3155523428PLPPST.xlsx
XLSX spreadsheet 21 KB Posted
- Contract number
- Not on record
- Issued by
- New York
About this file
This pricing document represents a New York State Department of Transportation (NYSDOT) contract vehicle for Paver Placed Surface Treatment (PPST) services, with pricing effective April 1, 2007 through March 31, 2008. The contract includes two primary awarded contractors: All States Construction, Inc., dba Gorman Construction, with multiple asphalt plants and liquids facilities across NYSDOT Regions 1 through 3 (locations in Scotia, Sunderland, Amsterdam, Clinton, and Oswego, New York); and Midland Asphalt Materials Inc., with facilities in Regions 4 and 5 (Lyons and Tonawanda, New York). The contract covers both conventional and modified paver-placed surface treatment services across multiple material types (Type A, B, and C formulations with F1, F2, and F3 variations).
Pricing is structured by production capacity (50-150 tons per day through 1,000+ tons per day) and material type, with unit prices ranging from approximately $309 to $576 per ton for base PPST services. The contract includes ancillary pricing for mobilization services based on distance (0-30, 31-60, 61-90, and 91+ miles), work zone traffic control for one-way and two-way operations, additional flaggers, pilot vehicles, construction signage, weekend premiums, and optional services including pavement marking abrasion and overlay splices. Additional fixed costs include pilot vehicle deployment at $1,700-$2,040 per day and weekend work premiums ranging from $8,100 to $16,050 per day. The pricing terms remained uniform across both contractors' multiple facility locations, with a contract period of one year ending March 31, 2008, following a bid opening on December 5, 2006.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3155523428QQPPST.xlsx | XLSX spreadsheet | |
| 3155523428a.pdf | ||
| 31555PriceAdjust25.xlsx | XLSX spreadsheet | |
| 315xxPriceAdjust26.xlsx | XLSX spreadsheet | |
| 3155523428GeneralSpec.pdf | ||
| 3155523428GroupSpec947.pdf | ||
| 3155523428Insurance.pdf | ||
| 3155523428NYSDOTStandardSpec.pdf | ||
| 3155523428ra.pdf | ||
| 3155523428DetailedSpec.pdf | ||
| 3155523428WorkZone.pdf | ||
| 3155523428p.pdf | ||
| 31502PriceAdjust24.xlsx | XLSX spreadsheet | |
| 3155523334p.pdf | ||
| 3155523334ra.pdf | ||
| 3155523334PLQQ.pdf | ||
| 31555PriceAdjust23.xlsx | XLSX spreadsheet | |
| 3155523334ContractSpecifics.pdf | ||
| 3155523334Insurance.pdf | ||
| 315xxPriceAdjust24.xlsx | XLSX spreadsheet | |
| 315xxPriceAdjust25.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING_PPST
| Paver Placed Surface Treatment - CONVENTIONAL Paver Placed Surface Treatment - CONVENTIONAL Paver Placed Surface Treatment - CONVENTIONAL Paver Placed Surface Treatment - CONVENTIONAL Paver Placed Surface Treatment - CONVENTIONAL | Paver Placed Surface Treatment - MODIFIED Paver Placed Surface Treatment - MODIFIED Paver Placed Surface Treatment - MODIFIED Paver Placed Surface Treatment - MODIFIED Paver Placed Surface Treatment - MODIFIED | |||||||
| Contractor | NYSDOT Region | NYSDOT Plant # | ||||||
| (Asphalt) | NYSDOT Plant # | |||||||
| (Liquids) | Location | City | State | Zip | County | Item 415.01010218 Type A F1 |
50-150 Tons/Day Item 415.01010218 Type A F1
151-500 Tons/Day Item 415.01010218 Type A F1
501-1000 Tons/Day Item 415.01010218 Type A F1
1000+ Tons/Day Item 415.01020218 Type A F2
50-150 Tons/Day Item 415.01020218 Type A F2
151-500 Tons/Day Item 415.01020218 Type A F2
501-1000 Tons/Day Item 415.01020218 Type A F2
1000+ Tons/Day Item 415.01030218 Type A F3
50-150 Tons/Day Item 415.01030218 Type A F3
151-500 Tons/Day Item 415.01030218 Type A F3
501-1000 Tons/Day Item 415.01030218 Type A F3
1000+ Tons/Day Item 415.02010218 Type B F1
50-150 Tons/Day Item 415.02010218 Type B F1
151-500 Tons/Day Item 415.02010218 Type B F1
501 to 1000 Tons/Day Item 415.02010218 Type B F1
1000+ Tons/Day Item 415.02020218 Type B F2
50-150 Tons/Day Item 415.02020218 Type B F2
151-500 Tons/Day Item 415.02020218 Type B F2
501-1000 Tons/Day Item 415.02020218 Type B F2
1000+ Tons/Day Item 415.02030218 Type B F3
50-150 Tons/Day Item 415.02030218 Type B F3
151-500 Tons/Day Item 415.02030218 Type B F3
501-1000 Tons/Day Item 415.02030218 Type B F3
1000+ Tons/Day Item 415.03010218 Type C F1
50 to 150 Tons/Day Item 415.03010218 Type C F1
151-500 Tons/Day Item 415.03010218 Type C F1
501-1000 Tons/Day Item 415.03010218 Type C F1
1000+ Tons/Day Item 415.03020218 Type C F2
50-150 Tons/Day Item 415.03020218 Type C F2
151-500 Tons/Day Item 415.03020218 Type C F2
501-1000 Tons/Day Item 415.03020218 Type C F2
1000+ Tons/Day Item 415.03030218 Type C F3
50-150 Tons/Day Item 415.03030218 Type C F3
151-500 Tons/Day Item 415.03030218 Type C F3
501-1000 Tons/Day Item 415.03030218 Type C F3
1000+ Tons/Day Item 415.11010218 Type A F1
50-150 Tons/Day Item 415.11010218 Type A F1
151-500 Tons/Day Item 415.11010218 Type A F1
501-1000 Tons/Day Item 415.11010218 Type A F1
1000+ Tons/Day Item 415.11020218 Type A F2
50-150 Tons/Day Item 415.11020218 Type A F2
151-500 Tons/Day Item 415.11020218 Type A F2
501-1000 Tons/Day Item 415.11020218 Type A F2
1000+ Tons/Day Item 415.11030218 Type A F3
50-150 Tons/Day Item 415.11030218 Type A F3
151-500 Tons/Day Item 415.11030218 Type A F3
501-1000 Tons/Day Item 415.11030218 Type A F3
1000+ Tons/Day Item 415.12010218 Type B F1
50-150 Tons/Day Item 415.12010218 Type B F1
151-500 Tons/Day Item 415.12010218 Type B F1
501-1000 Tons/Day Item 415.12010218 Type B F1
1000+ Tons/Day Item 415.12020218 Type B F2
50-150 Tons/Day Item 415.12020218 Type B F2
151-500 Tons/Day Item 415.12020218 Type B F2
501-1000 Tons/Day Item 415.12020218 Type B F2
1000+ Tons/Day Item 415.12030218 Type B F3
50-150 Tons/Day Item 415.12030218 Type B F3
151-500 Tons/Day Item 415.12030218 Type B F3
501-1000 Tons/Day Item 415.12030218 Type B F3
1000+ Tons/Day Item 415.13010218 Type C F1
50-150 Tons/Day Item 415.13010218 Type C F1
151-500 Tons/Day Item 415.13010218 Type C F1
501-1000 Tons/Day Item 415.13010218 Type C F1
1000+ Tons/Day Item 415.13020218 Type C F2
50-150 Tons/Day Item 415.13020218 Type C F2
151-500 Tons/Day Item 415.13020218 Type C F2
501-1000 Tons/Day Item 415.13020218 Type C F2
1000+ Tons/Day Item 415.13030218 Type C F3
50-150 Tons/Day Item 415.13030218 Type C F3
151-500 Tons/Day Item 415.13030218 Type C F3
501-1000 Tons/Day Item 415.13030218 Type C F3
1000+ Tons/Day Price /Ton for Mobilization from Contractor's Location to Project Location
50-150 Tons/Day 0-30 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
151-500 Tons/Day 0-30 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
501-1000 Tons/Day 0-30 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
1000+ Tons/Day 0-30 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
50-150 Tons/Day 31-60 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
151-500 Tons/Day 31-60 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
501-1000 Tons/Day 31-60 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
1000+ Tons/Day 31-60 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
50-150 Tons/Day 61-90 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
151-500 Tons/Day 61-90 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
501-1000 Tons/Day 61-90 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
1000+ Tons/Day 61-90 Miles Price /Ton for Mobilization from Contractor's Location to Project Location
50 to 150 Tons/Day 91+ Miles Price /Ton for Mobilization from Contractor's Location to Project Location
151-500 Tons/Day 91+ Miles Price /Ton for Mobilization from Contractor's Location to Project Location
501-1000 Tons/Day 91+ Miles Price /Ton for Mobilization from Contractor's Location to Project Location
1000+ Tons/Day 91+ Miles Work Zone Traffic Control by Contractor
50-150 Tons/Day 1-way
Price/Ton Work Zone Traffic Control by Contractor
151-500 Tons/Day 1-way
Price/Ton Work Zone Traffic Control by Contractor
501-1000 Tons/Day 1-way
Price/Ton Work Zone Traffic Control by Contractor
1000+ Tons/Day 1-way
Price/Ton Work Zone Traffic Control by Contractor
50-150 Tons/Day 2-way
Price/Ton Work Zone Traffic Control by Contractor
151-500 Tons/Day 2-way
Price/Ton Work Zone Traffic Control by Contractor
501-1000 Tons/Day 2-way
Price/Ton Work Zone Traffic Control by Contractor
1000+ Tons/Day 2-way
Price/Ton Additional Flaggers per Day per Flagger Pilot Vehicle (w/ Driver) per Day per Vehicle Optional Additional Construction Signs per Square Foot Additional Price per Day for Work on Weekends
Saturday Additional Price per Day for Work on Weekends
Sunday Abrading Existing Pavement Markings by the CONTRACTOR with optional Work Zone Traffic Control by AUTHORIZED USER
Price per Liner Foot Abrading Existing Pavement Markings by the CONTRACTOR with optional Work Zone Traffic Control by CONTRACTOR
Price per Linear Foot Optional Overlay Splices with optional Work Zone Traffic Control by AUTHORIZED USER
Price per Linear Foot Optional Overlay Splices with optional Work Zone Traffic Control by CONTRACTOR
Price per Linear Foot
| All States Construction, Inc., dba Gorman Construction | 1 | H0007 | L0104 | 6 Freeman's Bridge Road | Scotia | NY | 12302 | Schenectady | $564.720 | $450.720 | $426.720 | $384.720 | $528.720 | $414.720 | $384.720 | $348.720 | $528.720 | $414.720 | $384.720 | $348.720 | $540.720 | $438.700 | $408.720 | $366.720 | $504.720 | $396.720 | $366.720 | $330.720 | $504.720 | $390.720 | $372.720 | $330.720 | $528.720 | $414.720 | $390.720 | $348.720 | $504.720 | $378.720 | $348.720 | $318.720 | $504.720 | $378.720 | $348.720 | $318.720 | $576.720 | $462.720 | $450.720 | $396.720 | $541.920 |
| All States Construction, Inc., dba Gorman Construction | 1 | H0402 | L0108 | 325 Amherst Road | Sunderland | MA | 01375 | Other | $564.720 | $450.720 | $426.720 | $384.720 | $528.720 | $414.720 | $384.720 | $348.720 | $528.720 | $414.720 | $384.720 | $348.720 | $540.720 | $438.700 | $408.720 | $366.720 | $504.720 | $396.720 | $366.720 | $330.720 | $504.720 | $390.720 | $372.720 | $330.720 | $528.720 | $414.720 | $390.720 | $348.720 | $504.720 | $378.720 | $348.720 | $318.720 | $504.720 | $378.720 | $348.720 | $318.720 | $576.720 | $462.720 | $450.720 | $396.720 | $541.920 |
| All States Construction, Inc., dba Gorman Construction | 2 | H0007 | L0203 | 446 State Route 161 | Amsterdam | NY | 12010 | Montgomery | $564.720 | $450.720 | $426.720 | $384.720 | $528.720 | $414.720 | $384.720 | $348.720 | $528.720 | $414.720 | $384.720 | $348.720 | $540.720 | $438.700 | $408.720 | $366.720 | $504.720 | $396.720 | $366.720 | $330.720 | $504.720 | $390.720 | $372.720 | $330.720 | $528.720 | $414.720 | $390.720 | $348.720 | $504.720 | $378.720 | $348.720 | $318.720 | $504.720 | $378.720 | $348.720 | $318.720 | $576.720 | $462.720 | $450.720 | $396.720 | $541.920 |
| All States Construction, Inc., dba Gorman Construction | 2 | H0007 | L0104 | 20 Robinson Road | Clinton | NY | 13323 | Oneida | $564.720 | $450.720 | $426.720 | $384.720 | $528.720 | $414.720 | $384.720 | $348.720 | $528.720 | $414.720 | $384.720 | $348.720 | $540.720 | $438.700 | $408.720 | $366.720 | $504.720 | $396.720 | $366.720 | $330.720 | $504.720 | $390.720 | $372.720 | $330.720 | $528.720 | $414.720 | $390.720 | $348.720 | $504.720 | $378.720 | $348.720 | $318.720 | $504.720 | $378.720 | $348.720 | $318.720 | $576.720 | $462.720 | $450.720 | $396.720 | $541.920 |
| All States Construction, Inc., dba Gorman Construction | 3 | H0007 | L0104 | 1 West Van Buren Street | Oswego | NY | 13126 | Oswego | $564.720 | $450.720 | $426.720 | $384.720 | $528.720 | $414.720 | $384.720 | $348.720 | $528.720 | $414.720 | $384.720 | $348.720 | $540.720 | $438.700 | $408.720 | $366.720 | $504.720 | $396.720 | $366.720 | $330.720 | $504.720 | $390.720 | $372.720 | $330.720 | $528.720 | $414.720 | $390.720 | $348.720 | $504.720 | $378.720 | $348.720 | $318.720 | $504.720 | $378.720 | $348.720 | $318.720 | $576.720 | $462.720 | $450.720 | $396.720 | $541.920 |
| Midland Asphalt Materials Inc | 4 | H0054 | L0403 | 300 Cole Rd | Lyons | NY | 14489 | Wayne | $452.000 | $358.000 | $336.000 | $309.000 | $430.000 | $336.000 | $314.000 | $287.000 | $430.000 | $336.000 | $314.000 | $287.000 | $435.000 | $347.000 | $325.000 | $298.000 | $419.000 | $320.000 | $303.000 | $276.000 | $419.000 | $320.000 | $303.000 | $276.000 | $435.000 | $347.000 | $325.000 | $298.000 | $419.000 | $320.000 | $303.000 | $276.000 | $419.000 | $320.000 | $303.000 | $276.000 | $463.000 | $369.000 | $347.000 | $320.000 | $441.000 |
| Midland Asphalt Materials Inc | 5 | H0097 | L0502 | 640 Young Street | Tonawanda | NY | 14150 | Erie | $452.000 | $358.000 | $336.000 | $309.000 | $430.000 | $336.000 | $314.000 | $287.000 | $430.000 | $336.000 | $314.000 | $287.000 | $435.000 | $347.000 | $325.000 | $298.000 | $419.000 | $320.000 | $303.000 | $276.000 | $419.000 | $320.000 | $303.000 | $276.000 | $435.000 | $347.000 | $325.000 | $298.000 | $419.000 | $320.000 | $303.000 | $276.000 | $419.000 | $320.000 | $303.000 | $276.000 | $463.000 | $369.000 | $347.000 | $320.000 | $441.000 |
&8Group 31505 Liquid Bituminous Materials - Joint and Crack Filler/Sealer &8&A &8&F
&8Bid Opening: December 5, 2006 &8&P &8Contract Period: April 1, 2007 to March 31, 2008
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .