About this file
The document is a comprehensive construction drawing plan set for the City of Scranton's Three-Parks Improvements Project, developed by Thomas J. McLane and Associates, Inc. The project involves improvements to three parks: Orchard Street Park, Connors Park, North Scranton Mini-Park, and Novembrino Splash Park. The plan set, dated March 10, 2023, includes detailed site plans, erosion and sedimentation control details, and specifications for park renovations. The drawings outline proposed improvements such as new playground equipment, concrete walkways, landscaping, fencing, and site grading, with specific design details for each park location.
The project appears to be funded by the City of Scranton, with the Office of Community Development serving as the primary administrative contact. The plan set provides technical specifications for playground installation, landscape elements, drainage systems, and erosion control measures. Specific contractors are noted for different aspects of the project, including Kompan for playground supply and installation at Orchard Street Park and North Scranton Mini-Park, and Recreation Resources for playground installation at Novembrino Splash Park. The drawings include extensive details on site preparation, seeding, mulching, and construction techniques, suggesting a comprehensive approach to park improvement that considers both aesthetic and environmental factors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
B
X
L A
R K
S
U
M M
I T
P E
N N
S Y
L V
A N
I A t e l e f a x
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
P h
F a
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
MARCH 10, 2023
Park Location Map
PORTION OF AERIALS
46002540PAN, 46002530PAN, 47002540PAN, 47002530PAN,
48002540PAN, 48002530PAN (PASDA; PEMA 2018)
NOTICE FOR CONSTRUCTION PHASE AND 10 WORKING
DAYS IN DESIGN STAGE - STOP CALL 1-800-242-1776
PENNSYLVANIA LAW REQUIRES 3 WORKING DAYS
CALL BEFORE YOU DIG
PENNSYLVANIA ONE CALL SYSTEM, INC.
CV
ORCHARD STREET / CONNORS PARK; NORTH SCRANTON MINI PARK; AND NOVEMBRINO SPLASH PARK
PROPERTY OWNER
CITY OF SCRANTON
340 NORTH WASHINGTON AVENUE
SCRANTON, PA 18503
(570)-348-4100
Mayor
Paige Gebhardt Cognetti
City Council
William King Mark McAndrew
President / Chair of Rules Committee Vice President / Chair of Public Safety Committee
Jessica Rothchild, PT, DPT Thomas S. Schuster
Chair of Community Development Committee Chair of Finance Committee
Gerald Smurl
Chair of Public Works Committee
Project Contacts
Eileen Cipriani, Director
Office of Community Development
DRAWING INDEX
DESCRIPTION
SHEET
OS-1
CV
PARK IMPROVEMENTS PLAN
OS-2
SITE DETAILS & NOTES
NS-1
EXISTING CONDITIONS PLAN
NS-2
SITE DEMOLITION / E&S PLAN
NS-3
PARK IMPROVEMENTS PLAN
NS-4
SITE DETAILS & NOTES
COVER
ES-1
EROSION & SEDIMENTATION CONTROL DETAILS
Professional Responsibilities
Thomas J. McLane & Associates: Overall Site and Playground Layout; Site Demolition; Landscape Architecture
Colwell-Naegele Associates: Civil Engineering; E&S Control Measures
Recreation Resources: Playground Supply & Installation at Novembrino Splash Park
Kompan: Playground Supply & Installation at Orchard Street Park and N. Scranton Mini-Park
Professional Seals
ORCHARD STREET PARK
NORTH SCRANTON MINI-PARK
NOVEMBRINO SPLASH PARK
NV-1
PARK IMPROVEMENTS PLAN
NV-2
SITE DETAILS & NOTES
COMMON TO ALL PARKS
ES-2
EROSION & SEDIMENTATION CONTROL NOTES
ORCHARD
STREET
PARK
NOVEMBRINO
SPLASH
PAD
NORTH
SCRANTON
MINI- PARK
ORCHARD
STREET
PARK
NOVEMBRINO
SPLASH
PAD
NORTH
SCRANTON
MINI- PARK
OS-1
PARK
IMPROVEMENTS
PLAN
C O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
LEGEND
NEW CONCRETE
LAYOUT BASELINE
POURED IN PLACE
OS-2
SITE DETAILS
& NOTES
C O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
NOTE: GC WILL EXCAVATE TO SUBGRADE & INSTALL PERIMETER CURB/ SHELF, 2B STONE
SUBBASE, GEOTEXTILE FABRIC AND 4" PVC DRAIN PIPES. PLAYGROUND INSTALLER WILL
FURNISH AND INSTALL PIP SAFETY SURFACING AND PLAYGROUND EQUIPMENT. GC WILL BE
RESPONIBLE FOR EXCAVATION TO SUBGRADE.
PLAYGROUND MANUFACTURER & INSTALLER
CONTACT INFORMATION
KOMPAN
605 WEST HOWARD LANE, SUITE 101
AUSTIN, TEXAS 78753
MATT BURNS, PRINCIPAL SALES REPRESENTATIVE
PHONE: (310) 775-5082
EMAIL: MatBur@Kompan.com
DEPRESSED CURB DETAILS
NOT TO SCALE
OS-2
POURED-IN-PLACE
SAFETY SURFACE
CONTINUOUS
CONCRETE SHELF
(12"W x 6"D); DOWEL
INTO CURB
CONTINUOUS
CONCRETE SHELF
(12"W x 6"D)
CONTINUOUS CONCRETE SHELF
(12"W x 6"D) ALONG THE FULL
LENGTH OF CURB AND PIP EDGES;
USE MOUNDED 2B STONE TO HELP
'FORM' THE POUR
NOTE: CONCRETE TO BE
PENNDOT 408 - CLASS 'A'
3500 P.S.I. CONCRETE
CONCRETE CURB
(6"W x 18"D)
CLEAN WASHED AASHTO #57 STONE
FILTER FABRIC (CLASS 1)
PROVIDE CONTROL JOINTS
AT MAX. 5'-0" ON CENTER AND
" EXP. JOINT AT MAX. 20'-0"
ON CENTER.
COMPACTED SUBSOIL TO 95%
LAWN OR CONCRETE WALK EXTENSIONS
NOTE:
1. SURFACE OF RUBBER POURED-IN-PLACE AND DEPRESSED CURB AND/OR
EXISTING CONCRETE WALKWAYS TO BE FLUSH (NO DEVIATION IN
ELEVATIONS); PIP BY KOMPAN; AFTER USE AND WEAR, THE TRANSITION
SHALL NEVER EXCEED MORE THAN
" CHANGE IN ELEVATIONS.
2. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER ANY
SURFACE WATERS OR GROUNDWATER SYSTEMS.
NOT TO SCALE
POURED-IN-PLACE SURFACING
OS-2
Perennial Ryegrass Mixture(Lolium perenne). A combination of improved certified varieties with no one variety exceeding 50% of the total Ryegrass component. * Creeping
Red Fescue or Chewing Fescue. * Kentucky Bluegrass Mixture (Poa pratensis). A combination of improved certified varieties with no one variety exceeding 25% of the total
Bluegrass component.
LAWN MIX PENNDOT FORMULA 'B'
SEED RATE : 3 LB PER 1000SF MULCH RATE 3 TONS PER ACRE
OS-2
NOT TO SCALE
LAWN SEEDING - DISTURBED AREAS
REUSE ONSITE SOILS; PRIOR
TO FINE GRADING, TILL /
AERATE THE TOP 2 INCHES
SUBGRADE
LAWN MIX
2"
WIDTH VARIES TO FIT EXISTING CONDITIONS
NOTE: IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO
ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS. SEE
DETAIL 3/ES-1 FOR DIRECTION.
2 1/2" GATE / END POST
12"
2" LINE POST
12"
GATE
4'-0"
10' - 0"
8" DIA.
(3500 PSI
CONCRETE)
10" DIA.
(3500 PSI
CONCRETE)
AASHTO #57 STONE
BLACK
VINYL-COATED
Scope: Furnish all labor, material, equipment, tools, and incidentals necessary for the installation of Chain-link fencing at locations shown on the Drawings. The work includes but is not limited to installation of framework, fabric, gates, related hardware and accessories, and associated concrete footings and/or anchor plate.
Details:
- Applicable ASTM International Standards (latest revisions) as they apply to this work and related test methods, including: A153 / A153M Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware;
F626 Specification for Fence Fittings; F1043 Specification for Strength and Protective Coatings on Steel
Industrial Chain Link Fence Framework; F1083 Specification for Pipe, Steel, Hot-Dipped Zinc-Coated
(Galvanized) Welded, for Fence Structures
i. FABRIC: Chain-link, 9 gauge (GA) with a uniform square mesh measuring approximately 2” between its parallel sides, woven out of galvanized chain-link steel wire; ASTM F668 Class 2B, Fushion Bonded
ii. PIPES: ASTM F1083 and ASTM F1043, Group-1C, Schedule 40; PVC coating 10-15 mls. Thick, Color to match fence fabric (black)
1. 2” OD terminal posts (end, corner & pull); line posts to be 2” OD, Schedule 40 as well, due to minimal quantity
2. 2 ½” OD gate posts, Schedule 40
3. Top Rail: M/M 1-5/8” OD, ASTM F1083, Schedule 40
iii. FITTINGS: ASTM F626, galvanized; Wire ties 9 GA; Bottom tension wire is 9 GA, vinyl coated black
iv. FLANGE: The drawings (3/C-3) specify a square 6” x 6” x ¼” flange. However, there are multiple sizes & shapes in the market that would be an approved equal.
NOT TO SCALE
PLAYGROUND INSTALLATION NOTES
OS-2
NOT TO SCALE
CHAIN LINK FENCE
OS-2
NOTE:
1. SURFACING INSTALLATION BY OTHERS: CONTRACTOR TO PREPARE SUBBASE & INSTALL
ABUTTING CONCRETE CURBS & CONCRETE SHELF.
2. SURFACE OF RUBBER POURED-IN-PLACE AND DEPRESSED CURB AND/OR EXISTING
CONCRETE WALKWAYS TO BE FLUSH (NO DEVIATION IN ELEVATIONS);
3. PIP BY KOMPAN. AFTER USE AND WEAR, THE TRANSITION SHALL NEVER EXCEED MORE
THAN
" CHANGE IN ELEVATIONS.
4. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER ANY SURFACE
WATERS OR GROUNDWATER SYSTEMS.
5. CONCRETE TO BE PENNDOT 408 - CLASS 'A' 3500 P.S.I. CONCRETE
OS-2
NOT TO SCALE
DECIDUOUS TREE PLANTING (NIC; BY CITY)
NOT TO SCALE
CONCRETE WALKWAY EXTENSIONS
OS-2
SCALE: 1 INCH = 5 FEET
SWINGSET AREA PERIMETER CURB LAYOUT
OS-2
SEEDING NOTES:
1. SEED SHALL BE SURFACE SOWN, THEN PUSHED INTO
CONTACT WITH THE SOIL, EITHER MANUALLY USING A
RAKE OR MECHANICALLY USING DRAG.
2. SEED SHALL BE SPREAD UNDER DRY CONDITIONS.
3. CONTRACTOR SHALL USE ONLY PURE LIVE SEED (PLS).
IF NOT PLS, THEN CONTRACTOR MUST BUY ADDITIONAL
SEED TO ATTAIN THE 100% GERMINATION VALUE.
4. SLOW RELEASE FERTILIZATION SHALL OCCUR AT TIME
OF SEEDING. USE OSMOCOTE, A PALLETIZED
FERTILIZER.
5. TIME OF SEEDING SHOULD OCCUR WITHIN THE
GROWING SEASON, LATE APRIL TO MID-OCTOBER.
6. MIX SEED WITH DRY SAND TO FACILITATE UNIFORM
COVERAGE WHEN HAND-BROADCASTING THE SEED
RECOMMENDED MULCHING SPECIFICATIONS
1. MULCHING SHALL BE PROVIDED AS REQUIRED IN AREAS DIFFICULT TO VEGETATE, AND DURING OFF-SEASON OPERATIONS.
MULCHING METHODS AND MATERIALS SHALL CONFORM TO THE FOLLOWING:
a. MULCH MATERIALS SHALL BE UNROTTED SALT HAY, HAY OR SMALL GRAIN STRAW APPLIED AT THE RATE OF 3 TONS PER
ACRE. MULCH BLOWER SHALL NOT GRIND OR CHOP THE MATERIAL. WOODCHIPS, FREE OF INSECTS AND DISEASE ARE
PERMITTED AT A RATE OF 4-6 TONS PER ACRE.
b. MULCH SHALL BE SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THAT APPROXIMATELY 85% TO 95% OF THE SOIL
SURFACE WILL BE COVERED.
c. MULCH ANCHORING SHALL BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT TO MINIMIZE LOSS BY WIND OR WATER.
THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS, DEPENDING UPON THE SIZE OF THE SLOPE.
PEG AND TWINE: DRIVE 8” TO 10” PEGS TO WITHIN 2” TO 3” OF THE SOIL SURFACE EVERY 4' IN ALL DIRECTIONS. STAKES
MAY BE DRIVEN BEFORE OR AFTER APPLYING MULCH. SECURE THE MULCH TO THE SOIL SURFACE BY STRETCHING
TWINE BETWEEN PEGS IN A CRISS-CROSS OR SQUARE PATTERN, AND SECURE THE TWINE AROUND EACH PEG WITH
TWO OR MORE ROUND TURNS.
MULCH NETTING: STAPLE PAPER, JUTE, COTTON OR PLASTIC NETTINGS TO THE SOIL SURFACE. USE DEGRADABLE
NETTING IN AREAS TO BE MOWED.
MULCH MATERIALS AND BINDERS SHALL BE ROLLED IN PLACE BY TRACKED VEHICLE OR OTHER SUITABLE EQUIPMENT.
d. APPLICATIONS SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE MULCH, IN VALLEYS AND AT CRESTS OF
BANKS. REMAINDER OF AREA SHOULD BE UNIFORM IN APPEARANCE.
e. WOOD-FIBER OR PAPER-FIBER MULCH AT THE RATE OF 1,500 LBS PER ACRE, OR PER MANUFACTURER
RECOMMENDATION, MAY BE APPLIED BY A HYDROSEEDER. USE IS LIMITED TO FLATTER SLOPES AND DURING OPTIMUM
SEEDING PERIODS IN SPRING AND FALL.
f. OTHER:
WHERE EXCESSIVE SOIL EROSION, TRACKING OR FLOWING OF SEDIMENT IS EVIDENT OR ANTICIPATED, A MINIMUM OF
4” OF CRUSHED STONE SHALL BE PLACED WITHIN THE AFFECTED AREA AND MAINTAINED UNTIL PERMANENT
STABILIZATION IS PROVIDED. ADDITIONAL STONE SHALL BE PLACED AS REQUIRED UNTIL STABILIZATION IS ACHIEVED.
CRUSHED STONE SHALL CONFORM TO AASHTO DESIGNATION M43. SIZE NO. 2 (2-1/2” TO 1-1/2”).
NS-1
O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
EXISTING
CONDITIONS
PLAN
LEGEND
ASPHALT
SPOT ELEVATION
+ 1312.25
CONCRETE CURBS
NS-2
O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
SITE
DEMOLITION /
E&S PLAN
LEGEND
EXISTING ASPHALT
ROCK CONSTRUCTION ENTRANCE
SPOT ELEVATION
+ 1312.25
DEMO HATCH
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
NS-3
PARK
IMPROVEMENTS
PLAN
LEGEND
PROPOSED ASPHALT
RIP-RAP
DRAIN PIPE
SPOT ELEVATION
+ 1312.25
P
PIP SURFACING
PROPOSED CURB WITH CONC. SHELF
PROPOSED CONTOURS
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
NS-4
SITE DETAILS
& NOTES
Testing: Standard ASTM testing for concrete by an independent agency is part of the general contractors scope of work. This includes compressive strength, slump and air content testing. As stated in Section 03301: Cast-in-Place Concrete the concrete mix will have the following properties: Compressive Strength (28 days) - 3500 psi; Slump - 4 inches; and Air Content - 4.5 to 7.0 percent.
SOIL MIXTURE:
- 50% Septic Sand
- 25% Existing Soils / Topsoil
- 25% Compost (mushroom soil, decomposed mulch,..)
6" MAX. PONDING (799 TOP; 798.50 BOTTOM)
3" MULCH LAYER
SUBGRADE, TOP TILLED MIN. 4"
EMERGENT VEGETATION
(BY OTHERS)
SUBGRADE PREPARATION
1. EXISTING SUB-GRADE IN BIORETENTION AREAS SHALL NOT BE COMPACTED OR SUBJECT TO EXCESSIVE CONSTRUCTION EQUIPMENT TRAFFIC.
2. INITIAL EXCAVATION CAN BE PERFORMED DURING ROUGH SITE GRADING BUT SHALL NOT BE CARRIED TO WITHIN ONE FEET OF THE FINAL BOTTOM ELEVATION.
FINAL EXCAVATION SHOULD NOT TAKE PLACE UNTIL ALL DISTURBED AREAS IN THE DRAINAGE AREA HAVE BEEN STABILIZED.
3. WHERE EROSION OF SUB-GRADE HAS CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING IN THE GRADED BOTTOM, THIS MATERIAL SHALL
BE REMOVED WITH LIGHT EQUIPMENT AND THE UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES WITH A YORK RAKE OR EQUIVALENT BY LIGHT
TRACTOR.
4. BRING SUB-GRADE OF BIORETENTION AREA TO LINE, GRADE, AND ELEVATIONS INDICATED. FILL AND LIGHTLY REGRADE ANY AREAS DAMAGED BY EROSION, PONDING, OR TRAFFIC COMPACTION. ALL BIORETENTION AREAS SHALL BE LEVEL GRADE ON THE BOTTOM.
5. HALT EXCAVATION AND NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF EVIDENCE OF SINKHOLE ACTIVITY ARE ENCOUNTERED IN THE BIORETENTION AREA.
RAIN GARDEN INSTALLATION
1. UPON COMPLETION OF SUB-GRADE WORK, THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED AND SHALL INSPECT AT HIS/HER DISCRETION BEFORE PROCEEDING
WITH BIORETENTION INSTALLATION.
2. FOR THE SUBSURFACE STORAGE/INFILTRATION BED INSTALLATION, AMENDED SOILS SHOULD BE PLACED ON THE BOTTOM TO THE SPECIFIED DEPTH.
3. PLANTING SOIL SHALL BE PLACED IMMEDIATELY AFTER APPROVAL OF SUB-GRADE PREPARATION/BED INSTALLATION. ANY ACCUMULATION OF DEBRIS OR
SEDIMENT THAT TAKES PLACE AFTER APPROVAL OF SUB-GRADE SHALL BE REMOVED PRIOR TO INSTALLATION OF PLANTING SOIL.
4. INSTALL PLANTING SOIL (EXCEEDING ALL CRITERIA) IN 6-INCH MAXIMUM LIFTS AND LIGHTLY COMPACT (TAMP WITH BACKHOE BUCKET OR BY HAND). KEEP
EQUIPMENT MOVEMENT OVER PLANTING SOIL TO A MINIMUM - DO NOT OVER COMPACT. INSTALL PLANTING SOIL TO GRADES INDICATED ON THE DRAWINGS.
5. PLANT TREES AND SHRUBS ONLY FROM MID-MARCH THROUGH THE END OF JUNE OR FROM MID-SEPTEMBER THROUGH MID- NOVEMBER WITH APPROVAL BY LA.
6. PROTECT RAIN GARDENS FROM SEDIMENT AT ALL TIMES DURING CONSTRUCTION TO PREVENT SEDIMENT FROM WASHING INTO THESE AREAS DURING SITE
DEVELOPMENT.
7. WHEN THE SITE IS FULLY VEGETATED AND THE SOIL MANTLE STABILIZED THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED AND SHALL INSPECT THE RAIN GARDEN
DRAINAGE AREA AT HIS/HER DISCRETION BEFORE THE AREA IS BROUGHT ONLINE ARID SEDIMENT CONTROL DEVICES REMOVED.
8. WATER VEGETATION AT THE END OF EACH DAY FOR TWO WEEKS AFTER PLANTING IS COMPLETED.
YARD DRAIN NOTES:
1. DRAIN TO BE USED IS NYLOPLAST DRAIN BASIN WITH DOME
GRATE OR APPROVED EQUAL
2. 6" MINIMUM SUMP DEPTH
3. DOME GRATE MUST BE DUCTILE IRON AS PER ASTM A536
70-50-05
4. DOME GRATES FIT ONTO THE DRAIN BASINS WITH THE USE
OF A PVC BODY TOP
5. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL
CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS
N-12/HANCOR DUAL WALL) N-12 HP, & PVC SEWER (4" - 24")
6. DOME GRATE HAVE NO LOAD RATING
INTEGRATED DUCTILE IRON GRATE
TO MATCH 8" DRAIN PIPE
8"
VARIOUS TYPES OF INLET & OUTLET
ADAPTERS AVAILABLE: 4" - 30" FOR
CORRUGATED HDPE (ADS N-12 HANCOR
DUAL WALL, ADS/HANCOR SINGLE
WALL), N-12 HP, PVC SEWER (EX: SDR
35), PVC DWV (EX: SCH 40), PVC
C900/C905, CORRUGATED & RIBBED PVC
(OUTPUT TO A 4" PIPE)
3130 VERONA AVE
BUFORD, GA 30518
PHN (770) 932-2443
FAX (770) 932-2490
www.nyloplast-us.com
THE BACKFILL MATERIAL SHALL BE
CRUSHED STONE OR OTHER
GRANULAR MATERIAL MEETING THE
REQUIREMENTS OF CLASS I,
CLASS II, OR CLASS III MATERIAL AS
DEFINED IN ASTM D2321.
BEDDING & BACKFILL FOR SURFACE
DRAINAGE INLETS SHALL BE
PLACED & COMPACTED UNIFORMLY IN
ACCORDANCE WITH ASTM D2321.
4" MIN
MINIMUM PIPE BURIAL
DEPTH SAME AS SUMP
(6")
NS-4
NOT TO SCALE
UNDERDRAIN PIPE DETAIL
1'-0"
V A
R I E
S
4" PVC PIPE
2"+ ROUNDS
TRENCH:
6" X 12"
6" DEPTH
2"+ ROUNDS CLEAN
WASHED GRAVEL
WRAP TRENCH IN
GEO-TEXTILE FABRIC
4" PVC, SMOOTH
PERFORATED OR SOLID PIPE
GEO-TEXTILE
FABRIC
(VAR. PERFORATED/SOLID)
VARIES: PIP SURFACING;
LAWN; ASPHALT
(BY GENERAL CONTRACTOR)
(BY GENERAL CONTRACTOR)
POURED IN PLACE
(SAFETY SURFACE)
NOTE: IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER
ANY SURFACE WATERS OR GROUNDWATER SYSTEMS. SEE DETAIL 3/ES-1 FOR
DIRECTION.
2 1/2" END POST
12"
2" LINE POST
12"
10' - 0"
8" DIA.
(3500 PSI
CONCRETE)
10" DIA.
(3500 PSI
CONCRETE)
AASHTO #57 STONE
CHAIN LINK FENCE
NS-4
SCALE: NOT TO SCALE
MATCH EXISTING; OR
REUSE THE EXISTING
FENCE MESH
Scope: Furnish all labor, material, equipment, tools, and incidentals necessary for the installation of Chain-link fencing at locations shown on the Drawings. The work includes but is not limited to installation of framework, fabric, gates, related hardware and accessories, and associated concrete footings and/or anchor plate. NOTE: EXISTING POSTS, FABRIC, ETC. CAN BE REUSED IF GOOD CONDITION.
Details:
- Applicable ASTM International Standards (latest revisions) as they apply to this work and related test methods, including: A153 / A153M Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware;
F626 Specification for Fence Fittings; F1043 Specification for Strength and Protective Coatings on Steel
Industrial Chain Link Fence Framework; F1083 Specification for Pipe, Steel, Hot-Dipped Zinc-Coated
(Galvanized) Welded, for Fence Structures
i. FABRIC: Chain-link, 9 gauge (GA) with a uniform square mesh measuring approximately 2” between its parallel sides, woven out of galvanized chain-link steel wire; ASTM F668 Class 2B, Fushion Bonded
ii. PIPES: ASTM F1083 and ASTM F1043, Group-1C, Schedule 40; PVC coating 10-15 mls. Thick, Color to match fence fabric (black)
1. 2” OD terminal posts (end, corner & pull); line posts to be 2” OD, Schedule 40 as well, due to minimal quantity
2. 2 ½” OD gate posts, Schedule 40
3. Top Rail: M/M 1-5/8” OD, ASTM F1083, Schedule 40
iii. FITTINGS: ASTM F626, galvanized; Wire ties 9 GA; Bottom tension wire is 9 GA, vinyl coated black
iv. FLANGE: The drawings (3/C-3) specify a square 6” x 6” x ¼” flange. However, there are multiple sizes & shapes in the market that would be an approved equal.
NOT TO SCALE
ASPHALT WALKWAY INSTALLATION
NS-4
ANY OVERLAP IN
FABRIC MUST BE
MIN. 4"
NOT TO SCALE
PLAYGROUND INSTALLATION NOTES
NS-4
NOTE: GC WILL EXCAVATE TO SUBGRADE & INSTALL PERIMETER CURB/ SHELF, 2B
STONE SUBBASE, GEOTEXTILE FABRIC AND 4" PVC DRAIN PIPES. PLAYGROUND
INSTALLER WILL FURNISH AND INSTALL PIP SAFETY SURFACING, PLAY EQUIPMENT
AND FITNESS EQUIPMENT.
PLAYGROUND MANUFACTURER & INSTALLER
CONTACT INFORMATION
KOMPAN
605 WEST HOWARD LANE, SUITE 101
AUSTIN, TEXAS 78753
MATT BURNS, PRINCIPAL SALES REPRESENTATIVE
PHONE: (310) 775-5082
EMAIL: MatBur@Kompan.com
DEPRESSED CURB DETAILS
NOT TO SCALE
NS-4
POURED-IN-PLACE
SAFETY SURFACE
CONTINUOUS
CONCRETE SHELF
(12"W x 6"D); DOWEL
INTO CURB
CONTINUOUS
CONCRETE SHELF
(12"W x 6"D)
CONTINUOUS CONCRETE SHELF
(12"W x 6"D) ALONG THE FULL
LENGTH OF CURB AND PIP EDGES;
USE MOUNDED 2B STONE TO HELP
'FORM' THE POUR
NOTE: CONCRETE TO BE
PENNDOT 408 - CLASS 'A'
3500 P.S.I. CONCRETE
CONCRETE CURB
(6"W x 18"D)
CLEAN WASHED AASHTO #57 STONE
FILTER FABRIC (CLASS 1)
PROVIDE CONTROL JOINTS
AT MAX. 5'-0" ON CENTER AND
" EXP. JOINT AT MAX. 20'-0"
ON CENTER.
COMPACTED SUBSOIL TO 95%
VARIES: LAWN OR ASPHALT WALKWAY
NOTE:
1. SURFACE OF RUBBER POURED-IN-PLACE AND DEPRESSED CURB/ ASPHALT
WALKWAYS TO BE FLUSH (NO DEVIATION IN ELEVATIONS); PIP BY KOMPAN;
AFTER USE AND WEAR, THE TRANSITION SHALL NEVER EXCEED MORE THAN
CHANGE IN ELEVATIONS.
2. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER ANY
SURFACE WATERS OR GROUNDWATER SYSTEMS.
NOT TO SCALE
POURED-IN-PLACE SURFACING
NS-4
Perennial Ryegrass Mixture(Lolium perenne). A combination of improved certified varieties with no one variety exceeding 50% of the total Ryegrass component. * Creeping
Red Fescue or Chewing Fescue. * Kentucky Bluegrass Mixture (Poa pratensis). A combination of improved certified varieties with no one variety exceeding 25% of the total
Bluegrass component.
LAWN MIX PENNDOT FORMULA 'B'
SEED RATE : 3 LB PER 1000SF MULCH RATE 3 TONS PER ACRE
NS-4
NOT TO SCALE
LAWN SEEDING - DISTURBED AREAS
REUSE ONSITE SOILS; PRIOR
TO FINE GRADING, TILL /
AERATE THE TOP 2 INCHES
SUBGRADE
LAWN MIX
2"
NOTE:
1. SURFACING INSTALLATION BY OTHERS: CONTRACTOR TO PREPARE SUBBASE & INSTALL ABUTTING
CONCRETE CURBS & CONCRETE SHELF.
2. SURFACE OF RUBBER POURED-IN-PLACE AND DEPRESSED CURB / ASPHALT WALKWAYS TO BE FLUSH
(NO DEVIATION IN ELEVATIONS);
3. PIP BY KOMPAN. AFTER USE AND WEAR, THE TRANSITION SHALL NEVER EXCEED MORE THAN
CHANGE IN ELEVATIONS.
4. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER ANY SURFACE WATERS OR
GROUNDWATER SYSTEMS.
5. CONCRETE TO BE PENNDOT 408 - CLASS 'A' 3500 P.S.I. CONCRETE
NS-4
NOT TO SCALE
DECIDUOUS TREE PLANTING (NIC; BY CITY)
VARIES: PIP SURFACING;
LAWN; ASPHALT
NS-4
NOT TO SCALE
YARD DRAIN
1.5' OF PLANTING MIX:
- 50% Septic Sand
- 25% Existing Soils / Topsoil
- 25% Compost (mushroom soil, decomposed mulch,..)
NOT TO SCALE
RAIN GARDEN
NS-4
WIDTH VARIES TO FIT EXISTING CONDITIONS
NOT TO SCALE
CONCRETE BENCH PAD
NS-4
SEEDING NOTES:
1. SEED SHALL BE SURFACE SOWN, THEN PUSHED INTO
CONTACT WITH THE SOIL, EITHER MANUALLY USING A
RAKE OR MECHANICALLY USING DRAG.
2. SEED SHALL BE SPREAD UNDER DRY CONDITIONS.
3. CONTRACTOR SHALL USE ONLY PURE LIVE SEED (PLS).
IF NOT PLS, THEN CONTRACTOR MUST BUY ADDITIONAL
SEED TO ATTAIN THE 100% GERMINATION VALUE.
4. SLOW RELEASE FERTILIZATION SHALL OCCUR AT TIME
OF SEEDING. USE OSMOCOTE, A PALLETIZED
FERTILIZER.
5. TIME OF SEEDING SHOULD OCCUR WITHIN THE
GROWING SEASON, LATE APRIL TO MID-OCTOBER.
6. MIX SEED WITH DRY SAND TO FACILITATE UNIFORM
COVERAGE WHEN HAND-BROADCASTING THE SEED
RECOMMENDED MULCHING SPECIFICATIONS
1. MULCHING SHALL BE PROVIDED AS REQUIRED IN AREAS DIFFICULT TO VEGETATE, AND DURING OFF-SEASON OPERATIONS.
MULCHING METHODS AND MATERIALS SHALL CONFORM TO THE FOLLOWING:
a. MULCH MATERIALS SHALL BE UNROTTED SALT HAY, HAY OR SMALL GRAIN STRAW APPLIED AT THE RATE OF 3 TONS PER
ACRE. MULCH BLOWER SHALL NOT GRIND OR CHOP THE MATERIAL. WOODCHIPS, FREE OF INSECTS AND DISEASE ARE
PERMITTED AT A RATE OF 4-6 TONS PER ACRE.
b. MULCH SHALL BE SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THAT APPROXIMATELY 85% TO 95% OF THE SOIL
SURFACE WILL BE COVERED.
c. MULCH ANCHORING SHALL BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT TO MINIMIZE LOSS BY WIND OR WATER.
THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS, DEPENDING UPON THE SIZE OF THE SLOPE.
PEG AND TWINE: DRIVE 8” TO 10” PEGS TO WITHIN 2” TO 3” OF THE SOIL SURFACE EVERY 4' IN ALL DIRECTIONS. STAKES
MAY BE DRIVEN BEFORE OR AFTER APPLYING MULCH. SECURE THE MULCH TO THE SOIL SURFACE BY STRETCHING
TWINE BETWEEN PEGS IN A CRISS-CROSS OR SQUARE PATTERN, AND SECURE THE TWINE AROUND EACH PEG WITH
TWO OR MORE ROUND TURNS.
MULCH NETTING: STAPLE PAPER, JUTE, COTTON OR PLASTIC NETTINGS TO THE SOIL SURFACE. USE DEGRADABLE
NETTING IN AREAS TO BE MOWED.
MULCH MATERIALS AND BINDERS SHALL BE ROLLED IN PLACE BY TRACKED VEHICLE OR OTHER SUITABLE EQUIPMENT.
d. APPLICATIONS SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE MULCH, IN VALLEYS AND AT CRESTS OF
BANKS. REMAINDER OF AREA SHOULD BE UNIFORM IN APPEARANCE.
e. WOOD-FIBER OR PAPER-FIBER MULCH AT THE RATE OF 1,500 LBS PER ACRE, OR PER MANUFACTURER
RECOMMENDATION, MAY BE APPLIED BY A HYDROSEEDER. USE IS LIMITED TO FLATTER SLOPES AND DURING OPTIMUM
SEEDING PERIODS IN SPRING AND FALL.
f. OTHER:
WHERE EXCESSIVE SOIL EROSION, TRACKING OR FLOWING OF SEDIMENT IS EVIDENT OR ANTICIPATED, A MINIMUM OF
4” OF CRUSHED STONE SHALL BE PLACED WITHIN THE AFFECTED AREA AND MAINTAINED UNTIL PERMANENT
STABILIZATION IS PROVIDED. ADDITIONAL STONE SHALL BE PLACED AS REQUIRED UNTIL STABILIZATION IS ACHIEVED.
CRUSHED STONE SHALL CONFORM TO AASHTO DESIGNATION M43. SIZE NO. 2 (2-1/2” TO 1-1/2”).
MEN'S
RESTROOM
WOMEN'S
RESTROOM
MANAGER'S
OFFICE
POLICE
ROOM
UTILITY
ROOM
S T
O R
A G
E
ENTRANCE
E
A
C
C
E
S
S
I
B
L
E
R
O
U
T
E
ACCESSIBLE ROUTE
COMMUNITY ROOM
SAND DUNE
SAND DUNE
A C
C E
S S
IB
L E
R O
U T
E
NV-2
New Trees (Typ.)
(NIC; By City)
NV-2
NV-2
ES-1
P
NV-2
ES-1
C O
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
PARK
IMPROVEMENTS
PLAN
NV-1
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
SITE DETAILS
& NOTES
NV-2
2B STONE, GEOTEXTILE WRAPPED
4" MAX. PONDING
SUBGRADE PREPARATION
1. EXISTING SUB-GRADE IN BIORETENTION AREAS SHALL NOT BE COMPACTED OR SUBJECT TO EXCESSIVE CONSTRUCTION EQUIPMENT TRAFFIC.
2. INITIAL EXCAVATION CAN BE PERFORMED DURING ROUGH SITE GRADING BUT SHALL NOT BE CARRIED TO WITHIN ONE FEET OF THE FINAL BOTTOM ELEVATION.
FINAL EXCAVATION SHOULD NOT TAKE PLACE UNTIL ALL DISTURBED AREAS IN THE DRAINAGE AREA HAVE BEEN STABILIZED.
3. WHERE EROSION OF SUB-GRADE HAS CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING IN THE GRADED BOTTOM, THIS MATERIAL SHALL
BE REMOVED WITH LIGHT EQUIPMENT AND THE UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF 6 INCHES WITH A YORK RAKE OR EQUIVALENT BY LIGHT
TRACTOR.
4. BRING SUB-GRADE OF BIORETENTION AREA TO LINE, GRADE, AND ELEVATIONS INDICATED. FILL AND LIGHTLY REGRADE ANY AREAS DAMAGED BY EROSION, PONDING, OR TRAFFIC COMPACTION. ALL BIORETENTION AREAS SHALL BE LEVEL GRADE ON THE BOTTOM.
5. HALT EXCAVATION AND NOTIFY LANDSCAPE ARCHITECT IMMEDIATELY IF EVIDENCE OF SINKHOLE ACTIVITY ARE ENCOUNTERED IN THE BIORETENTION AREA.
SOAK AWAY INSTALLATION
1. UPON COMPLETION OF SUB-GRADE WORK, THE LANDSCAPE ARCHITECT SHALL BE NOTIFIED AND SHALL INSPECT AT HIS/HER DISCRETION BEFORE PROCEEDING
WITH BIORETENTION INSTALLATION.
2. 2B STONE, WRAPPED IN GEOTEXTILE FABRIC, SHALL BE PLACED IMMEDIATELY AFTER APPROVAL OF SUB-GRADE PREPARATION/BED INSTALLATION. ANY
ACCUMULATION OF DEBRIS OR SEDIMENT THAT TAKES PLACE AFTER APPROVAL OF SUB-GRADE SHALL BE REMOVED PRIOR TO INSTALLATION OF STONEL.
SOAK AWAY PITS
NV-2
SCALE: NOT TO SCALE
CONTINUOUS
CONCRETE SHELF
(12"W x 6"D)
CONTINUOUS CONCRETE SHELF
(12"W x 6"D) ALONG THE FULL
LENGTH OF PIP EDGES
(WALKWAY); USE MOUNDED 2B
STONE TO HELP 'FORM' THE POUR
NOT TO SCALE
POURED-IN-PLACE SURFACING
NV-2
Perennial Ryegrass Mixture(Lolium perenne). A combination of improved certified varieties with no one variety exceeding 50% of the total Ryegrass component. * Creeping
Red Fescue or Chewing Fescue. * Kentucky Bluegrass Mixture (Poa pratensis). A combination of improved certified varieties with no one variety exceeding 25% of the total
Bluegrass component.
LAWN MIX PENNDOT FORMULA 'B'
SEED RATE : 3 LB PER 1000SF MULCH RATE 3 TONS PER ACRE
SEEDING NOTES:
1. SEED SHALL BE SURFACE SOWN, THEN PUSHED INTO
CONTACT WITH THE SOIL, EITHER MANUALLY USING A
RAKE OR MECHANICALLY USING DRAG.
2. SEED SHALL BE SPREAD UNDER DRY CONDITIONS.
3. CONTRACTOR SHALL USE ONLY PURE LIVE SEED (PLS).
IF NOT PLS, THEN CONTRACTOR MUST BUY ADDITIONAL
SEED TO ATTAIN THE 100% GERMINATION VALUE.
4. SLOW RELEASE FERTILIZATION SHALL OCCUR AT TIME
OF SEEDING. USE OSMOCOTE, A PALLETIZED
FERTILIZER.
5. TIME OF SEEDING SHOULD OCCUR WITHIN THE
GROWING SEASON, LATE APRIL TO MID-OCTOBER.
6. MIX SEED WITH DRY SAND TO FACILITATE UNIFORM
COVERAGE WHEN HAND-BROADCASTING THE SEED
NV-2
NOT TO SCALE
LAWN SEEDING - DISTURBED AREAS
REUSE ONSITE SOILS; PRIOR
TO FINE GRADING, TILL /
AERATE THE TOP 2 INCHES
SUBGRADE
LAWN MIX
2"
NOTE:
1. SURFACING INSTALLATION BY OTHERS: CONTRACTOR TO PREPARE SUBBASE & INSTALL
ABUTTING CONCRETE CURBS & CONCRETE SHELF.
2. SURFACE OF RUBBER POURED-IN-PLACE AND DEPRESSED CURB AND/OR CONCRETE
WALKWAYS TO BE FLUSH (NO DEVIATION IN ELEVATIONS);
3. PIP BY KOMPAN. AFTER USE AND WEAR, THE TRANSITION SHALL NEVER EXCEED MORE
THAN
" CHANGE IN ELEVATIONS.
4. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO ENTER ANY SURFACE
WATERS OR GROUNDWATER SYSTEMS.
NV-2
NOT TO SCALE
DECIDUOUS TREE PLANTING (NIC; BY CITY)
(BY GENERAL CONTRACTOR)
(BY GENERAL CONTRACTOR)
POURED IN PLACE
(SAFETY SURFACE)
ANY OVERLAP IN
FABRIC MUST BE
MIN. 4"
NOT TO SCALE
PLAYGROUND INSTALLATION NOTES
NV-2
NOTE: GC WILL EXCAVATE TO SUBGRADE & INSTALL CONCRETE WALKS/ SHELF, 2B
STONE SUBBASE, GEOTEXTILE FABRIC AND 4" PVC DRAIN PIPES. PLAYGROUND
INSTALLER WILL FURNISH AND INSTALL PIP SAFETY SURFACING, PLAY EQUIPMENT
AND MUSICAL INSTRUMENTS.
BACKFILL (TOPSOIL)
LAWN - FLUSH TO
CONCRETE
NOT TO SCALE
CONCRETE SIDEWALK
NV-2
NOTES
1. IN NO CASE SHALL CONCRETE WASH WATER BE ALLOWED TO
ENTER ANY SURFACE WATERS OR GROUNDWATER SYSTEMS.
MEDIUM BROOM FINISH (TYP)
TOOLED CONCRETE EDGE
1/2" WIDE X 1" DEEP TOOLED CONTROL JOINT
SCORING PATTERN TO BE EQUAL
(TYP), 1/2" WIDTH
SIDEWALK SCORING PATTERN
PLAYGROUND MANUFACTURER & INSTALLER
CONTACT INFORMATION
RECREATION RESOURCES
425 MCFARLAN ROAD #100 KENNETT SQUARE PA, 19348
PHONE: (800) 220-4402
FAX: 610-444-3359
EMAIL: info@recreation-resource.com
TO SIDEWALK WIDTH
(EX. 6' WIDE WALK = 6' O.C. CONTROL JIONT)
NV-2
NOT TO SCALE
UNDERDRAIN PIPE DETAIL
1'-0"
V A
R I E
S
4" PVC PIPE
2"+ ROUNDS
TRENCH:
6" X 12"
6" DEPTH
2"+ ROUNDS CLEAN
WASHED GRAVEL
WRAP TRENCH IN
GEO-TEXTILE FABRIC
4" PVC, SMOOTH
PERFORATED OR SOLID PIPE
GEO-TEXTILE
FABRIC
(VAR. PERFORATED/SOLID)
VARIES: PIP SURFACING;
LAWN; ASPHALT
VARIES: PIP SURFACING;
LAWN; ASPHALT
ABUTTING LAWN
NV-2
NOT TO SCALE
MUSIC INSTRUMENTS
RAINBOW TRIO
(BONGOS, METALLOPHONE, CHIMES)
RAINBOW SAMBAS
RECOMMENDED MULCHING SPECIFICATIONS
1. MULCHING SHALL BE PROVIDED AS REQUIRED IN AREAS DIFFICULT TO VEGETATE, AND DURING OFF-SEASON OPERATIONS. MULCHING METHODS AND MATERIALS SHALL CONFORM TO THE
FOLLOWING:
a. MULCH MATERIALS SHALL BE UNROTTED SALT HAY, HAY OR SMALL GRAIN STRAW APPLIED AT THE RATE OF 3 TONS PER ACRE. MULCH BLOWER SHALL NOT GRIND OR CHOP THE
MATERIAL. WOODCHIPS, FREE OF INSECTS AND DISEASE ARE PERMITTED AT A RATE OF 4-6 TONS PER ACRE.
b. MULCH SHALL BE SPREAD UNIFORMLY BY HAND OR MECHANICALLY SO THAT APPROXIMATELY 85% TO 95% OF THE SOIL SURFACE WILL BE COVERED.
c. MULCH ANCHORING SHALL BE ACCOMPLISHED IMMEDIATELY AFTER PLACEMENT TO MINIMIZE LOSS BY WIND OR WATER. THIS MAY BE DONE BY ONE OF THE FOLLOWING METHODS, DEPENDING UPON THE SIZE OF THE SLOPE.
PEG AND TWINE: DRIVE 8” TO 10” PEGS TO WITHIN 2” TO 3” OF THE SOIL SURFACE EVERY 4' IN ALL DIRECTIONS. STAKES MAY BE DRIVEN BEFORE OR AFTER APPLYING MULCH.
SECURE THE MULCH TO THE SOIL SURFACE BY STRETCHING TWINE BETWEEN PEGS IN A CRISS-CROSS OR SQUARE PATTERN, AND SECURE THE TWINE AROUND EACH PEG WITH
TWO OR MORE ROUND TURNS.
MULCH NETTING: STAPLE PAPER, JUTE, COTTON OR PLASTIC NETTINGS TO THE SOIL SURFACE. USE DEGRADABLE NETTING IN AREAS TO BE MOWED.
MULCH MATERIALS AND BINDERS SHALL BE ROLLED IN PLACE BY TRACKED VEHICLE OR OTHER SUITABLE EQUIPMENT.
d. APPLICATIONS SHOULD BE HEAVIER AT EDGES WHERE WIND CATCHES THE MULCH, IN VALLEYS AND AT CRESTS OF BANKS. REMAINDER OF AREA SHOULD BE UNIFORM IN
APPEARANCE.
e. WOOD-FIBER OR PAPER-FIBER MULCH AT THE RATE OF 1,500 LBS PER ACRE, OR PER MANUFACTURER RECOMMENDATION, MAY BE APPLIED BY A HYDROSEEDER. USE IS LIMITED TO
FLATTER SLOPES AND DURING OPTIMUM SEEDING PERIODS IN SPRING AND FALL.
f. OTHER:
WHERE EXCESSIVE SOIL EROSION, TRACKING OR FLOWING OF SEDIMENT IS EVIDENT OR ANTICIPATED, A MINIMUM OF 4” OF CRUSHED STONE SHALL BE PLACED WITHIN THE
AFFECTED AREA AND MAINTAINED UNTIL PERMANENT STABILIZATION IS PROVIDED. ADDITIONAL STONE SHALL BE PLACED AS REQUIRED UNTIL STABILIZATION IS ACHIEVED.
CRUSHED STONE SHALL CONFORM TO AASHTO DESIGNATION M43. SIZE NO. 2 (2-1/2” TO 1-1/2”).
YARD DRAIN NOTES:
1. DRAIN TO BE USED IS NYLOPLAST DRAIN BASIN WITH DOME
GRATE OR APPROVED EQUAL
2. 6" MINIMUM SUMP DEPTH
3. DOME GRATE MUST BE DUCTILE IRON AS PER ASTM A536
70-50-05
4. DOME GRATES FIT ONTO THE DRAIN BASINS WITH THE USE
OF A PVC BODY TOP
5. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL
CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS
N-12/HANCOR DUAL WALL) N-12 HP, & PVC SEWER (4" - 24")
6. DOME GRATE HAVE NO LOAD RATING
INTEGRATED DUCTILE IRON GRATE
TO MATCH 8" DRAIN PIPE
8"
VARIOUS TYPES OF INLET & OUTLET
ADAPTERS AVAILABLE: 4" - 30" FOR
CORRUGATED HDPE (ADS N-12 HANCOR
DUAL WALL, ADS/HANCOR SINGLE
WALL), N-12 HP, PVC SEWER (EX: SDR
35), PVC DWV (EX: SCH 40), PVC
C900/C905, CORRUGATED & RIBBED PVC
(OUTPUT TO A 4" PIPE)
3130 VERONA AVE
BUFORD, GA 30518
PHN (770) 932-2443
FAX (770) 932-2490
www.nyloplast-us.com
THE BACKFILL MATERIAL SHALL BE
CRUSHED STONE OR OTHER
GRANULAR MATERIAL MEETING THE
REQUIREMENTS OF CLASS I,
CLASS II, OR CLASS III MATERIAL AS
DEFINED IN ASTM D2321.
BEDDING & BACKFILL FOR SURFACE
DRAINAGE INLETS SHALL BE
PLACED & COMPACTED UNIFORMLY IN
ACCORDANCE WITH ASTM D2321.
4" MIN
MINIMUM PIPE BURIAL
DEPTH SAME AS SUMP
(6")
NV-2
NOT TO SCALE
YARD DRAIN
CONCRETE PAD BY GENERAL
CONTRACTOR; INSTALLATION
BY RECREATION RESOURCES.
4" OF TOPSOIL
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
ES-1
24" DIAMETER COMPOST
FILTER SOCK. 4' MIN.
OVERLAP ON UPSLOPE
SIDE OF FILTER RING.
24" DIAMETER
COMPOST
FILTER SOCK
2" X 2" X 36" WOODEN
STAKES PLACED 5' O.C.
2" X 2" X 36" WOODEN
STAKES PLACED 5' O.C.
MAXIMUM DEPTH OF
CONCRETE WASHOUT
WATER IS 50% OF FILTER
RING HEIGHT
DIRECT CONCRETE
WASHOUT WATER
INTO FILTER RING
SECTION NTS
PLAN NTS
NOTES:
1. INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE
2. 18" DIAMETER FILTER SOCK MAY BE STACKED ONTO
DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL
CONFIGURATION FOR ADDED HEIGHT.
3. A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE
PLACED AT THE LOCATION OF THE WASHOUT PRIOR TO
INSTALLING THE SOCKS.
12" MIN
NOTES:
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY
SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT
MEET THE FOLLOWING STANDARDS:
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED
WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS
SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A
GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS
SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL
MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS
LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF
PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES
SHALL BE FLOATING AND SCREENED.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS
CORRECTED.
1 FT.
1 FT.
3 FT. MIN.
6 IN. COMPOST LAYER
6 IN. SUMP
AASHTO NO. 57
6 IN. MIN
R-3 ROCK
WOOD POSTS
HEIGHT OF ROCK
FILTER=5/6 HEIGHT OF
AASHTO NO. 57
FILTER FABRIC FENCE, OR
OUTLET CROSS-SECTION
UP-SLOPE FACE
NOTES:
- A ROCK FILTER OUTLET SHALL BE INSTALLED WHERE FAILURE OF A SILT FENCE OR COMPOST FILTER SOCK
HAS OCCURRED DUE TO CONCENTRATED FLOW. ANCHORED COMPOST LAYER SHALL BE USED ON UPSLOPE
FACE IN HQ AND EV WATERSHEDS.
- SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/3 THE HEIGHT OF THE OUTLET.
FIRMLY ANCHORED
1 MIN.
1 MIN.
COMPOST FILTER SOCK
1 MIN.
FILTER FABRIC FENCE, OR
COMPOST FILTER SOCK
BLANKET EDGES STAPLED AND
OVERLAPPED (4 IN. MIN.)
INSTALL BEGINNING OF ROLL IN 6 IN. x 6 IN.
ANCHOR TRENCH, STAPLE, BACKFILL AND
COMPACT SOIL
STARTING AT TOP OF
SLOPE, ROLL BLANKETS
IN DIRECTION OF WATER FLOW
PREPARE SEED BED
(INCLUDING APPLICATION OF
LIME, FERTILIZER AND SEED)
PRIOR TO BLANKET
INSTALLATION
REFER TO MANUF.
RECOMMENDED STAPLING
PATTERN FOR STEEPNESS
AND LENGTH OF SLOPE
BEING BLANKETED
THE BLANKET
SHOULD NOT BE
STRETCHED; IT
MUST MAINTAIN
GOOD SOIL CONTACT
OVERLAP BLANKET ENDS 6 IN.
MIN. WITH THE UPSLOPE
BLANKED OVERLYING THE
DOWNSLOPE BLANKET (SHINGLE
STYLE). STAPLE SECURELY.
NOTES:
- SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN DRAWINGS PRIOR TO INSTALLING THE BLANKET.
- PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE.
- SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.
- BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR
STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET.
- THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
- BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM
UNIFORM 70% COVERAGE THROUGHOUT THE BLANKETED AREA. DAMAGED OR DISPLACED BLANKETS SHALL BE RESTORED OR REPLACED WITHIN 4
CALENDAR DAYS.
NOTE:
- USE BLANKET FOR ALL
SLOPES 3:1 OR GREATER
- USE S-150 NETTING
EXISTING
CONTOURS
12" COMPOST
FILTER SOCK
2 IN. x 2 IN.
WOODEN STAKES
PLACED 10 FT ON
CENTER
2 IN. x 2 IN. WOODEN STAKES
PLACED 10 FT ON CENTER*
12" COMPOST FILTER SOCK
BLOWN/PLACED
FILTER MEDIA
I N
M I N
F
L
O
W
F
L
O
W
DISTURBED AREA
UNDISTURBED AREA
DISTURBED AREA
UNDISTURBED AREA
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
DIA IN.
12"
MATERIAL
TYPE
5 mil HDPE
MESH
OPENING
TENSILE
STRENGTH
26 psi
ULTRAVIOLET STABILITY
% ORIGINAL STENGTH
MINIMUM FUNCTIONAL
LONGEVITY
6 MONTHS
23% at 1000 hr.
LENGTH (AS SHOWN ON PLANS; MIN. 20')
FT.
EARTH FILL
PIPE AS NECESSARY
GEOTEXTILE
EXISTING
GROUND
MOUNTABLE
BERM (6 IN. MIN.)*
H O
W N
N
A
N S
M
I N
PROFILE
PLAN VIEW
NOTES:
REMOVE TOPSOIL PRIOR TO INSTALLATION
OF ROCK CONSTRUCTION ENTRANCE.
EXTEND ROCK OVER FULL WIDTH OF
ENTRANCE.
RUNOFF SHALL BE DIVERTED FROM
ROADWAY TO A SUITABLE SEDIMENT
REMOVAL BMP PRIOR TO ENTERING ROCK
CONSTRUCTION ENTRANCE.
MOUNTABLE BERM SHALL BE INSTALLED
WHEREVER OPTIONAL CULVERT PIPE IS
USED AND PROPER PIPE COVER AS
SPECIFIED BY MANUFACTURER IS NOT
OTHERWISE PROVIDED. PIPE SHALL BE
SIZED APPROPRIATELY FOR SIZE OF DITCH
BEING CROSSED.
MAINTENANCE:
- ROCK CONSTRUCTION ENTRANCE
THICKNESS SHALL BE CONSTANTLY
MAINTAINED TO THE SPECIFIED
DIMENSIONS BY ADDING ROCK.A
STOCKPILE SHALL BE MAINTAINED ON
SITE FOR THIS PURPOSE.
- ALL SEDIMENT DEPOSITED ON PAVED
ROADWAYS SHALL BE REMOVED AND
RETURNED TO THE CONSTRUCTION SITE
IMMEDIATELY. IF EXCESSIVE AMOUNTS
OF SEDIMENT ARE BEING DEPOSITED ON
ROADWAY, EXTEND LENGTH OF ROCK
CONSTRUCTION ENTRANCE BY 10 FOOT
INCREMENTS UNTIL CONDITION IS
ALLEVIATED OR INSTALL WASH RACK.
- WASHING THE ROADWAY OR SWEEPING
THE DEPOSITS INTO ROADWAY DITCHES,
SEWERS, CULVERTS, OR OTHER
DRAINAGE COURSES IS NOT
ACCEPTABLE.
E X
I S
T I N
G
R
O A
D W
A Y
NOTES:
- SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL.
- COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP EROSION CONTROL MANUAL.
- COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER
SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN BARRIER ALIGNMENT.
MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT EXCEED THAT SPECIFIED FOR THE SIZE OF
THE SOCK AND THE SLOPE OF ITS TRIBUTARY AREA.
- TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS.
- ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF
THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
- COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED
24 HOURS OF INSPECTION.
- BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE
RECOMMENDATIONS.
- UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK
MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT
OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
- COMPOST SHOULD BE A WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM AGRICULTURE, FOOD, STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE COMPOST SHOULD BE
AEROBICALLY COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE ODORS, SHOULD BE
REASONABLY FREE (<1% BY DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE COMPOST PRODUCT SHOULD
NOT RESEMBLE THE RAW MATERIAL FROM WHICH IT WAS DERIVED. WOOD AND BARK CHIPS, GROUND
CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS ARE NOT ACCEPTABLE AS THE ORGANIC
COMPONENT OF THE MIX.
MIN. 8" AASHTO #1
M
I N
M
I N
* MOUNTABLE BERM USED TO PROVIDE PROPER COVER FOR PIPE
LENGTH (AS SHOWN ON PLANS; MIN. 20')
(SITE TOO SMALL TO ACCOMMODATE STANDARD 50')
NOTES:
- POST CONSTRUCTION, COMPOST CAN BE USED
IN THE LANDSCAPE AREAS
STOCKPILE AREA
ES-1
SCALE: NOT TO SCALE
EROSION CONTROL BLANKET INSTALLATION
ES-1
SCALE: NOT TO SCALE
PUMPED WATER FILTER BAG (If needed during installation of footers)
ES-1
SCALE: NOT TO SCALE
ROCK CONSTRUCTION ENTRANCE (RCE)
ES-1
SCALE: NOT TO SCALE
COMPOST SOCK CONCRETE WASHOUT
ES-1
SCALE: NOT TO SCALE
ROCK FILTER OUTLET
ES-1
SCALE: NOT TO SCALE
12" COMPOST FILTER SOCK
ES-1
SCALE: NOT TO SCALE
2"X2"X6' STAKES
FENCING - ORANGE
VINYL CONSTRUCTION
6' MAX.
TOP VIEW
5'
1' MIN.
PRIOR TO PERFORMING ANY WORK WITHIN THE CONTRACT LIMIT
LINE CONTRACTOR SHALL INSTALL ALL TREE PROTECTION FENCES.
THESE FENCES SHALL REMAIN IN PLACE UNTIL SUBSTANTIAL
COMPLETION OF THE CONTRACT HAS BEEN GRANTED. ALL NEW
WORK TO BE EXECUTED INSIDE THESE FENCES SHALL BE
PERFORMED ONLY WITH THE AID OF HAND TOOLS AND HAND
OPERATED MACHINE EQUIPMENT. NO MACHINE DRIVEN VEHICLES
OR EQUIPMENT WILL BE ALLOWED INSIDE THESE FENCED AREAS.
TREE PROTECTION FENCING
ES-1
SCALE: NOT TO SCALE
FASTENERS**
G
R
O
U
N
D
M
I N
SUPPORT POSTS*
NO 7 GA TENSION WIRE
FABRIC FENCE
EXISTING CHAIN LINK FENCE
COMPACTED BACKFILL
*POSTS SPACE @ 10' MAX. USE 2 1/2" DIA. GALVANIZED OR ALUMINUM
POSTS.
**CHAIN LINK TO POST FASTENERS SPACED @ 14" MAX. USE NO. 6 GAUGE
ALUMINUM WIRE OR NO. 9 GALVANIZED STEEL PRE-FORMED CLIPS. CHAIN
LINK TO TENSION WIRE FASTENERS SPACED @ 60" MAX. USE NO 10 GAUGE
GALVANIZED STEEL WIRE. FABRIC TO CHAIN FASTENERS SPACED @ 24" MAX
ON CENTER
TOE ANCHOR TRENCH
8 IN.
6 IN.
FILL
SLOPE
8 FT. MIN.
NOTES:
- FABRIC SHALL HAVE THE MINIMUM PROPERTIES AS SHOWN IN TABLE 4.3 OF THE PA DEP EROSION CONTROL MANUAL.
- FABRIC WIDTH SHALL BE 42 IN. MINIMUM.
- POSTS SHALL BE INSTALLED USING A POSTHOLE DRILL.
- CHAIN LINK SHALL BE GALVANIZED NO. 11.5 GA. STEEL WIRE WITH 2-1/4 IN. OPENING, NO. 11 GA. ALUMINUM COATED STEEL WIRE IN
ACCORDANCE WITH ASTM-A-491, OR GALVANIZED NO. 9 GA. STEEL WIRE TOP AND BOTTOM WITH GALVANIZED NO. 11 GA. STEEL INTERMEDIATE
WIRES. NO. 7 GAGE TENSION WIRE TO BE INSTALLED HORIZONTALLY THROUGH HOLES AT TOP AND BOTTOM OF CHAIN-LINK FENCE OR
ATTACHED WITH HOG RINGS AT 5 FT MAX. CENTERS.
- SILT FENCE SHALL BE PLACED AT LEVEL EXISTING GRADE. BOTH ENDS OF THE FENCE SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45
DEGREES TO THE MAIN FENCE ALIGNMENT.
- SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH HALF THE ABOVE GROUND HEIGHT OF THE FENCE.
- FENCE SHALL BE REMOVED AND PROPERLY DISPOSED OF WHEN TRIBUTARY AREA IS PERMANENTLY STABILIZED.
FASTENERS
POST
FABRIC FENCE
6"
MIN
JOINING FENCE SECTIONS
SUPER SILT FENCE (Alternative to CFS)
ES-1
SCALE: NOT TO SCALE
CONTRACTOR TO ATTACH FABRIC FENCE TO THE ALREADY
EXISTING CHAIN LINK FENCING AT NOVEMBRINO AND/OR
NORTH SCRANTON MINI-PARK, IF LESS EXPENSIVE AND
FUNCTIONAL OPTION)
INSTALL USING
STAPLE PATTERN C.
N
SU
LT
IN
G E
N G
IN
EE
RS
P
A
R
M M
I T
P E
N N
S Y
L V
A N t e l f a
La nd sc ap e A rc hi te ct ur e
- E nv ir on m en ta l S ci en ce
S t a f f o r d
A v e n u e
S c r a n t o n
P
T h o m a s J
M c L a n e a n d
A s s o c ia te s
In c
ES-2
RECYCLING OR DISPOSAL OF MATERIALS
ANTICIPATED WASTES: THERE IS PLAY EQUIPMENT AND TREES/STUMPS SLATED FOR REMOVAL AT
ORCHARD STREET PARK; NO SPECIFIED SITE DEMOLITION AT NOVEMBRINO ; AND ASPHALT/CONCRETE
REMOVAL AT THE MINI-PARK. WASTES MAY BE UNCOVERED DURING EXCAVATION DUE TO THE URBAN
LANDSCAPE (BRICKS, TRASH, ETC.). OTHER WASTES ARE EXPECTED AND ORDINARY LIKE EXCESS GRAVEL
OR EXCAVATED ROCK, AS WELL AS, MATERIALS USED FOR THE BANK PROTECTION LIKE PLASTIC WRAP, CARDBOARD, GEOTEXTILE, ETC..
ANY SEDIMENT REMOVED FROM E&S MEASURES OR EXCESS CUT SHALL BE DISPOSED OF IN LANDSCAPED
AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY
STABILIZED, OR PLACED IN TOPSOIL STOCKPILES.
THE CONTRACTOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE OF ALL BUILDING MATERIALS
AND WASTES IN ACCORDANCE WITH THE DEPARTMENT OF ENVIRONMENTAL PROTECTION'S SOLID WASTE
MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1 ET SEQ., AND 287.1 ET SEQ. THE
CONTRACTOR SHALL NOT ILLEGALLY BURY, DUMP, OR DISCHARGE ANY BUILDING MATERIAL OR WASTES AT
THE SITE.
ENVIRONMENTAL DUE DILIGENCE / DETERMINATION OF
CLEAN FILL
THE RESPONSIBILITY OF CLEAN FILL DETERMINATION AND ENVIRONMENTAL DUE DILIGENCE RESTS ON THE
APPLICANT.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT, SOLID
MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER
WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE
WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES
NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT HAS BEEN PROCESSED FOR RE-USE.)
ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED
TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY
OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL
TESTING IS NOT A REQUIRED PART OF DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE
PAST LAND USE OF THE PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR
RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A
REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL. TESTING
SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S POLICY "MANAGEMENT
OF FILL".
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS WASTE AND
MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR RESIDUAL WASTE
REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287 RESIDUAL WASTE MANAGEMENT OR 271 MUNICIPAL
WASTE MANAGEMENT, WHICHEVER IS APPLICABLE.
EROSION & SEDIMENTATION CONTROL BMP'S
GENERAL NOTES:
1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION SEQUENCE AND MAINTENANCE OF E & S MEASURES UNTIL
RECEIPT OF SUBSTANTIAL COMPLETION NOTIFICATION FROM OWNER. THE OWNER ACCEPTS RESPONSIBILITY FOR
MAINTENANCE OF STORM AND E & S MEASURES AFTER SUBSTANTIAL COMPLETION NOTIFICATION IS ISSUED.
2.ALL DISTURBED AREAS ARE TO BE RESTORED AND STABILIZED FOLLOWING THE 'LAWN SEEDING - DISTURBED AREAS'
DETAILS. ON-STIE SOILS TO BE USED IF SUITABLE. ANY IMPORTED TOP SOIL TO MEET MINIMUM STANDARDS OF PA PUB 408.
3.EROSION AND SEDIMENTATION BMP'S MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE
BEGINS WITHIN THE TRIBUTARY AREAS OF THOSE BMP'S.
BMP NARRATIVE DESCRIPTION 102.4(b)(5)(vi)}
THE PROPOSED BMP'S INCLUDE SEEDING AND COMPOST FILTER SOCK. THE COMPOST SILT SOCK WILL BE UTILIZED DOWNSLOPE
OF THE PROPOSED DEVELOPMENT AREA. SEEDING WILL BE UTILIZED AS SHOWN AND AS NEEDED.
SEQUENCE OF BMP INSTALLATION & REMOVAL 102.4(b)(5)(vii)}
ALL SPECIFIED E&S BMP'S SHALL BE INSTALLED FIRST IN THE CONSTRUCTION SEQUENCE AT ALL SITES. REMOVAL WILL OCCUR
AFTER 70% COVERAGE AND CESSATION OF EARTH DISTURBANCE.
BMP MAINTENANCE PROGRAM {102.4(b)(5)(x)} - INSPECTION
BMP INSPECTION SCHEDULE: THE CONTRACTOR OR INSPECTOR SHALL KEEP A WRITTEN REPORT DOCUMENTING INSPECTIONS
AND REPAIRS OF ALL BMPS.
COMPOST FILTER SOCK / ROCK FILTER
- INSPECT ON A WEEKLY BASIS AND AFTER EACH STORM EVENT TO CHECK FOR SEDIMENT ACCUMULATION. ANY REPAIRS
SHOULD BE PERFORMED IMMEDIATELY. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE
GROUND HEIGHT OF THE BARRIER AND DISPOSED OF IN ACCORDANCE WITH THE RECYCLING AND DISPOSAL OF MATERIALS
NOTES.
TEMPORARY CONTROL MEASURES
TEMPORARY CONTROL MEASURES SHALL INCLUDE THE FOLLOWING:
1. WINTER STABILIZATION *: DURING NON-GERMINATING SEASON STABILIZE SITE WITH STRAW MULCH AT 3 TON PER ACRE.
2.COMPOST FILTER SOCK: INSTALL AS DETAILED ON THE DRAWING AND WHERE INDICATED ON THE EROSION AND
SEDIMENTATION CONTROL PLAN. CONTRACTOR IS RESPONSIBLE TO PROVIDE ADDITIONAL FABRIC TO ANY AREA
DISTURBED OUTSIDE OF THE ACTIVE WORK AREA WHERE SEDIMENT LADEN WATER MAY BE EXPECTED TO FLOW ONTO
INACTIVE AREAS.
3.ROCK CONSTRUCTION ENTRANCE: AN AASHTO #1 ROCK CONSTRUCTION ENTRANCE WILL BE USED.
4.ROCK FILTER OUTLET: IS USED AS NEEDED FOR ANY OVERTOPPING OF COMPOST FILTER SOCK.
5.TEMPORARY SEEDING *: ALL AREAS DISTURBED BY ON SITE GRADING WHERE WORK HAS CEASED SHALL BE STABILIZED
IMMEDIATELY. APPLY TEMPORARY SEEDING MIX WHERE PERMANENT SEEDING CANNOT BE USED WITHIN 4 DAYS OF
DISTURBANCE. TEMPORARY SEEDING SHALL INCLUDE THE FOLLOWING: - FERTILIZER, 10-10-10 ---------------------------- 500 LBS.
PER ACRE
- ANNUAL RYEGRASS (LOLLUM MULTIFLORUM) ----------------- 50 LBS. PER ACRE
- LIME ----------------------------------------- 1 TON. PER ACRE
- MULCH (STRAW) --------------------------------- 3 TON PER ACRE
PERMANENT CONTROL MEASURES
PERMANENT CONTROL MEASURES SHALL INCLUDE THE FOLLOWING:
1. PERMANENT SEEDING *: USE PA DOT FORMULA B WITH FERTILIZATION/MULCH APPLICATIONS MEETING SPECIFICATIONS
SET FORTH BY THE PA DOT PUB 408; SEE TABLE BELOW FERTILIZATION / MULCH
- FERTILIZER, 10-20-20 ---------------------------- 22.9 LBS PER 1000 SF / 1,000 LBS.
PER ACRE
- LIME ----------------------------------------- 275LBS PER 1000 SF / 6 TON PER ACRE
- MULCH (STRAW) --------------------------------- 138 LBS PER 1000 SF / 3 TON PER
ACRE
2. EROSION CONTROL NETTING: USE NETTING AS DIRECTED ON ANY SLOPES. EroNet S75 Erosion Control Blanket, STAPLE
PATTERN C.
MAINTENANCE OF E&S CONTROL FACILITIES
1. UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE OPERATOR SHALL ASSURE THAT THE BEST
MANAGEMENT PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND
COMPLETELY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL BEST MANAGEMENT PRACTICE
FACILITIES AND MAINTAIN AND MAKE AVAILABLE COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE
INSPECTIONS. ALL MAINTENANCE WORK, INCLUDING CLEANING, REPAIR, REPLACEMENT, REGRADING, AND RESTABILIZATION SHALL BE PERFORMED IMMEDIATELY.
2. UNTIL THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .