3_Scranton_3-Park_Improvements_Project_Wages&Specs.pdf

PDF 2 MB Posted

Attached to
City of Scranton Three Parks Improvement Project
Solicitation number
Not on record
Issued by
Lackawanna County, Pennsylvania

About this file

This document is a comprehensive compilation of technical specifications, prevailing wage rates, and project details for the City of Scranton's Three-Parks Improvements Project, which involves renovations at Orchard Street/Connors Park, North Scranton Mini-Park, and Novembrino Splash Pad. The project scope includes site clearing, earthwork, soil erosion control, concrete work, bituminous pavement installation, lawn and grass establishment, and associated infrastructure improvements. The contract was awarded on September 20, 2022, with a project classification as Highway, and involves multiple technical sections covering everything from subgrade preparation to final landscaping.

The document provides detailed prevailing wage rates for various construction trades, including laborers, operators, carpenters, electricians, and other specialized workers, with rates effective from 2021-2022. Wage rates vary by trade and classification, with total hourly compensation (including base wage and fringe benefits) ranging from approximately $37 to $85 per hour depending on the specific job category. The project specifications emphasize compliance with Pennsylvania Department of Transportation (PennDOT) Publication 408 standards, require specific material certifications, and mandate strict quality control measures including subgrade preparation, compaction requirements, and erosion control techniques. The technical specifications also outline precise installation methods, material requirements, and performance standards for each phase of the park improvement project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE CITY OF SCRANTON

THREE-PARKS IMPROVEMENTS PROJECT

ORCHARD STREET/CONNORS PARK ~ NORTH SCRANTON MINI-PARK ~ NOVEMBRINO SPLASH PAD

PA PREVAILING WAGE RATES

Project Name: City of Scranton 3-Park Renovation Project

Awarding Agency: Scranton Parks & Recreation

Contract Award Date: 9/20/2022

Serial Number: 22-06975

Project Classification: Highway

Determination Date: 8/29/2022

Assigned Field Office: Scranton

Field Office Phone Number: (570)963-4577

Toll Free Phone Number: (877)214-3962

Project County: Lackawanna County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 8/29/2022 Page 1 of 6

Project: 22-06975 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 7/1/2021 $34.58 $20.67 $55.25

Asbestos & Insulation Workers 7/1/2022 $35.83 $20.67 $56.50

Boilermaker (Commercial, Institutional, and Minor Repair Work)

1/1/2019 $29.26 $18.48 $47.74

Boilermakers 1/1/2021 $49.32 $34.90 $84.22

Boilermakers 1/1/2022 $50.17 $35.30 $85.47

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2021 $36.82 $17.36 $54.18

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/1/2022 $37.57 $18.76 $56.33

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

4/30/2023 $39.47 $18.76 $58.23

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

4/28/2024 $41.32 $18.76 $60.08

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $43.17 $18.76 $61.93

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

5/1/2021 $31.78 $18.63 $50.41

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

5/1/2022 $32.88 $18.63 $51.51

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

5/1/2023 $34.03 $18.63 $52.66

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

5/1/2024 $35.23 $18.63 $53.86

Cement Finishers & Plasterers 5/2/2021 $29.02 $18.48 $47.50

Cement Finishers & Plasterers 6/1/2022 $37.06 $13.50 $50.56

Cement Masons 6/1/2021 $35.88 $13.50 $49.38

Cement Masons 6/1/2022 $36.48 $14.00 $50.48

Drywall Finisher 5/1/2021 $29.58 $21.57 $51.15

Drywall Finisher 5/1/2022 $30.71 $22.36 $53.07

Electricians 6/1/2012 $33.37 $15.19 $48.56

Electricians 6/1/2013 $33.77 $16.04 $49.81

Electricians 6/1/2014 $34.36 $16.95 $51.31

Electricians 6/1/2015 $34.36 $17.80 $52.16

Electricians 6/1/2016 $34.36 $18.80 $53.16

Electricians 6/1/2017 $34.36 $19.85 $54.21

Electricians 6/1/2020 $41.23 $20.31 $61.54

Electricians 12/1/2020 $41.23 $20.81 $62.04

Electricians 6/1/2021 $42.23 $21.59 $63.82

Electricians 6/1/2022 $43.23 $22.63 $65.86

Elevator Constructor 1/1/2018 $47.48 $33.00 $80.48

Glazier 5/1/2021 $29.57 $19.36 $48.93

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2021 $34.01 $31.13 $65.14

Laborers (Class 01 - See notes) 5/2/2021 $22.65 $19.53 $42.18

Laborers (Class 01 - See notes) 5/1/2022 $23.05 $20.48 $43.53

Laborers (Class 01 - See notes) 4/30/2023 $26.32 $21.03 $47.35

Laborers (Class 02 - See notes) 5/2/2021 $24.65 $19.53 $44.18

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 8/29/2022 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Laborers (Class 02 - See notes) 5/1/2022 $25.05 $20.48 $45.53

Laborers (Class 02 - see notes) 4/30/2023 $27.82 $21.03 $48.85

Laborers (Class 03 - See notes) 5/2/2021 $25.42 $19.53 $44.95

Laborers (Class 03 - See notes) 5/1/2022 $25.82 $20.48 $46.30

Laborers (Class 03 - See notes) 4/30/2023 $28.32 $21.03 $49.35

Laborers (Class 04 - See notes) 5/2/2021 $26.72 $19.53 $46.25

Laborers (Class 04 - See notes) 5/1/2022 $27.12 $20.48 $47.60

Laborers (Class 04 - See notes) 4/30/2023 $25.97 $21.03 $47.00

Laborers (Class 05 - See notes) 5/2/2021 $24.65 $19.53 $44.18

Laborers (Class 05 - See notes) 5/1/2022 $25.05 $20.48 $45.53

Laborers (Class 05 - See notes) 4/30/2023 $27.47 $21.03 $48.50

Laborers (Class 06 - See notes) 5/2/2021 $27.02 $19.68 $46.70

Laborers (Class 06 - See notes) 5/1/2022 $27.47 $20.33 $47.80

Laborers (Class 06 - See notes) 4/30/2023 $27.97 $21.03 $49.00

Marble Mason 5/1/2021 $34.23 $15.90 $50.13

Marble Mason 5/1/2022 $35.13 $16.70 $51.83

Marble Mason 5/1/2023 $37.08 $16.70 $53.78

Marble Mason 5/1/2024 $39.03 $16.70 $55.73

Marble Mason 5/1/2025 $40.98 $16.70 $57.68

Millwright 5/1/2020 $36.04 $19.31 $55.35

Operators (Building, Class 01 - See Notes) 5/1/2021 $39.87 $27.94 $67.81

Operators (Building, Class 01 - See Notes) 5/1/2022 $41.41 $28.40 $69.81

Operators (Building, Class 01A - See Notes) 5/1/2021 $42.12 $28.60 $70.72

Operators (Building, Class 01A - See Notes) 5/1/2022 $43.66 $29.06 $72.72

Operators (Building, Class 02 - See Notes) 5/1/2021 $39.59 $27.85 $67.44

Operators (Building, Class 02 - See Notes) 5/1/2022 $41.13 $28.31 $69.44

Operators (Building, Class 02A - See Notes) 5/1/2021 $41.84 $28.52 $70.36

Operators (Building, Class 02A - See Notes) 5/1/2022 $43.38 $28.98 $72.36

Operators (Building, Class 03 - See Notes) 5/1/2021 $36.87 $27.04 $63.91

Operators (Building, Class 03 - See Notes) 5/1/2022 $38.41 $27.50 $65.91

Operators (Building, Class 04 - See Notes) 5/1/2021 $35.72 $26.72 $62.44

Operators (Building, Class 04 - See Notes) 5/1/2022 $37.27 $27.17 $64.44

Operators (Building, Class 05 - See Notes) 5/1/2021 $35.27 $26.59 $61.86

Operators (Building, Class 05 - See Notes) 5/1/2022 $36.82 $27.04 $63.86

Operators (Building, Class 06 - See Notes) 5/1/2021 $34.40 $26.32 $60.72

Operators (Building, Class 06 - See Notes) 5/1/2022 $35.95 $26.77 $62.72

Operators (Building, Class 07A- See Notes) 5/1/2021 $48.31 $31.86 $80.17

Operators (Building, Class 07A- See Notes) 5/1/2022 $50.17 $32.40 $82.57

Operators (Building, Class 07B- See Notes) 5/1/2021 $47.96 $31.77 $79.73

Operators (Building, Class 07B- See Notes) 5/1/2022 $49.81 $32.31 $82.12

Painters Class 1 (see notes) 5/1/2021 $29.02 $21.57 $50.59

Painters Class 1 (see notes) 5/1/2022 $29.65 $22.36 $52.01

Painters Class 2 (see notes) 5/1/2021 $31.92 $21.57 $53.49

Painters Class 2 (see notes) 5/1/2022 $33.05 $22.36 $55.41

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 8/29/2022 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Painters Class 3 (see notes) 5/1/2021 $38.02 $21.57 $59.59

Painters Class 3 (see notes) 5/1/2022 $39.40 $22.36 $61.76

Pile Driver Divers (Building, Heavy, Highway) 1/1/2021 $54.75 $20.10 $74.85

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 1/1/2021 $36.50 $20.10 $56.60

Piledrivers 1/1/2022 $37.60 $20.50 $58.10

Plasterers 6/1/2021 $36.46 $13.00 $49.46

Plumbers and Steamfitters 12/1/2021 $46.24 $22.07 $68.31

Plumbers and Steamfitters 12/1/2022 $47.74 $22.32 $70.06

Roofers 5/1/2021 $31.00 $20.86 $51.86

Roofers 5/1/2022 $31.75 $21.36 $53.11

Sheet Metal Workers 5/1/2021 $31.60 $27.26 $58.86

Sheet Metal Workers 5/1/2022 $33.62 $28.24 $61.86

Sign Makers and Hangars 7/17/2021 $29.49 $23.90 $53.39

Sign Makers and Hangars 7/15/2022 $30.54 $24.35 $54.89

Sprinklerfitters 4/1/2021 $40.33 $26.94 $67.27

Sprinklerfitters 4/1/2022 $42.29 $27.48 $69.77

Terrazzo Finisher 5/1/2021 $33.23 $19.03 $52.26

Terrazzo Finisher 5/1/2022 $34.46 $19.24 $53.70

Terrazzo Finisher 5/1/2023 $35.79 $19.25 $55.04

Terrazzo Finisher 5/1/2024 $37.16 $19.26 $56.42

Terrazzo Grinder 5/1/2021 $33.94 $19.03 $52.97

Terrazzo Grinder 5/1/2022 $35.19 $19.24 $54.43

Terrazzo Grinder 5/1/2023 $36.54 $19.25 $55.79

Terrazzo Grinder 5/1/2024 $37.92 $19.26 $57.18

Terrazzo Mechanics 5/1/2021 $33.83 $20.78 $54.61

Terrazzo Mechanics 5/1/2022 $35.12 $20.99 $56.11

Terrazzo Mechanics 5/1/2023 $36.51 $21.00 $57.51

Terrazzo Mechanics 5/1/2024 $37.94 $21.01 $58.95

Terrazzo Setter 5/1/2019 $31.81 $19.67 $51.48

Tile & Marble Finisher 5/1/2021 $31.32 $15.40 $46.72

Tile & Marble Finisher 5/1/2022 $32.62 $15.80 $48.42

Tile & Marble Finisher 5/1/2023 $34.57 $15.80 $50.37

Tile & Marble Finisher 5/1/2024 $36.52 $15.80 $52.32

Tile & Marble Finisher 5/1/2025 $38.47 $15.80 $54.27

Tile Setter 5/1/2021 $34.23 $15.90 $50.13

Tile Setter 5/1/2022 $35.13 $16.70 $51.83

Tile Setter 5/1/2023 $37.08 $16.70 $53.78

Tile Setter 5/1/2024 $39.03 $16.70 $55.73

Tile Setter 5/1/2025 $40.98 $16.70 $57.68

Truckdriver class 1(see notes) 5/1/2021 $37.72 $0.00 $37.72

Truckdriver class 2 (see notes) 5/1/2021 $37.79 $0.00 $37.79

Truckdriver class 3 (see notes) 5/1/2021 $38.28 $0.00 $38.28

Window Film / Tint Installer 6/1/2019 $24.52 $12.08 $36.60

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 8/29/2022 Page 4 of 6

Project: 22-06975 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 5/1/2022 $34.02 $18.39 $52.41

Carpenter and Piledriver 5/1/2021 $33.12 $17.74 $50.86

Cement Finishers 6/1/2016 $32.43 $11.35 $43.78

Electric Lineman 1/1/2018 $55.43 $22.48 $77.91

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2021 $34.01 $31.13 $65.14

Laborers (Class 01 - See notes) 5/1/2021 $23.21 $18.09 $41.30

Laborers (Class 01 - See notes) 5/1/2022 $24.01 $18.54 $42.55

Laborers (Class 01 - See notes) 5/1/2023 $24.81 $18.99 $43.80

Laborers (Class 01 - See notes) 5/1/2024 $25.61 $19.49 $45.10

Laborers (Class 02 - See notes) 5/1/2021 $29.83 $18.09 $47.92

Laborers (Class 02 - See notes) 5/1/2022 $30.63 $18.54 $49.17

Laborers (Class 02 - See notes) 5/1/2023 $31.43 $18.99 $50.42

Laborers (Class 02 - See notes) 5/1/2024 $32.23 $19.49 $51.72

Laborers (Class 03 - See notes) 5/1/2021 $26.82 $18.09 $44.91

Laborers (Class 03 - See notes) 5/1/2022 $27.62 $18.54 $46.16

Laborers (Class 03 - See notes) 5/1/2023 $28.42 $18.99 $47.41

Laborers (Class 03 - See notes) 5/1/2024 $29.22 $19.49 $48.71

Laborers (Class 04 - See notes) 5/1/2021 $27.17 $18.09 $45.26

Laborers (Class 04 - See notes) 5/1/2022 $27.97 $18.54 $46.51

Laborers (Class 04 - See notes) 5/1/2023 $28.77 $18.99 $47.76

Laborers (Class 04 - See notes) 5/1/2024 $29.57 $19.49 $49.06

Laborers (Class 05 - See notes) 5/1/2021 $27.84 $18.09 $45.93

Laborers (Class 05 - See notes) 5/1/2022 $28.64 $18.54 $47.18

Laborers (Class 05 - See notes) 5/1/2023 $29.44 $18.99 $48.43

Laborers (Class 05 - See notes) 5/1/2024 $30.24 $19.49 $49.73

Laborers (Class 06 - See notes) 5/1/2021 $27.26 $18.09 $45.35

Laborers (Class 06 - See notes) 5/1/2022 $28.06 $18.54 $46.60

Laborers (Class 06 - See notes) 5/1/2023 $28.86 $18.99 $47.85

Laborers (Class 06 - See notes) 5/1/2024 $29.66 $19.49 $49.15

Laborers (Class 07 - See notes) 5/1/2021 $27.55 $18.09 $45.64

Laborers (Class 07 - See notes) 5/1/2022 $28.35 $18.54 $46.89

Laborers (Class 07 - See notes) 5/1/2023 $29.15 $18.99 $48.14

Laborers (Class 07 - See notes) 5/1/2024 $29.95 $19.49 $49.44

Laborers (Class 08 - See notes) 5/1/2021 $28.03 $18.09 $46.12

Laborers (Class 08 - See notes) 5/1/2022 $28.83 $18.54 $47.37

Laborers (Class 08 - See notes) 5/1/2023 $29.63 $18.99 $48.62

Laborers (Class 08 - See notes) 5/1/2024 $30.43 $19.49 $49.92

Operators (Heavy, Class 01 - See Notes) 5/1/2021 $38.44 $27.52 $65.96

Operators (Heavy, Class 01 - See Notes) 5/1/2022 $39.98 $27.98 $67.96

Operators (Heavy, Class 01A - See Notes) 5/1/2021 $40.69 $28.18 $68.87

Operators (Heavy, Class 01A - See Notes) 5/1/2022 $42.23 $28.64 $70.87

Operators (Heavy, Class 02 - See Notes) 5/1/2021 $38.16 $27.43 $65.59

Operators (Heavy, Class 02 - See Notes) 5/1/2022 $39.70 $27.89 $67.59

Operators (Heavy, Class 02A - See Notes) 5/1/2021 $40.41 $28.10 $68.51

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 8/29/2022 Page 5 of 6

Project: 22-06975 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 02A - See Notes) 5/1/2022 $41.95 $28.56 $70.51

Operators (Heavy, Class 03 - See Notes) 5/1/2021 $35.24 $26.57 $61.81

Operators (Heavy, Class 03 - See Notes) 5/1/2022 $36.78 $27.03 $63.81

Operators (Heavy, Class 04 - See Notes) 5/1/2021 $34.10 $26.24 $60.34

Operators (Heavy, Class 04 - See Notes) 5/1/2022 $35.65 $26.69 $62.34

Operators (Heavy, Class 05 - See Notes) 5/1/2021 $33.65 $26.11 $59.76

Operators (Heavy, Class 05 - See Notes) 5/1/2022 $35.20 $26.56 $61.76

Operators (Heavy, Class 06 - See Notes) 5/1/2021 $32.77 $25.84 $58.61

Operators (Heavy, Class 06 - See Notes) 5/1/2022 $34.31 $26.31 $60.62

Operators (Heavy, Class 07A - See Notes) 5/1/2021 $46.59 $31.37 $77.96

Operators (Heavy, Class 07A - See Notes) 5/1/2022 $48.45 $31.91 $80.36

Operators (Heavy, Class 07B - See Notes) 5/1/2021 $46.25 $31.26 $77.51

Operators (Heavy, Class 07B - See Notes) 5/1/2022 $48.10 $31.81 $79.91

Operators (Highway, Class 01 - See Notes) 5/1/2021 $39.10 $25.70 $64.80

Operators (Highway, Class 01 - See Notes) 5/1/2022 $39.10 $27.70 $66.80

Operators (Highway, Class 01a - See Notes) 5/1/2021 $41.35 $26.38 $67.73

Operators (Highway, Class 01a - See Notes) 5/1/2022 $41.35 $28.38 $69.73

Operators (Highway, Class 02 - See Notes) 5/1/2021 $37.93 $25.35 $63.28

Operators (Highway, Class 02 - See Notes) 5/1/2022 $37.93 $27.35 $65.28

Operators (Highway, Class 03 - See Notes) 5/1/2021 $37.23 $25.16 $62.39

Operators (Highway, Class 03 - See Notes) 5/1/2022 $37.23 $27.15 $64.38

Operators (Highway, Class 04 - See Notes) 5/1/2021 $36.77 $25.03 $61.80

Operators (Highway, Class 04 - See Notes) 5/1/2022 $36.77 $27.03 $63.80

Operators (Highway, Class 05 - See Notes) 5/1/2021 $36.26 $24.87 $61.13

Operators (Highway, Class 05 - See Notes) 5/1/2022 $36.26 $26.88 $63.14

Operators (Highway, Class 06 - See Notes) 5/1/2021 $39.33 $25.78 $65.11

Operators (Highway, Class 06 - See Notes) 5/1/2022 $39.33 $27.77 $67.10

Operators (Highway, Class 06/A - See Notes) 5/1/2021 $41.58 $26.43 $68.01

Operators (Highway, Class 06/A - See Notes) 5/1/2022 $41.58 $28.43 $70.01

Operators (Highway, Class 07/A - See Notes) 5/1/2021 $47.08 $29.49 $76.57

Operators (Highway, Class 07/A - See Notes) 5/1/2022 $47.38 $31.59 $78.97

Operators (Highway, Class 07/B - See Notes) 5/1/2021 $45.66 $29.08 $74.74

Operators (Highway, Class 07/B - See Notes) 5/1/2022 $45.97 $31.17 $77.14

Painters Class 2 (see notes) 5/1/2020 $31.53 $20.71 $52.24

Painters Class 3 (see notes) 5/1/2020 $37.63 $20.71 $58.34

Pile Driver Divers (Building, Heavy, Highway) 1/1/2021 $54.75 $20.10 $74.85

Pile Driver Divers (Building, Heavy, Highway) 1/1/2022 $56.40 $20.50 $76.90

Piledrivers 5/1/2021 $33.12 $17.74 $50.86

Piledrivers 5/1/2022 $34.02 $18.39 $52.41

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 5/1/2021 $37.72 $0.00 $37.72

Truckdriver class 2 (see notes) 5/1/2021 $37.79 $0.00 $37.79

Truckdriver class 3 (see notes) 5/1/2021 $38.28 $0.00 $38.28

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 8/29/2022 Page 6 of 6

TECHNICAL SPECIFICATIONS

The contractor shall complete the project scope of work items, in accordance with the construction plans, as well as, the attached technical specifications.

Provided technical specifications include the following:

Soil Erosion & Sedimentation Control – Section 02000

Earthwork – Section 02300

Lawns & Grasses – Section 02920

Cast-in-Place Concrete – Section 03301

Site Clearing – Section 02230

Bituminous Pavement – Section 02511

SOIL EROSION & SEDIMENTATION CONTROL

THE CITY OF SCRANTON –THREE-PARKS IMPROVEMENTS PROJECT

SECTION 02000

SOIL EROSION AND SEDIMENTATION CONTROL

PART 1 GENERAL

The contractor shall be required to utilize all erosion and sedimentation control practices on the plans to prevent the discharge of pollutants from the project area during construction.

The contractor shall be required to implement the following control measures and those described in the contract documents.

1.01 CONTROL MEASURES:

A. Reduce to the greatest extent practicable the area of disturbance and duration of exposure of readily erodible soils.

B. Protect the exposed soils by use of temporary vegetation, or seeding and mulch, or by accelerating the establishment of permanent vegetation. Complete and protect segments of work as rapidly as possible.

C. Retard the rate of runoff from the construction site and control the dispersal of runoff.

D. Utilize compost filter sock and other sediment holding devices at inlets, cross drains, etc.

E. Trap all sediment resulting from construction in temporary or permanent silt holding basins. This includes pump discharges resulting from dewatering operations.

F. Sprinkle or apply dust suppressor on haul roads and within the project area in order to keep air borne dust within tolerable limits as determined by the landscape architect.

G. Should construction operations be suspended for any appreciable length of time, temporary measure for control of erosion must be utilized.

PART 2 PRODUCTS

2.01 GEOTEXTILES:

A. Geotextiles shall be in accordance with Penn DOT Publication 408, Section 735 and as specified in the construction drawings and this manual.

2.02 TEMPORARY SEEDING:

B. Temporary seeding shall be employed using Annual Ryegrass (lolium multi-forum).

PART 3 EXECUTION

3.01 COMPOST FILTER SOCKS:

A. Prior to earth moving activities the Contractor shall install compost filter sock as required adjacent to drainage culverts, inlets, end walls, etc.

B. Compost Filter Sock and sediment traps shall be maintained by removing trapped sediment upstream and by removing sediment from the fabric when it becomes clogged.

SOIL EROSION & SEDIMENTATION CONTROL

3.02 SEEDING:

C. All seeding and mulching in ditches and swales and by all other denuded areas shall be maintained by filling in washouts and reseeding and mulching until vegetation has been established.

D. On areas where permanent seeding may be delayed for 20 or more days, temporary seeding shall be employed.

END OF SECTION 02000

EARTHWORK

SECTION 02300:

EARTHWORK

PART 1 GENERAL

1.01 DEFINITIONS:

1. Backfill: Soil materials used to fill in excavation.

2. Base Course: Layer placed between the subbase course and asphalt paving.

3. Bedding course: Layer placed over the excavated subgrade in a trench before laying pipe.

4. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

5. Drainage Course: Layer supporting slab-on-grade used to minimize capillary flow of pore water.

6. Excavation: Removal of material encountered above subgrade elevations.

1. Additional Excavation: Excavation below subgrade elevations as directed by Architect. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.

2. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated dimensions without direction by Architect. Unauthorized excavation, as well as remedial work directed by Architect, shall be without additional compensation.

7. Fill: Soil materials used to raise existing grades.

8. Structure: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man-made stationary features constructed above or below the ground surface.

9. Subbase Course: Layer placed between the subgrade and base course for asphalt paving, or layer placed between the subgrade and a concrete pavement or walk.

10. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, drainage fill, or topsoil materials.

11. Utilities include on-site underground pipes, conducts, ducts, and cables, as well as underground services within buildings.

1.02 EXISTING UTILITIES:

A. Do not interrupt utilities serving facilities occupied by Owner or others unless permitted in writing by Architect and then only after arranging to provide temporary utility services according to requirements indicated.

PART 2 PRODUCTS

2.01 SOILS:

A. Soil Materials: Provide borrow soil materials when sufficient satisfactory soil materials are not available from excavations.

B. Satisfactory Soils: ASTM D 2487 soil satisfaction groups GW, GP, GM, SW, SP, and SM, or combinations of these group symbols; free of rock or gravel larger than 3 inches (75 mm) in any dimension, debris, waste, frozen materials, vegetation, and other deleterious matter.

C. Unsatisfactory Soils: ASTM D 2487 soil classification groups GC, SC, ML, MH, CL, CH, OL, OH, and PT, or a combination of these group symbols.

D. Backfill and Fill: Satisfactory soil materials.

2.02 AGGREGATE:

A. Subbase Materials: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand: ASTM D 2940; with at least 90 percent passing a 1-1/2 inch (38 mm) sieve and not more than 12 percent passing a

No. 200 (0.075 mm) sieve.

B. Bedding: Naturally or artificially graded mixture of natural or crushed gravel, crushed stone, and natural or crushed sand; ASTM D 2940; except with 100 percent passing a 1 inch (38 mm) sieve and 0 to 5 percent passing a No. 8 (2.36 mm) sieve.

C. Drainage Fill: Washed, narrowly graded mixture of crushed stone, or crushed or uncrushed gravel; ASTM D 448; coarse-aggregate grading Size 57; with 100 percent passing a 1-1/2 inch (38 mm) sieve and 0 to 5 percent passing a No. 8 (2.36 mm) sieve.

2.03 WARNING TAPE:

A. Detectable Warning Tape: Polyethylene film warning tape encasing a metallic core, minimum 6 inches (150 mm) wide and 4 mils (0.1 mm) thick, continuously inscribed with a description of the utility.

PART 3 EXECUTION

3.01 PREPARATION AND PROTECTION:

A. Protect structures, utilities, sidewalks, pavements, and other facilities from damage caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations.

B. Provide erosion- and sedimentation-control measures.

C. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding Project site and surrounding area.

D. Protect subgrades from softening, undermining, washout, and damage by rain or water accumulation.

3.02 EXCAVATION:

A. Excavation to subgrade elevations regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.

1. If excavated materials intended for fill and backfill include unsatisfactory soil materials and rock, replace with satisfactory soil materials.

B. Excavation for structures, pavements, and walks to indicate elevations and dimensions.

Extend excavations for placing and removing concrete formwork, for installing services and other construction and for inspections.

C. Excavated utility trenches to indicate gradients, lines, depths, and invert elevations of uniform widths to provide a working clearance on each side of pipe or conduit. Excavate trench walls vertically from trench bottom to 12 inches (300 mm) higher than top of pipe or conduit.

1. Excavate trenches deeper than bottom of pipe elevation, 6 inches (150 mm) deeper in rock, 4 inches (100 mm) deeper elsewhere, to allow for bedding course.

Hand excavate for bell of pipe.

3.03 SUBGRADE:

A. Proof roll subgrades, before filling or placing aggregate courses, with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof roll wet or saturated subgrades.

B. Reconstruct subgrades damaged by freezing temperatures, frost, rain, accumulated water, or construction activities.

3.04 UNAUTHORIZED EXCAVATION:

A. Fill unauthorized excavated under foundations or wall footings by extending bottom elevation of concrete foundation or footing to excavation bottom, without altering top elevation. Lean concrete fill may be used when approved by Architect.

1. Fill unauthorized excavations under other construction or utility pipe as directed by

Architect.

3.05 STOCKPILE:

A. Stockpile borrow materials and satisfactory soil materials, without intermixing, in shaped, graded, drained, and covered stockpiles. Stockpile soil materials away from edge of excavations and outside drip line of remaining trees.

3.06 FILL:

A. Utility Trench Backfill: Place, compact, and shape bedding course to provide continuous support for pipes and conduits over rock and other unyielding bearing surfaces and to fill unauthorized excavations.

1. Place and compact backfill of satisfactory soil materials of subbase material, free of particles larger than 1 inch (25 mm), to a height of 12 inches (300 mm) over the utility pipe or conduit. Place and compact final backfill of satisfactory soil material to final subgrade.

2. Install warning tape directly above utilities, 12 inches (300 mm) below finished grade, except 6 inches (150 mm) below subgrade under pavements and slabs.

B. Fill: Place and compact fill material in layers to required elevations.

C. Uniformly moisten or aerate subgrade and each subsequent fill or backfill layer before compaction to within 2 percent of optimum moisture content.

1. Remove and replace, or scarify and air-dry, otherwise satisfactory soil material that exceeds optimum moisture content by 2 percent and is too wet to compact to specified dry unit weight.

3.07 COMPACTION:

A. Place backfill and fill materials in layers not more than 8 inches (200 mm) in loose depth for material compacted by heavy compaction equipment, and not more than 4 inches (100

mm) in lose depth for material compacted by hand-operated tampers.

B. Compact soil to not less than the following percentages of maximum dry unit weight according to ASTM D 1557:

1. Under structures, building slabs, steps, and pavements, scarify and recompact top

12 inches (300 mm) of existing subgrade and each layer of backfill or fill material at 95 percent.

2. Under walkways, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill or fill material at 92 percent.

3. Under lawn or unpaved areas, scarify and recompact top 6 inches (150 mm) below subgrade and compact each layer of backfill material at 85 percent.

3.08 GRADING:

A. Uniformly grade areas to a smooth surface, free from irregular surface changes. Comply with compaction requirements and grade to cross sections, lines, and elevation indicated.

Grade lawns, walks, and unpaved subgrades to tolerances of plus or minus 1 inch (25

mm) and pavements and areas within building lines to plus or minus ½ inch (13 mm).

3.09 UNDER SLABS:

A. Subbase and Base Courses: Under pavements and walks, place subbase course on prepared subgrade. Place base course material over subbase. Compact to required grades, lines, cross sections, and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 1557.

B. Under slabs-on-grade, place drainage course on prepared subgrade. Compact to required cross sections and thickness to not less than 95 percent of maximum dry unit weight according to ASTM D 698.

3.10 TESTING:

A. Testing Agency: Owner will engage a qualified independent geotechnical engineering testing agency to perform field quality-control testing.

1. Allow testing agency to inspect and test subgrades and each fill or backfill layer.

Proceed with subsequent earthwork only after test results for previously completed work comply with requirements.

2. When testing agency reports that subgrades, fill, or backfills have not achieved degree of compaction specified, scarify and moisten or aerate, or remove and replace soil to depth required; recompact and retest until specified compaction is obtained.

3.11 REPAIRS:

A. Repair and reestablish grades to specified tolerances where completed or partially completed surfaces become eroded, rutted, settles, or where they lose compaction.

B. Where settling occurs before Project correction period elapses, remove finished surfacing, backfill with additional soil material, compact, and reconstruct surfacing.

3.12 DISPOSAL:

A. Disposal: Remove surplus satisfactory soil and waste material, including unsatisfactory soil, trash, and debris, and legally dispose of it off Owner’s property.

END OF SECTION 02300

LAWNS AND GRASSES

SECTION 02920

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the contract, including general and supplementary conditions and division 1 specification sections, apply to this section.

1.02 SUMMARY:

A. This section includes the following:

1. Seeding.

2. Sodding.

3. Lawn renovation.

1.03 DEFINITIONS:

1. Finish grade: elevation of finished surface of planting soil.

2. Manufactured soil: soil produced off-site by homogeneously blending mineral soils or sand with stabilized organic soil amendments to produce topsoil or planting soil.

3. Planting soil: native or imported topsoil, manufactured topsoil, or surface soil modified to become topsoil; mixed with soil amendments.

4. Subgrade: surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.

1.04 SUBMITTALS:

A. Product data: for each type of product indicated.

B. Certification of grass seed: from seed vendor for each grass-seed mixture stating the botanical and common name and percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.

1. Certification of each seed mixture for turfgrass sod, identifying source, including name and telephone number of supplier.

A. Product certificates: for soil amendments and fertilizers, signed by product manufacturer.

B. Qualification data: for landscape installer.

C. Material test reports: for existing surface soil and imported topsoil.

D. Planting schedule: indicating anticipated planting dates for each type of planting.

E. Maintenance instructions: recommended procedures to be established by owner for maintenance of lawns and meadows during a calendar year. Submit before expiration of required maintenance periods.

1.05 QUALITY ASSURANCE:

A. Installer qualifications: a qualified landscape installer whose work has resulted in successful lawn and meadow establishment on projects of comparable scope and complexity. Installer to maintain an experienced full-time supervisor on project site when planting is in progress.

B. Soil-testing laboratory qualifications: an independent laboratory, recognized by the state department of agriculture, with the experience and capability to conduct the testing indicated and that specializes in types of tests to be performed.

C. Topsoil analysis: furnish soil analysis by a qualified soil-testing laboratory stating percentages of organic matter; gradation of sand, silt, and clay content; cation exchange capacity; sodium absorption ratio; deleterious material; ph; and mineral and plant-nutrient content of topsoil. Report suitability of topsoil for lawn growth. State recommended quantities of nitrogen, phosphorus, and potash nutrients and soil amendments to be added to produce satisfactory topsoil.

D. Pre-installation conference: conduct conference at project site prior to beginning work.

1.06 DELIVERY, STORAGE, AND HANDLING:

A. Seed: deliver seed in original sealed, labeled, and undamaged containers.

B. Sod: harvest, deliver, store, and handle sod according to requirements in tpi's "specifications for turfgrass sod materials" and "specifications for turfgrass sod transplanting and installation" in its "guideline specifications to turfgrass sodding."

1.07 SCHEDULING:

A. Planting restrictions: plant during one of the following periods. Coordinate planting periods with maintenance periods to provide required maintenance from date of substantial completion.

1. Spring planting: march 15 to june 1

2. Fall planting: august 1 to october 15

B. Weather limitations: proceed with planting only when existing and forecasted weather conditions permit.

1.08 LAWN MAINTENANCE:

A. Begin maintenance immediately after each area is planted and continue until acceptable lawn is established, but for not less than 30 days from date of substantial completion. When full maintenance period has not elapsed before end of planting season, or if lawn is not fully established, continue maintenance during next planting season.

1. Sodded lawns: 30 days from date of substantial completion.

B. Maintain and establish lawn by watering, fertilizing, weeding, mowing, trimming, replanting, and other operations. Roll, re-grade, and replant bare or eroded areas and re-mulch as necessary to produce a uniformly smooth, full lawn. In areas where mulch or seer has been disturbed by wind or rain, continue maintenance operations, add new seed and mulch as required. Anchor as required to prevent displacement.

C. Watering: provide and maintain temporary piping, hoses, and lawn-watering equipment to convey water from sources and to keep lawn uniformly moist to a depth of 4 inches (100 mm).

1. Schedule watering to prevent wilting, puddling, erosion, and displacement of seed or mulch. Lay out temporary watering system to avoid walking over muddy or newly planted areas.

2. Water lawn at a minimum rate of 1 inch (25 mm) per week.

D. Mow lawn as soon as top growth is tall enough to cut (max. 4” ht.). Repeat mowing to maintain specified height without cutting more than 1/3 of grass height. Do not delay mowing until grass blades bend over or become matted. Do not mow when grass is wet.

Schedule initial and subsequent mowings to maintain the following grass height:

1. Mow grass 2-1/2 to 3 inches (50 to 75 mm) high.

E. Lawn post-fertilization: apply fertilizer after initial mowing and when grass is dry. Halve the amount of nitrogen and apply twice during maintenance period, if preferred. Use fertilizer that will provide actual nitrogen of at least 1 lb/1000 sq. Ft. (0.45 kg/92.9 sq. M) to lawn area.

PART 2 PRODUCTS

2.01 SEED:

A. Grass seed: fresh, clean, dry, new-crop seed complying with aosa's "journal of seed technology; rules for testing seeds" for purity and germination tolerances.

B. Seed species: state-certified seed of grass species as follows, with not less than 95 percent germination, not less than 85 percent pure seed, and not more than 0.5 percent weed seed.

C. Temporary seed mix: lollium mulitflorum – annual ryegrass

D. Permanent seed mix: varieties to be approved by landscape architect.

2.02 TURFGRASS SOD:

A. Turfgrass sod: certified free of thatch, weeds, diseases, nematodes, and insects, complying with tpi's "specifications for turfgrass sod materials" in its "guideline specifications to turfgrass sodding." furnish viable sod of uniform density, color, and texture, strongly rooted, and capable of `vigorous growth and development when planted.

B. Turfgrass species:

1. 50 percent kentucky bluegrass (poa pratensis).in approved varieties

2. 30 percent chewings red fescue (festuca rubra).in approved varieties

3. 20 percent perennial ryegrass (lolium perenne). In approved varieties

2.03 TOPSOIL:

A. Topsoil: ASTM D 5268, ph range of 5.5 to 7, a minimum of 6 percent organic material content; free of stones 1 inch (25 mm) or larger in any dimension and other extraneous materials harmful to plant growth. Topsoil from off-site sources. Obtain topsoil from naturally well-drained construction or mining sites where topsoil occurs at least 4 inches (100

mm) deep; do not obtain from agricultural land, bogs or marshes.

2.04 INORGANIC SOIL AMENDMENTS:

A. Lime: ASTM C 602, agricultural limestone containing a minimum 80 percent calcium carbonate equivalent and as follows:

1. Class: class o, with a minimum 95 percent passing through no. 8 (2.36-mm) sieve and a minimum 55 percent passing through no. 60 (0.25-mm) sieve.

2. Provide lime in form of dolomitic limestone.

A. Sulfur: granular, biodegradable, containing a minimum of 90 percent sulfur, with a minimum 99 percent passing through no. 6 (3.35-mm) sieve and a maximum 10 percent passing through no. 40 (0.425-mm) sieve.

B. Iron sulfate: granulated ferrous sulfate containing a minimum of 20 percent iron and 10 percent sulfur.

C. Aluminum sulfate: commercial grade, unadulterated.

D. Sand: clean, course, washed, natural or manufactured, free of toxic materials.

2.05 ORGANIC SOIL AMENDMENTS:

A. Peat: sphagnum peat moss, partially decomposed, finely divided or granular texture, with a ph range of 3.4 to 4.8.

B. Manure: well-rotted, unleached, stable or cattle manure containing not more than 25 percent by volume of straw, sawdust, or other bedding materials; free of toxic substances, stones, sticks, soil, weed seed, and material harmful to plant growth.

2.06 FERTILIZER:

A. Superphosphate: commercial, phosphate mixture, soluble; a minimum of 20 percent available phosphoric acid.

B. Commercial fertilizer: commercial-grade complete fertilizer of neutral character, consisting of fast- and slow-release nitrogen, 50 percent derived from natural organic sources of urea formaldehyde, phosphorous, and potassium in the following composition in amounts recommended in soil reports from a qualified soil-testing agency.

C. Slow-release fertilizer: granular or pelleted fertilizer consisting of 50 percent water-insoluble nitrogen, phosphorus, and potassium. If used as a soil amendment, revise fertilizer mix to remedy deficiencies found in soil tests.

D. Mulches

1. Straw mulch: provide air-dry, clean, mildew- and seed-free, salt hay or threshed straw of wheat, rye, oats, or barley.

2. Fiber mulch: biodegradable, dyed-wood, cellulose-fiber mulch; nontoxic; free of plant-growth or germination inhibitors; with maximum moisture content of 15 percent and a ph range of 4.5 to 6.5.

3. Non-asphaltic tackifier: colloidal tackifier recommended by fiber-mulch manufacturer for slurry application; nontoxic and free of plant-growth or germination inhibitors.

PART 3 EXECUTION

3.01 EXAMINATION:

A. Examine areas to receive lawns and grass for compliance with requirements and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected.

3.02 PREPARATION:

B. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations. Protect adjacent and adjoining areas from hydroseeding overspray.

C. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.

3.03 LAWN PREPARATION:

A. Limit lawn subgrade preparation to areas to be planted the same day.

B. Newly graded subgrades: loosen subgrade to a minimum depth of 4 inches (75 mm).

Remove stones larger than 1 inch (25 mm) in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off owner's property.

1. Thoroughly blend planting soil mix off-site before spreading or spread topsoil, apply soil amendments and fertilizer on surface, and thoroughly blend planting soil mix.

C. Delay mixing fertilizer with planting soil if planting will not proceed within a few days.

D. Mix lime with dry soil before mixing fertilizer.

1. Spread planting soil mix to a depth of 4 inches (100 mm) but not less than required to meet finish grades after light rolling and natural settlement. Do not spread if planting soil or subgrade is frozen, muddy, or excessively wet.

E. Finish grading: grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch (13 mm) of finish elevation.

Roll and rake, remove ridges, and fill depressions to meet finish grades. Limit fine grading to areas that can be planted in the immediate future. Fine grade to assure positing surface water drainage away from all structures.

F. Moisten prepared lawn areas before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.

G. Restore areas if eroded or otherwise disturbed after finish grading and before planting.

3.04 SEEDING:

A. Sow seed with spreader or seeding machine. Do not broadcast or drop seed when wind velocity exceeds 5 mph (8 km/h). Evenly distribute seed by sowing equal quantities in two directions at right angles to each other.

1. Do not use wet seed or seed that is moldy or otherwise damaged.

A. Sow seed at the rate of 3 to 4 lb/1000 sq. Ft. (1.4 to 1.8 kg/92.9 sq. M).

B. Rake seed lightly into top 1/8 inch (3 mm) of topsoil, roll lightly, and water with fine spray.

C. Protect seeded areas with slopes exceeding 1:4 with erosion-control blankets installed and stapled according to manufacturer's written instructions.

D. Protect seeded areas with slopes not exceeding 1:6 by spreading straw mulch. Spread uniformly at a minimum rate of 2 tons/acre (42 kg/92.9 sq. M) to form a continuous blanket

1-1/2 inches (38 mm) in loose depth over seeded areas. Spread by hand, blower, or other suitable equipment.

1. Anchor straw mulch by crimping into topsoil with suitable mechanical equipment.

2. Bond straw mulch by spraying with asphalt emulsion at the rate of 10 to 13 gal./1000

sq. Ft. (38 to 49 l/92.9 sq. M). Take precautions to prevent damage or staining of structures or other plantings adjacent to mulched areas. Immediately clean damaged or stained areas.

3. 5 HYDROSEEDING:

A. Hydroseeding: mix specified seed, fertilizer, and fiber mulch in water, using equipment specifically designed for hydroseed application. Continue mixing until uniformly blended into homogeneous slurry suitable for hydraulic application.

1. Mix slurry with tackifier.

2. Apply slurry uniformly to all areas to be seeded in a two-step process:

A. First slurry application should be a combination of seed mix, fertilizer, lime, and 5-10% of mulching material.

B. The second slurry application should be a combination of tackifier and the balance of mulching material.

3.06 SODDING

A. Lay sod within 24 hours of harvesting. Do not lay sod if dormant or if ground is frozen or muddy.

B. Lay sod to form a solid mass with tightly fitted joints. Butt ends and sides of sod; do not stretch or overlap. Stagger sod strips or pads to offset joints in adjacent courses. Avoid damage to subgrade or sod during installation. Tamp and roll lightly to ensure contact with subgrade, eliminate air pockets, and form a smooth surface. Work sifted soil or fine sand into minor cracks between pieces of sod; remove excess to avoid smothering sod and adjacent grass.

1. Lay sod across angle of slopes exceeding 1:3.

2. Anchor sod on slopes exceeding 1:6 with wood pegs [or steel staples] spaced as recommended by sod manufacturer but not less than 2 anchors per sod strip to prevent slippage.

C. Saturate sod with fine water spray within two hours of planting. During first week, water daily or more frequently as necessary to maintain moist soil to a minimum depth of 1-1/2 inches (38 mm) below sod.

3.07 SATISFACTORY LAWNS

A. Satisfactory seeded lawn: at end of maintenance period, a healthy, uniform, close-nit stand of grass has been established, free of weeds and surface irregularities, with turf coverage exceeding 90 percent over any 10 sq. Ft. (0.92 sq. M) area and bare spots not exceeding 5 by

5 inches (125 by 125 mm) in area.

B. Satisfactory sodded lawn: at end of maintenance period, a healthy, well-rooted, even-colored, viable lawn has been established, free of weeds, open joints, bare areas, and surface irregularities.

C. Reestablish lawns that do not comply with requirements and continue maintenance until lawns are satisfactory.

3.08 CLEANUP AND PROTECTION

A. Promptly remove soil and debris created by lawn work from paved areas. Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.

B. Erect barricades and warning signs as required to protect newly planted areas from traffic.

Maintain barricades throughout maintenance period and remove after lawn is established.

C. Remove erosion-control measures after grass establishment period.

END OF SECTION 02920

CAST IN PLACE CONCRETE

SECTION 03301

CAST-IN-PLACE CONCRETE

A. SUBMITTALS:

A. In addition to Product Data, submit design mixes for each concrete mix.

B. QUALITY ASSURANCE:

A. Comply with ACI 301, “Specification for Structural Concrete,” and ACI 117, “Specifications for Tolerances for Concrete Construction and Materials.”

1. Installer Qualifications: An experienced installer who has completed pavement work similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance.

2. Manufacturer Qualifications: Manufacturer of ready-mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment.

PART 2 PRODUCTS

1.02 STEEL REINFORCEMENT: AS FOLLOWS:

1. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

2. Plain-Steel Wire: ASTM A 82, as drawn.

3. Plain-Steel Welded Wire Fabric: ASTM A 185, flat sheets.

1.03 CONCRETE MATERIALS: AS FOLLOWS:

A. Portland Cement: ASTM C 150, Type I or II.

B. Aggregate: ASTM C 33, uniformly graded, from a single source.

C. Water: ASTM C 94.

D. Synthetic Fiber: Fibrillated or monofilament polypropylene fibers engineered and designed for use in concrete, complying with ASTM C 1116, Type III, ½ to 1 ½ inches

(13 to 38 mm) long.

E. Air-Entraining Admixture: ASTM C 260.

F. Water-Reducing Admixture: ASTM C 494, Type A.

G. High-Range, Water-Reducing Admixture: ASTM C 494, Type F.

H. Water-Reducing and Accelerating Admixture: ASTM C 494, Type E.

I. Water-Reducing and Retarding Admixture: ASTM C 494, Type D.

2.03 RELATED MATERIALS: AS FOLLOWS:

A. Vapor Retarder: Multi-ply reinforced polyethylene sheet, ASTM E 1745, Class C, not less than 7.8 mils (0.18 mm) thick; or polyethylene sheet, ASTM D 4397, not less than 10 mils (0.25 mm) thick.

B. Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulose fiber, or ASTM D 1752, cork or self-expanding cork.

2.04 CURING MATERIALS: AS FOLLOWS:

A. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq.yd. (305 g/sq.m) dry.

B. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

C. Clear, Solvent-Borne, Membrane-Forming Curing Compound: ASTM C 309, Type I, Class B.

D. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type I, Class

E. Concrete Mixes: Prepare design mixes, proportioned according to ACI 301, with the following propperties:

1. Compressive Strength (28 Days): 3500 psi (24.1 Mpa).

2. Slump: 4 inches (100 mm).

3. Air Content: 4.5 to 7.0 percent.

F. Synthetic Fiber: Uniformly disperse in concrete mix at manufacturer’s recommended rate, but not less than 1.0 lb./cu. Yd. (0.60 kg/cu. M).

G. Ready-Mixed Concrete: Comply with ASTM C 94.

H. Ready-Mixed Concrete: Comply with ASTM C 94 and ASTM C 1116.

I. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94. Mix concrete materials in appropriate srum-type batch machine mixer.

PART 3 EXECUTION

3.01 VAPOR RETARDER:

A. Install, protect, and repair vapor-retarder sheets according to ASTM E 1643.

3.02 STEEL REINFORCEMENT:

A. Comply with CRSI’s “Manual of Standard Practice” for vapor retarder before placing concrete.

1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder before placing concrete.

B. Joints: Locate and install construction, isolation, and contraction joints.

C. Concrete Placement: Comply with recommendations in ACI 304R for measuring, mixing, transporting, and placing concrete.

1. Consolidate concrete with mechanical vibrating equipment.

2. Screed and initial-float concrete surfaces using bull floats or darbies before excess moisture or bleedwater appears on the surface.

D. Finish formed surfaces as follows:

1. Rough-Formed Finish: Apply to concrete surfaces not exposed to public view.

2. Smooth-Formed Finish: Apply to concrete surfaces exposed to public view or to be covered with a coating or covering material applied directly to concrete, such as waterproofing, dampproofing, veneer plaster, or painting.

a. Apply smooth-rubbed finish to smooth-formed finished concrete.

E. Finished unformed surfaces as follows:

1. Scratch Finish: Apply scratch finisht to surfaces to receive concrete floor topping or mortar setting beds for ceramic or quarry tile, portland cement terrazzo, and other bonded cementitious floor finish, unless otherwise indicated.

2. Float Finish: Apply float finish to surfaces indicated, to surfaces to receive trowel finish, and to floor and slab surfaces to be covered with fluid-applied or sheet waterproofing, built-up or membrane roofing, or sand-bed terrazzo.

3. Trowel Finish: Apply a hard trowel finish to surfaces indicated and to floor and slab surfaces exposed to view or to be covered with resilient flooring, carpet, ceramic or quarry tile set over a cleavage membrane, paint, or another think film-finish coating system.

4. Trowel and Fine-Broom Finish: Apply a partial trowel finish, stopping after second troweling, to surfaces indicated and to surfaces where ceramic or quarry tile is to be installed by either thickset or thin-set methods. Immediately after troweling, and when concrete is still plastic, slightly scarify surface with a fine broom.

5. Non-slip Broom Finish: Apply a nonslip broom finish to surfaces indidcated and to exterior concrete platforms, steps, and ramps. Immediately after float finishing, slightly roughen trafficked surface by brooming with fiber-bristle broom perpendicular to main traffic route.

G. Concrete Protection and Curing: Protect concrete from cold or hot weather during mixing, placing, and curing.

1. Begin curing after finishing concrete, but not before free water has disappeared from concrete surface.

2. Cure formed and unformed concrete for at least seven days by moisture curing, moisture-retaining-cover curing, or curing compound.

H. Remove and replace concrete that does not comply with requirements in this Section.

END OF SECTION 03301

SITE CLEARING

SECTION 02230

PART 1 - GENERAL

1.1 RELATED DOCUMENTS:

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY:

A. This Section includes the following:

1. Protecting existing trees and vegetation to remain.

2. Removing trees and other vegetation.

3. Clearing and grubbing.

4. Topsoil stripping.

5. Removing above-grade site improvements.

6. Disconnecting, capping or sealing, and abandoning site utilities in place.

7. Disconnecting, capping or sealing, and removing site utilities.

1.3 DEFINITIONS:

A. Topsoil: Natural or cultivated surface-soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 2 inches (50 mm) in diameter; and free of weeds,…