315xxPriceAdjust24.xlsx

XLSX spreadsheet 11 MB Posted

Attached to
Comprehensive Liquid Bituminous Materials (Statewide)
Contract number
Not on record
Issued by
New York

About this file

This document is a monthly asphalt price adjustment spreadsheet for New York State Department of Transportation (NYSDOT) contracts covering the period from May 2024 through August 2025. The document applies to two specific contract awards: Award 31503 for Bituminous Concrete Asphalt Mixtures (Contract Numbers PC70400-PC70416) and Award 31555 for Liquid Bituminous Materials (Contract Numbers PC70393-PC70399), both designated as 2024 VPP NYSDOT Specific Projects funded by federal and state sources.

The contracts cover a comprehensive range of asphalt-related materials and services including chip seal, cold recycling, heater scarification, microsurfacing, paver placed surface treatment, joint and crack filler/sealer, and various asphalt mixtures. Price adjustments are calculated monthly based on changes in the F.O.B. terminal price for unmodified PG 64-22 binder, using a February 1, 2024 baseline of $602.000 per ton. The adjustments apply to different material categories with varying petroleum content percentages and are measured per gallon, pound, lane mile, or ton depending on the specific item. Monthly prices have fluctuated from lows of $591 per ton in January and December 2025 to highs of $648 per ton in August 2025, with corresponding positive or negative price adjustments calculated using specific formulas that account for each material's petroleum content percentage. Price adjustments are only applied when changes exceed minimum thresholds of $0.010 per gallon, $0.001 per pound, $0.002 per linear foot, or $0.10 per ton.

View the file

Other files

File Type Posted
3155523428PLPPST.xlsx XLSX spreadsheet
3155523428QQPPST.xlsx XLSX spreadsheet
3155523428a.pdf PDF
31555PriceAdjust25.xlsx XLSX spreadsheet
315xxPriceAdjust26.xlsx XLSX spreadsheet
3155523428ra.pdf PDF
3155523428DetailedSpec.pdf PDF
3155523428WorkZone.pdf PDF
3155523428p.pdf PDF
3155523428GeneralSpec.pdf PDF
3155523428GroupSpec947.pdf PDF
3155523428Insurance.pdf PDF
3155523428NYSDOTStandardSpec.pdf PDF
31502PriceAdjust24.xlsx XLSX spreadsheet
3155523334p.pdf PDF
3155523334ra.pdf PDF
3155523334ContractSpecifics.pdf PDF
3155523334Insurance.pdf PDF
315xxPriceAdjust25.xlsx XLSX spreadsheet
3155523334PLQQ.pdf PDF
31555PriceAdjust23.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 2025 Asphalt Price Adjustment - August 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:August 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:AugustPosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The August 2025 Average is$648.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$648.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.196ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.111ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.111$0.000January591
702.3101RS-263.002.7065.70$0.129$0.000February598
702.3102HFRS-263.002.7065.70$0.129$0.000March610
702.3201MS-265.008.2073.20$0.143$0.000April621
702.3301HFMS-265.008.2073.20$0.143$0.000May626
702.3401HFMS-2h65.002.7067.70$0.133ERROR:#REF!June632
702.3402HFMS-2s65.008.2073.20$0.143ERROR:#REF!July646
702.3501SS-157.000.2057.20$0.112ERROR:#REF!August648
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.128ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.112ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.128ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.129ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.129ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.143ERROR:#REF!
702.4001CRS-160.002.7062.70$0.123ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.123ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.133ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.147ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.147ERROR:#REF!
702.4401CSS-157.000.2057.20$0.112ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.128ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.112ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.128ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.122ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.123ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.133ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.122ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.015ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$11.001ERROR:#REF!
Mastic Materials-40.000.2040.20$7.869ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$4.232ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$4.232ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$4.232ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$3.542ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$3.542ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$3.542ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$3.542ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$6.302ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$5.612ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.450ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.450ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$4.255ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.542ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$3.312ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.990ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.714ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.079
407.0103Straight Tack Coat55.000.2055.20$0.108
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.098
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.196) =$3.196
Total Material Price After Adjustment:$3.196per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($11.001) =$1,511.001
Total Material Price After Adjustment:$1,511.001per Lane Mile
FORMULAS & EXAMPLE
MICROSURFACING AND ASPHALT MIX ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($4.232) =$204.232
Total Material Price After Adjustment:$204.232per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot July 2025 Asphalt Price Adjustment - July 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:July 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JulyPosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The July 2025 Average is$646.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$646.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.188ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.106ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.106$0.000January591
702.3101RS-263.002.7065.70$0.123$0.000February598
702.3102HFRS-263.002.7065.70$0.123$0.000March610
702.3201MS-265.008.2073.20$0.137$0.000April621
702.3301HFMS-265.008.2073.20$0.137$0.000May626
702.3401HFMS-2h65.002.7067.70$0.127ERROR:#REF!June632
702.3402HFMS-2s65.008.2073.20$0.137ERROR:#REF!July646
702.3501SS-157.000.2057.20$0.107ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.122ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.107ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.122ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.123ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.123ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.137ERROR:#REF!
702.4001CRS-160.002.7062.70$0.117ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.117ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.127ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.141ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.141ERROR:#REF!
702.4401CSS-157.000.2057.20$0.107ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.122ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.107ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.122ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.116ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.117ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.127ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.116ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.015ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$10.523ERROR:#REF!
Mastic Materials-40.000.2040.20$7.527ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$4.048ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$4.048ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$4.048ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$3.388ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$3.388ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$3.388ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$3.388ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$6.028ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$5.368ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.300ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.300ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$4.070ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.388ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$3.168ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.860ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.596ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.075
407.0103Straight Tack Coat55.000.2055.20$0.103
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.094
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.188) =$3.188
Total Material Price After Adjustment:$3.188per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($10.523) =$1,510.523
Total Material Price After Adjustment:$1,510.523per Lane Mile
FORMULAS & EXAMPLE
MICROSURFACING AND ASPHALT MIX ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($4.048) =$204.048
Total Material Price After Adjustment:$204.048per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2025 Asphalt Price Adjustment - June 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:June 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JunePosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The June 2025 Average is$632.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$632.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.128ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.072ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.072$0.000January591
702.3101RS-263.002.7065.70$0.084$0.000February598
702.3102HFRS-263.002.7065.70$0.084$0.000March610
702.3201MS-265.008.2073.20$0.093$0.000April621
702.3301HFMS-265.008.2073.20$0.093$0.000May626
702.3401HFMS-2h65.002.7067.70$0.086ERROR:#REF!June632
702.3402HFMS-2s65.008.2073.20$0.093ERROR:#REF!July
702.3501SS-157.000.2057.20$0.073ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.083ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.073ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.083ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.084ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.084ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.093ERROR:#REF!
702.4001CRS-160.002.7062.70$0.080ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.080ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.086ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.096ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.096ERROR:#REF!
702.4401CSS-157.000.2057.20$0.073ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.083ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.073ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.083ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.079ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.080ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.086ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.079ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.010ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$7.174ERROR:#REF!
Mastic Materials-40.000.2040.20$5.132ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$2.760ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$2.760ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$2.760ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$2.310ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$2.310ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$2.310ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$2.310ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$4.110ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$3.660ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$2.250ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$2.250ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$2.775ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$2.310ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$2.160ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$1.950ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$1.770ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.051
407.0103Straight Tack Coat55.000.2055.20$0.070
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.064
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.128) =$3.128
Total Material Price After Adjustment:$3.128per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($7.174) =$1,507.174
Total Material Price After Adjustment:$1,507.174per Lane Mile
FORMULAS & EXAMPLE
MICROSURFACING AND ASPHALT MIX ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($2.76) =$202.760
Total Material Price After Adjustment:$202.760per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2025 Asphalt Price Adjustment - May 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:May 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MayPosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The May 2025 Average is$626.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$626.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.102ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.058ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.058$0.000January591
702.3101RS-263.002.7065.70$0.067$0.000February598
702.3102HFRS-263.002.7065.70$0.067$0.000March610
702.3201MS-265.008.2073.20$0.075$0.000April621
702.3301HFMS-265.008.2073.20$0.075$0.000May626
702.3401HFMS-2h65.002.7067.70$0.069ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.075ERROR:#REF!July
702.3501SS-157.000.2057.20$0.058ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.067ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.058ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.067ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.067ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.067ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.075ERROR:#REF!
702.4001CRS-160.002.7062.70$0.064ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.064ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.069ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.077ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.077ERROR:#REF!
702.4401CSS-157.000.2057.20$0.058ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.067ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.058ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.067ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.064ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.064ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.069ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.064ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.008ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$5.740ERROR:#REF!
Mastic Materials-40.000.2040.20$4.106ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$2.208ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$2.208ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$2.208ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.848ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.848ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.848ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.848ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$3.288ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.928ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$1.800ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$1.800ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$2.220ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$1.848ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$1.728ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$1.560ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$1.416ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.041
407.0103Straight Tack Coat55.000.2055.20$0.056
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.051
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.102) =$3.102
Total Material Price After Adjustment:$3.102per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($5.74) =$1,505.740
Total Material Price After Adjustment:$1,505.740per Lane Mile
FORMULAS & EXAMPLE
MICROSURFACING AND ASPHALT MIX ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($2.208) =$202.208
Total Material Price After Adjustment:$202.208per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot April 2025 Asphalt Price Adjustment - April 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:April 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:AprilPosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The April 2025 Average is$621.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$621.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.081ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.046ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.046$0.000January591
702.3101RS-263.002.7065.70$0.053$0.000February598
702.3102HFRS-263.002.7065.70$0.053$0.000March610
702.3201MS-265.008.2073.20$0.059$0.000April621
702.3301HFMS-265.008.2073.20$0.059$0.000May
702.3401HFMS-2h65.002.7067.70$0.055ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.059ERROR:#REF!July
702.3501SS-157.000.2057.20$0.046ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.053ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.046ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.053ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.053ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.053ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.059ERROR:#REF!
702.4001CRS-160.002.7062.70$0.051ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.051ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.055ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.061ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.061ERROR:#REF!
702.4401CSS-157.000.2057.20$0.046ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.053ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.046ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.053ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.050ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.051ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.055ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.050ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.006ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$4.544ERROR:#REF!
Mastic Materials-40.000.2040.20$3.250ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$1.425ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$1.425ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$1.758ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$1.463ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$1.368ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$1.235ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$1.121ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.033
407.0103Straight Tack Coat55.000.2055.20$0.045
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.041
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.081) =$3.081
Total Material Price After Adjustment:$3.081per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($4.544) =$1,504.544
Total Material Price After Adjustment:$1,504.544per Lane Mile
FORMULAS & EXAMPLE
MICROSURFACING AND ASPHALT MIX ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($1.748) =$201.748
Total Material Price After Adjustment:$201.748per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot March 2025 Asphalt Price Adjustment - March 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2024 VPP NYSDOT Specific Projects) (Federal & State Funds) 23340 PC70400 - PC70416 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2024 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Microsurfacing; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23339 PC70393 - PC70399

Bituminous materials price adjustment(s) EFFECTIVE on:March 1, 2025ERROR:#REF!
Award(s) using February 1, 2024 base index of$602.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MarchPosted Price2024
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The March 2025 Average is$610.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$602.000February
The February 1, 2024 Base Average FOB Terminal Price for Asphalt Cement was$602.000per ton.New Average =$610.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May623
All Asphalt Price Adjustments will be computed to three decimal places.June628
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly636
the price adjustments listed below:August633
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September621
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November593
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember591
702.0700Asphalt Filler (18-60)100.000.20100.20$0.034ERROR:#VALUE!Month2025
702.3001RS-155.001.7056.70$0.019ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.019$0.000January591
702.3101RS-263.002.7065.70$0.022$0.000February598
702.3102HFRS-263.002.7065.70$0.022$0.000March610
702.3201MS-265.008.2073.20$0.025$0.000April
702.3301HFMS-265.008.2073.20$0.025$0.000May
702.3401HFMS-2h65.002.7067.70$0.023ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.025ERROR:#REF!July
702.3501SS-157.000.2057.20$0.019ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.022ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.019ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.022ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.022ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.022ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.025ERROR:#REF!
702.4001CRS-160.002.7062.70$0.021ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.021ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.023ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.026ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.026ERROR:#REF!
702.4401CSS-157.000.2057.20$0.019ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.022ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.019ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.022ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.021ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.021ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.023ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.021ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.003ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$1.913ERROR:#REF!
Mastic Materials-40.000.2040.20$1.369ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$0.736ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$0.736ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$0.736ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$0.616ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$0.616ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$0.616ERROR:#REF!

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .