3-IFB 26-02 Addendum No. 1.pdf
PDF 167 KB Posted
- Solicitation number
- 26-02
- Issued by
- Newton County, California
About this file
This is Addendum No. 1 for an Invitation for Bids (IFB) No. 26-02 issued by the Santa Cruz Metropolitan Transit District (METRO) for a Bus Overflow Parking Project located at 809 W. Beach Street in Watsonville, California. The bid is due on September 2, 2025, at 2:00 PM, with a deadline of August 15, 2025, at 5:00 p.m. for submitting formal questions or requests for approved equals. The addendum provides clarifications to the original IFB, including confirmation that no Project Labor Agreement (PLA) is required and no prequalification is needed to bid.
The estimated project cost is approximately $430,000, according to the engineer's rough estimate. The addendum addresses a specific technical question about concrete lighting pole bases, indicating that they can be either cast-in-place or precast, with detailed requirements for conduit placement, ground electrode coordination, and submittal of installation procedures for structural review. No liquidated damages clause is included in this IFB, and all questions must be submitted through the Bonfire procurement portal. Bidders are required to acknowledge receipt of this addendum on their Bid Form in the Bidder's Declarations and Statement of Understanding section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
Date of Issue: August 5, 2025
SANTA CRUZ METROPOLITAN TRANSIT DISTRICT
Invitation for Bids (IFB) No. 26-02 For Bus Overflow Parking Project at 809 W. Beach Street, Watsonville, CA
BIDS DUE: September 2, 2025 @ 2:00 PM
Notice is hereby given that the Santa Cruz Metropolitan Transit District, Santa Cruz, State of California (“METRO”) is providing the following clarifications, modifications, additions and/or deletions to the Invitation for Bids (IFB) No. 26-02 for Bus Overflow Parking Project at 809 W. Beach Street, Watsonville, CA. This Addendum shall become a part of the original IFB as issued by the Santa Cruz Metropolitan Transit District.
Bidders must acknowledge receipt of Addendum No. 1 on Bid Form – Document 1, in the Bidder’s Declarations and Statement of Understanding section. Any adjustment resulting from this Addendum shall be included in the IFB. Where in conflict, the terms and conditions of this Addendum supersede those in the Invitation for Bids.
All questions concerning the IFB or this Addendum shall be submitted via the Bonfire procurement portal by clicking the “Ask a question” link to the right of the Questions Due Date.
The deadline for formal questions/requests for approved equals is August 15, 2025 by 5:00 p.m.
This Addendum forms a part of the Contract Documents, and modifies the following as noted below:
1. ADDENDUM CONTENT
Addendum No. 1: A total of two (2) pages
2. BIDDERS’ REQUESTS FOR CLARIFICATIONS
2.1 Is this project covered by a Project Labor Agreement (PLA)?
Answer: No, there is no PLA.
2.2 Is prequalification required to participate in the bidding for this project?
Answer: No, prequalification is not required to bid.
2.3 What is the liquidated damages amount for this project?
Answer: METRO has not included a liquidated damages clause in this IFB.
2.4 What is the estimated cost of the project?
Answer: We have an engineer’s rough estimate of around $430K.
2.5 For the concrete bases for the pole lights, can precast bases be an option, or do they have to be poured on-site?
Answer: Concrete lighting pole bases can be cast-in-place or precast. However, the conduits for power and security are entering the lighting pole from below; therefore, those would need to be precast into the concrete base to match the angles of the underground approaching conduits. Also, the ground electrode for the lighting pole would need to be coordinated and cast into a precast concrete base. METRO and the design team would require the contractor to provide a submittal or shop drawing for addressing all these items prior to accepting a precast option. Additionally, we would require that the contractor provide their installation procedure for structural review before they perform the construction.
END OF ADDENDUM NO. 1
Tanya Gilliam Purchasing Agent