About this file
This is a Bid Tabulation Report for the South Canyon Spring Fence Welding Project issued by the State of Utah Division of Purchasing in conjunction with the Utah Division of Wildlife Resources. The project involves upgrading existing fencing for habitat protection at South Canyon Spring in the Book Cliffs area, specifically requiring the welding of two rungs of succor rod to 300 existing drill pipe posts. The scope of work is detailed in Attachment B, with contractors required to provide welding and torch equipment only. The contract is structured as a unit price bid with 300 items required, each representing one welding assembly. The evaluation criteria follows the Utah Procurement Code's objective standards, with multiple or alternate quotes prohibited—bidders submitting multiple proposals will have only their primary bid considered.
Seventeen vendors submitted bids for this project, with total costs ranging from $5,697.00 to $150,000.00. Unit prices varied significantly across bidders, from $18.99 per item (allservices contact welding services llc) to $419.00 per item (The 5 Seventeen Company). The lowest responsive bid was submitted by England Construction at $19,875.00 total cost ($66.25 per item), while the highest was DiamondBack welding llc at $150,000.00 total cost ($250.00 per item). The bid tabulation indicates this was a lowest-cost evaluation process with no set-asides mentioned, and the document reflects the comparative analysis of all responsive bids received for contract award consideration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-SOUTH CANYON SPRING FENCE WELDING CONTRACT SPECIFICATIONS SOW.pdf | ||
| 2-Unofficial BidTabulationReport Bid Table BT-12CJ 1789759150.162736 - Copy.xlsx | XLSX spreadsheet | |
| 4-Award Memo.pdf (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Angels Fabrication LLC | Brown Outdoor Builds | Custom Fence Co. | DiamondBack welding llc | England Construction | HG Outdoor Customs | Harrison Oilfield Services, Inc | Northend Builders LLC | R. Thomas Construction, LLC | Range Line Fence LLC | T N T Fence, Inc. | Taig Nielsen Construction | The 5 Seventeen Company | WLW INC. | Western Sky Ranch LLC | allservices | contact welding services llc | |||||
| Total Cost | $58,500.00 | $48,000.00 | $150,000.00 | $19,875.00 | $85,500.00 | $36,000.00 | $57,000.00 | $56,250.00 | $59,001.00 | $60,000.00 | $25,500.00 | $58,080.00 | $125,700.00 | $10,050.00 | $5,697.00 | $55,800.00 | $19,800.00 | ||||
| # | Items | Quantity | |||||||||||||||||||
| Required | Unit |
of
| Measurement | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| SOUTH CANYON SPRING FENCE WELDING CONTRACT SPECIFICATIONS SOW: Totals | $58,500.00 | $24,000.00 | $75,000.00 | $19,875.00 | $85,500.00 | $18,000.00 | $57,000.00 | $28,125.00 | $59,001.00 | $60,000.00 | $25,500.00 | $29,040.00 | $0.00 | $10,050.00 | $5,697.00 | $55,800.00 | $19,800.00 | ||||||||||||||||||||
| #1-1 | Work according to Attachment B Scope of Work - total cost including all material | 300 | Each | $195.00 | $58,500.00 | $80.00 | $24,000.00 | $250.00 | $75,000.00 | $66.25 | $19,875.00 | $285.00 | $85,500.00 | $60.00 | $18,000.00 | $190.00 | $57,000.00 | $93.75 | $28,125.00 | $196.67 | $59,001.00 | $200.00 | $60,000.00 | $85.00 | $25,500.00 | $96.80 | $29,040.00 | $0.00 | $0.00 | $33.50 | $10,050.00 | $18.99 | $5,697.00 | $186.00 | $55,800.00 | $66.00 | $19,800.00 |
| South Canyon Total project: Totals | $0.00 | $24,000.00 | $75,000.00 | $0.00 | $0.00 | $18,000.00 | $0.00 | $28,125.00 | $0.00 | $0.00 | $0.00 | $29,040.00 | $125,700.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||
| #2-1 | Total project | 300 | Each | $0.00 | $0.00 | $80.00 | $24,000.00 | $250.00 | $75,000.00 | $0.00 | $0.00 | $0.00 | $0.00 | $60.00 | $18,000.00 | $0.00 | $0.00 | $93.75 | $28,125.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $96.80 | $29,040.00 | $419.00 | $125,700.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |