3-Questions Pre-Bid Meeting 25-26.pdf

PDF 64 KB Posted

Attached to
Murray Police Training Center Range Make-Up Air Handler Replacement
Solicitation number
25-26
Issued by
Salt Lake County, Utah

About this file

This document is a minutes record from a Mandatory Pre-bid meeting for the Murray Police Training Center Range Make-Up Air Handler Replacement Request for Proposal (RFP), identified as project #25-26. The meeting addressed three key questions from potential bidders regarding the project's implementation details. Working hours were specified as Monday through Friday, 7am-5pm, with potential for permit-based extended hours, and scheduling to be coordinated through Tom Martin at Murray Police Department.

The RFP confirms that control system upgrades are part of the project scope, specifically noting control panel installation, programming, and required documentation as outlined in sections 2.3 and 2.6 of the RFP. While the primary project focuses on the range make-up air handler replacement, bidders were encouraged to optionally propose an A/C solution, though it is not within the current project's core scope of work. The document suggests that interested contractors should carefully review the full RFP, particularly pages 7-8, for comprehensive project details and requirements.

View the file

Other files

File Type Posted
2-Doc0074.pdf PDF
5-1.pdf PDF
4-PXL 20250716 131737154.jpg JPG image
1-RFP MAU 2025.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions asked at the Mandatory Pre-bid meeting for #25-26 for Murray Police Training Center Range Make-Up Air Handler Replacement RFP.

1. What are the working hours?

a. We have to follow county guidelines for noise ordinance. You may apply for a permit to operate outside of that. Scheduling must be coordinated through Tom Martin at Murray P.D. but in general M-F (7am-5pm).

2. Are the controls getting upgraded?

a. Yes, they are. As stated in the RFP on page 7-8. 2.3 Installation Services. Control panel installation and programming. 2.6 Training and Documentation. Control system documentation.

3. Are you interested in an A/C option?

a. It is not in the scope of work, but you are welcome to propose an A/C option.