3-WEST NORTHWEST D1 WILDLIFE HABITAT PROJECT PT 4.pdf
PDF 1 MB Posted
- Solicitation number
- AM26-106
- Issued by
- Davis County, Utah
About this file
This is an Invitation for Bid (IFB) document issued by the State of Utah Division of Purchasing on behalf of the Division of Wildlife Resources for the West Northwest D1 Wildlife Habitat Project-Sheep Creek Geological Loop Phase 5 (WRI Project #7582). The project encompasses lop and scatter services for up to 2,233 acres located in Daggett County, Utah. Participation in this solicitation is limited to prequalified contractors only, and no mandatory site visit is required. The project performance period runs from September 15, 2026, through December 1, 2026. A single contract award is anticipated and will be made to the lowest cost responsive and responsible vendor, with the determination methodology based on the lowest cost per acre. Vendors must guarantee their pricing through project completion.
Award will be determined using a lowest-cost evaluation criteria on a per-acre basis. The solicitation is restricted to contractors on the current pre-approved/pre-qualified vendor list, ensuring that only qualified entities may submit proposals. Vendors are required to maintain their quoted pricing throughout the duration of the project, providing cost certainty for the contracting agency. No information regarding funding sources, total project budget, or specific pricing ranges is detailed in the available documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D1WNW_Phase5_ImplementationAreas.prj | — | |
| D1WNW_Phase5_ImplementationAreas.shp | — | |
| 9-Award Memo.pdf | ||
| D1WNW_Phase5_ImplementationAreas.shp.xml | XML file | |
| 7-Attachment A-PO Terms and Conditions.docx | DOCX document | |
| 1-Contract Performance Evaluation FOR REFERENCE USE ONLY.pdf | ||
| 11-Award Memo.pdf | ||
| 12-AM27-106 Bid Results.xlsx | XLSX spreadsheet | |
| D1WNW_Phase5_ImplementationAreas.dbf | DBF file | |
| D1WNW_Phase5_ImplementationAreas.kmz | KMZ file | |
| 2-Vendor Prerequisites - IFB Agency.pdf | ||
| 5-Attachment B-Scope of Work.docx | DOCX document | |
| 10-AM27-106 Bid Results.xlsx | XLSX spreadsheet | |
| 4-WEST NORTHWEST D1 WILDLIFE HABITAT PROJECT PT 3.pdf | ||
| D1WNW_Phase5_ImplementationAreas.sbx | — | |
| D1WNW_Phase5_ImplementationAreas.shx | — | |
| D1WNW_Phase5_ImplementationAreas.cpg | — | |
| 8-AM27-106 Bid Results(UNOFFICIAL).xlsx | XLSX spreadsheet | |
| D1WNW_Phase5_ImplementationAreas.sbn | — |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Esri, NASA, NGA, USGS, FEMA, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community¯
0 0.75 1.50.38 Miles
West Northwest D1 Wildlife Habitat Project- Sheep Creek Geological Loop- Phase 5: WRI Project # 7582
File details come from the government source that posted it. Updated .