3-WJPU26081701 Zone 5 N. Water Storage Reservoir SOQ.pdf

PDF 206 KB Posted

Attached to
Zone 5 N. Water Storage Reservoir SOQ-REISSUE
Solicitation number
WJPU26081701
Issued by
Salt Lake County, Utah

About this file

This document is a Request for Statements of Qualifications (RSOQ) issued by West Jordan City, Utah, in conjunction with the engineer Horrocks, for pre-qualifying general contractors to bid on the Zone 5 North 4.0 MG Water Storage Reservoir project. The project involves constructing a new fully buried circular AWWA D110 Type 1 wire-wrapped reinforced concrete tank with appurtenant infrastructure, including site grading, landscaping, electrical work, and site piping for inlet, gravity feed outlet, drain line, and overflow systems. The site is located west of U-111 and Terraine Road on Hikers Pass Drive in West Jordan, Utah. Statements of Qualifications must be submitted via the Utah Public Procurement Place (U3P) website by 2:00 pm MDT on Thursday, September 3, 2026. Bidding documents are anticipated to be released to pre-qualified contractors in July 2026, with bids due in August 2026, a Notice to Proceed issued in September 2026, and final project completion targeted for approximately November 2027. Communications regarding the pre-qualification process will be posted on the U3P website prior to 10:00 am MDT on Thursday, August 27, 2026.

Minimum qualifications for contractor pre-qualification include a proven track record without unresolved contract claims, no projects completed by surety in the past five years, minimum $2 million in general liability insurance, bonding capacity for 100 percent of the bid price, current Utah contractor's license (E100 classification), a minimum of ten years' experience in reinforced concrete water reservoir construction, at least one completed AWWA D-110 Type 1 concrete drinking water storage reservoir of 3 MG or greater capacity within the past ten years, an experience modification rate (EMR) of 1.5 or better based on a three-year rolling average, and designated project manager and onsite superintendent with minimum ten years' construction experience each, including prior experience on similar AWWA D-110 Type 1 projects of at least 3 MG capacity. Pre-qualified contractors will be evaluated on general statement clarity and completeness (5 points), project team personnel and qualifications (20 points), project approach and scheduling (20 points), previous project experience and performance (35 points), and financial statement information including bonding capacity and pending claims (20 points). Only contractors pre-qualified under this RSOQ will receive invitations to bid. Pre-qualification does not constitute a commitment to award any contract phases. The Owner reserves the right to reject any or all SOQs and to modify the project schedule and scope.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for General Contractor Statements of Qualifications

Zone 5 North

4.0 MG Water Storage Reservoir

SOQ# WJPU26081701

August 17, 2026

OWNER/ISSUING OFFICE

West Jordan City

8000 S. Redwood Road West Jordan, UT 84088

ENGINEER

Horrocks

4246 S. Riverboat Rd. Ste. 200 Salt Lake City, UT 84123

West Jordan City

Zone 5 North 4.0 MG Water Storage Reservoir

Request for Statements of Qualifications

REQUEST FOR GENERAL CONTRACTOR STATEMENTS OF QUALIFICATIONS

West Jordan City Zone 5 North 4.0 MG Water Storage Reservoir

GENERAL

West Jordan City (“Owner”) requests general contractor Statements of Qualifications (“SOQs”) for the purpose of pre-qualifying potential contractors who may bid on the Zone 5 North 4.0 MG Water Storage Reservoir (“Project”). Invitations to bid on the Project will be issued only to those general contractors who are pre-qualified under this Request for Statements of Qualifications (RSOQ). The submittal requirements and the evaluation criteria for pre-qualification purposes are as defined herein. Neither Owner nor Engineer will be responsible for full or partial sets of the prequalification documents, including addenda, if any, obtained from sources other than the Issuing Office.

PURPOSE

The purpose of the pre-qualification process is to select those general contractors the Owner deems to be qualified and capable of completing the Project on schedule and in conformance with the Contract Documents. Only those firms that are pre-qualified by the Owner will be invited to submit a Bid on the Project.

PROJECT ADMINISTRATION

All communications relative to this pre-qualification shall be posted on Utah Public Procurement Place (U3P) website prior to 10:00 am MDT on Thursday, August 27, 2026.

PROJECT DESCRIPTION AND COMPLEXITY

The Project generally consists of constructing a new fully buried circular AWWA D110 Type 1 wire-wrapped tank constructed from reinforced concrete and all appurtenant items to the site shown in the project documents. The project site is located west of U-111 and Terraine Road, on Hikers Pass Dr. in West Jordan, UT.

Other components of the project include site grading, landscaping, lighting, electrical and site piping for the inlet, gravity feed outlet, drain line and overflow.

Schedule. It is anticipated that bidding documents for the Project will be released to pre-qualified bidders in July 2026 and that bids will be due in August 2026, with a Notice to Proceed issued in September 2026.

The final completion date will be approximately November 2027. The schedule is tentative and subject to change.

SUBMITTAL PROCEDURE AND DEADLINE

Contractors’ SOQs will be submitted on the U3P website until 2:00 pm MDT on Thursday, September 3, 2026.

This is a firm deadline. Any SOQ that fails to clearly present all the required information, or that is not in the required format, may be considered non-responsive and rejected.

Information contained in the SOQs will be considered public information and reasonable precautions will be taken to ensure the security of the documents. If a contractor deems any portion of its SOQ to be proprietary, or to contain information that should otherwise not be disclosed to the public, each such portion of the SOQ should be marked as “proprietary” or “confidential.” and include with your submission a statement of why the information should not be subject to disclosure under the Utah Government Records Access and Management Act (GRAMA). The Owner makes no warranty of whether information so marked will be immune from disclosure under GRAMA. All SOQs will become and remain the property of the Owner.

Request for Statements of Qualifications

The Owner reserves the right to request a contractor to clarify any part of the SOQ. Response to such requests shall be made in writing and will become part of the SOQ. Unsolicited supplementary information and materials received after the deadline will not be considered in the evaluation.

The Owner reserves the right to reject any or all SOQs, to waive any formality in the pre-qualification information, to make selections and pre-qualify contractors, and to modify the schedule and scope of this Project as it may best serve the interest of the Owner.

CONTENT OF SOQ

The general contractor SOQ shall include the information requested below.

Title page - The title page shall include the name of the Owner, the name of the Project and the title – West Jordan City 4.0 MG Water Storage Reservoir at Zone 5 North Site – and the name of the contractor submitting the SOQ.

Bidder Qualifications Statement Form

Required Attachments (as listed in Section 11.0 of the Bidder Qualifications Statement Form)

MINIMUM QUALIFICATIONS

To be considered, a general contractor shall meet all of the following minimum qualifications. The below criteria shall be considered as pass or fail in the Owner’s evaluation.

• The Contractor shall have a proven track record of completed projects without unresolved contract claims and damage claims. Outstanding claims or frequent claims resulting in arbitration, mediation or litigation may prevent the Contractor from being pre-qualified.

• Have no project completed by a surety in the past five (5) years.

• Contractor shall have at least $2 million in general liability insurance, additional insurance requirements will be listed in Article 5 of the project manual.

• The Contractor shall have available bonding capacity to bond for 100% of the bid price of the Project.

• Contractor shall hold a current Utah contractor’s license in a classification appropriate to this Project (E100).

• The Contractor shall have significant experience (minimum ten (10) years) in the construction of reinforced concrete water reservoirs.

• The Contractor shall have constructed at least one (1) AWWA D-110 Type 1 concrete drinking water storage reservoirs in the past ten years, each with a capacity of 3 MG or greater.

• Contractor shall demonstrate an experience modification rate (EMR or EMOD) of 1.5 or better, based on the most recent three-year rolling average.

• The Contractor’s project manager shall have at least ten (10) years of construction experience as a project manager and shall have been the project manager on at least one (1) AWWA D-110 Type 1 concrete drinking water storage reservoir projects of at least 3 MG in size. The project manager shall have served on at least one of the projects on the general contractor’s Bidder Qualifications Statement.

• The Contractor’s onsite superintendent shall have at least ten (10) years of construction experience as a superintendent and shall have been the superintendent on at least one (1) concrete drinking water storage reservoir project. The superintendent shall have served on at least one of the projects on the general contractor’s Bidder Qualifications Statement.

• West Jordan City reserves the right to review and approve or deny the contractor’s selection of onsite personnel if they do not meet the qualifications presented herein.

Request for Statements of Qualifications

EVALUATION OF SOQs Contractors that meet the preceding minimum requirements will be evaluated according to the criteria and formula set forth below. The evaluation is solely for the purpose of determining which general contractors (together with their proposed subcontractors) are qualified for successful and timely performance of the Project.

1. General (5 points)

Statement clarity and presentation Statement completeness

2. Project Team Personnel and Qualifications (20 points)

Key personnel qualifications Key personnel experience Subcontractors

3. Project Approach and Scheduling (20 points)

Construction of a water storage reservoir in an urban area Site piping Pre-stressing operations Site grading/drainage and landscaping

4. Previous Project Experience/Performance (35 points)

Past project performance Timely completion of work Prompt warranty service Uncompleted projects Overall successful completion

5. Financial Statement Information (20 points)

Value of current work Pending claims/disputes Liquidated damages withheld Bonding capacity

NOTIFICATION OF PRE-QUALIFIED CONTRACTORS

All contractors submitting SOQs will be notified on U3P of the results of the Owner’s evaluation of the SOQs.

Invitations to bid will be issued only to those contractors who are pre-qualified. The Owner’s decision will be final. The Owner reserves the right to reject any and all SOQs and to waive any minor informality. Pre-qualification of contractors shall not constitute a commitment by the Owner to issue any invitations to bid or award any or all phases of any projects.

Bidder Qualifications Statement

BIDDER QUALIFICATIONS STATEMENT

ARTICLE 1—GENERAL INFORMATION

1.01 Provide contact information for the Business:

Legal Name of Business:

Corporate Office

Name: Phone number:

Title: Email address:

Business address of corporate office:

Local Office

Name: Phone number:

Title: Email address:

Business address of local office:

1.02 Provide information on the Business’s organizational structure:

Form of Business: ☐ Sole Proprietorship ☐ Partnership ☐ Corporation

☐ Limited Liability Company ☐ Joint Venture comprised of the following companies:

1.

2.

3.

Provide a separate Qualification Statement for each Joint Venturer.

Date Business was formed: State in which Business was formed:

Is this Business authorized to operate in the Project location? ☐ Yes ☐ No ☐ Pending

1.03 Identify all businesses that own Business in whole or in part (25% or greater), or that are wholly or partly (25% or greater) owned by Business:

Name of business: Affiliation:

Address:

Name of business: Affiliation:

Address:

Name of business: Affiliation:

Address:

Bidder Qualifications Statement

1.04 Provide information regarding the Business’s officers, partners, and limits of authority.

Name: Title:

Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $

Name: Title:

Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $

Name: Title:

Authorized to sign contracts: ☐ Yes ☐ No Limit of Authority: $

Name: Title:

ARTICLE 2—LICENSING

2.01 Provide information regarding licensure for Business:

Name of License:

Licensing Agency:

License No: Expiration Date:

Name of License:

Licensing Agency:

License No: Expiration Date:

ARTICLE 3—DIVERSE BUSINESS CERTIFICATIONS

3.01 Provide information regarding Business’s Diverse Business Certification, if any. Provide evidence of current certification.

Certification Certifying Agency Certification Date

☐ Disadvantaged Business Enterprise

☐ Minority Business Enterprise

☐ Woman-Owned Business Enterprise

☐ Small Business Enterprise

☐ Disabled Business Enterprise

☐ Veteran-Owned Business Enterprise

☐ Service-Disabled Veteran-Owned Business

☐ HUBZone Business (Historically Underutilized) Business

☐ Other

☐ None

Bidder Qualifications Statement

ARTICLE 4—SAFETY

4.01 Provide information regarding Business’s safety organization and safety performance.

Name of Business’s Safety Officer:

Safety Certifications

Certification Name Issuing Agency Expiration

4.02 Provide Worker’s Compensation Insurance Experience Modification Rate (EMR), Total Recordable Frequency Rate (TRFR) for incidents, and Total Number of Recorded Manhours (MH) for the last 3 years and the EMR, TRFR, and MH history for the last 3 years of any proposed Subcontractor(s) that will provide Work valued at 10% or more of the Contract Price. Provide documentation of the EMR history for Business and Subcontractor(s).

Year

Company EMR TRFR MH EMR TRFR MH EMR TRFR MH

4.03 Provide a short, written narrative summarizing the major components of the Business’s worker safety program.

Bidder Qualifications Statement

ARTICLE 5—FINANCIAL

5.01 Provide information regarding the Business’s financial stability. Provide the most recent audited financial statement, and if such audited financial statement is not current, also provide the most current financial statement.

Financial Institution:

Business address:

Date of Business’s most recent financial statement: ☐ Attached

Date of Business’s most recent audited financial statement: ☐ Attached

Financial indicators from the most recent financial statement

Contractor’s Current Ratio (Current Assets ÷ Current Liabilities)

Contractor’s Quick Ratio ((Cash and Cash Equivalents + Accounts Receivable + Short Term Investments) ÷ Current Liabilities)

ARTICLE 6—SURETY INFORMATION

6.01 Provide information regarding the surety company that will issue required bonds on behalf of the Business, including but not limited to performance and payment bonds.

Surety Name:

Surety is a corporation organized and existing under the laws of the state of:

Is surety authorized to provide surety bonds in the Project location? ☐ Yes ☐ No

Total bonding capacity:

Current available bonding capacity:

Is surety listed in “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” published in Department Circular 570 (as amended) by the Bureau of the Fiscal Service, U.S. Department of the Treasury?

☐ Yes ☐ No

Mailing Address (principal place of business):

Physical Address (principal place of business):

Phone (main): Phone (claims):

Bidder Qualifications Statement

ARTICLE 7—INSURANCE

7.01 Provide information regarding Business’s insurance company(s), including but not limited to its Commercial General Liability carrier. Provide information for each provider.

Name of insurance provider, and type of policy (CLE, auto, etc.):

Insurance Provider Type of Policy (Coverage Provided)

Are providers licensed or authorized to issue policies in the Project location? ☐ Yes ☐ No Does provider have an A.M. Best Rating of A-VII or better? ☐ Yes ☐ No

Mailing Address (principal place of business):

Physical Address (principal place of business):

Phone (main): Phone (claims):

ARTICLE 8—CONSTRUCTION EXPERIENCE

8.01 Provide information that will identify the overall size and capacity of the Business.

Average number of current full-time employees:

Estimate of revenue for the current year:

Estimate of revenue for the previous year:

8.02 Provide information regarding the Business’s previous contracting experience.

Years of experience with projects like the proposed project:

As a general contractor: As a joint venturer:

Has Business, or a predecessor in interest, or an affiliate identified in Paragraph 1.03:

Been disqualified as a bidder by any local, state, or federal agency within the last 5 years?

☐ Yes ☐ No

Been barred from contracting by any local, state, or federal agency within the last 5 years?

☐ Yes ☐ No

Been released from a bid in the past 5 years? ☐ Yes ☐ No

Defaulted on a project or failed to complete any contract awarded to it? ☐ Yes ☐ No

Refused to construct or refused to provide materials defined in the contract documents or in a change order? ☐ Yes ☐ No

Been a party to any currently pending litigation or arbitration? ☐ Yes ☐ No

Provide full details in a separate attachment if the response to any of these questions is Yes.

Bidder Qualifications Statement

8.03 List all projects currently under contract in Schedule A and provide indicated information.

8.04 List a minimum of three and a maximum of six projects completed in the last 8 years in Schedule B and provide indicated information to demonstrate the Business’s experience with projects similar in type and cost of construction.

Present detailed information to demonstrate the Business’s experience with work similar to the scope and complexity described in the “Project Description and Complexity” section herein.

Projects listed should include those that demonstrate experience sufficient to meet the minimum qualification criteria.

The Owner shall be entitled to contact each reference listed by the Business. The Business, by submitting a SOQ, expressly agrees that any information concerning the contractor in possession of said entities and references may be made available to the Owner, and if requested, contractor shall provide a written consent to the release of information. Information requested, but not supplied by said entities and references may be grounds for adversely considering a contractor’s pre-qualification application.

8.05 In Schedule C, provide information on key individuals whom Business intends to assign to the Project. Provide resumes for those individuals included in Schedule C. Key individuals include the Project Manager, Project Superintendent, Quality Manager, and Safety Manager. Resumes may be provided for Business’s key leaders as well.

ARTICLE 9—SUBCONTRACTORS

Identify which portions of the listed components of the work that the Business will perform with their own crews. If subcontractors will be used, indicate the name of the subcontractor(s) anticipated to be used and the type of work they will be performing.

Type of work: Performed by:

Earthwork, grading and subgrade preparation ☐ Contractor’s own forces ☐ Subcontractor __________________________

Structural concrete placement ☐ Contractor’s own forces ☐ Subcontractor __________________________

Site piping ☐ Contractor’s own forces ☐ Subcontractor __________________________

Landscaping ☐ Contractor’s own forces ☐ Subcontractor __________________________

Electrical ☐ Contractor’s own forces ☐ Subcontractor __________________________

Other ________________________________ ☐ Contractor’s own forces ☐ Subcontractor __________________________

Other ________________________________ ☐ Contractor’s own forces ☐ Subcontractor __________________________

Other ________________________________ ☐ Contractor’s own forces ☐ Subcontractor __________________________

Bidder Qualifications Statement

ARTICLE 10—QUALITY ASSURANCE/QUALITY CONTROL PROCESS AND MATERIALS TESTING

Provide a short, written narrative describing the key components of the Business’s internal QA and QC processes, including materials testing:

ARTICLE 11—REQUIRED ATTACHMENTS

11.01 Provide the following information with the Statement of Qualifications:

A. If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as required in Paragraph 1.02.

B. Diverse Business Certifications if required by Paragraph 3.01.

C. Certification of Business’s safety performance if required by Paragraph 4.02.

D. Financial statements as required by Paragraph 5.01.

E. Attachments providing additional information as required by Paragraph 8.02.

F. Schedule A (Current Projects) as required by Paragraph 8.03. Fill out this form for each current project.

G. Schedule B (Previous Experience with Similar Projects) as required by Paragraph 8.04. Fill out this form for 3 – 6 projects.

H. Schedule C (Key Individuals) and resumes for the key individuals listed, as required by Paragraph 8.05.

I. Schedule D (Work Approach and Risk Management)

J. Additional items as pertinent.

Bidder Qualifications Statement

This Statement of Qualifications is offered by:

Business:

(typed or printed name of organization)

By:

(individual’s signature)

Name:

(typed or printed)

Title:

(typed or printed)

Date:

(date signed)

(If Business is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.)

Attest:

(individual’s signature)

Name:

(typed or printed)

Title:

(typed or printed)

Address for giving notices:

Designated Representative:

Name:

(typed or printed)

Title:

(typed or printed)

Address:

Phone:

Email:

Bidder Qualifications Statement

Schedule A—Current Projects (fill this form out for each current project)

Name of Organization:

Project Owner: Project Name:

General Description of Project:

Construction Cost: Date Project Completed:

Completed on time? If not, explain.*

Were claims/disputes filed? If so, explain.*

No. of Change Orders: Cost of Change Orders:

Reason for Change Order(s):

Key Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager

Name

Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)

Name Title/Position Organization Telephone Email

Owner

Designer

Construction Manager

Description of similarities to the Project:

*An explanation may be attached.

Bidder Qualifications Statement

Schedule B—Previous Experience with Similar Projects (fill this form out for 3 – 6 projects)

Name of Organization:

Project Owner: Project Name:

General Description of Project:

Construction Cost: Date Project Completed:

Completed on time? If not, explain.*

Were claims/disputes filed? If so, explain.*

No. of Change Orders: Cost of Change Orders:

Reason for Change Order(s):

Key Project Personnel Project Manager Project Superintendent Safety Manager Quality Control Manager

Name

Reference Contact Information (listing names indicates approval to contacting the names individuals as a reference)

Name Title/Position Organization Telephone Email

Owner

Designer

Construction Manager

Description of similarities to the Project:

*An explanation may be attached.

Bidder Qualifications Statement

Schedule C—Key Individuals

Project Manager Name of individual Years of experience as project manager Years of experience with this organization Number of similar projects as project manager Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project

Candidate’s role on project

Candidate’s role on project

Project Superintendent Name of individual Years of experience as project superintendent Years of experience with this organization Number of similar projects as project superintendent Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project Candidate’s role on project

Candidate’s role on project

Bidder Qualifications Statement

Safety Manager Name of individual Years of experience as project manager Years of experience with this organization Number of similar projects as project manager Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project

Candidate’s role on project

Candidate’s role on project

Quality Control Manager Name of individual Years of experience as project superintendent Years of experience with this organization Number of similar projects as project superintendent Number of similar projects in other positions Current Project Assignments

Name of assignment Percent of time used for this project

Estimated project completion date

Reference Contact Information (listing names indicates approval to contact named individuals as a reference) Name Name Title/Position Title/Position Organization Organization Telephone Telephone Email Email Project Project

Candidate’s role on project

Candidate’s role on project

Bidder Qualifications Statement

Schedule D—Work Approach and Risk Management

Based on past project experience, describe your general approach to scheduling and accomplishing a project containing the following elements, including a description of personnel, equipment, phasing to meet deadlines, and staging. Identify potential risks to schedule and your approach to managing those risks:

Construction of a water storage reservoir in an urban area Site piping Pre-stressing operations Site grading/drainage and landscaping

Please attached sheets as needed.

Request for General Contractor
Statements of Qualifications
Zone 5 North
4.0 MG Water Storage Reservoir
Request for General Contractor Statements of Qualifications
West Jordan City
Zone 5 North 4.0 MG Water Storage Reservoir
GENERAL
PURPOSE
PROJECT ADMINISTRATION
PROJECT DESCRIPTION AND COMPLEXITY
SUBMITTAL PROCEDURE AND DEADLINE
CONTENT OF SOQ
MINIMUM QUALIFICATIONS
EVALUATION OF SOQs
NOTIFICATION OF PRE-QUALIFIED CONTRACTORS
Bidder Qualifications Statement
Article 1—General Information
1.01 Provide contact information for the Business:
1.02 Provide information on the Business’s organizational structure:
1.03 Identify all businesses that own Business in whole or in part (25% or greater), or that are wholly or partly (25% or greater) owned by Business:
1.04 Provide information regarding the Business’s officers, partners, and limits of authority.
Article 2—Licensing
2.01 Provide information regarding licensure for Business:
Article 3—Diverse Business Certifications
3.01 Provide information regarding Business’s Diverse Business Certification, if any. Provide evidence of current certification.
Article 4—Safety
4.01 Provide information regarding Business’s safety organization and safety performance.
4.02 Provide Worker’s Compensation Insurance Experience Modification Rate (EMR), Total Recordable Frequency Rate (TRFR) for incidents, and Total Number of Recorded Manhours (MH) for the last 3 years and the EMR, TRFR, and MH history for the last 3 years of any proposed Subcontractor(s) that will provide Work valued at 10% or more of the Contract Price. Provide documentation of the EMR history for Business and Subcontractor(s).
4.03 Provide a short, written narrative summarizing the major components of the Business’s worker safety program.
Article 5—Financial
5.01 Provide information regarding the Business’s financial stability. Provide the most recent audited financial statement, and if such audited financial statement is not current, also provide the most current financial statement.
Article 6—Surety Information
6.01 Provide information regarding the surety company that will issue required bonds on behalf of the Business, including but not limited to performance and payment bonds.
Article 7—Insurance
7.01 Provide information regarding Business’s insurance company(s), including but not limited to its Commercial General Liability carrier. Provide information for each provider.
Article 8—Construction Experience
8.01 Provide information that will identify the overall size and capacity of the Business.
8.02 Provide information regarding the Business’s previous contracting experience.
8.03 List all projects currently under contract in Schedule A and provide indicated information.
8.04 List a minimum of three and a maximum of six projects completed in the last 8 years in Schedule B and provide indicated information to demonstrate the Business’s experience with projects similar in type and cost of construction.
Present detailed information to demonstrate the Business’s experience with work similar to the scope and complexity described in the “Project Description and Complexity” section herein. Projects listed should include those that demonstrate experience sufficient to meet the minimum qualification criteria.
8.05 In Schedule C, provide information on key individuals whom Business intends to assign to the Project. Provide resumes for those individuals included in Schedule C. Key individuals include the Project Manager, Project Superintendent, Quality Manager, and Safety Manager. Resumes may be provided for Business’s key leaders as well.
Article 9—Subcontractors
Article 10—Quality Assurance/Quality Control PRocess and materials testing
Article 11—Required Attachments
11.01 Provide the following information with the Statement of Qualifications:
A. If Business is a Joint Venture, separate Qualifications Statements for each Joint Venturer, as required in Paragraph 1.02.
B. Diverse Business Certifications if required by Paragraph 3.01.
C. Certification of Business’s safety performance if required by Paragraph 4.02.
D. Financial statements as required by Paragraph 5.01.
E. Attachments providing additional information as required by Paragraph 8.02.
F. Schedule A (Current Projects) as required by Paragraph 8.03. Fill out this form for each current project.
G. Schedule B (Previous Experience with Similar Projects) as required by Paragraph 8.04. Fill out this form for 3 – 6 projects.
H. Schedule C (Key Individuals) and resumes for the key individuals listed, as required by Paragraph 8.05.
I. Schedule D (Work Approach and Risk Management)
J. Additional items as pertinent.

File details come from the government source that posted it. Updated .