About this file
This is an unofficial bid tabulation report for a Request for Quotes (RFQ) issued by the State of Utah Division of Purchasing on behalf of the Utah Division of Wildlife Resources for the South Canyon Spring Fence Welding Project. The project involves upgrading existing fencing for habitat protection of the South Canyon Spring in the Book Cliffs area, specifically requiring welding of two rungs of succor rod to 300 existing drill pipe posts. The contractor is required to provide only welding and torch equipment for the project, with all work performed according to the specifications outlined in Attachment B Scope of Work. The RFQ was issued on a lowest cost evaluation basis, with responsive and responsible vendors invited to submit quotes complying with the identified specifications.
Seventeen contractors submitted bids for the 300-unit project, with total costs ranging from a low bid of $5,697.00 by contact welding services llc to a high bid of $150,000.00 by DiamondBack welding llc. The unit prices varied significantly across bidders, ranging from $18.99 to $419.00 per unit. Other notable bids included Brown Outdoor Builds at $24,000.00 ($80.00 per unit), England Construction at $19,875.00 ($66.25 per unit), HG Outdoor Customs at $36,000.00 ($60.00 per unit), and Northend Builders LLC at $28,125.00 ($93.75 per unit). The bidding process evaluated quotes based on objective criteria outlined in the Utah Procurement Code, with no multiple or alternate quotes accepted from any single bidder.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-official BidTabulationReport Bid Table BT-12CJ 1789759150.162736 - Copy.xlsx | XLSX spreadsheet | |
| 1-SOUTH CANYON SPRING FENCE WELDING CONTRACT SPECIFICATIONS SOW.pdf | ||
| 4-Award Memo.pdf (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| Angels Fabrication LLC | Brown Outdoor Builds | Custom Fence Co. | DiamondBack welding llc | England Construction | HG Outdoor Customs | Harrison Oilfield Services, Inc | Northend Builders LLC | R. Thomas Construction, LLC | Range Line Fence LLC | T N T Fence, Inc. | Taig Nielsen Construction | The 5 Seventeen Company | WLW INC. | Western Sky Ranch LLC | allservices | contact welding services llc | |||||
| Total Cost | $58,500.00 | $48,000.00 | $150,000.00 | $19,875.00 | $85,500.00 | $36,000.00 | $57,000.00 | $56,250.00 | $59,001.00 | $60,000.00 | $25,500.00 | $58,080.00 | $125,700.00 | $10,050.00 | $5,697.00 | $55,800.00 | $19,800.00 | ||||
| # | Items | Quantity | |||||||||||||||||||
| Required | Unit |
of
| Measurement | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
| Cost | Unit |
| Price | Total |
Cost
| SOUTH CANYON SPRING FENCE WELDING CONTRACT SPECIFICATIONS SOW: Totals | $58,500.00 | $24,000.00 | $75,000.00 | $19,875.00 | $85,500.00 | $18,000.00 | $57,000.00 | $28,125.00 | $59,001.00 | $60,000.00 | $25,500.00 | $29,040.00 | $0.00 | $10,050.00 | $5,697.00 | $55,800.00 | $19,800.00 | ||||||||||||||||||||
| #1-1 | Work according to Attachment B Scope of Work - total cost including all material | 300 | Each | $195.00 | $58,500.00 | $80.00 | $24,000.00 | $250.00 | $75,000.00 | $66.25 | $19,875.00 | $285.00 | $85,500.00 | $60.00 | $18,000.00 | $190.00 | $57,000.00 | $93.75 | $28,125.00 | $196.67 | $59,001.00 | $200.00 | $60,000.00 | $85.00 | $25,500.00 | $96.80 | $29,040.00 | $0.00 | $0.00 | $33.50 | $10,050.00 | $18.99 | $5,697.00 | $186.00 | $55,800.00 | $66.00 | $19,800.00 |
| South Canyon Total project: Totals | $0.00 | $24,000.00 | $75,000.00 | $0.00 | $0.00 | $18,000.00 | $0.00 | $28,125.00 | $0.00 | $0.00 | $0.00 | $29,040.00 | $125,700.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||||||||||||
| #2-1 | Total project | 300 | Each | $0.00 | $0.00 | $80.00 | $24,000.00 | $250.00 | $75,000.00 | $0.00 | $0.00 | $0.00 | $0.00 | $60.00 | $18,000.00 | $0.00 | $0.00 | $93.75 | $28,125.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $96.80 | $29,040.00 | $419.00 | $125,700.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |