About this file

This is an evaluation committee spreadsheet prepared by the Lancaster County Conservation District for the Supplee Farm Stream Restoration Project, a natural channel stream restoration initiative on approximately 3,500 linear feet of Conowingo Creek in Fulton Township, Lancaster County, Pennsylvania. The spreadsheet serves as a reference document for how proposals will be evaluated and is not intended for bidder submission. The project encompasses comprehensive restoration services including installation of in-stream habitat structures, riparian bank stabilization, bankfull bench grading, stream crossings, streambank fencing, riparian buffer establishment, and vegetative stabilization. A mandatory pre-bid site showing was scheduled for January 20, 2026 at 1:00 PM EST, with bids due by 12:00 AM EST on February 7, 2026 via the PennBid online platform. The bid opening occurred on February 9, 2026 at 10:00 AM EST, with the anticipated award date of March 10, 2026 at 10:00 AM EST. The project performance period runs from June 1, 2026 through February 15, 2027. A rebid was subsequently issued with a pre-bid site showing available upon request, bids due by 11:30 PM EST on June 13, 2026, bid opening on June 15, 2026 at 10:00 AM EST, and award scheduled for July 14, 2026 at 10:00 AM EST.

The evaluation criteria allocate 31 total points across four sections: Qualifications of Firm (15 points), Technical Approach (8 points), Firm's Costs (8 points), and project timeline considerations. Bidders must demonstrate 5-10 years of practical stream restoration experience in Lancaster County or Southcentral Pennsylvania, with evaluation of regional project history, reference quality and quantity, project management capacity, and professional competence in natural channel stream restoration theory, stream assessment, and construction methodologies. The Technical Approach section evaluates understanding of project scope and detailed work scheduling with preference for earlier completion dates, ranging from August 31, 2027 (1 point) to December 31, 2026 (4 points). The Firm's Costs section scores budget justification and project scope modifications, with preference for implementations maintaining 95-100% of the original design (4 points) down to implementations of 60-79% (2 points). The project is funded through a Section 319 Nonpoint Source Pollution Grant administered by the Pennsylvania Department of Environmental Protection, triggering prevailing wage requirements and Build America, Buy America mandates requiring all materials and products to be U.S.-produced. Bids exceeding $250,000 require a 5% bid guarantee, 100% performance bond, 100% payment bond, and $1,000,000 in worker's compensation and public liability insurance. Payment is structured in up to three phases with 90% reimbursement within 90 days of submittal and final 10% within 160 days, contingent upon state funding availability.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

START HERE

NOTE - THIS EVALUATION SPREADSHEET IS NOT FOR BIDDERS. IT IS SHARED AS A REFERENCE FOR HOW PROJECTS WILL BE EVALUATED. PLEASE DO NOT SUBMIT THIS WITH YOUR BID.

Evaluation Summary Combined

DATE:
PROJECT :Supplee Farm Stream Restoration (Conowingo Creek)
Grant Agreement319 Nonpoint Source Management Grant

Evaluator's Name: NAME

Evaluations should be completed, signed, and emailed to Grace Chamberlain, Project Coordinator GraceChamberlain@lancasterconservation.org no later than 11:59 PM on March 6th

All scores will be expressed as a numeric value based on a total of 100 points total. Scores for a category will be the sum of the individual sub-categories. All sub-categories are to be given a point score not exceeding the value listed on the score sheet.

Vendor Name
Place scores for each Firm in the column using the scoring key below.
EVALUATION CRITERIA*Weighting Factor PointsEXAMPLE OnlyContractor #1Contractor #2Contractor #3Ranking Scale
Section 1. Qualifications of Firm1234
A. Firm must have worked in Lancasater County/Southcentral region, with 5-10 years of practical restoration experience.4.0Little to no relevant experience in the region and in this fieldNot much worked completed in the county/southcentral region (1-2 projects); less than 5 years of practical experienceSome work done in the county/southcentral region (3-4 projects); more than 5 years of practical experienceExtensive work completed in the county/southcental region (5 or more projects); within the 5-10 year range of practical experience
B. Proven capacity to deliver prompt and complete service on time - has 3 of references.4.0No relevant experience or references provided; references do not prove ability to deliverSome experience; references demonstrate some ability to deliver; provided one written testimonies as a part of the bidSome experience; references prove ability to deliver good service; provided multiple written testimonies (2+) as a part of the bidLots of experience; Excellent references that demonstrate proven ability to deliver; provided multiple written testimonies (3+) as a part of the bid
C. Proven Ability to Manage a Project of This Size & Scale4.0Never completed a project of this size/sacleCompleted only a 1-2 projects of this size/sacleCompleted 3-4 projects of this size/scale and were managed wellCompleted 5 or more projects of this size/scale and were managed excellently
D. The firm that is selected for this project must be able to demonstrate professional competence in the following planning disciplines:Firm does not demonstrate competence in any of the discplines listedFirm demonstrates competence in 2 of the 4 discplines listedFirm demonstrates competence in 3 of the 4 discplines listedFirm demonstrates great competence in all of the discplines listed
> Natural Channel Stream Restoration Theory1.0
> Stream/Watershed Assessment1.0
> Stream Restoration Construction1.0
QUALIFICATIONS of FIRM Score*15.0
Ranking Scale
Section 2. Technical Approach (see Scoring Key above)1234
A. Firm understands the issues, scope, and depth of the work involved in project based on previous experience, questions asked during the pre-bid mtg, and any comments on the design4.0Firm does not demonstrate a strong understanding of issues/scope/depth of workFirm demonstrates some understanding of issues/scope/depth of work (lack of experience)Firm demonstrates a good understanding of issues/scope/depth of work, based on past experiencesFirm demonstrates an excellent understanding of issues/scope/depth of work,based on past experiences
B. Firm provided a detailed work schedule and timetable for completing the project within the preferred time period4.0Firm can complete/close out project by 8/31/27. Evidence of this completion date is detailed in firm's work schedule and timetable.Firm can complete/close out project by 7/31/27. Evidence of this completion date is detailed in firm's work schedule and timetable.Firm can complete/close out project by 2/15/27. Evidence of this completion date is detailed in firm's work schedule and timetable.Firm will complete/close out project by 12/31/2026. Evidence of this completion date is detailed in firm's work schedule and timetable.
Score8.0
Rank
Section 3. Firm's CostsRanking Scale
A. Price:8.01234
The firm provided a budget that support its projected costs for construction labor and materials plus the costs of assessment, design, and permitting the project. The proposed budget justifies the total cost.Firm is proposing extensive modifications to the project scope Less than 60% of the original project design will be implemented.Firm is proposing significant modifications to the project scope 60-79% of the original project design will be implemented.Firm is proposing reasonable modifications to the project scope. 80-94% of the original project design will be implemented.Firm is proposing only a few modifications to the project scope 95-100% of the original project design will be implemented.
Score8.0
Rank
Section 4. Final Total Score8.0
OVERALL POINTS31.0
OVERALL RANK

CERTIFICATION:

I hereby certify that as a member of the Neff-Dellinger Run Selection Committee, I have evaluated the proposals of all subcontractors who responded and rated those firms based on the above criteria to the best of my ability in a fair and equitable manner, independent of outside influence, persuasion or coercion.
____________________________________________________________________________________
SignatureDate

Donegal Chapter of Trout Unlimited Natural Channel Stream Restoration Dellinger Run

&D Page &P of

Evaluation Committee

Evaluation Committee
Organization
Donegal Trout Unlimited
Penn State Agriculture & Environment Center
Lancaster County Conservation District
Natural Resource Conservation Service
Chesapeake Bay Foundation
Alliance for the Chesapeake Bay
All evaluators will be given equal weight and the final score will be an average of all evaluator's final scores.

Evaluation (2)

PROJECT :Professional Audting Services
RFP#15-030
DEPARTMENT:Controller's Office

Evaluator's Name:

Evaluations should be completed and emailed to Linda Schreiner no later than 9:00 AM on Thursday, September 17th.

Scoring Directions:
All scores will be expressed as a numeric value based on a total of 100 points total. Scores will be allocated to three categories each of which has one or more sub category. The total score for a category will be the sum of the individual sub-categories. All sub-categories are to be given a point score not exceeding the value listed on the score sheet. Use the Scoring Key below to calculate the individual point value by multiplying the allocation of the sub-category by the scoring key factor corresponding to your overall evaluation of that sub-category.

Example: Customer Service assessed as Poor would be 3.0 X 0.3 = 0.9

Vendor Name
Place scores for each vendor in the column using the following assignment
Scoring Key
0.0 Insufficient data to evaluate
0.3 Poor
0.5 Marginal/does not meet expectations
0.7 Fair - somewhat meets expectations
0.8 Good - meets expectations
0.9 Very Good - Consistently exceeds some expectations
1.0 Excellent - Outstanding in all respects, consistently
SELECTION CRITERIAWeighting FactorEXAMPLE OnlyVENDORVENDORVENDORVENDORVENDOR
Section 1. Qualifications of Firm and Key Personnel
Qualifications of Firm
A. Firm's History, Dependability and Relevant Experience4.00.5
B. Proven capacity to deliver prompt and complete service on time.4.00.5
C. Proven Ability to Manage a Project of This Size4.00.5
D. Familiarity of County Government and its Operations4.00.5
Qualifications of Key Personnel
A. Key Personnel Meet Qualifications and Requirements4.00.5
B. Experience and Capabilities of Key Personnal4.00.5
QUALIFICATIONS of FIRM Score24.012.00.00.00.00.00.0
Section 2. Technical Approach
A. Provide a management system, sufficient in scope, content, personnel and procedure to effectively implement and manage the custodial service program. (Clause 3j(1) - Page 24)6.00.5
B. Copies of licenses, permits, registrations. (Clasue 3b - Page 23)4.00.5
C. Demonstrated Training Methods and Procedures.6.00.5
D. Provided an Equipment List (make, model, and quantity).4.00.5
E. Provide copies of daily check list or inspection log that will be used. (Clasue 8f - Page 27)4.00.5
F. Demonstrated Quality Control Processes and Procedures.6.00.5
Score30.015.00.00.00.00.00.0
Rank
Section 4. References
A. Demostrates focus on customer service3.00.5
B. Customer satisfaction is high3.00.5
Score6.03.00.00.00.00.00.0
Rank

Total Score 60.0 30.0 0.0 0.0 0.0 0.0 0.0

Fee Schedule/Proposal -

TO BE COMPLETED BY PURCHASING

A. Pricen/an/an/an/an/a
Score
Rank
Total Score40.00.00.00.00.00.0
OVERALL POINTS100.00.00.00.00.00.0
OVERALL RANK
CERTIFICATION:
I hereby certify that as a member of the Evaluation/Source Selection Committee, I have evaluated the proposals of all vendors or persons who responded and rated those vendors or persons based on the above criteria to the best of my ability in a fair and equitable manner, independent of outside influence, persuasion or coercion.
_________________________________________________________________