This document is a Quick Quote form template for New York State's Office of General Services (OGS) Statewide Contract Award 23428 covering Comprehensive Liquid Bituminous Materials. The contract falls under Group 31555, Lot 6, which addresses Paver Placed Surface Treatment in both conventional and modified applications. Two contractors are identified as participating vendors under this statewide vehicle: PC70942 - All States Construction, Inc. dba Gorman Construction and PC70952 - Midland Asphalt Materials, Inc.
The Quick Quote mechanism allows agencies and users to obtain pricing for paver-placed surface treatment materials with monthly price adjustments based on binder costs published by OGS. Contractors provide unit pricing per ton for material delivery and application, with options for additional services including work zone traffic control, overlay splices, mobilization, additional flaggers, pilot vehicles, weekend work, construction signs, and pavement marking abrasion. The contract includes twenty material item classifications across conventional and modified types (Type A, B, and C) with various formulations (F1, F2, F3), identified by specific item numbers beginning with 415. Pricing terms explicitly require that contractor quote unit prices without adjustments cannot exceed the base contract price, and total project costs are adjusted monthly based on published binder price adjustment tables to reflect actual execution dates. The form accommodates project-specific parameters including quantity in tons, haul distance, project duration, and scheduling requirements such as weekend or specific day work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3155523428ra.pdf | ||
| 3155523428DetailedSpec.pdf | ||
| 3155523428WorkZone.pdf | ||
| 3155523428p.pdf | ||
| 3155523428GeneralSpec.pdf | ||
| 3155523428GroupSpec947.pdf | ||
| 3155523428Insurance.pdf | ||
| 3155523428NYSDOTStandardSpec.pdf | ||
| 3155523428PLPPST.xlsx | XLSX spreadsheet | |
| 3155523428a.pdf | ||
| 31555PriceAdjust25.xlsx | XLSX spreadsheet | |
| 315xxPriceAdjust26.xlsx | XLSX spreadsheet | |
| 3155523334ContractSpecifics.pdf | ||
| 3155523334Insurance.pdf | ||
| 315xxPriceAdjust24.xlsx | XLSX spreadsheet | |
| 315xxPriceAdjust25.xlsx | XLSX spreadsheet | |
| 3155523334PLQQ.pdf | ||
| 31555PriceAdjust23.xlsx | XLSX spreadsheet | |
| 31502PriceAdjust24.xlsx | XLSX spreadsheet | |
| 3155523334p.pdf | ||
| 3155523334ra.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quick Quote Paver Placed ST
GROUP 31555 - AWARD 23428 - COMPREHENSIVE LIQUID BITUMINOUS MATERIALS
(Statewide)
LOT 6 - PAVER PLACED SURFACE TREATMENT - CONVENTIONAL & MODIFIED
AGENCY/USER COMPLETES THIS SECTION FOR QUICK QUOTE
Date when the Quick Quote form is sent to the contractor: / /
NOTE:
1. The user and the contractor understand that the Project's Total Cost to be shown below will include all the needed Price Adjustments for the month indicated (the month when the Quick Quote form is sent to the contractor). If the project (or part of the project) is executed in a different month than the one used to calculate this Quick Quote, then the Project's Total Cost will change accordingly to reflect the Price Adjustments for the Month in which the project (or part of the project) was actually performed.
2. The contractor understands that at no time may a quick quote unit price (without the Price Adjustment) exceed the contract price. Materials cost, hauling expenses, etc., can be lowered by the contractor any time during the quick quote process.
Agency/User:
Project Name: Quick Quote #
Project Location:
Conventional or Modified Paver Placed Surface Treatment Material:
Item #: Select from the drop-down menu
Estimated Total Quantity Required: Tons
Additional Items (enter a check mark if required):
Work Zone Traffic Control by Contractor Required
One-way Roadway Two-way Roadway
Abrade Pavement Markings
Linear Feet (WZTC by Agency)
Linear Feet (WZTC by Contractor)
Overlay Splices
Linear Feet (WZTC by Agency)
Linear Feet (WZTC by Contractor)
Additional Flaggers Required Number of Additional Flaggers:
Work Required on Select from the drop-down menu
Pilot Vehicle w/ Driver Number of Vehicles:
OCP Insurance Required
Anticipated Project Start Date:
Agency/User Contact:
Agency/User Telephone:
Quick Quote must be returned by:
Agency/User Comments: (Note: Press Alt+Enter to create a new line)
| CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE | |||
| Project Name: | 0 | Quick Quote # | 0 |
Contractor & PC #: Select from the drop-down menu
Plant Location: Plant #:
Estimated Haul Distance: Miles Phone
Estimated Number of Days or Hours to Complete the Project
| A. | Conventional or Modified Paver Placed Surface Treatment Price (including haul, | |
| deliver & apply) = | per Ton |
Material Price Adjustment Calculation for the Month of: 0 / 0
B. Monthly Binder Price Adjustment per Ton = deandrej: From the monthly price adjustment table published on the OGS website for the month indicated:
http://www.ogs.ny.gov/purchase/spg/lists/gp_315.asp
| C. | Conventional or Modified Paver Placed Surface Treatment Price (including haul, | ||
| deliver & apply) with Price Adjustment (A + B) = | $0.000 | / Ton |
D. Total Tons = Tons
| E. | Conventional or Modified Paver Placed Surface Treatment (including haul, | |
| deliver & apply) Total Material Cost (C x D) = | $0.000 |
Additional Price for Mobilization to Project Location = / Ton
Total Tons = Tons
F. Total Additional Price for Mobilization to Project Location = $0.000
Work Zone Traffic Control Price = / Ton
Total Tons = Tons
G. Total Price for Work Zone Traffic Control = $0.000
Overlay Splices Price = / Linear Foot
Total Linear Feet = LF By Agency/User By Contractor
H. Total Price for Overlay Splices = $0.000
Price Additional Flagger(s) = per Day
Number of Additional Flagger(s) = Number of Days =
I. Total Price Additional Flagger(s) = $0.000
Price Pilot Vehicle w/ Driver = per Day
Number of Days = Number of Vehicles =
J. Total Price Pilot Vehicle w/ Driver = $0.000
Work on Saturday Price = Number of Saturdays =
K. Total Price Work on Saturday = $0.000
Work on Sunday Price = Number of Sundays =
L. Total Price Work on Sunday = $0.00
| CONTRACTOR COMPLETES THIS SECTION FOR QUICK QUOTE | |||
| Project Name: | 0 | Quick Quote # | 0 |
Additional Construction Signs Price = per Square Foot
Total Square Feet = SqF
M. Total Price Additional Construction Signs = $0.000
Abrade Markings Price = per Linear Foot
Total Linear Feet = LF By Agency/User By Contractor
N. Total Price Abrade Markings = $0.000
O. OCP Insurance =
Project's Total Cost including all the Price Adjustments for: 0 / 0
Project's Total Cost including Price Adjustment (E to O) = $0.000
Can Contractor Supply? Drop-drown menu
Can Contractor meet Schedule? Drop-drown menu
Print Name Date
Contractor Signature
NOTE:
1. The user and the contractor understand that the Project's Total Cost shown above includes all the needed Price Adjustments for the month indicated (the month when the Quick Quote form was sent to the contractor). If the project (or part of the project) is executed in a different month than the one used to calculate this Quick Quote, then the Project's Total Cost will change accordingly to reflect the Price Adjustments for the Month in which the project (or part of the project) was actually performed.
2. The contractor understands that at no time may a quick quote unit price (without the Price Adjustment) exceed the contract price. Materials cost, hauling expenses, etc., can be lowered by the contractor any time during the quick quote process.
| Months | Days | Year | Material Items #1 | Liquid Contractor | Work Required on | ||
| January | 1 | 2026 | Select from the drop-down menu | Select from the drop-down menu | Select from the drop-down menu | ||
| February | 2 | 2027 | 415.01010218 Type A F1 - Conventional | PC70942 - All States Construction, Inc. | |||
| dba Gorman Construction | Saturday | ||||||
| March | 3 | 2028 | 415.01020218 Type A F2 - Conventional | PC70952 - Midland Asphalt Materials, Inc. | Sunday | ||
| April | 4 | 415.01030218 Type A F3 - Conventional | Saturday & Sunday | ||||
| May | 5 | 415.02010218 Type B F1 - Conventional | |||||
| June | 6 | 415.02020218 Type B F2 - Conventional | |||||
| July | 7 | 415.02030218 Type B F3 - Conventional | |||||
| August | 8 | 415.03010218 Type C F1 - Conventional | |||||
| September | 9 | 415.03020218 Type C F2 - Conventional | |||||
| October | 10 | 415.03030218 Type C F3 - Conventional | |||||
| November | 11 | 415.11010218 Type A F1 - Modified | |||||
| December | 12 | 415.11020218 Type A F2 - Modified | |||||
| 13 | 415.11030218 Type A F3 - Modified | ||||||
| 14 | 415.12010218 Type B F1 - Modified | ||||||
| 15 | 415.12020218 Type B F2 - Modified | ||||||
| 16 | 415.12030218 Type B F3 - Modified | ||||||
| 17 | 415.13010218 Type C F1 - Modified | ||||||
| 18 | 415.13020218 Type C F2 - Modified | ||||||
| 19 | 415.13030218 Type C F3 - Modified | ||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 | |||||||
| 25 | |||||||
| 26 | |||||||
| 27 | |||||||
| 28 | |||||||
| 29 | |||||||
| 30 | |||||||
| 31 |
File details come from the government source that posted it. Updated .