321316 Decorative Concrete Paving Addendum No 1.pdf
PDF 133 KB Posted
- Solicitation number
- S-KN0010-00015212
- Issued by
- Jackson County, Moro City, Oregon
About this file
This is an addendum to the specifications for decorative concrete paving work on the South Beach Placemaking Project in Newport, Oregon. The addendum details requirements for colored concrete paving installation, including the application of color hardeners, curing compounds, and sealing compounds. The work encompasses four color types: Denim Blue or Pool Blue (Type B), Dark Red or Quarry Red (Type R), Burgundy Mauve or Federal Yellow (Type P), and Pistachio Green or Slate Green (Type G). Acceptable manufacturers are limited to Sika Corporation and Brickform, with specific product lines identified for color hardeners and sealants. The specifications require a pre-job conference one week prior to concrete placement, with attendance from the design professional, general contractor, construction manager, subcontractor, ready-mix concrete representative, and manufacturer's representative. A colored concrete mockup measuring 5 feet by 5 feet must be constructed at a location selected by the design professional, using the same workers and processes intended for permanent work, and must remain through project completion as a quality standard.
Material specifications require a minimum cement content of six sacks per cubic yard with a slump of 4 inches or less, and prohibit the use of calcium chloride to prevent mottling and surface discoloration. Curing must be performed immediately after initial surface hardening using liquid membrane curing and sealing compound at manufacturer-recommended coverage rates. A seal coat application is deferred until 28 days after concrete placement, assuming a cure coat has been applied. Installer qualifications require a minimum of 5 years' experience with similar work, while manufacturer qualifications must demonstrate 10 years' experience in product manufacture. The general contractor bears responsibility for temporary floor protection throughout construction to safeguard concrete surface quality, with heavy-duty seaming tape explicitly prohibited as it causes permanent damage. All concrete work not covered by other materials must be protected throughout the project and treated as finished flooring.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTH BEACH PLACEMAKING
32 13 16 - Decorative Concrete Paving Addendum #1
Specifications
SECTION 32 13 16 - DECORATIVE CONCRETE PAVING
PART 1 - GENERAL
1.1 SUMMARY
A. Drawings and general provisions of Contract, including General and Supplementary Conditions in Part 1, apply to Work of this Section.
B. Section Includes:
1. Color hardener applied to pavements where indicated on Drawings.
2. Curing of colored concrete.
C. Related Requirements:
1. Division 03 Section "Cast-In-Place Concrete" for general applications of concrete.
1.2 REFERENCES
A. American Concrete Institute (ACI):
1. ACI 301 "Specification for Structural Concrete for Buildings."
2. ACI 302 IR "Recommended Practice for Concrete Floor and Slab Construction."
3. ACI 303.1 "Standard Specification for Cast-In-Place Architectural Concrete."
4. ACI 304 "Recommended Practice for Measuring, Mixing, Transporting and Placing of Concrete."
5. ACI 305R "Recommended Practice for Hot Weather Concreting."
6. ACI 306R "Recommended Practice for Cold Weather Concreting."
B. American Society of Testing and Materials (ASTM):
1. ASTM C309 "Standard Specifications for Liquid Membrane-Forming Compounds for Curing Concrete."
2. ASTM C494 "Standard Specification for Chemical Admixtures for Concrete.
1.3 ACTION SUBMITTALS
A. Product Data: Submit manufacturer's complete technical data sheets for the following:
1. Color hardener.
2. Curing compound.
B. Samples for Color Selection: Manufacturer's color charts showing full range of colors available. Final colors to be verified by Landscape Architect
C. Curing Compound for Selection: Manufacturer's color charts showing full range of colors available.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For firms indicated in "Quality Assurance" Article, including list of completed projects.
B. Design Mixes: For each type of integrally colored concrete.
C. Product Data: Submit manufacturer’s complete technical data sheets for the following:
1. Curing and Sealing Compound
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Manufacturer with 10-year's experience in manufacture of specified products.
B. Installer Qualifications: An installer with 5-year's experience with work of similar scope and quality.
C. Comply with the requirements of ACI 301.
D. Obtain each specified material from same source and maintain high degree of consistency in workmanship throughout Project.
E. Notification of manufacturer's authorized representative shall be given at least 1 week before start of Work.
F. Colored Concrete Mockup:
1. Provide under provisions of Part 1.
2. At location on Project selected by design professional, place and finish 5 feet by 5 feet or a panel earea for each color.
3. Construct mockup using processes and techniques intended for use on permanent work, including curing procedures. Include samples of control, construction, and expansion joints in sample panels. Mockup shall be produced by the individual workers who will perform the work for the Project.
4. Accepted mockup provides visual standard for work of Section.
5. Mockup shall remain through completion of the work for use as a quality standard for finished work.
6. Remove mockup when directed or approved field samples may become part of the completed Work if undisturbed at completion of Project.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver products in original factory unopened, undamaged packaging bearing identification of product, manufacturer, batch number, and expiration data, as applicable.
B. Store the product in a location protected from damage, construction activity, and precipitation in strict accordance with the manufacturer's recommendations.
1.7 FIELD CONDITIONS
A. Schedule placements to minimize exposure to wind and hot sun before curing materials are applied.
B. Avoid placing concrete if rain, snow, or if frost is forecast within 24 hours. Protect fresh concrete from moisture and freezing.
C. Comply with professional practices described in ACI 305R and ACI 306R.
1.8 PRE-JOB CONFERENCE
A. It is suggested that the Design Professional, General Contractor, Construction Manager, Subcontractor, Ready-Mix Concrete Representative, and Manufacturer's Representative be present.
B. A. One week prior to placement of concrete, a meeting shall be held to discuss the Project and application methods.
PART 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Sika Corporation, (800) 800-9900.
B. Brickform, https://www.brickform.com/
2.2 MATERIALS
A. Cast-in-Place Concrete: Comply with requirements of Division 32 Section "Concrete Paving.”
B. Color Hardener: LITHOCHROME Color Hardener, Sika Corporation or Concrete Color Hardener from Brickform. Select quantity of color mix to achieve highest color saturation for each color.
1. Type ‘B’
a. Color: 1511-S Denim Blue. As selected by landscape architect from Scofield Color from Chart A-132CH - LITHOCHROME Color Hardener.
Albedo: Minimum SRI of 29 or greater. Or
b. Color: 660 Pool Blue – As selected by landscape architect from Brickform- Standard-Color-Card.
2. Type ‘R’
a. Color: A-27 Dark Red. As selected by landscape architect from Scofield Color from Chart A-132CH - LITHOCHROME Color Hardener. Albedo:
Minimum SRI of 29 or greater. Or
b. Color: 1065 Quarry Red – As selected by landscape architect from Brickform-Standard-Color-Card.
3. Type ‘P’
a. Color: 0808 Burgundy Mauve. As selected by landscape architect from Scofield Color from Chart A-132CH - LITHOCHROME Color Hardener.
Albedo: Minimum SRI of 29 or greater. Or
b. Color: 3100 Federal Yellow – As selected by landscape architect from Brickform-Standard-Color-Card.
4. Type ‘G’
a. Color 3892-S Pistachio Green. As selected by landscape architect from Scofield Color from Chart A-132CH - LITHOCHROME Color Hardener.
Albedo: Minimum SRI of 29 or greater. Or
b. Color: 825 Slate Green – As selected by landscape architect from Brickform-Standard-Color-Card.
5. Submit sample chips for all selected colors to Landscape architect for final approval.
C. Curing Compound for Color Hardener Concrete to comply with ASTM C309 and be for use with colored hardener.
D. Sealing Compound to comply with ASTM C309 and be for use with colored concrete.
1. SCOFIELD® Cureseal 700 Matte, Sika Corporation. Submit for approval to landscape architect. A second coat (seal coat) should be applied 28 days after placement of concrete. Or
2. Deco Guard siloxane modified methyl methacrylate, Surface Koatings Inc.
Only one coat to be applied.
E. SUBSTITUTIONS: The use of products other than those specified will be considered, provided colors match colors selected.
2.3 CONCRETE MIX DESIGN
A. Comply with requirements of Division 32 Section "Concrete Paving” and the following:
1. Minimum Cement Content: Six sacks per cubic yard of concrete.
2. Slump of concrete shall be consistent throughout Project at 4 inches or less.
At no time shall slump exceed 5 inches. If super plasticizers or mid-range water reducers are allowed, slump shall not exceed 8 inches.
B. Do not add calcium chloride to mix as it causes mottling and surface discoloration.
C. Supplemental admixtures shall not be used unless approved by manufacturer.
D. Do not add water to the mix in the field.
E. Maximum air content shall not exceed 5 percent.
PART 3 - EXECUTION
3.1 CONCRETE PLACEMENT
A. Move concrete into place with square-tipped shovels or concrete rakes.
B. Vibrators, when used, shall be inserted and withdrawn vertically.
C. Concrete shall be struck to specified level with wood or magnesium straight edge or mechanical vibrating screed.
D. Concrete surface shall be further leveled and consolidated with highway magnesium straight edge and/or magnesium bull float.
E. Mechanically float concrete surfaces as soon as concrete surface has taken its initial set and will support weight of a power float machine equipped with float shoes or combination blades and operator.
3.2 INSTALLATION –COLORED HARDENER
A. Apply as per manufacturer’s instructions to achieve highest color saturation for each color.
3.3 CURING
A. Walkways shall be cured with liquid membrane curing and sealing compound as recommended by manufacturer.
B. Apply immediately after surface has hardened sufficiently so that application of curing and sealing compound will not mar surface. Apply uniformly over entire surface at coverage rate recommended by manufacturer and meeting or exceeding the moisture retention requirements of ASTM C309. One coat should be applied as a cure coat. The seal coat should not be applied until 28 days after placement of concrete.
C. There shall be no free water on surface at time of application.
3.4 SEALING
A. Prepare dry, cured concrete surfaces according to manufacturer's instructions.
1. The seal coat should not be applied until 28 days after placement of concrete and assumes that a cure coat has been applied.
B. Verify adequacy of slip resistance in compliance with ADA requirements.
3.5 PROTECTION OF FINISHED WORK
A. The General Contractor is responsible for using Temporary Protection throughout the project to safeguard the surface quality of concrete slabs before and after application of decorative finishes or installations of other materials.
B. All concrete work that will be not be covered by other materials will be protected throughout the project. The concrete slab must be treated as a finished floor at all times during construction.
C. Temporary Floor Protection will be removed only while finish work to the concrete is being performed and will be replaced after the final finish has cured sufficiently.
D. DO NOT APPLY THE HEAVY DUTY SEAMING TAPE TO BARE OR FINISHED
WORK OR SURFACES AT ANY TIME. IT WILL PERMANENTLY DAMAGE THE
CONCRETE.
END OF SECTION 32 13 16