June 2026 Asphalt Price Adjustment - June 2026
| Group | Description | Award # | Contract No. |
| 31555 | Comprehensive Liquid Bituminous Materials | | |
(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23428 PC70942- PC70962
Bituminous materials price adjustment(s) EFFECTIVE on: June 1, 2026 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)
| | Award(s) using November 1, 2025 base index of | | | | $638.000 | per ton. | | | | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Year: | 2026 | | |
| | the following price adjustments have been calculated. | | | | | | | Month: | June | Posted Price | 2026 |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The June 2026 Average is | | | $793.000 | per ton | | | Month | $/ton |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Asphalt Price Adjustment | | January | - |
| | The November 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | Base Average = | $638.000 | February | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | New Average = | $793.000 | March | - |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | April | 730 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | May | 777 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | June | 793 |
| | the price adjustments listed below: | | | | | | | | | July | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | August | |
| | ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.661 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.374 | ERROR:#VALUE! | | | | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.374 | $0.000 | | | Month | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.433 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.433 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.483 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.483 | ERROR:#REF! | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.483 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.377 | $0.000 | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2p | 63.00 | 2.70 | 65.70 | $0.433 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2p | 63.00 | 2.70 | 65.70 | $0.433 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2p | 65.00 | 8.20 | 73.20 | $0.483 | ERROR:#REF! | | | | 2028 |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | Month | $/ton |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | January | |
| | 702.4101 | CRS-2 | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | February | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.496 | ERROR:#REF! | | | March | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.496 | ERROR:#REF! | | | April | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.377 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.430 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.410 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.414 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.447 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.410 | ERROR:#REF! | | | | |
| | 702-XXXXT | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.265 | ERROR:#REF! | | | | |
| | 702-XXXXT | Straight Tack Coat | | | | *See note below | ERROR:#REF! | | | | |
| | 702-XXXXTT | Non-Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.331 | ERROR:#REF! | | | | |
*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.051 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.371 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.044 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | PG 64S-22 + Fiber | Asphalt Product | 95.00 | 0.20 | 95.20 | $0.628 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | Mastic Material | Aggregate Reinforced Mastic Mat. | 40.00 | 0.20 | 40.20 | $0.031 | ERROR:#REF! |
| | Rout, Clean & Seal Application Method - ASTM D6690 Type II only | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LINEAR FEET | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.006 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $14.260 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $14.260 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $14.260 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $11.935 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $11.935 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $11.935 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $11.935 | ERROR:#REF! |
| | 414.02030118 | Quick-set Slurry, Type II, F3 | 13.50 | 0.20 | 13.70 | $21.235 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type III, F3 | 12.00 | 0.20 | 12.20 | $18.910 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0x0F0218 | Paver Placed ST | 6.50 | 1.00 | 7.50 | $11.625 | ERROR:#REF! |
| | 415.1x0F0218 | Rubber Modified Paver Placed ST | 6.50 | 1.00 | 7.50 | $11.625 | ERROR:#REF! |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $3.000 + | $0.661 | = | $3.661 |
| Total Material Price After Adjustment: | | $3.661 | per gallon | |
| FORMULAS & EXAMPLE |
| HEATER SCARIFICATION ITEMS |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $0.550 + | $0.051 | = | $0.601 |
| Total Material Price After Adjustment: | | $0.601 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment =
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.371 | = | $45.371 |
| Total Material Price After Adjustment: | | $45.371 | per gallon | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment =
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.031 | = | $45.031 |
| Total Material Price After Adjustment: | | $45.031 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing) |
Unit prices per linear foot will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per linear foot) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 14,400 |
| Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $1,500.000 + | $0.006 | = | $1,500.006 |
| Total Material Price After Adjustment: | | $1,500.006 | per linear foot | |
| FORMULAS & EXAMPLE |
| MICROSURFACING, PAVER PLACED SURFACE TREATMENT |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $200.000 + | $14.260 | = | $214.260 |
| Total Material Price After Adjustment: | | $214.260 | per ton | |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2026 Asphalt Price Adjustment - May 2026
| Group | Description | Award # | Contract No. |
| 31555 | Comprehensive Liquid Bituminous Materials | | |
(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23428 PC70942- PC70962
Bituminous materials price adjustment(s) EFFECTIVE on: May 1, 2026 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)
| | Award(s) using November 1, 2025 base index of | | | | $638.000 | per ton. | | | | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Year: | 2026 | | |
| | the following price adjustments have been calculated. | | | | | | | Month: | May | Posted Price | 2026 |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The May 2026 Average is | | | $777.000 | per ton | | | Month | $/ton |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Asphalt Price Adjustment | | January | - |
| | The November 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | Base Average = | $638.000 | February | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | New Average = | $777.000 | March | - |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | April | 730 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | May | 777 |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | June | |
| | the price adjustments listed below: | | | | | | | | | July | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | August | |
| | ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.593 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.335 | ERROR:#VALUE! | | | | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.335 | $0.000 | | | Month | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.389 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.389 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.433 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.433 | ERROR:#REF! | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.433 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.338 | $0.000 | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2p | 63.00 | 2.70 | 65.70 | $0.389 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2p | 63.00 | 2.70 | 65.70 | $0.389 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2p | 65.00 | 8.20 | 73.20 | $0.433 | ERROR:#REF! | | | | 2028 |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | Month | $/ton |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | January | |
| | 702.4101 | CRS-2 | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | February | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.445 | ERROR:#REF! | | | March | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.445 | ERROR:#REF! | | | April | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.338 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.386 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.368 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.371 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.400 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.368 | ERROR:#REF! | | | | |
| | 702-XXXXT | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.238 | ERROR:#REF! | | | | |
| | 702-XXXXT | Straight Tack Coat | | | | *See note below | ERROR:#REF! | | | | |
| | 702-XXXXTT | Non-Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.297 | ERROR:#REF! | | | | |
*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.046 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.332 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.039 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | PG 64S-22 + Fiber | Asphalt Product | 95.00 | 0.20 | 95.20 | $0.563 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | Mastic Material | Aggregate Reinforced Mastic Mat. | 40.00 | 0.20 | 40.20 | $0.028 | ERROR:#REF! |
| | Rout, Clean & Seal Application Method - ASTM D6690 Type II only | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LINEAR FEET | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.005 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $12.788 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $12.788 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $12.788 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $10.703 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $10.703 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $10.703 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $10.703 | ERROR:#REF! |
| | 414.02030118 | Quick-set Slurry, Type II, F3 | 13.50 | 0.20 | 13.70 | $19.043 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type III, F3 | 12.00 | 0.20 | 12.20 | $16.958 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0x0F0218 | Paver Placed ST | 6.50 | 1.00 | 7.50 | $10.425 | ERROR:#REF! |
| | 415.1x0F0218 | Rubber Modified Paver Placed ST | 6.50 | 1.00 | 7.50 | $10.425 | ERROR:#REF! |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $3.000 + | $0.593 | = | $3.593 |
| Total Material Price After Adjustment: | | $3.593 | per gallon | |
| FORMULAS & EXAMPLE |
| HEATER SCARIFICATION ITEMS |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $0.550 + | $0.046 | = | $0.596 |
| Total Material Price After Adjustment: | | $0.596 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment =
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.332 | = | $45.332 |
| Total Material Price After Adjustment: | | $45.332 | per gallon | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment =
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.028 | = | $45.028 |
| Total Material Price After Adjustment: | | $45.028 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing) |
Unit prices per linear foot will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per linear foot) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 14,400 |
| Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $1,500.000 + | $0.005 | = | $1,500.005 |
| Total Material Price After Adjustment: | | $1,500.005 | per linear foot | |
| FORMULAS & EXAMPLE |
| MICROSURFACING, PAVER PLACED SURFACE TREATMENT |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $200.000 + | $12.788 | = | $212.788 |
| Total Material Price After Adjustment: | | $212.788 | per ton | |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot April 2026 Asphalt Price Adjustment - April 2026
| Group | Description | Award # | Contract No. |
| 31555 | Comprehensive Liquid Bituminous Materials | | |
(Asphalt Emulsions; Chip Seal; Cold Recycling; Heater Scarification; Joint & Crack Filler/Sealer; Microsurfacing and/or Quick Set Slurry Seal; and Paver Placed Surface Treatment – Conventional & Rubber Modified) (Statewide) 23428 PC70942- PC70962
Bituminous materials price adjustment(s) EFFECTIVE on: April 20, 2026 ERROR:#REF! Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder)
| | Award(s) using November 1, 2025 base index of | | | | $638.000 | per ton. | | | | | |
| | In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s), | | | | | | | Year: | 2026 | | |
| | the following price adjustments have been calculated. | | | | | | | Month: | April | Posted Price | 2026 |
| | MONTHLY PG 64-22 BINDER ADJUSTMENT: | | The April 2026 Average is | | | $730.000 | per ton | | | Month | $/ton |
| | (F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent) | | | | | | | Asphalt Price Adjustment | | January | - |
| | The November 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was | | | | $638.000 | per ton. | | Base Average = | $638.000 | February | - |
| | Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to more | | | | | | | New Average = | $730.000 | March | - |
| | than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price. | | | | | | | | | April | 730 |
| | All Asphalt Price Adjustments will be computed to three decimal places. | | | | | | | | | May | |
| | Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by using | | | | | | | | | June | |
| | the price adjustments listed below: | | | | | | | | | July | |
| | Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page. | | | | | | | | | August | |
| | ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | | | | October | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | | | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | November | | | | | |
| | 702.0700 | Asphalt Filler (18-60) | 100.00 | 0.20 | 100.20 | $0.392 | ERROR:#VALUE! | | | December | |
| | 702.3001 | RS-1 | 55.00 | 1.70 | 56.70 | $0.222 | ERROR:#VALUE! | | | | 2027 |
| | 702.3002 | RS-1h | 55.00 | 1.70 | 56.70 | $0.222 | $0.000 | | | Month | $/ton |
| | 702.3101 | RS-2 | 63.00 | 2.70 | 65.70 | $0.257 | $0.000 | | | January | |
| | 702.3102 | HFRS-2 | 63.00 | 2.70 | 65.70 | $0.257 | $0.000 | | | February | |
| | 702.3201 | MS-2 | 65.00 | 8.20 | 73.20 | $0.287 | $0.000 | | | March | |
| | 702.3301 | HFMS-2 | 65.00 | 8.20 | 73.20 | $0.287 | ERROR:#REF! | | | April | |
| | 702.3401 | HFMS-2h | 65.00 | 2.70 | 67.70 | $0.265 | ERROR:#REF! | | | May | |
| | 702.3402 | HFMS-2s | 65.00 | 8.20 | 73.20 | $0.287 | ERROR:#REF! | | | June | |
| | 702.3501 | SS-1 | 57.00 | 0.20 | 57.20 | $0.224 | $0.000 | | | July | |
| | 702.3501 | | | | | | | | | | |
| (Cold Recycling only) | SS-1 | 65.00 | 0.20 | 65.20 | $0.255 | ERROR:#REF! | | | | August | | |
| | 702.3601 | SS-1h | 57.00 | 0.20 | 57.20 | $0.224 | ERROR:#REF! | | | September | |
| | 702.3601 | | | | | | | | | | |
| (Cold Recycling only) | SS-1h | 65.00 | 0.20 | 65.20 | $0.255 | ERROR:#REF! | | | | October | | |
| | 702.3101P | RS-2p | 63.00 | 2.70 | 65.70 | $0.257 | ERROR:#REF! | | | November | |
| | 702.3102P | HFRS-2p | 63.00 | 2.70 | 65.70 | $0.257 | ERROR:#REF! | | | December | |
| | 702.3301P | HFMS-2p | 65.00 | 8.20 | 73.20 | $0.287 | ERROR:#REF! | | | | 2028 |
| | 702.4001 | CRS-1 | 60.00 | 2.70 | 62.70 | $0.245 | ERROR:#REF! | | | Month | $/ton |
| | 702.4002 | CRS-1h | 60.00 | 2.70 | 62.70 | $0.245 | ERROR:#REF! | | | January | |
| | 702.4101 | CRS-2 | 65.00 | 2.70 | 67.70 | $0.265 | ERROR:#REF! | | | February | |
| | 702.4201 | CMS-2 | 65.00 | 10.20 | 75.20 | $0.294 | ERROR:#REF! | | | March | |
| | 702.4301 | CMS-2h | 65.00 | 10.20 | 75.20 | $0.294 | ERROR:#REF! | | | April | |
| | 702.4401 | CSS-1 | 57.00 | 0.20 | 57.20 | $0.224 | ERROR:#REF! | | | | |
| | 702.4401 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1 | 65.00 | 0.20 | 65.20 | $0.255 | ERROR:#REF! | | | | | | |
| | 702.4501 | CSS-1h | 57.00 | 0.20 | 57.20 | $0.224 | ERROR:#REF! | | | | |
| | 702.4501 | | | | | | | | | | |
| (Cold Recycling only) | CSS-1h | 65.00 | 0.20 | 65.20 | $0.255 | ERROR:#REF! | | | | | | |
| | 702.4601 | CQS-1h | 62.00 | 0.20 | 62.20 | $0.244 | ERROR:#REF! | | | | |
| | 702.4001P | CRS-1p | 60.00 | 2.70 | 62.70 | $0.245 | ERROR:#REF! | | | | |
| | 702.4101P | CRS-2p | 65.00 | 2.70 | 67.70 | $0.265 | ERROR:#REF! | | | | |
| | 702.4601P | CQS-1p | 62.00 | 0.20 | 62.20 | $0.244 | ERROR:#REF! | | | | |
| | 702-XXXXT | Diluted Tack Coat | 40.00 | 0.20 | 40.20 | $0.157 | ERROR:#REF! | | | | |
| | 702-XXXXT | Straight Tack Coat | | | | *See note below | ERROR:#REF! | | | | |
| | 702-XXXXTT | Non-Tracking Tack Coat | 50.00 | 0.20 | 50.20 | $0.197 | ERROR:#REF! | | | | |
*Note: For Material Designation 702-XXXXT Straight Tack Coat, use Total Allowable Petroleum % for appropriate emulsion grade
| | HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | 417.0101 | Recycling Agent | 65.00 | 1.00 | 66.00 | $0.030 | ERROR:#REF! |
| | JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.220 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.026 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / GALLON | | | | | | | |
| | PG 64S-22 + Fiber | Asphalt Product | 95.00 | 0.20 | 95.20 | $0.373 | ERROR:#REF! |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / POUND | | | | | | | |
| | Mastic Material | Aggregate Reinforced Mastic Mat. | 40.00 | 0.20 | 40.20 | $0.018 | ERROR:#REF! |
| | Rout, Clean & Seal Application Method - ASTM D6690 Type II only | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | PETROLEUM | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUSTMENT / LINEAR FEET | | | | | | | |
| | ASTM D6690 Type II | Joint Sealer | 56.00 | 0.20 | 56.20 | $0.004 | ERROR:#REF! |
| | MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 413.02010118 | Microsurfacing, Type II, F1 | 9.00 | 0.20 | 9.20 | $8.464 | ERROR:#REF! |
| | 413.02020118 | Microsurfacing, Type II, F2 | 9.00 | 0.20 | 9.20 | $8.464 | ERROR:#REF! |
| | 413.02030118 | Microsurfacing, Type II, F3 | 9.00 | 0.20 | 9.20 | $8.464 | ERROR:#REF! |
| | 413.03010118 | Microsurfacing, Type III, F1 | 7.50 | 0.20 | 7.70 | $7.084 | ERROR:#REF! |
| | 413.03020118 | Microsurfacing, Type III, F2 | 7.50 | 0.20 | 7.70 | $7.084 | ERROR:#REF! |
| | 413.03030118 | Microsurfacing, Type III, F3 | 7.50 | 0.20 | 7.70 | $7.084 | ERROR:#REF! |
| | 413.04030118 | Microsurfacing, Type III Rut Filling | 7.50 | 0.20 | 7.70 | $7.084 | ERROR:#REF! |
| | 414.02030118 | Quick-set Slurry, Type II, F3 | 13.50 | 0.20 | 13.70 | $12.604 | ERROR:#REF! |
| | 414.03030118 | Quick-set Slurry, Type III, F3 | 12.00 | 0.20 | 12.20 | $11.224 | ERROR:#REF! |
| | PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS: | | | | | | |
| | ITEM | GRADE / DESCRIPTION | % ASPHALT | FUEL | | | |
| ALLOWANCE | TOTAL ALLOWABLE | | | | | | | |
| PETROLEUM % | PRICE ADJUST / TON | | | | | | | |
| | 415.0x0F0218 | Paver Placed ST | 6.50 | 1.00 | 7.50 | $6.900 | ERROR:#REF! |
| | 415.1x0F0218 | Rubber Modified Paver Placed ST | 6.50 | 1.00 | 7.50 | $6.900 | ERROR:#REF! |
| FORMULAS & EXAMPLE |
| ASPHALT EMULSIONS, CHIP SEAL AND COLD RECYCLING ITEMS |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $3.000 + | $0.392 | = | $3.392 |
| Total Material Price After Adjustment: | | $3.392 | per gallon | |
| FORMULAS & EXAMPLE |
| HEATER SCARIFICATION ITEMS |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of 417.0101 at $0.550/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $0.550 + | $0.030 | = | $0.580 |
| Total Material Price After Adjustment: | | $0.580 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per gallon will be subject to adjustment based on the following formula:
Price Adjustment =
| (per gallon) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 235 |
| Example: 1 gallon of ASTM D6690 Type II at $45.000/gallon (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.220 | = | $45.220 |
| Total Material Price After Adjustment: | | $45.220 | per gallon | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing) |
Unit prices per pound will be subject to adjustment based on the following formula:
Price Adjustment =
| (per pound) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 2000 |
| Example: 1 pound of Mastic Material at $45.000/pound (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $45.000 + | $0.018 | = | $45.018 |
| Total Material Price After Adjustment: | | $45.018 | per pound | |
| FORMULAS & EXAMPLE |
| JOINT AND CRACK FILLER/SEALER ITEMS (for Routing, Cleaning and Sealing) |
Unit prices per linear foot will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per linear foot) | New Monthly Average | | |
| F.O.B. Terminal Price | - | Base Average F.O.B. | |
| Terminal Price | | ) X Total Allowable Petroleum % | |
| | | 14,400 |
| Example: 1 linear foot of ASTM D6690 Type II at $1,500.000/LF (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $1,500.000 + | $0.004 | = | $1,500.004 |
| Total Material Price After Adjustment: | | $1,500.004 | per linear foot | |
| FORMULAS & EXAMPLE |
| MICROSURFACING, PAVER PLACED SURFACE TREATMENT |
Unit prices per ton will be subject to adjustment based on the following formula:
Price Adjustment = (
| (per ton) | New Monthly Average | |
| F.O.B. Terminal Price | - | Base Average F.O.B. |
| Terminal Price | | ) X Total Allowable Petroleum % |
| Example: 1 ton of 413.02010118 at $200.000/ ton (example, not reflecting actual pricing from the contract) | | | | |
| Binder Adjustment: | | | | |
| $200.000 + | $8.464 | = | $208.464 |
| Total Material Price After Adjustment: | | $208.464 | per ton | |
https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot