND SHALL BE PERFORMED IN COMPLETE
ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD MEASUREMENTS AND INSTRUMENTATION, FORM NUMBER 12173, VOLUME TWO, OR NEBB PROCEDURAL STANDARDS FOR TESTING, ADJUSTING AND BALANCING OF ENVIRONMENTAL SYSTEMS
(THIRD EDITION) APPLICABLE TO AIR DISTRIBUTION AND SECTION APPLICABLE TO HYDRONIC BALANCING.
6. ANY SYSTEM OR COMPONENT SETTING FOUND TO BE GREATER THAN ±10% DEVIATION FROM DESIGN PARAMETERS SHALL BE
RE-BALANCED.
7. TAB CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENTS TO DAMPERS, VALVES, ACTUATORS, VARIABLE FREQUENCY DRIVES
(VFDS), SHEAVES, THERMOSTATIC CONTROL DEVICES AS WELL AS ALL OTHER MEANS OF SPEED, FLOW, PRESSURE TEMPERATURE
REGULATION TO OBTAIN VALUES SPECIFIED ON CONTRACT DOCUMENTS. CONTRACTOR SHALL PROVIDE ADDITIONAL BELTS AND
SHEAVES TO AS REQUIRED FOR BALANCING EFFORT, AT NO ADDITIONAL COST TO THE KENNEDY CENTER.
8. MEASUREMENTS AND ADJUSTMENTS SHALL INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
A. PUMPS:
A.1. ENTERING AND LEAVING FLUID PRESSURE
A.2. MOTOR SPEED
A.3. MOTOR VOLTAGE
A.4. MOTOR AMPERAGE (PER PHASE)
A.5. FLUID FLOW THROUGH COIL (GPM)
A.6. TDH AT DESIGN FLOW (FT-HD)
A.7. SHUTOFF HEAD (FT-HD)
B. BALANCING VALVES:
B.1. DIFFERENTIAL PRESSURE (FT OR IN-HD)
B.2. FLOW RATE (GPM)
B.3. VALVE SETTING
C. CHILLERS & COOLING TOWERS:
C.1. BALANCE CHILLER CONDENSER FOR COOLING TOWER OPERATION AND RE-BALANCE UPON RETURN TO RIVER
WATER SOURCED CONDENSER WATER SUPPLY UPON COMPLETION OF PROJECT.
C.2. SUCTION AND CONDENSING TEMPERATURE & PRESSURES
C.3. ENTERING & LEAVING CHILLED/CONDENSER WATER TEMPERATURES
C.4. CHILLED AND CONDENSER FLUID FLOW RATE (GPM)
C.5. WET/DRY BULB AIR TEMPERATURES ENTERING/LEAVING TOWER
SECTION 15111 - PIPE, FITTINGS AND JOINTS
1. DOMESTIC COLD (CW), PIPE AND FITTINGS (ABOVE GRADE): CROSS LINKED POLYETHYLENE (PEX). TUBING SHALL BE TYPE B OR C, TYPE A SHALL NOT BE ACCEPTABLE. CONTRACTOR SHALL USE FITTINGS AND ACCESSORIES FROM SINGLE MANUFACTURER. ALL
FIXTURE STUB-OUT TERMINATIONS SHALL BE MADE WITH MANUFACTURERS RIGID THRU WALL TERMINATION FITTINGS. ALL TUBING
AND SPECIALITY FITTINGS SHALL BE ANCHORED TO BUILDING STRUCTURE IN STRICT ACCORDANCE WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS. ALL MANIFOLDS SHALL BE COPPER/BRASS WITH BRONZE BALL VALVES.
A. CONNECTION AND FITTING TYPES SHALL BE ASTM F1960 COLD EXPANSION TYPE AS MANUFACTURED BY UPONOR OR
EVERLOC+ AS MANUFACTURED BY REHAU
B. PROVIDE MANUFACTURER'S PIPE SUPPORT CHANNELS WHERE SUPPORT SPACING EXCEEDS MANUFACTURER'S WRITTEN
INSTRUCTIONS.
2. AUXILIARY CONDENSER WATER PIPING (CHILLER PLANT TO RENTAL COOLING TOWERS) (ABOVE GRADE) 2" AND SMALLER:
SEAMLESS COPPER WATER TUBE, ANSI B88, TYPE "L", HARD TEMPER; WROUGHT COPPER SOLDER JOINT FITTINGS, ANSI B16.22
SOLDERED JOINTS, ASTM B32, TIN-ANTIMONY 95-5.
OR
TYPE 304/316L, SCHEDULE 10S STAINLESS STEEL WITH MATCHING STAINLESS STEEL PRESS FIT FITTINGS. VIC PRESS SYSTEM AS
MANUFACTURED BY VICTAULIC, OR APPROVED EQUAL.
3. AUXILIARY CONDENSER WATER PIPING (CHILLER PLANT TO RENTAL COOLING TOWERS) (ABOVE GRADE) 2
" AND LARGER: TYPE
304/316, SCHEDULE 10S STAINLESS STEEL, ROLL GROOVED END FOR MECHANICAL FITTINGS. GROOVED MECHANICAL FITTINGS
FOR STAINLESS STEEL PIPE SHALL BE ASTM A536, GRADE 65-45-12 DUCTILE IRON WITH HOT DIPPED GALVANIZED COATING.
FITTINGS SHALL BE PROVIDED WITH MANUFACTURER'S EPDM GASKETS RATED FOR CONTINUOUS OPERATION FROM -30 TO 230 °F.
SYSTEM SHALL RATED FOR USE IN CONDENSER WATER SYSTEMS. SYSTEM COMPONENTS AS MANUFACTURED BY VICTAULIC, OR
APPROVED EQUAL.
4. RIVER WATER SOURCED CONDENSER WATER PIPING 2" AND SMALLER: ASTM A53, SCHEDULE 80 BLACK STEEL, BLACK CAST-IRON
SCREWED FITTINGS, ANSI B16.4.
5. RIVER WATER SOURCED CONDENSER WATER PIPING 2
" AND LARGER: ASTM A53, SCHEDULE 40 BLACK STEEL, ROLL GROOVED
END FOR MECHANICAL FITTINGS. GROOVED MECHANICAL FITTINGS FOR STEEL PIPE, ASTM A536, GRADE 65-45-12 DUCTILE IRON
WITH MANUFACTURER'S ENAMEL COATING. FITTINGS SHALL BE PROVIDED WITH MANUFACTURER'S EPDM GASKETS RATED FOR
CONTINUOUS OPERATION -30 TO 230 °F. SYSTEM COMPONENTS AS MANUFACTURED BY VICTAULIC, OR APPROVED EQUAL.
5. RIVER WATER SOURCED CONDENSER WATER (SUBMERGED SERVICE): ASTM A53, SCHEDULE 40 BLACK STEEL, WELDED
CONNECTIONS WITH STEEL FITTINGS. END CONNECTIONS TO FOOT VALVES AND PUMP SUCTION WALL THIMBLES SHALL BE ASTM
CLASS 150 FLANGED WITH 316L STAINLESS STEEL HARDWARE. AFTER FABRICATION, WELDS SHALL BE DE-SCALED, PIPE BORE AND
EXTERIOR SURFACES MEDIA BLASTED TO REMOVE ALL MILL SCALE, THEN COATED INTERNALLY AND EXTERNALLY WITH FUSION
BONDED EPOXY COATING HAVING MINIMUM 24 MIL THICKNESS. DO NOT COAT MATING SURFACES OF FLANGED CONNECTIONS.
6. PUMPED DRAIN LINE 2" AND SMALLER (EXTERIOR TO TANK): ASTM A53, SCHEDULE 80 BLACK STEEL, BLACK CAST-IRON SCREWED
FITTINGS, ANSI B16.4. PIPING SHALL BE DE-SCALED WIRE BRUSHED CLEAN AND GIVEN TWO (2) COATS OF RUST PREVENTATIVE
ZINC CHROMATE PRIMER AND TWO (2) COATS OF GLOSS BLACK ALKYD ENAMEL PAINT.
7. PUMPED DRAIN LINE 2
" AND LARGER (EXTERIOR TO TANK): ASTM A53, SCHEDULE 80 BLACK STEEL, STEEL BUTT WELDED FITTINGS, ASTM A234. PIPING SHALL BE DE-SCALED WIRE BRUSHED CLEAN AND GIVEN TWO (2) COATS OF RUST PREVENTATIVE ZINC
CHROMATE PRIMER AND TWO (2) COATS OF GLOSS BLACK ALKYD ENAMEL PAINT.
8. RIVER WATER TANK SWEEP SYSTEM PIPING AND SUMP PUMP DISCHARGE PIPING (IN TANK): ASTM D 2467 PRESSURE RATED
SCHEDULE 80 PVC WITH MATCHING SOLVENT WELDED FITTINGS.
9. RIVER WATER TANK SWEEP PIPING (EXTERIOR TO TANK): ASTM A53, SCHEDULE 80 BLACK STEEL, STEEL BUTT WELDED FITTINGS, ASTM A234. ALL WELD JOINTS SHALL BE DE-SCALED WIRE BRUSHED CLEAN AND GIVEN TWO (2) COATS OF RUST PREVENTATIVE
ZINC CHROMATE PRIMER AND TWO (2) COATS OF GLOSS BLACK ALKYD ENAMEL PAINT.
SECTION 15112 - VALVES
1. ALL SHUTOFF VALVES SHALL BE LINE SIZE.
2. ALL VALVES SHALL BE PROVIDED WITH 1" DIAMETER BRASS TAGS, WITH INDIVIDUAL IDENTIFYING NUMBERS STAMPED INTO TAG.
NUMBERS SHALL BE
" TALL (MINIMUM). PROVIDE VALVE CHART IN FRAME WITH GLASS COVER IN MECHANICAL ROOMS.
3. ALL VALVES INSTALLED IN INSULATED PIPING SYSTEMS SHALL HAVE 2" STEM EXTENSIONS.
4. SHUTOFF VALVES: CLASS AS REQUIRED FOR SPECIFIC INSTALLATION.
5. CONDENSER WATER (AUXILIARY AND RIVER WATER SOURCED):
A. VALVES FOR USE IN DOMESTIC WATER SYSTEMS SHALL BE AWWA APPROVED FOR USE IN POTABLE WATER SYSTEMS.
BALANCING VALVES: MANUAL BALANCING VALVES WITH PRESSURE PORTS AND VALVE MEMORY STOP. NEXUS ULTURI XB OR
APPROVED EQUAL.
C. SHUTOFF VALVES 2" AND SMALLER: VALVES SHALL BE BALL TYPE WITH 3-PIECE, FULL STAINLESS STEEL BODY, STAINLESS
STEEL FULL PORT BALL, WITH STAINLESS STEEL STEM, TEFLON SEAT, SCREW CONNECTION. STEM EXTENSIONS SHALL BE
PROVIDED FOR VALVES INSTALLED IN INSULATED PIPING. STEM EXTENSIONS SHALL RAISE HANDLE FIXING POINT TO MINIMUM
1" ABOVE INSULATION OUTER SURFACE
C.1. PROVIDE CHAINWHEEL ACTUATOR WITH POSITION INDICATOR AND CHAIN FOR VALVES LOCATED AT 8'-0" AFF. OR
HIGHER. CHAIN SHALL EXTEND TO 48" AFF.
D. SHUTOFF AND CONTROL VALVES (2
" AND LARGER): VALVES SHALL BE HIGH PERFORMANCE, DOUBLE OFFSET,
BI-DIRECTIONAL RATED BUTTERFLY TYPE, WITH CLASS 150 LUGGED OR GROOVED CAST STEEL BODY, RTFE SEAT, STAINLESS
STEEL STEM AND DISC, STEM EXTENSION FOR INSULATED PIPING, RATED FOR 100% BUBBLE TIGHT BI-DIRECTIONAL END OF
LINE SHUTOFF SERVICE. STEM EXTENSIONS SHALL BE PROVIDED FOR VALVES INSTALLED IN INSULATED PIPING. STEM
EXTENSIONS SHALL RAISE HANDLE FIXING POINT TO MINIMUM 1" ABOVE INSULATION OUTER SURFACE.
D.1. PROVIDE HANDWHEEL ACTUATOR WITH POSITION INDICATOR FOR VALVES 8"Ø AND LARGER.
D.2. PROVIDE CHAINWHEEL ACTUATOR WITH POSITION INDICATOR AND CHAIN FOR VALVES LOCATED AT 8'-0" AFF. OR
HIGHER. CHAIN SHALL EXTEND TO 48" AFF.
D.3. PROVIDE ELECTRIC ACTUATOR WITH HANDWHEEL OVERRIDE AND POSITION INDICATOR FOR CONTROL VALVES.
ACTUATOR SHALL IN A NEMA 3R ENCLOSURE.
E. SLUICE GATE VALVE: SLUICE GATE VALVES SHALL BE FABRICATED CONSTRUCTION FROM 316L STAINLESS STEEL. VALVES
SHALL PROVIDE POSITIVE BI-DIRECTIONAL SHUTOFF WITH A MAXIMUM LEAKAGE RATE OF 0.05 GPM/FOOT OF SEAT PERIMETER
AT 25 FEET OF STATIC HEAD. VALVES SHALL HAVE RIGID MOUNTING AND SEAT FRAME, STEM, STEM GUIDES, WALL BRACKETS
AND HARDWARE CONSTRUCTED FROM 316L STAINLESS STEEL. SEATS SHALL BE CONSTRUCTED FROM ULTRA HIGH
MOLECULAR WEIGHT POLYETHYLENE (UHWMPE). SEALS SHALL BE VITON. PROVIDE TOP MOUNTED STEM PEDESTAL, ELECTRIC
BEVEL GEAR ACTUATOR WITH MANUAL HANDWHEEL OVERRIDE. VALVE SHALL PROVIDE 36"x36" CLEAR FLOW PATH WHEN IN
FULL OPEN POSITION. PROVIDE CAST IN PLACE WALL THIMBLE WITH MOUNTING FLANGE FOR VALVE MOUNTING. SEE
STRUCTURAL DRAWINGS FOR THIMBLE INSTALLATION REQUIREMENTS. VALVE SHALL BE MODEL SS-250 AS MANUFACTURED
BY WATERMAN, OR APPROVED EQUAL.
F. HORIZONTAL SWING CHECK VALVES ¼” THROUGH 2”: CHECK VALVES SHALL BE CLASS 200# SWP, 400# WOG, HORIZONTAL
SWING CHECK, Y PATTERN BODY WITH INTEGRAL SEAT. BODY, CAP, LEVER AND DISC SHALL BE OF ASTM B61 CAST BRONZE.
HINGE PIN OF STAINLESS STEEL, PLUG AND DISC NUT OF ASTM B16 BRASS, MSS SP-80, TYPE 3. MILWAUKEE VALVE FIGURE
NUMBER 508 (THREADED) OR APPROVED EQUAL.
G. HORIZONTAL SWING CHECK VALVES 2-1/2” THROUGH 6”: CHECK VALVES SHALL BE CLASS 250# SWP, 500# WOG, HORIZONTAL
SWING CHECK. BODY AND BONNET SHALL BE OF ASTM A126 CLASS B CAST IRON. SIDE PLUG AND HANGER PIN ASTM B16
BRASS. HANGER, DISC NUT, DISC OF ASTM B62 CAST BRONZE (6” DISC IS CAST IRON WITH DISC RING OF CAST ASTM B62
BRONZE), 125 LB, FLANGED ENDS, BOLTED BONNET, MSS SP-71, TYPE 1. MILWAUKEE VALVE FIGURE NUMBER F-2970-M, OR
APPROVED EQUAL.
SPECIFICATIONS
14904.010
2/08/2019
- 2/08/2019
FINAL SUBMISSION
FINAL SUBMISSION
A
B
2 3
C
D
1 2 3
4 5
4 5
PROJECT:
C
EBL ENGINEERS, LLC
MECHANICAL * ELECTRICAL * FIRE PROTECTION
8005 Harford Road, Baltimore, Maryland 21234-5701
D
The Professional Engineering Center e-mail ebl@eblengineers.com
(410) 668-8000 FAX (410) 668-8001
B
A
SHEET TITLE
CHECKED BY:
MARK
PROJECT NO:
DATE:
DRAWN BY:
ISSUE:
DATE DESCRIPTION
TH
E
JO
H
N F
. K
EN
N
ED
Y C
EN
TE
R fo r t he
P
ER
FO
R
M
IN
G A
R
TS
F .S
T, N
W W
A
SH
IN
G
TO
N
, D C
C O
N D
E N
S E
R
W
A T
S
T E
M
R
E P
A I R
S
J F
K K
T
A S
K
SEAL:
G-001
PJP
JSR
G p r o je c ts .0 c a d d S u b m is si o n
F in a l\ .0
G .d w g
:2 :1
P M
JR
A
IT
H E L
AutoCAD SHX Text B. BALANCING VALVES: MANUAL BALANCING VALVES WITH PRESSURE PORTS AND VALVE MEMORY STOP. NEXUS ULTURI XB OR
SECTION 15113 - PIPING SPECIALTIES
1. RIVER WATER SOURCED CONDENSER WATER IN-LINE WYE STRAINER (ADD ALTERNATE #4): PROVIDE FABRICATED
STEEL "Y" STRAINER FOR 24"Ø PIPE IN RIVER PUMP ROOM. STRAINER BODY AND FLANGES SHALL BE FABRICATED
FROM CARBON STEEL. FLANGES SHALL BE CLASS 150 WITH RAISED FACE. STRAINER BASKET SHALL BE
REMOVABLE AND CONSTRUCTED FROM MONEL WITH
" PERFORATIONS. STRAINER HEAD SHALL BE CLASS 150,
CONSTRUCTED FROM THE SAME MATERIAL AS THE STRAINER BODY AND FLANGES. STRAINER HEAD SHALL BE
DRILLED AND TAPPED FOR 1
" BLOWDOWN. PROVIDE SLIP HINGE FOR STRAINER HEAD TO ALLOW SWING DOWN
OF HEAD DURING MAINTENANCE. BASIS OF DESIGN MODEL FSA AS MANUFACTURED BY KECKLEY. CONTRACTOR
SHALL PROVIDE THE FOLLOWING ADDITIONAL ACCESSORIES:
1.1. 2" MOTOR OPERATED 2- POSITION BLOWDOWN VALVE. VALVE TYPE SHALL BE FULL PORT FULL STAINLESS
STEEL BALL TYPE AS SPECIFIED IN SECTION 15112. VALVE ACTUATOR SHALL BE PROVIDED WITH SPRING
RETURN TO THE NORMALLY CLOSED POSITION.
1.1. STAND ALONE PLC BASED DIFFERENTIAL PRESSURE MONITOR AND CONTROLLER FOR AUTOMATIC STRAINER
BLOW-DOWN.
1.2. 100 MESH SCREEN INSERT (INSTALLED)
1.3. 30 MESH SCREEN INSERT (PROVIDE TO KENNEDY CENTER FOR FUTURE).
2. SUCTION DIFFUSER: SUCTION DIFFUSER SHALL BE CLASS 125 WITH ASTM A126-B CAST IRON OR ASTM A536
DUCTILE IRON BODY AND INTEGRAL STRAIGHTENING VANES. ALL INTERNAL WETTED AND EXTERNAL SURFACES
SHALL BE COATED WITH FUSION BONDED EPOXY. PROVIDE 304 OR 316L PERMANENT STRAINER BASKET WITH
DIAMETER HOLES AND 20 MESH REMOVABLE START-UP STRAINER. CONTRACTOR SHALL REMOVE START-UP
STRAINER AFTER RUNNING PUMP FOR 8 HOURS CONTINUOUSLY.
3. RIVER WATER FOOT VALVES: FOOT VALVES SHALL PROVIDE POSITIVE BUBBLE TIGHT SHUTOFF FOR MAINTAINING
PUMP PRIME. VALVES SHALL BE GLOBE TYPE WITH ENLARGED BODIES PROVIDING FULL LINE SIZE + 10% FLOW
AREA AROUND GLOBE DISC. BODY SHALL BE ASTM A536 GR 65-45-12 DUCTILE IRON OR ASTM A126 GR. B CAST
IRON. ALL INTERIOR AND EXTERIOR SURFACES SHALL BE COATED WITH FUSION BONDED EPOXY COATING. VALVE
CONNECTION SHALL BE ASME CLASS 125# FLANGED FOR PIPE SIZE INDICATED. GLOBE/PLUG AND SEAT SHALL
BRONZE ASTM B584. FOOT VALVE SHALL BE EQUIPPED WITH A STRAINER HAVING NET FREE AREA EQUAL TO PIPE
CONNECTION CROSS SECTIONAL FLOW AREA. STRAINER AND ALL HARDWARE SHALL BE CONSTRUCTED FROM
TYPE 304 STAINLESS STEEL. VALVES SHALL BE DEZURIK/APCO SERIES 1400, OR APPROVED EQUAL.
4. SWEEP JETS (DRAFT TANK SWEEP SYSTEM)(ADD ALTERNATE #1): JETS SHALL BE VENTURI TYPE WITH FAN PROFILE
CONSTRUCTED FROM FIBER REINFORCED PLASTIC (FRP) WITH NPT CONNECTION FITTINGS. SWEEP JETS SHALL BE
SIZED FOR 10 GPM OF PRIMARY WATER FLOW EACH AT INLET PRESSURE OF 50 PSIG. SWEEP JETS SHALL BE
INTERSEPTOR SERIES AS MANUFACTURED BY PEP, OR APPROVED EQUAL.
5. SWEEP JETS (TRAVELING SCREEN SLUICE TROUGH)(ADD ALTERNATE #2): JETS SHALL BE VENTURI TYPE WITH FAN
PROFILE CONSTRUCTED FROM FIBER REINFORCED PLASTIC (FRP) WITH NPT CONNECTION FITTINGS. JETS SHALL
BE SIZED FOR 30 GPM OF PRIMARY WATER AT 50 PSIG. INLET PRESSURE.
SECTION 15127 - METERS, INSTRUMENTATION AND GAGES
1. THERMOMETERS: SHALL HAVE BRASS CASE, ADJUSTABLE ANGLE HEAD, 9 INCH SCALE AS MANUFACTURED BY H.O.
TRERICE CO. PROVIDE THERMOWELLS FOR PIPE INSTALLATIONS.
RANGE AS FOLLOWS:
CONDENSER WATER: 30-130 °F
2. PRESSURE GAUGES: SHALL BE H.O. TRERICE CO., OR EQUAL, NO. 600 SERIES, 3
" DIAL, WITH NO. 872 PRESSURE
SNUBBERS AND NO. 865 GAUGE COCKS. RANGE SHALL BE 0-100 PSIG.
3. DIFFERENTIAL PRESSURE SENSORS/TRANSDUCERS: SHALL BE FOXBORO MODEL IDP10, OR APPROVED EQUAL.
TRANSDUCER SHALL BE REMOTE MOUNTED WITH 4-20 MA OUTPUT TO DIGITAL CONTROL SYSTEM AND 0-100 PSIG
SENSING RANGE. INSTRUMENT BLOCK SHALL BE CONSTRUCTED FROM STAINLESS STEEL WITH BUILT IN DRAIN AND
VENT PORTS. INSTALL NEEDLE VALVES ON TRANSDUCER INLETS FOR EACH TUBE CONNECTION. INSTRUMENT
TUBING CONVEYING CHILLED WATER BETWEEN PIPE AND TRANSDUCERS SHALL BE TYPE-K OR TYPE-L FLEXIBLE
COPPER TUBING WITH FLARED CONNECTIONS AND BRASS FITTINGS.
4. PRESSURE SENSORS/TRANSDUCERS: SHALL BE FOXBORO MODEL IAP20, OR APPROVED EQUAL. TRANSDUCER
SHALL BE REMOTE MOUNTED WITH 4-20 MA OUTPUT TO DIGITAL CONTROL SYSTEM AND -14.7 TO 300 PSIG SENSING
RANGE. INSTRUMENT BLOCK SHALL BE CONSTRUCTED FROM STAINLESS STEEL WITH BUILT IN DRAIN AND VENT
PORTS. INSTALL NEEDLE VALVES ON TRANSDUCER INLETS FOR EACH TUBE CONNECTION. INSTRUMENT TUBING
CONVEYING CHILLED WATER BETWEEN PIPE AND TRANSDUCERS SHALL BE TYPE-K OR TYPE-L FLEXIBLE COPPER
TUBING WITH FLARED CONNECTIONS AND BRASS FITTINGS.
5. FLOW METERS (DOMESTIC MAKEUP WATER): FLOW METERS SHALL BE RECORDALL DISC SERIES AS
MANUFACTURED BY BADGER METER, OR APPROVED EQUAL. UNITS SHALL BE DISC TYPE WITH LEAD FREE BRONZE
BODY AND ANALOG TOTALIZING OUTPUT DISPLAY IN GALLONS.
6. ULTRASONIC WATER DEPTH SENSOR (LS-1-1, LS-1-2, LS-2-1, LS-2-2) (ADD ALTERNATE #2): FLOW METERS SHALL BE
NON-CONTACT ULTRASONIC TYPE WITH ADJUSTABLE RANGE FROM 2 TO 40' SUITABLE FOR LIQUID SENSING.
SENSOR SHALL PROVIDE 4-20 mA OUTPUT CALIBRATED TO DISTANCE/DEPTH SCALE. UNITS SHALL BE HOUSED IN A
WATER TIGHT SUBMERSIBLE (IP67 MINIMUM) PVC OR STAINLESS STEEL ENCLOSURE. PROVIDE STAINLESS STEEL
MOUNTING BRACKET AND HARDWARE FOR POSITIONING SENSORS IN TRAVELING SCREEN FLOW CHANNEL.
SENSOR SHALL BE INSTALLED AND CALIBRATED IN STRICT ACCORDANCE WITH MANUFACTURER'S WRITTEN
INSTRUCTIONS. SENSORS SHALL BE MODEL RPS-4000 AS MANUFACTURED BY MIGATRON CORP. OR APPROVED
EQUAL.
7. STRAINER BLOW DOWN FLOW SWITCH (FS-1): FLOW SWITCH SHALL BE SAIL TYPE WITH MAGNETICALLY ACTUATED
SWITCHING, BRASS BODY AND 300 SERIES STAINLESS STEEL SAIL, MODEL V10 AS MANUFACTURED BY DWYER
INSTRUMENT, OR APPROVED EQUAL.
SECTION 15130 - INSULATION
1. PIPE INSULATION
A. INTERIOR PIPING: SHALL BE RIGID MOLDED GLASS FIBER PIPE INSULATION WITH ASJ TYPE FACTORY APPLIED
JACKETING HAVING A "K" FACTOR NOT EXCEEDING 0.25 AT 75 DEGREES F MEAN AND DENSITY OF 3-4 LBS/CU
FT. THICKNESS AS INDICATED.
PIPE SIZE
SYSTEM/DESCRIPTION INSULATION TYPE ≤ 1" 1
"-2
" 3"-4" 5"-6"
DOMESTIC COLD WATER A
" 1" 1"
B. ALL PIPE INSULATION SHALL BE INSTALLED CONTINUOUS THROUGH SUPPORT POINTS. PROVIDE
PRE-MOLDED FITTING INSULATION AND PVC OUTER JACKETS AT VALVES AND FITTINGS. ALL DOMESTIC
WATER PIPING (<55 °F) SHALL HAVE INSULATION LAPS, JOINTS AND ENDS VAPOR MASTIC SEALED. ALL PIPING
SYSTEM INSULATION ENDS SHALL BE TAPERED AND VAPOR MASTIC SEALED.
SECTION 15140 - SUPPORTS
1. PROVIDE SUPPORTS TO MAINTAIN REQUIRED SLOPE AND ALIGNMENT. SECURE HANGERS TO RODS WITH DOUBLE
NUTS. ALL SUPPORT RODS AND UN-GALVANIZED SUPPORT MEMBERS SHALL BE THOROUGHLY CLEANED AND
GIVEN TWO COATS OF BLACK, RUST PREVENTIVE PAINT.
2. ROLLER SUPPORTS: PIPING 8"Ø AND LARGER SHALL BE SUPPORTED ON ROLLER SUPPORTS. ROLLERS SHALL
HAVE ADJUSTABLE HEIGHT. ROLLER SUPPORTS FOR INTERIOR APPLICATIONS SHALL BE ELECTROPLATED.
ROLLER SUPPORTS FOR EXTERIOR APPLICATIONS (INCLUDING THROUGH OUTDOOR AIR WELL AND PLENUM)
SHALL BE GALVANIZED. BASIS OF DESIGN PRODUCT MODEL 3114 AS MANUFACTURED BY B-LINE SYSTEMS, INC.
3. PIPE INSULATION PROTECTION: FOR INSULATED PIPE, BETWEEN HANGER AND COVERING PROVIDE AN 18-GAUGE
GALVANIZED SHEET METAL SADDLE FORMED TO FIT BOTTOM HALF OF INSULATION. MINIMUM SIDE DIMENSION OF
SADDLE EQUAL TO ONE-HALF THE INSULATION CIRCUMFERENCE. PROVIDE WELDING TYPE STEEL LOAD BEARING
INSERTS FOR ALL PIPING 4" AND LARGER. LOAD BEARING INSERTS SHALL BE WELDED TO CARRIER PIPE. SHIELDS
AND LOAD BEARING INSERTS SHALL BE MINIMUM 12" LONG.
SECTION 15150 - VIBRATION ISOLATORS
1. VIBRATION ISOLATION SHALL BE PROVIDED AS FOLLOWS:
A. FLEXIBLE PIPE CONNECTORS: SHALL BE BRAIDED STAINLESS STEEL OVER CORRUGATED STAINLESS STEEL
CORE WITH CLASS 125# FLANGED OR SCREWED END CONNECTIONS AS SPECIFIED FOR CONNECTED PIPE
SIZE. FLEXIBLE PIPE CONNECTORS SHALL BE LINE SIZE.
B. CONCRETE INERTIA BASES (ALL BASE MOUNTED PUMPS AND UTILITY FAN SETS ON CONCRETE PADS):
INERTIA BASES SHALL BE 6" DEEP, REINFORCED CONCRETE IN PAINTED STEEL FRAME WITH OPEN SPRING
ISOLATORS. ISOLATORS SHALL BE ANCHORED TO BASE FRAME AND CONCRETE EQUIPMENT PAD/FLOOR.
SECTION 15310 - PUMPS
1. PUMPS SHALL BE OF THE TYPE, SIZE AND CAPACITY AS SCHEDULED ON THE DRAWINGS.
2. PUMP MOTORS SHALL BE PREMIUM EFFICIENCY. PUMPS BEING CONTROLLED BY VARIABLE FREQUENCY DRIVES
(VFDS) SHALL BE EQUIPPED WITH PREMIUM EFFICIENCY, INVERTER DUTY MOTORS.
3. SUBMERSIBLE SUMP PUMPS
A. PUMPS SHALL BE SUBMERSIBLE TYPE WITH EPOXY COATED CAST IRON HOUSING, CAST BRONZE IMPELLER, A300 STAINLESS STEEL PUMP SHAFT, WITH CARBON CERAMIC SEALS. IMPELLER SHALL BE SEMI OPEN, NON-CLOG DESIGN. PUMP SHALL BE RATED FOR CONTINUOUS DUTY AND CAPABLE OF RUNNING DRY
WITHOUT DAMAGE OR OVERHEATING.. PUMPS SHALL BE MODEL 4DWS AS MANUFACTURED BY BELL &
GOSSETT OR APPROVED EQUAL. PERFORMANCE AS SCHEDULED.
4. BASE MOUNTED PUMPS:
A. PROVIDE BASE MOUNTED END SUCTION TYPE CENTRIFUGAL PUMPS. PUMPS SHALL HAVE RADIALLY SPLIT, SELF VENTING CENTERLINE DISCHARGE, CAST IRON CASINGS, BRONZE IMPELLER, BALL BEARING FRAME, MECHANICAL SHAFT SEALS, SEAL FLUSHING LINE WITH SHUTOFF COCKS AND FILTER, CLASS 125 FLANGED
SUCTION AND DISCHARGE CONNECTIONS, AND DRILLED AND TAPPED GAUGE PORTS. PUMPS SHALL BE
RESILIENTLY COUPLED. PUMPS SHALL BE MOUNTED ON MANUFACTURER'S STEEL SUPPORT BASE FRAME.
PUMPS SHALL BE MODEL 4030 AS MANUFACTURED BY ARMSTRONG, OR APPROVED EQUAL. PERFORMANCE
AS SCHEDULED.
B. PROVIDE STEEL FRAMED, CONCRETE FILLED INERTIA BASES FOR ALL BASE MOUNTED PUMPS.
C. PROVIDE FLEXIBLE METALLIC HOSE CONNECTIONS AT ALL BASE MOUNTED PUMP SUCTION AND DISCHARGE
CONNECTIONS.
SECTION 15600 - EQUIPMENT
2. ELECTRIC HEAT TRACE TAPE:
2.1. ELECTRIC HEAT TRACE SHALL BE AS MANUFACTURED BY THERMON, OR OWNER APPROVED EQUAL.
2.2. HEAT TRACE SHALL BE SELF-REGULATING CONSISTING OF TWO NICKEL-PLATED COPPER BUS WIRES
EMBEDDED IN A CROSS-LINKED SEMI-CONDUCTIVE POLYMER CORE. THE HEATER SHALL BE CAPABLE OF
VARYING ITS HEAT OUTPUT ALONG ITS ENTIRE LENGTH, ALLOWING THE HEATER TO CROSS OVER ITSELF
WITHOUT OVERHEATING. THE HEATER SHALL BE COVERED BY A POLYOLEFIN DIELECTRIC JACKET RATED 300
VAC AT 105 °C AND A TINNED COPPER BRAID (12 AWG EQUIVALENT WIRE SIZE). THE HEATING CABLE SHALL
BE SUITABLE FOR USE ON METALLIC AND NONMETALLIC PIPING. ON NONMETALLIC PIPING, THE CABLE SHALL
BE ATTACHED TO THE PIPE WITH A PARALLEL COVERING OF ALUMINUM TAPE. PROVIDE MANUFACTURER'S
BIMETALLIC PIPE WALL SENSING THERMOSTAT, THERMOSTAT SHALL BE PRESET AT 40°F. UPON COMPLETION
OF THE PROJECT, HEAT TRACE TAPE SHALL BE REMOVED FROM PIPE AND EQUIPMENT, NEATLY
ROLLED/PACKAGED, LENGTHS LABELED AND RETURNED TO THE KENNEDY CENTER FOR FUTURE USE. THE
FOLLOWING SHALL BE ELECTRICALLY HEAT TRACED:
2.2.1. EXTERIOR ABOVE GRADE CW MAKE-UP WATER HOSE/PIPING..
2.2.2. RENTAL PUMP VOLUTE AND HOSE LOCATED EXTERIOR TO THE BUILDING SERVING CT-2 & PUMP-2.
3. TRAVELING WATER SCREENS (ADD ALTERNATE #2)
3.1. FLOW -THROUGH TRAVELING WATER SCREENS SHALL INCLUDE A HEAD SHAFT WITH TWO SPROCKETS AND
TORQUE TUBE ALL CONSTRUCTED OF STAINLESS STEEL WITH COMPOSITE SPROCKET TEETH, DRIVE
REDUCER KEYED DIRECTLY ON THE HEAD SHAFT, MOTOR FLANGED ON THE REDUCER, REDUCER HELD IN
POSITION BY TORQUE ARM, AND HEAD FRAME TO SECURE BEARINGS AND TORQUE ARM. SPRAY PIPING
SHALL BE CONSTRUCTED OF STAINLESS STEEL AND SUPPORTED IN HEAD STRUCTURE WITH INJECTOR TYPE
REMOVABLE COMPOSITE NOZZLES, EACH WITH BUILT IN STRAINER AND SELF CLEANING WITH SPRAY PIPE
END BLOW-DOWN VALVES. PROVIDE DECK DEBRIS COLLECTION TROUGH. THE SCREEN HEAD ABOVE THE
DECK SHALL BE ENCLOSED BY REMOVABLE SPLASH-PROOF COVERS WITH INSPECTION WINDOWS . THE
CHAINS, INCLUDING LINKS, BUSHES, PINS AND AND PANEL-SECURING STUDS SHALL BE CONSTRUCTED OF
STAINLESS STEEL, AND INCLUDE COMPOSITE ROLLERS. A CURVED STAINLESS STEEL BOOT-PLATE SHALL
SEAL THE BOTTOM OF THE CHANNEL AND MOLDED COMPOSITE PLATES SHALL SEAL THE ENDS. USE OF A
LOWER SPROCKET FOR CHAIN RE-DIRECTION SHALL NOT BE ACCEPTABLE.
3.2. SCREEN PANEL ELEMENTS SHALL BE CONSTRUCTED FROM 316L STAINLESS STEEL OR COMPOSITE NO-CLING
TYPE DEEP CAST MESH SCREENS WITH
" APERTURES, BOLTED TO STAINLESS STEEL FRAMES. SCREENS
SHALL INCLUDE LARGE DEBRIS LIFTING TRAYS AND SEALS BETWEEN CONSECUTIVE PANEL FRAMES.
3.3. ALL COMPONENTS EXPOSED TO THE WATER SHALL BE CONSTRUCTED OF 316L STAINLESS STEEL OR
COMPOSITE MATERIALS FOR CORROSION RESISTANCE.
3.4. EACH TRAVELING SCREEN SHALL HANDLE A FLOW-THROUGH PATTERN OF 10,000 GPM OF BRACKISH WATER, WITH A DECK LEVEL OF 24'-6-1/4", HIGH WATER LEVEL OF 23'-0", LOW WATER LEVEL OF 7'-0", CHANNEL WIDTH
OF 6'-2", AND A MAXIMUM VELOCITY OF 1.4 FEET PER SECOND.
3.5. PROVIDE STANDALONE PLC CONTROLLER AND TIE INTO EXISTING JCI FX BAS CONTROL SYSTEM. PLC
CONTROLLER SHALL DISPLAY OPERATING STATUS, CHAIN SPEED, WASHDOWN HEADER PRESSURE AND HEAD
DIFFERENTIAL FROM UPSTREAM TO DOWNSTREAM OF UNIT. CONTROLLER SHALL PROVIDE MANUAL
OVERRIDE FOR CHAIN DRIVE SYSTEM START/STOP AND BACK WASH SYSTEM. ALL PARAMETERS AND
ALARMS SHALL BE RELAYED AND DISPLAYED AT THE CENTRAL PLANT OPERATOR'S DDC WORKSTATION.
3.6. PROVIDE MAINTENANCE CONTRACT FOR INSPECTION AND SERVICING OF TRAVELING SCREEN UNITS ON
QUARTERLY BASIS. CONTRACT SHALL BE BROKEN OUT AS A SEPARATE LINE ITEM IN THE CONTRACTOR'S BID
AND BE BASED ON A ONE (1) YEAR SERVICE AGREEMENT WITH CONTINUING RENEWAL OPTION. ALL
INSPECTION AND MAINTENANCE SHALL BE PERFORMED BY THE INSTALLED EQUIPMENT REPRESENTATIVE.
3.7. TRAVELING WATER SCREENS SHALL BE AS MANUFACTURED BY WTR (WESTECH), BEAUDREY A.S., EVOQUA, OR APPROVED EQUAL.
SECTION 15650 - RENTAL EQUIPMENT
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION, PIPING, LIFTING, RIGGING, TRAFFIC CONTROL, ELECTRICAL CABLING FROM RENTAL EQUIPMENT TO SPECIFIED BUILDING POWER SOURCE, CONNECTING TO
POWER SOURCE, STARTUP, OPERATION, BREAKDOWN AND CLEANUP ASSOCIATED WITH RENTAL COOLING
TOWERS, PUMPS AND CONDENSER WATER CHEMICAL TREATMENT SYSTEM.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING OPERATIONAL AND SERVICE SUPPORT FOR ALL RENTAL
EQUIPMENT. CONTRACTOR SHALL PROVIDE SERVICE RESPONSE WITHIN TWO (2) HOURS OF NOTIFICATION BY THE
KENNEDY CENTER. CONTRACTOR SHALL DESIGNATE POINT OF CONTACT(S) WITH 24 HR ON CALL AVAILABILITY.
3. CONTRACTOR SHALL PROVIDE WEEKLY INSPECTION AND MAINTEANCE FOR THE DURATION OF THE RENTAL
EQUIPMENT OPERATION PERIOD. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LUBRICATION, CHEMICAL
TREATMENT, PARTS AND MATERIALS REQUIRED TO MAINTAIN THE RENTAL EQUIPMENT.
4. CONTRACTOR SHALL ENGAGE RENTAL COMPANY AS SOON AS POSSIBLE TO RETAIN REQUIRED RENTAL COOLING
TOWER. DUE TO CAPACITY OF TOWER REQUIRED AND LIMITED AVAILABILITY, AUGMENTED RENTAL RETAINER
CONTRACT WILL BE NECESSARY TO INSURE SPECIFIED TOWERS ARE AVAILABLE AT THE TIME OF PERFORMANCE.
BASIS OF DESIGN RENTAL AGENCY IS AGGREKO. CONTACT PHILLIP BEANBLOSSOM AT (410) 299-1586.
5. RENTAL COOLING TOWERS: RENTAL COOLING TOWERS SHALL BE TRAILER MOUNTED ON MAXIMUM 53' TRAILER.
RENTAL TOWERS SHALL REMAIN ON TRAILERS FOR THE DURATION OF THE PERFORMANCE PERIOD. CONTRACTOR
SHALL PROVIDE CRIBBING AND BLOCKING TO LEVEL COOLING TOWERS FRONT TO BACK AND SIDE TO SIDE IN
ACCORDANCE WITH RENTAL AGENCY'S REQUIREMENTS. PIPING AND HOSE SIZES MUST BE AS SPECIFIED IN
DIAGRAM ON DRAWING M-601. COOLING TOWERS SHALL BE EQUIPPED WITH STAND ALONE CONTROLLER AND
LEAVING WATER TEMPERATURE SENSOR FOR STAND ALONE CONTROL. EXISTING BUILDING JCI FX DDC CONTROL
SYSTEM SHALL BE MODIFIED TO PROVIDE ENABLE/DISABLE SIGNAL TO EACH COOLING TOWER FOR STAGING AS
SPECIFIED IN SEQUENCE ON DRAWING M-601. TOWER CAPACITIES AND OPERATING PARAMETERS AS SPECIFIED.
5.1. PROVIDE AUXILIARY SUMP HIGH LEVEL OR OVERFLOW DRAIN WATER MINDER SENSOR FOR ALARM AT
BUILDING JCI FX DDC OPERATOR'S WORKSTION.
6. RENTAL CONDENSER WATER PUMPS: PUMPS SHALL BE SKID MOUNTED. PUMPS SHALL BE PROVIDED WITHOUT
MOTOR STARTERS. IF PROVIDED WITH MOTOR STARTERS, CONTRACTOR SHALL BYPASS STARTER. EXISTING
BUILDING JCI FX DDC CONTROL SYSTEM SHALL BE MODIFIED TO PROVIDE CONTROL OF RENTAL PUMPS VIA.
MOTOR STARTERS AND CONTACTS TO BE PERMANENTLY INSTALLED UNDER THIS PROJECT. SEE DRAWING M-601
AND ELECTRICAL DRAWINGS FOR ADDITIONAL REQUIREMENTS. PUMPS SIZE AND CAPACITIES AS SPECIFIED.
7. CONDENSER WATER RENTAL CHEMICAL TREATMENT SYSTEM: THE CONTRACTOR SHALL RETAIN THE SERVICES
OF A PROFESSIONAL WATER TREATMENT COMPANY TO PROVIDE EQUIPMENT, CHEMICAL AND SERVICES TO
MAINTAIN SPECIFIED WATER QUALITY IN THE RENTAL COOLING TOWERS FOR THE DURATION OF THE PROJECT.
THE CHEMICAL TREATMENT COMPANY SHALL PROVIDE A SYSTEM CONTAINING MICROPROCESSOR BASED
CONTROLLERS WITH ALARM & STATUS OUTPUTS FOR ACCURATELY CONTROLLING CHEMICAL DOSING AND TDS
(TOTAL DISSOLVED SOLIDS), POLYETHYLENE MEDIA STORAGE TANKS (30 GALLON) AND CONTAINMENT SKIDS, MONITORING INSTRUMENTATION, SENSORS, AGITATION AND CHEMICAL DELIVERY INJECTION PUMPS. SYSTEM
SHALL CONTINUOUSLY MONITOR WATER PARAMETERS AND INJECT CHEMICAL AND BLOWDOWN AS REQUIRED.
CONTINUOUS DOSING SHALL NOT BE ALLOWED. PROVIDE SOLUTION TANKS FOR CORROSION/SCALE INHIBITOR
AND BIOCIDE. SYSTEM SHALL MAINTAIN THE FOLLOWING VALUES:
PH: MAINTAIN WITHIN 7.8 TO 8.4
TOTAL ALKALINITY: 500 PPM
CHEMICAL OXYGEN DEMAND: 15 PPM
TDS: MAX. 1,500 PPM.
SULFATES: MAX. 250 PPM
CHLORIDES: MAX 250 PPM
CALCIUM HARDNESS: MAX 600 PPM
15972 - DDC CONTROLS
1. CONTROLS UNLIMITED, INC. CURRENTLY HOLDS THE CONTRACT FOR ALL CONTROLS WORK AT THE KENNEDY
CENTER. ALL CONTROL WORK SHALL BE PERFORMED BY CONTROLS UNLIMITED. CONTACT INFORMATION:
MICHAEL LOONEY (703) 897-4300.
2. THE CONTRACTOR SHALL FURNISH AND INSTALL EQUIPMENT CAPABLE OF PROVIDING CONTROL AND MONITORING
PER THE SPECIFIED DUTIES AND SEQUENCES . DDC CONTROLS SHALL BE COMPATIBLE WITH AND INTEGRATE INTO
THE EXISTING JOHNSON CONTROLS FACILITY EXPLORER (JCI FX) DDC SYSTEM.
3. MODIFY CONTROL SYSTEM PROGRAMMING, I/O CAPABILITY AND OPERATOR'S WORKSTATION GRAPHICS PACKAGE
AS REQUIRED TO INCORPORATE SPECIFIED FUNCTIONALITY . GRAPHIC MODIFICATIONS SHALL BE COORDINATED
AND APPROVED BY THE KENNEDY CENTER PRIOR TO IMPLEMENTATION.
4. PROVIDE REMOTE ACCESS AND ALARM ANNUNCIATION TO EXISTING KENEDY CENTER CENTRAL JCI FX DDC
SYSTEM. CONTRACTOR SHALL INTEGRATE WATER METER, PRESSURE SENSORS, CONTROL VALVE, TEMPERATURE
SENSOR I/O AND ALARMS INTO THE BUILDING DDC CONTROL SYSTEM. ALL SPECIFIED POINTS SHALL BE MADE
VISIBLE AT THE DDC CONTROL SYSTEM OPERATOR'S WORKSTATION.THE CONTRACTOR SHALL PROVIDE ALL
NECESSARY PROGRAMMING, GRAPHICS CHANGES, COMPONENTS AND WIRING AS REQUIRED FOR A COMPLETE
INTEGRATION.THE FOLLOWING POINTS SHALL BE MADE AVAILABLE AND TRENDED:
4.1. RENTAL COOLING TOWERS:
4.1.1. ENABLE/DISABLE FOR EACH TOWER AND PUMP (INDEPENDENTLY)
4.1.2. HIGH SUMP LEVEL OR OVERFLOW DRAIN WATER MINDER (ALARM)
4.2. CONDENSER WATER PRESSURE AND DIFFERENTIAL PRESSURE
4.2.1. INSTANTANEOUS PRESSURE (SUPPLY, RETURN AND DIFFERENTIAL AT EACH LOCATION)
4.2.2. PRESSURE AND DIFFERENTIAL PRESSURE TREND S
4.3. TRAVELING SCREEN TSF-1 & TSF-2 (ADD ALTERNATE #23)
4.3.1. UPSTREAM FLOW CHANNEL HEAD (FT)
4.3.2. DOWNSTREAM FLOW CHANNEL HEAD (FT)
4.3.3. CHAIN SPEED (FT/MIN)
4.3.4. DRIVE SYSTEM STATUS (ON/OFF)
4.3.5. WASH DOWN SYSTEM STATUS (ON/OFF)
4.3.6. OVERRIDE STATUS (MANUAL/AUTOMATIC)
4.3.7. ALARMS
4.3.7.1. (HIGH DIFFERENTIAL HEAD (UPSTREAM-DOWNSTREAM)
4.3.7.2. MOTOR OVERCURRENT
4.3.7.3. LOSS OF COMMUNICATION
4.3.7.4. WASHDOWN HEADER PRESSURE (PSIG)
SPECIFICATIONS
14904.010
2/08/2019
- 2/08/2019
FINAL SUBMISSION
FINAL SUBMISSION
A
B
2 3
C
D
1 2 3
4 5
4 5
PROJECT:
C
EBL ENGINEERS, LLC
MECHANICAL * ELECTRICAL * FIRE PROTECTION
8005 Harford Road, Baltimore, Maryland 21234-5701
D
The Professional Engineering Center e-mail ebl@eblengineers.com
(410) 668-8000 FAX (410) 668-8001
B
A
SHEET TITLE
CHECKED BY:
MARK
PROJECT NO:
DATE:
DRAWN BY:
ISSUE:
DATE DESCRIPTION
TH
E
JO
H
N F
. K
EN
N
ED
Y C
EN
TE
R fo r t he
P
ER
FO
R
M
IN
G A
R
TS
F .S
T, N
W W
A
SH
IN
G
TO
N
, D C
C O
N D
E N
S E
R
W
A T
S
T E
M
R
E P
A I R
S
J F
K K
T
A S
K
SEAL:
G-002
PJP
JSR
G p r o je c ts .0 c a d d S u b m is si o n
F in a l\ .0
G .d w g
:2 :2
P M
JR
A
IT
H
L
SECTION 260000 - GENERAL ELECTRICAL REQUIREMENTS
1. PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SUPERVISION, SERVICES, ETC. NECESSARY FOR AND INCIDENTAL TO THE
COMPLETE INSTALLATION OF ALL ELECTRICAL WORK AND RELATED SYSTEMS AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, AND/OR REQUIRED TO DELIVER TO THE KENNEDY CENTER A COMPLETE INSTALLATION READY FOR CONTINUOUS AND SATISFACTORY
OPERATION.
2. THE CONTRACTOR SHALL EXAMINE THE PREMISES PRIOR TO SUBMITTING HIS BID AND OBSERVE THE CONDITIONS UNDER WHICH
THE WORK WILL BE DONE OR OTHER CIRCUMSTANCES WHICH WILL AFFECT THE CONTEMPLATED WORK. NO ALLOWANCE WILL BE
MADE SUBSEQUENTLY IN THIS CONNECTION FOR ANY ERROR OR NEGLIGENCE ON THE CONTRACTOR'S PART.
3. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED PERMITS.
4. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL REQUIRED INSPECTIONS.
5. CERTIFICATES OF FINAL INSPECTION AND APPROVAL REQUIRED BY AGENCIES OR AUTHORITIES HAVING JURISDICTION SHALL
COVER ALL ELECTRICAL WORK.
6. ALL ELECTRICAL EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED BY THE CONTRACTOR FOR TWO (2) YEARS AFTER DATE OF
ACCEPTANCE.
7. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ALL REPAIRS AND ADJUSTMENTS TO EQUIPMENT AND SYSTEMS DURING THIS
GUARANTEE PERIOD. CONTRACTOR SHALL BE RESPONSIBLE FOR SERVICING THE MANUFACTURERS WARRANTIES DURING THE
WARRANTY PERIOD.
8. COMPLETE SHOP DRAWINGS AND MATERIAL LISTS SHALL BE SUBMITTED BY THE CONTRACTOR FOR THE APPROVAL BY THE
KENNEDY CENTER IN ACCORDANCE WITH THE REQUIREMENTS OF THE GENERAL CONDITIONS. NO WORK SHALL BE FABRICATED
OR ORDERED BY THE CONTRACTOR UNTIL APPROVAL HAS BEEN GIVEN BY THE KENNEDY CENTER.
9. THE ELECTRICAL WORK COVERED UNDER THE SPECIFICATIONS AND DRAWINGS SHALL BE PERFORMED IN STRICT ACCORDANCE
WITH THE NATIONAL ELECTRICAL CODE (N.E.C), THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA 70), (NFPA 72), (NFPA 90A), (NFPA 101), (NFPA 1221), THE AMERICANS WITH DISABILITIES ACT (ADA), AND UL LABORATORIES (UL 1971).
10. THE CONTRACTOR SHALL PROVIDE TESTS AND ADJUSTMENTS FOR THE DISTRIBUTION SYSTEM (600 VOLTS AND BELOW)
INCLUDING:
A. THAT ALL LIGHTING, POWER AND CONTROL CIRCUITS ARE CONTINUOUS AND FREE FROM SHORT CIRCUITS.
B. THAT ALL CIRCUITS ARE FREE FROM UNSPECIFIED GROUNDS.
C. THAT THE RESISTANCE TO GROUND OF ALL NON-GROUNDED CIRCUITS IS LESS THAN ONE MEGOHM.
D. THAT ALL CIRCUITS ARE PROPERLY CONNECTED IN ACCORDANCE WITH THE APPLICABLE WIRING DIAGRAMS.
E. THAT ALL CIRCUITS ARE OPERABLE WHICH DEMONSTRATION SHALL INCLUDE FUNCTIONING OF EACH CONTROL NOT LESS
THAN TEN TIMES AND CONTINUOUS OPERATION OF EACH LIGHTING AND POWER CIRCUIT FOR NOT LESS THAN 1/2 HOUR.
F. THAT ALL ALARM AND SIGNAL SYSTEMS AND ALL EMERGENCY AND EXIT LIGHT SYSTEMS ARE PROPERLY FUNCTIONING.
11. THE CONTRACTOR SHALL PROVIDE THE OWNER, UPON COMPLETION AND ACCEPTANCE OF THE WORK, WITH A SET OF
REPRODUCIBLE RECORD DRAWINGS, CLEARLY SHOWING THE PATH OF THE UNDERGROUND SYSTEMS, LOCATIONS OF EQUIPMENT, AND ANY DIMENSIONAL CHANGES.
12. ALL EQUIPMENT (DISCONNECTS, PANELBOARDS, STARTERS, RELAYS, SWITCHES WITH PILOT LIGHTS, PUSHBUTTON STATIONS, ETC.) SHALL BE IDENTIFIED AS TO ITS FUNCTION, EQUIPMENT, OR AREA SERVED, ETC.
13. ON THE COMPLETION OF THE WORK, THE SYSTEMS AND EQUIPMENT SHALL BE CAREFULLY TESTED BY THE CONTRACTOR FOR
ACTUAL OPERATION, AND THE VARIOUS PIECES OF EQUIPMENT MADE TO FUNCTION AS INTENDED. THE ENTIRE INSTALLATION WILL
NOT BE READY FOR ACCEPTANCE UNTIL IT IS FUNCTIONING SMOOTHLY AND SATISFACTORILY.
14. ELECTRICAL CONTRACTOR SHALL COORDINATE ALL ELECTRICAL REQUIREMENTS FOR THE…