3 DPL Site Civil 20 Oct 25.pdf
PDF 9 MB Posted
- Attached to
- Dalton Public Library Reading Pavilion
- Solicitation number
- PE-75500-NONST-2025-000000048
- Issued by
- Wilcox County, Georgia
About this file
The documents represent site development plans for the Dalton Whitfield County Public Library's Reading Pavilion Phase #3 project, prepared by Richards & Associates Engineering, Inc. for the Northwest Georgia Regional Library System. The project is located in Land Lot 199, District 12, Section 3 in the City of Dalton, Whitfield County, Georgia, and covers approximately 2.64 acres with 0.90 acres of disturbed area. The civil engineering plans include comprehensive details for site preparation, erosion control, grading, drainage, storm water management, and construction phasing, with specific documentation for initial, intermediate, and final project stages.
The site plans outline detailed specifications for underground storage, storm water management, utility relocations, and site infrastructure. The project includes constructing a new two-story library building with associated parking, landscaping, and supporting civil infrastructure. Key technical components include a Contech CS-4 water quality treatment unit, underground chambers, storm sewer systems, and specific erosion control measures. The documentation indicates careful planning for environmental compliance, including adherence to Georgia Water Quality Control Act requirements and National Pollutant Discharge Elimination System (NPDES) permits. The engineering team has meticulously planned each construction phase, with specific notes on utility coordination, site preparation, and post-construction stabilization and maintenance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
1. THESE PLANS HAVE BEEN SIGNED AND SEALED FOR REVIEW ONLY. THEY CANNOT BE
USED FOR CONSTRUCTION UNTIL THEY HAVE BEEN APPROVED, STAMPED AND SIGNED BY THE
APPROPRIATE AUTHORITIES AND ALL NECESSARY PERMITS HAVE BEEN OBTAINED BY THE
CLIENT.
2. THE CLIENT IS ULTIMATELY RESPONSIBLE FOR OBTAINING THE APPROPRIATE PERMITS FOR
CONSTRUCTION FROM ALL FEDERAL, STATE AND LOCAL PERMITTING AUTHORITIES. RICHARDS &
ASSOCIATES ENGINEERING, INC. IS NOT LIABLE FOR THE FAILURE OF THE CLIENT TO OBTAIN
THE NECESSARY PERMITS.
3. THIS DRAWING SHEET IS PART OF A COMPLETE SET OF DESIGN DRAWINGS. IT SHOULD
NOT BE SEPARATED FROM THE SET. INFORMATION PERTINENT TO THIS SHEET MAY BE FOUND
ON OTHER SHEETS IN THE SET.
4. A COPY OF THE CURRENT SET OF APPROVED DRAWINGS MUST BE KEPT ON THE
CONSTRUCTION SITE AT ALL TIMES.
5. THE CLIENT IS RESPONSIBLE FOR ENSURING THAT THE CONTRACTOR HAS A COPY OF THE
CURRENT SET OF APPROVED DRAWINGS ONSITE AT ALL TIMES.
6. IF ANY CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE
DISCOVERED, EITHER ON THE CONSTRUCTION DOCUMENTS OR THE FIELD CONDITIONS, THE
CONTRACTOR MUST NOTIFY THE ENGINEER IMMEDIATELY, AND SHALL NOT COMMENCE
OPERATION UNTIL THE CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS
ARE RESOLVED. RICHARDS & ASSOCIATES ENGINEERING, INC. WILL NOT BE RESPONSIBLE FOR
CONFLICTS IF WE ARE NOT NOTIFIED PRIOR TO INSTALLATION.
7. THESE DRAWINGS HAVE BEEN STAMPED AND SIGNED ENGINEERING DESIGN CONTENT ONLY.
PROPERTY LINE INFORMATION SHOWN ON THESE DRAWINGS HAS BEEN PROVIDED BY THE
CLIENT OR A REGISTERED LAND SURVEYOR AND ARE SHOWN FOR REFERENCE ONLY. THE
CLIENT MUST ENGAGE THE SERVICES OF A REGISTERED LAND SURVEYOR TO RESEARCH, PLAT
AND LOCATE ALL PROPERTY CORNERS PRIOR TO THE PURCHASE OF THE PROPERTY AND
COMMENCEMENT OF CONSTRUCTION. RICHARDS & ASSOCIATES ENGINEERING, INC. IS NOT
RESPONSIBLE FOR VERIFYING THE LOCATION OF OR EXISTENCE OF THE LIMITS OR BOUNDARY
OF THE CLIENT'S PROPERTY. AT THE CLIENT'S REQUEST, RICHARDS & ASSOCIATES
ENGINEERING, INC. USES THE INFORMATION PROVIDED BY THE CLIENT, EITHER DIRECTLY OR
THROUGH THE CLIENT'S SURVEYOR, TO PRODUCE CONSTRUCTION DRAWINGS FOR THE CLIENT.
THESE DRAWINGS MAY HAVE BEEN PREPARED FOR A SITE NOT CURRENTLY OWNED BY THE
CLIENT. THE CLIENT IS RESPONSIBLE FOR ENSURING THAT HE HAS THE RIGHT TO OCCUPY
THE PROPERTY FOR THE PURPOSE OF CONSTRUCTION. RICHARDS & ASSOCIATES ENGINEERING,
INC. MAKES NO CLAIMS AS TO THE OWNERSHIP OF THE SUBJECT PROPERTY OR ADJACENT
PROPERTIES.
LOCATED IN LAND LOT 199, DISTRICT 12, SECTION 3
CITY OF DALTON
PARCEL: 12-199-27-057
WHITFIELD COUNTY, GEORGIA
N 34.775745°, W 84.977352°
SITE AREA: ±2.64 ACRES
DISTURBED AREA: ±0.90 ACRES
OWNER/DEVELOPER:
NORTHWEST GEORGIA
REGIONAL LIBRARY SYSTEM
310 CAPPES STREET
DALTON, GA 30720
24 HOUR LOCAL CONTACT RESPONSIBLE FOR
EROSION, SEDIMENTATION AND POLLUTION
CONTROLS:
XXX
PRIMARY PERMITTEE:
XXX
DESIGN PROFESSIONAL'S CERTIFICATION
1. I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION
CONTROL PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM
OF BEST MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY
CONTROL ACT AND THE DOCUMENT "MANUAL FOR EROSION AND SEDIMENT
CONTROL IN GEORGIA" (MANUAL) PUBLISHED BY THE GEORGIA SOIL AND
WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH
THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE
SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM
WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT
PRACTICES AND SAMPLING METHODS IS EXPECTED TO MEET THE
REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO. GAR 100001.
2. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED
AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY
AUTHORIZED AGENT, UNDER MY SUPERVISION.
3. GEORGIA'S 305(b)/303(d) LIST DOCUMENTS HAVE BEEN CONSULTED.
10/20/25
STEPHEN R. RICHARDS, PE DATE
GSWCC LEVEL II CERTIFICATION NO. 8688
THIS PROJECT IS DESIGNED TO BE IN COMPLIANCE WITH THE GEORGIA GENERAL
PERMIT NO. GAR100001 AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL
POLLUTANT DISCHARGE ELIMINATION SYSTEM WITH CONSTRUCTION ACTIVITY FOR
STAND ALONE CONSTRUCTION PROJECTS EFFECTIVE AUGUST 1, 2018 AND THE
MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA, EFFECTIVE
JANUARY 1, 2016.
NTS
Call before you dig.
below.Know what's www.Georgia811.com
SHEET INDEX
C0 COVER SHEET
C1 INITIAL PHASE SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
C2 INTERMEDIATE A SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
C3 INTERMEDIATE B SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
C4 FINAL PHASE SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL PLAN
C5 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILS
C6 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILS
C7 SOIL EROSION, SEDIMENTATION & POLLUTION CONTROL DETAILS
C8 EXISTING CONDITIONS & DEMOLITION PLAN
C9 SITE PLAN
C10 GRADING & DRAINAGE PLAN
C11 CONSTRUCTION DETAILS
SITE DEVELOPMENT PLANS
FOR
DALTON LIBRARY
CAPPES STREET
SITE
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
EE
T.
DA
LT
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
CIVIL
COVER SHEET
C0
10/20/25
RAE 24-018
SRR
SSMH
FF
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
TOP= 777.3
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
INV= 758.65
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
S
A
N
I
T
A
R
Y
E
W
S
E
M
E
N
T
X
X
X
X
X
X
X
X
X
X
X
X
Sd2-P Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P Sd2-P
Sd2-P
Sd2-F Sd2-F
Ds1 Ds2 Du
Ds1 Ds2 Du
Ds1 Ds2 Du
Sd1-S
C-POP
X X
X
Sd1-S
C-POP
Sd1-NS
FILTREXX
Sd1-NS
FILTREXX
X
X
X
Cw
X X
X
Sd1-S
C-POP
Cr
18' WIDE CONSTRUCTION
DRIVE WITH 6" STONE
COORDINATE EXIT ONTO WAUGH STREET
WITH DALTON PUBLIC WORKS DEPARTMENT
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
CoCw
CONSTRUCTION SEQUENCE (INITIAL PHASE)
1. CALL FOR UTILITY LOCATE PRIOR TO ANY LAND DISTURBING
ACTIVITY.
2. INSTALL CONSTRUCTION EXIT (Co).
3. INSTALL CONCRETE WASHOUT BASIN (Cw).
4. INSTALL SILT FENCE (Sd1-NS) AS SHOWN.
5. INSTALL INLET PROTECTION AS SHOWN (Sd2-P, Sd2-F).
NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCE
AROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,
HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATER
THAN 24".
Cd
CHECKDAM
Co
CONSTRUCTION
EXIT
Sd1
BARRIER
SEDIMENT
TYPE
Rt
RETROFITTING
Rt
Sd2
SEDIMENT TRAP
INLET
Sd3
SEDIMENT BASIN
TEMPORARY
St
PROTECTION
STORM DRAIN
OUTLET
St
Bf
Bf
Ds2
TEMPORARY
STABILIZATION
DISTURBED AREA
SEEDING)
(WITH
Ds2
Ds3
VEGETATION)
PERMANENT
DISTURBED AREA
STABILIZATION
(WITH
Ds3
EROSION CONTROL LEGEND
BUFFER
ZONE
STABILIZATION
DISTURBED AREA
MULCHING
ONLY)
(WITH
Ds1
Ds1
Di
Fr
DIVERSION DITCH
Di
FILTER RING
STONE
MATTING
EROSION CONTROL
Ss
Ss
TEMPORARY
SEDIMENT TRAP
Sd4
Sd4
Su
ROUGHENING
SURFACE
Su
Pm
Du
POLYACRYLAMIDE
DUST CONTROL
PAM
Du
Ch
CHANNEL STABILIZATION
Ch-(type)
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
INITIAL PHASE
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL PLAN
C1
10/20/25
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
TOP= 777.3
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
INV= 758.65
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
N
I
T
A
W
S
E
M
E
N
T
X
X
X
X
X
X
X
X
X
X
X
X
Sd2-P Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P Sd2-P
Sd2-P
Sd2-F Sd2-F
Ds1 Ds2 Du
Ds1 Ds2 Du
Ds1 Ds2 Du
Sd1-S
C-POP
X X
X
Sd1-S
C-POP
Sd1-NS
FILTREXX
Sd1-NS
FILTREXX
X
X
X
Cw
X X
X
Sd1-S
C-POP
Cr
18' WIDE CONSTRUCTION
DRIVE WITH 6" STONE
CONSTRUCT 6" STONE BASE
FOR HEAVY EQUIPMENT PER
GEO-PIER CONTRACTOR'S
REQUIREMENT
COORDINATE EXIT ONTO WAUGH STREET
WITH DALTON PUBLIC WORKS DEPARTMENT
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
DISTURBANCE
LIMIT
DISTURBANCE
LIMIT
CoCw
CONSTRUCTION SEQUENCE (INTERMEDIATE PHASE A)
1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT AS
REQUIRED.
2. BUILD STONE PAD FOR GEO-PIER INSTALLATION.
3. MAINTAIN DUST CONTROL AND PLACE TEMPORARY MULCH
AND/OR GRASSING AS NEEDED.
NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCE
AROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,
HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATER
THAN 24".
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
INTERMEDIATE A
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL PLAN
C2
10/20/25
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
TOP= 777.3
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
INV= 758.65
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
N
I
T
A
W
S
E
M
E
N
T
Sd2-F
Sd2-P
Co
X
X
X
X
X
X
X
X
X
X
X
X
Cw
Sd2-P Sd2-P
Sd2-P
Sd2-P
Sd2-P
Sd2-P Sd2-P
Sd2-P
Sd2-F Sd2-F
Ds1 Ds2 Du
Ds1 Ds2 Du
Ds1 Ds2 Du
Sd1-S
C-POP
X X
X
Sd1-S
C-POP
Sd1-NS
FILTREXX
Sd1-NS
FILTREXX
X
X
X
Cw
X X
X
Sd1-S
C-POP
Cr
18' WIDE CONSTRUCTION
DRIVE WITH 6" STONE
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
DISTURBANCE
LIMIT
DISTURBANCE
LIMIT
CONSTRUCTION SEQUENCE (INTERMEDIATE PHASE B)
1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT AS
REQUIRED.
2. INSTALL STORM SEWER.
3. CONSTRUCT BUILDING.
4. MAINTAIN DUST CONTROL AND PLACE TEMPORARY MULCH
AND/OR GRASSING AS NEEDED.
NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCE
AROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,
HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATER
THAN 24".
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
INTERMEDIATE B
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL PLAN
C3
10/20/25
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
TOP= 777.3
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
INV= 758.65
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
N
I
T
A
W
S
E
M
E
N
T
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
DISTURBANCE
LIMIT
DISTURBANCE
LIMIT
Ds3
Ds3
Ds3
Ds3
Ds3
CONSTRUCTION SEQUENCE (FINAL PHASE)
1. MAINTAIN ALL INSTALLED BMP'S. REMOVE SEDIMENT AS
REQUIRED. MAINTAIN MONITORING PROGRAM.
2. COMPLETE GRADING OPERATIONS AND STABILIZE ALL DISTURBED
AREAS WITH THE APPROPRIATE PERMANENT VEGETATION OR
OTHER SURFACE TREATMENT. INSTALL MATTING ON ALL POND
SLOPES AND 4" OF STRAW ON ALL OTHER DISTURBED AREAS.
3. REMOVE CONCRETE WASHOUT BASIN. STABILIZE THE AREA
WITH THE APPROPRIATE PERMANENT VEGETATION.
4. ONCE FINAL STABILIZATION HAS BEEN ACHIEVED IN ALL OTHER
AREAS, REMOVE PERIMETER SILT FENCE AND CONSTRUCTION
EXITS. STABILIZE THESE AREAS WITH THE APPROPRIATE
PERMANENT VEGETATION. BY DEFINITION, FINAL STABILIZATION
MEANS THAT ALL SOIL DISTURBING ACTIVITIES AT THE SITE
HAVE BEEN COMPLETED, AND THAT FOR UNPAVED AREAS AND
AREAS NOT COVERED BY PERMANENT STRUCTURES AND AREAS
LOCATED OUTSIDE THE WASTE DISPOSAL LIMITS OF A LANDFILL
CELL THAT HAS BEEN CERTIFIED BY EPD FOR WASTE DISPOSAL,
100% OF THE SOIL SURFACE IS UNIFORMLY COVERED IN
PERMANENT VEGETATION WITH A DENSITY OF 70% OR GREATER,
OR LANDSCAPED ACCORDING TO THE PLAN (UNIFORMLY
COVERED WITH LANDSCAPING MATERIALS IN PLANNED
LANDSCAPED AREAS), OR EQUIVALENT PERMANENT
STABILIZATION MEASURES AS DEFINED IN THE MANUAL
(EXCLUDING A CROP OF ANNUAL VEGETATION AND SEEDING OF
TARGET CROP PERENNIALS APPROPRIATE FOR THE REGION).
NOTE: AT THE END OF EACH DAY, CONSTRUCT A SAFETY FENCE
AROUND ALL SEDIMENT BASINS OR TRAPS, DITCHES, TRENCHES,
HOLES, ETC. WITH 2:1 OR STEEPER SLOPES AND A DEPTH GREATER
THAN 24".
CONSTRUCTION SCHEDULED TO BEGIN ON XX
A C T I V I T Y S C H E D U L E
MONTHS FROM START OF CONSTRUCTION
LANDSCAPE
PAVING
BUILDING
CONSTRUCTION
TEMPORARY
FINAL GRASS
GRASSING
EARTHWORK
EROSION CONTROL
MAINTAIN
SEDIMENT
CONTROL
21 3 4 5 6
AND BE COMPLETED ON OR BEFORE XX
REMOVAL OF
TEMPORARY BMPs
CLEARING
FOR BMPs
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
FINAL PHASE
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL PLAN
C4
10/20/25
TYPICAL INSTALLATION GUIDELINES FOR ROLLED
EROSION CONTROL PRODUCTS (RECP)
BLANKET AND MATTING CROSS-SECTIONS
UPSTREAM TERMINAL TRANSVERSE CHECK SLOT DOWNSTREAM TERMINAL
1'-2" 1'-0"
6" 9" 1'-2" 1'-0"
15'-20'5'
15"
5'
3"
5'
3' OVERLAP
ROLL #3
ROLL #1
ROLL #2
SEQUENTIAL ROLL RUN OUT IN
CHANNELS
PICTORAL VIEW OF TRANSVERSE SLOT
9"
6"
36"
STEP 1: CUT TERMINAL SLOT.
STEP 2: SNUG MAT INTO SLOT.
STEP 3:
A. STAKE MAT INTO SLOT.
B. USE 1" X 3" PRESSURE TREATED
BOARD TO SPACE MAT AGAINST
VERTICAL CUT.
C. BACKFILL AND COMPACT.
STEP 4:
A. REVERSE MAT ROLL DIRECTION TO
OVERLAY CHECK LOT.
B. STAKE MAT TO ANCHOR TERMINAL.
STEP 1: CUT
CHECK SLOT.
STEP 2: WORK UPSTREAM ACROSS
CHECK SLOT AND LAP BACK 15".
STEP 3: TUCK MAT LAP INTO SLOT
AND STAKE.
STEP 4:
A. BACKFILL AND PROGRESS UPSTREAM
B. PULL OUT TEMPORARY STAKES WHEN
NO LONGER NEEDED FOR TENSIONING.
STEP 1: CUT
TERMINAL SLOT.
STEP 2: STAKE
MAT INTO SLOT.
STEP 3:
BACKFILL TERMINAL
SLOT.
STEP 4:
A. ROLL MAT UP-
STREAM OVER REFILLED TERMINAL.
B. STAKE MAT DOWN TO ANCHOR
TERMINAL.
C. PROGRESS UPSTREAM WITH ROLL.
TEMPORARILY STAKE MAT UNDER MODERATE TENSION.
NOTES:
1. START AT DOWNSTREAM TERMINAL AND PROGRESS UPSTREAM.
2. FIRST ROLL IS CENTERED LONGITUDINALLY IN MID-CHANNEL AND
PINNED WITH TEMPORARY STAKES TO MAINTAIN ALIGNMENT.
3. SUBSEQUENT ROLLS FOLLOW IN STAGGERED SEQUENCE BEHIND
THE FIRST ROLL. USE THE CENTER ROLL FOR ALIGNMENT TO THE
CHANNEL CENTER.
4. WORK OUTWARDS FROM THE CHANNEL CENTER TO THE EDGE.
5. USE 3" OVERLAPS AND STAKE AT 5' INTERVALS ALONG THE
SEAMS.
6. USE 3' OVERLAPS AND SHINGLE DOWNSTREAM TO CONNECT THE
LINING AT THE ROLL ENDS.
Ss
FLOW
SOD DIRECTIONS
DIRECTION OF FLOW
DIRECTION OF FLOW
SODDED WATERWAYS
SOD AREA
SWALE/WATERWAY
PEG DETAIL
NETTING DIRECTIONS
IN CRITICAL AREAS, SECURE SOD WITH
NETTING USING STAPLES.
PEG OR STAPLE
LAY NET WITH THE DIRECTION OF FLOW.
LAY SOD ACROSS THE DIRECTION OF FLOW.
SOD
SOD NETTING
6"-10"
USE PEGS OR STAPLES TO FASTEN SOD
FIRMLY -- AT THE ENDS OF STRIPS AND
IN THE CENTER, OR EVERY 3-4 FEET IF
THE STRIPS ARE LONG. WHEN READY TO
MOW, DRIVE PEGS OR STAPLES FLUSH
WITH THE GROUND.
BUTTING: ANGLED ENDS CAUSED BY THE AUTOMATIC
SOD CUTTER MUST BE MATCHED CORRECTLY.
LAY SOD IN A STAGGERED PATTERN. BUTT THE STRIPS
TIGHTLY AGAINST EACH OTHER. DO NOT LEAVE SPACES
AND DO NOT OVERLAP. A SHARPENED MASON'S
TROWEL IS A HANDY TOOL FOR TUCKING DOWN THE
ENDS AND TRIMMING PIECES.
SHOOTS OR GRASS BLADES: GRASS
SHOULD BE GREEN AND HEALTHY, MOWED
AT A 2"-3" CUTTING HEIGHT.
CORRECTINCORRECT
Step 3.
Step 2.
Step 1.
SOD LAYOUT AND PREPARATION
DIRECTIONS FOR INITIAL MAINTENANCE
APPEARANCE OF GOOD SOD
SOD MAINTENANCE AND INSTALLATION
MOW WHEN THE SOD IS ESTABLISHED -- IN 2-3 WEEKS. SET THE MOWER
HIGH (2"-3").
WATER TO A DEPTH OF 4" AS NEEDED. WATER WELL AS SOON AS THE SOD
IS LAID.
ROLL SOD IMMEDIATELY TO ACHIEVE FIRM CONTACT WITH THE SOIL
ROOT ZONE: SOIL AND ROOTS.
SHOULD BE 1/2"-3/4" THICK WITH
DENSE ROOT MAT FOR STRENGTH.
THATCH: GRASS CLIPPINGS AND DEAD
LEAVES (UP TO 1/2" THICK).
Ds4
CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
NOTES:
1. AVOID LOCATING ON STEEP SLOPES OR AT CURVES ON PUBLIC ROADS.
2. REMOVE ALL VEGETATION AND OTHER UNSUITABLE MATERIAL FROM THE FOUNDATION AREA, GRADE, AND
CROWN FOR POSITIVE DRAINAGE.
3. AGGREGATE SIZE SHALL BE IN ACCORDANCE WITH NATIONAL STONE ASSOCIATION R-2 (1.5"-3.5" STONE).
4. GRAVEL PAD SHALL HAVE A MINIMUM THICKNESS OF 6".
5. PAD WIDTH SHALL BE EQUAL FULL WIDTH AT ALL POINTS OF VEHICULAR EGRESS, BUT NO LESS THAN 20'.
6. A DIVERSION RIDGE SHOULD BE CONSTRUCTED WHEN GRADE TOWARD PAVED AREA IS GREATER THAN 2%..
7. INSTALL PIPE UNDER THE ENTRANCE IF NEEDED TO MAINTAIN DRAINAGE DITCHES.
8. WHEN WASHING IS REQUIRED, IT SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT
DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN (DIVERT ALL SURFACE RUNOFF AND
DRAINAGE FROM THE ENTRANCE TO A SEDIMENT CONTROL DEVICE).
9. WASHRACKS AND/OR TIRE WASHERS MAY BE REQUIRED DEPENDING ON SCALE AND CIRCUMSTANCE. IF
NECESSARY, WASHRACK DESIGN MAY CONSIST OF ANY MATERIAL SUITABLE FOR TRUCK TRAFFIC THAT
REMOVE MUD AND DIRT.
10.MAINTAIN AREA IN A WAY THAT PREVENTS TRACKING AND/OR FLOW OF MUD ONTO PUBLIC
RIGHTS-OF-WAYS. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES
USED TO TRAP SEDIMENT.
6" MIN.
6" MIN.
M
I
N
M
I
N
FLOW
FLOW
ENTRANCE ELEVATION
CULVERT UNDER
ENTRANCE(IF NEEDED)
DIVERSION RIDGE
(SEE NOTE 6)
N.S.A R-2 (1.5"-3.5")
COARSE AGGREGATE
GEOTEXTILE UNDERLINER
TIRE WASHRACK AREA/
TIRE WASHERS
SUPPLY WATER TO
WASH WHEELS IF
NECESSARY
GEOTEXTILE UNDERLINER
COARSE AGGREGATE
ORIGINAL
GRADE
HARD SURFACE
PUBLIC ROAD
SEDIMENT TRAP
(SEE NOTE 8)
Co
SILT FENCE - TYPE NON-SENSITIVE
SIDE VIEW
FLOW
18" MIN.
32" MIN.
30"
6"
2"
6' MAX. O.C.
FABRIC
TRENCH
6"
18" MIN.
30" MIN.
FRONT VIEW
NOTES:
1. USE STEEL OR WOOD POSTS OR AS SPECIFIED BY THE EROSION, SEDIMENTATION,
AND POLLUTION CONTROL PLAN.
2. HEIGHT (*) IS TO BE SHOWN ON THE EROSION, SEDIMENTATION, AND POLLUTION
CONTROL PLAN.
Sd1-NS
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL
DETAILS
C5
10/20/25
NOTES:
1. Temporary concrete washout facilities shall be located a minimum of 50 ft from storm drain inlets, open drainage facilities, and watercourses, unless determined infeasible. Each facility shall be located away from construction traffic or access areas to prevent disturbance or tracking.
2. A sign shall be installed adjacent to each washout facility to inform concrete equipment operators to utilize the proper facilities.
3. Temporary concrete washout facilities shall be constructed and maintained in sufficient quantity and size to contain all liquid and concrete waste generated by washout operations.
4. Temporary washout facilities shall have a temporary pit or bermed areas of sufficient volume to completely contain all liquid and waste concrete materials generated during washout procedures.
5. Perform washout of concrete mixer trucks in designated areas only.
6. Wash concrete only from mixer truck shootschutes into concrete wash outapproved concrete washout facility. Washout may be collected in an impermeable bag for disposal.
7. Pump excess concrete in concrete pump bin back into concrete mixer truck.
8. Concrete washout from concrete pumper bins can be washed into concrete pumper trucks and discharged into designated washout area or properly disposed offsite.
9. Transit trucks are not to be washed at concrete washout.
10. Once concrete wastes are washed into the designated area and allowed to harden, the concrete shall be broken up, removed, and disposed of per state and local regulations.
11. On site concrete waste storage and disposal procedures shall be monitored at least weekly.
12. When temporary concrete washout facilities are no longer required for the work, the hardened concrete shall be removed and disposed of in conformance with state and local regulations.
13. Holes, depressions or other ground disturbance caused by the removal of the temporary concrete washout facilities shall be backfilled and repaired.
TEMPORARY ON-SITE CONCRETE TRUCK WASH
WOOD OR METAL
STAKES (2 PER BALE)
STAPLES
(2 PER BALE)
STRAW BALE
10mil PLASTIC LINING
NATIVE MATERIAL
(OPTIONAL)
BINDING WIRE
9' (min)
9" (min)
10 mil PLASTIC LINING
STRAW BALE
(TYP)
200 mm
50 mm
3.05 DIA.
STEEL WIRE
36"
36"
PLYWOOD
24" x 48"
PAINTED WHITE
BLACK LETTERS
6" HEIGHT
LAG SCREWS
(12.5 mm)
WOOD POST
(4"x4"x96")
STAKE
(TYP)
SECTION B-B
NOT TO SCALE
PLAN
NOT TO SCALE
CONCRETE WASHOUT
SIGN DETAIL
(OR EQUIVALENT)
STAPLE DETAILTYPE: ABOVE GRADE
WITH STRAW BALES
NOTES:
1. ACTUAL LAYOUT DETERMINED IN THE FIELD.
2. THE CONCRETE WASHOUT SIGN SHALL BE
INSTALLED WITHIN 10 m OF THE TEMPORARY
CONCRETE WASHOUT FACILITY.
CONCRETE
WASHOUT
nitrate (or equivalent) when plants are 2 to 4 inches tall.
__________ at a rate of____lbs. per acre greater than___percent will be mulched immediately
C. Other Requirements or Exceptions perennial seed shall be sown in areas where a temporary at the rate of tons per acre every 4 to 6 years. The area may be mowed at proper season to control vegetation.
wheat or rye may be established. As sson as it is practical, seeding perennial seed has expired, a temporary cover of operation, no hay mulch is required. When the season for
Where liquid plastic materials are used with the hydroseeding seeded or sodded areas with cultipacker or roller sprigs and keep them cool and moist until planted. Firm inches. If the area is to be sprigged, plant only freshly dug over the area and covered to a depth of about _____
(SEE SEEDING SCHEDULE). Seed will be distributed uniformly
4. Mulching: Pond spillways and all seeded areas with slopes
Second year application of pounds of analysis fertilizer per acre and topdress with pounds of ammonium nitrate per acre. Apply agricultural limestone gallons emulsion mixed with 100 gallons water for each ton emulsified asphalt (grade AE5 or SS1) at a rate of 100 packer or disk harrow with the blades set straight or with ground surface. When feasible, anchor mulch with a per acre or to cover approximately____percent of the from competing weeds, at the rate of about___tons after seeding by spreading uniformly dry straw or hay, free
3. Seeding: All areas will be seeded with ______ cover has been sown.
B. Management of mulch.
immediately following planting.
or appropriate seasonal grass
FESCUE
6-12-12
TALL
present. Remove rocks, roots, and other objects that will hydroseeded. Lime must be included in initial seedbed preparation preparation and mix thoroughly with the soil. Apply fertilizer (or equivalent) per acre. Spread lime and fertilizer uniformly over all areas immediately before final land
2. Fertilizer: Apply_____pounds of __________ analysis interfere with vegetation establishment or maintenance operations. No seedbed preparation is needed where least 4 inches on all areas where a good seedbed is not
1. Seedbed Preparation: Prepare seedbed to depth of at
VEGETATIVE PLAN FOR AREAS DISTURBED
All bare areas resulting from construction operations will be established to perennial vegetation as soon as possible after final minimum coverage of 2 tons per acre
DURING CONSTRUCTION
topdressing of _______ pounds per acre of ammonium grading is complete.
A. Initial Treatment
6-12-12
# PER 1000
YEAR TWO
AT PLANTING
YEAR TWO
AT PLANTING
AT PLANTING
YEAR TWO
6-12-12
6-12-12
10-10-10
0-10-10
6-12-12
6-12-12
6-12-12
1000 25
YEAR TWO
AT PLANTING
AT PLANTING
AT PLANTING
YEAR TWO
YEAR
0-10-10
6-12-12
6-12-12
# PER
ACRE
ANALYSIS
6-12-12
6-12-12
SQ. FT.
50-100
50-100 1.2-2.3
1.2-2.3
50-100
0-50
1.2-2.3
0-1.2
50-100
50-100
1.2-2.3
1.2-2.3
# PER 1000# PER
ACRE
50-100
50-100
SQ. FT.
1.2-2.3
1.2-2.3
BROWNTOP MILLET
CROWNVETCH
WEEPING LOVEGRASS
RYE GRAIN
RYE GRAIN
TABLE 3. FERTILIZER RATES
COMMON BERMUDA (UNHULLED)
RYE GRAIN
TALL FESCUE
TALL FESCUE
RYE GRAIN
TALL FESCUE
PLANTING OPTIONS
APPALOW LESPEDEZA (SCARIFIED)
SUNFLOWER "AZTEC MAXIMILLIAN"
APPALOW LESPEDEZA (UNSCARIFIED)
1000 256-12-12
YEAR TWO
AT PLANTING
YEAR TWO
AT PLANTING
YEAR TWO
10-10-10
6-12-12
6-12-12
6-12-12
AT PLANTING
6-12-12 1500 35
1.2-2.350-100
50-100
50-100
50-100
50-100
1.2-2.3
1.2-2.3
1.2-2.3
1.2-2.3
50-100 1.2-2.3
COMMON BERMUDA (HULLED)
BROWNTOP MILLET
TALL FESCUE
WEEPING LOVEGRASS
WEEPING LOVEGRASS
YEAR TWO
but marginal dates.)
M-L
J F M A M J J A S O N D
Planting Dates by Resource Areas
(Solid lines indicate optimum dates, dotted lines indicate permissable
Planting Dates
M-L
800 sprigs.
cubic feet or approximately
A bushel contains 1.25 approximately 650 sprigs.
Remarks
A cubic foot contains or
Broadcast
sq. ft.
Species
Coastal, Common, Midland, or Tift 44
BERMUDA SPRIGS
(Cynodon dactylon)
Per Per
Acre 1000
Rates 1/ - PLS 2/ spd plugs 3' x 3'
40 cu. ft. 0.9 cu. ft.
60 lbs. 1.4 lb
30 lbs. 0.7 lb with other perennials
(Paspalum notatum)
BAHIA, WILMINGTON
temorary cover alone or with
Ds3
Area 3/
Resource
PLANTS, PLANTING RATES, AND PLANTING DATES FOR PERMANENT COVER
Grows similar to Tall fescue.
J F M A M J J A S O N D
M-L
30 cu. ft. 0.7 cu. ft.
50 cu. ft. 1.1 cu. ft.
M-L
J F M A M J J A S O N D
M-L
J F M A M J J A S O N D
J F M A M J J A S O N D alone
GRASS
athletic fields.
Northward.
Use from North Atlanta and
Inoculate seed with M inoculant.
of Tall fescue or 15 pounds of rye.
to late fall. Mix with 30 pounds pink, and white blossoms spring fire resistant. Attractive rose, 100,000 seeds per pound. Dense growth. Drought tolerant and
227,000 seeds per pound. Use alone only on better sites.
Not for droughty soils. Mix with perennial lespedezas or
Crownvetch. Apply topdressing
Not for heavy use areas or in spring following fall plantings.
J F M A M J J A S O N D with other perennials
REED CANARY
(Phalaris arundinacea)
3/ M-L represents to Mountain; Blue Ridge; and Ridges and Valleys MLRAs.
2/ PLS is an abbreviation for Pure Live Seed.
1/ Reduce seeding rates by 50% when drilled.
30lbs 0.7 lb.
15 lbs. 0.3 lb
50lbs 1.1 lb.
CROWNVETECH
(Coronilla varia) with wintert seasons grasses annuals or cool
FESCUE, TALL
(Festuca arundinacea) alone with other perennials
Tift 78 or Tift 44
Coastal, Common, growing. Sod froming. Slow to
166,000 seed per pound. Low crop. Will spread into bermuda establish. Plant with a companion pastures and lawns.
Mix with Sericia lespedeza or weeping lovegrass.
227,000 seed per pound. Dense cover. Very competitive in
55,000 seed per pound. Good recommended for mixtures.
mixtures.
on droughty sites. Not dense cover. May reach 5 feet on productive soils. Not as winterhardy as rye or barley cover. Drought tolerant and
18,000 seed per pound. Quick in height. Not recommended
13,000 seed per pound. Use winterhardy.
for mixtures.
88,000 seed per pound. Quick
Remarks
(Sorghum sudanese)
SUDANGRASS
in mixtures alone alone
10 lbs. 0.2 lb
40 lbs. 0.9 lb
60 lbs. 1.4 lb
M-L dotted lines indicate permissable
(Solid lines indicate optimum dates, (128 lbs.)
Rates 2/ - PLS 3/
(168 lbs.)
(Secale cereale)
RYEGRASS, ANNUAL
(Lolium temulentum)
RYE
alone in mixtures
(Avena sativa)
OATS
alone in mixtures alone
Species
(Pennesetum glaucum)
MILLET, PEARL
Ds1
Ds2
1/2 bu. 0.6 lb
3 bu. 3.9 lb
(28 lbs.)
M-L
M-L
50 lbs. 1.1 lb
1 bu. 0.7 lb
(32 lbs.)
4 bu. 2.9 lb
M-L
Resource
Acre 1000
sq. ft.
Per Per
Area
M-L
Broadcast but marginal dates.)
J F M A M J J A S O N D
Planting Dates
Planting Dates by Resource Areas
DISTURBED AREA STABILIZATION (WITH MULCHING ONLY) - 4 INCH MINIMUM COVERAGE
J F M A M J J A S O N D
J F M A M J J A S O N D
J F M A M J J A S O N D
PLANTS, PLANTING RATES, AND PLANTING DATES FOR TEMPORARY COVER OR COMPANION CROPS
J F M A M J J A S O N D
Cw
NOTES:
1. STOCKPILED TOPSOIL WILL BE COVERED WITH PLASTIC OR
STRAW.
2. DEPENDING ON LOCATION, SILT FENCE MAY BE REQUIRED ON
DOWNSTREAM SIDE OF STOCKPILE AREA
Tp
Du DUST CONTROL
NOTES:
1. The generation of dust during grading operations will be controlled by the use of temporary vegetation and mulching in disturbed areas.
2. In an emergency situation, the site should be sprinkled with water until the surface is wet. This process should be repeated as necessary.
3. All disturbed areas must be grassed with permanent vegetation within 14 days of achieving finished grade.
STONE CHECK DAM
CROSS SECTION
MINIMUM 9"
24" MAXIMUM
24" MAXIMUM
NOTES:
1. CHECK DAMS ARE TO BE USED ONLY IN SMALL OPEN CHANNELS (THEY ARE NOT TO
BE USED IN LIVE STREAMS).
2. THE DRAINAGE AREA FOR STONE CHECK DAMS SHALL NOT EXCEED TWO ACRES.
3. THE CENTER OF THE CHECK DAM MUST BE AT LEAST 9 INCHES LOWER THAN THE
OUTER EDGES.
4. THE DAM HEIGHT SHOULD BE A MAXIMUM OF 2 FEET FROM CENTER TO RIM EDGE.
5. THE SIDE SLOPES OF THE CHECK DAM SHALL NOT EXCEED A 2:1 SLOPE.
6. GEOTEXTILE SHALL BE USED TO PREVENT THE MITIGATION OF SUBGRADE SOIL
PARTICLES INTO THE STONES (REFER TO AASHTO M288-96, SECTION 7.3, TABLE 3).
PROFILE VIEW
STONE CHECK DAM
SPACING BETWEEN CHECK DAMS
L
A B
A = THE TOE OF THE UPSTREAM CHECK DAM.
B = TOP OF THE DOWNSTREAM CHECK DAM.
L = THE DISTANCE SUCH THAT POINTS A AND
B ARE OF EQUAL ELEVATION.
Cd-S
SEEDING NOTE: IF PERMANENT
VEGETATION IS REQUIRED BEFORE
SEPTEMBER 15, USE THE APPROPRIATE
SEED AND FERTILIZER FROM THE
CHARTS.
2"-10" STONE
GENERAL - This vegetative plan will be carried out on road cut and fill slopes, shoulders, and other critical areas created by construction and land disturbance activities.
Seeding will be done as s oon as construction in an area is completed. Plan tings will be made to control erosion, to reduce damages from sedim ent and runoff to downstream areas, and to improve the safety and beauty of the development area.
subsoil and substrata. Fertility is low and the physical characteristics of the exposed material are unfavorable to all but the most hardy plants.
TREATMENT SPECIFICATIONS
A. Hydroseeding. When hydraulic seeding and fertilizing equipment is used, no grading and shaping or seedbed preparation will be required. The fertilizer, seed and wood cellulose fiber mulch will b e mixed with water and ap plied in a slurry. All slurr y ingredients must be combined to form a homogeneous mixture, and sprea d uniformly over the area, leaving about 25% of the ground surface exposed.
B. Hand seeding. Grade, shape and smooth where needed to provide for safe equipment operation at seeding time an d for maintenance purposes.
The lime and fertilizer in dry form will be spread uniformly over the area immediately before seedbed preperation.
A seedbed will be done with cultipacker-seeder, drill, rotary seeder or other
SOIL CONDITIONS - Due to grading and construction, the areas to be treated are mainly mechanical or hand seeder. Seed will be distributed uniformly over a freshly prepared seedbed and covered lightly.
Within 24 hours after seedin g, straw or hay mulch will be spread uniformly over the area, leaving about 25% of the ground surface exp osed.
Mulch will be spread with blower-type mulch equipment or by hand and anchored immediately after it is spread. A disk harrow with the disk set straight or a special packer disk may be used to press the mulch into the soil.
PREPARATION APPLICATION RATES
Agricultural limestone: 4000 lbs/acre Fertilizer 5-10-15: 1500 lbs/acre
Mulch, straw or hay: 5000 lbs/acre Fiber mulch: 1000 lbs/acre **
** required only on hydroseeding operations
TOPDRESSING: To be applied when plants are 2-4 inches. Fertilize 300 lbs/acr e
SECOND YEAR FERTILIZER
0-20-20 or equivalent: 500 lbs/acre (hydro seeding) or 5-10-15 800 lbs/acre
SEED SPECIES OPTIONS AND PLANTING DATES
Bermuda: 10 lbs/acre : 3/1 to 6/15 Lovegrass: 4 lbs/acre : 3/1 to 6/15
Sericia lespedeza: 60 lbs/acre 3/1 to 6/15
Fescue: 50 lbs/acre : 6/15 to 2/28 Rye: 50 lbs/acre : 11/1 to 2/18
CRITICAL AREA VEGETATIVE PLAN
Ds3 Ds3
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL
DETAILS
C6
10/20/25
NOTES:
1. DESIGN IS FOR SLOPES NO GREATER THAN 5%
(NOT DESIGNED FOR CONCENTRATED FLOWS).
2. THE STEEL POSTS SUPPORTING THE SILT FENCE
MATERIAL SHOULD BE SPACED EVENLY AROUND
THE PERIMETER OF THE INLET (MAXIMUM OF 3'
APART).
3. THE STEEL POSTS SHOULD BE SECURELY DRIVEN
AT LEAST 18" DEEP.
4. THE FABRIC SHOULD BE ENTRENCHED AT LEAST
12" AND THEN BACKFILLED WITH CRUSHED STONE
OR COMPACTED SOIL.
3' MIN.
FABRIC WITH WIRE-BACKING SUPPORT
GATHER EXCESS AT CORNERS
WIRE-BACKING
*FABRIC ENTRENCHED AT
LEAST 12" AND BACKFILLED
WITH CRUSHED STONE OR
COMPACTED SOIL.
BURIED FABRIC
STAKE
CRUSHED STONE OR COMPACTED SOIL
12" MIN.
DROP INLET WITH GRATE
18" MIN.
FABRIC AND SUPPORTING FRAME FOR
1.5' MAX.
3' MAX.
3' MAX.
STEEL FRAME AND SILT FENCE INSTALLATION
INLET PROTECTION
Sd2-F
GEOTEXTILE FABRICS
STONE/SOIL INTERFACE
CONTECH FILTER FABRIC
(OR APPROVED EQUAL
PER GDOT QUALIFIED PRODUCT LIST #28)
PROPEX GEOTEX 102F FOR WOVEN FABRIC
PROPEX GEOTEX 351 FOR NON-WOVEN FABRIC
TURF REINFORCEMENT MAT
PROPEX TRM
(OR APPROVED EQUAL
PER GDOT QUALIFIED PRODUCT LIST #49)
PROPEX LANDLOK 450 FOR DITCH FLOWS UP TO 18fps AND
SLOPES 3:1 AND FLATTER
PROPEX PYRAMAT 75 FOR DITCH FLOWS UP TO 25fps AND
SLOPES GREATER THAN 3:1
Sd2-P
FILTREXX® 8" SOXX™
CURB
EXCESS SOXX™ MATERIAL TO
BE DRAWN IN AND TIED OFF TO
2x2 WOODEN STAKE, (TYP.)
SECURE SOXX™ TO GRATE WITH
RUBBER TIE DOWNS
CURB
FILTREXX® 8" SOXX™
DRAIN INLET SECTION
CURBSIDE OPTION "B" PLAN
FILTREXX® INLET PROTECTION
NTS
CURB
FILTREXX® 8" SOXX™
STORM GRATE
STORM GRATE
WIRE TIES, (TYP.)
CURBSIDE OPTION "A" PLANDRAIN INLET PLAN
NOTES:
1. ALL MATERIAL TO MEET FILTREXX® SPECIFICATIONS.
2. FILTER MEDIA™ FILL TO MEET APPLICATION REQUIREMENTS.
3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER.
EXCESS SOXX™ MATERIAL TO
BE DRAWN IN AND TIED OFF TO
2x2 WOODEN STAKEFILTREXX® 8" SOXX™
CATCH
BASINCATCH
BASIN
CURBSIDE SECTION
SLOPER INTERRUPTERSd1-NS
FILTREXX IS AN APPROVED ALTERNATE
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
SOIL EROSION
SEDIMENTATION
AND POLLUTION
CONTROL
PLAN
C7
10/20/25
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
C.C. PADIO
COVERED
C.C. WALK
C.C. WALK
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
SIGN
BRICK
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
N
I
T
A
W
S
E
M
E
N
T
LOCATION FOR UG
STORMWATER STORAGE
-REMOVE & REPLACE
±3,000sf OF ASPHALT
-REMOVE & REPLACE
±94lf OF CURB &
GUTTER
SEE ARCHITECTURAL PLANS
FOR DEMOLITION ASSOCIATED
WITH THE BUILDING
RELOCATE
WATER LINE
REMOVE SIGN
REMOVE
CONCRETE
FLUME
SAW-CUT AND
REMOVE ±96'x2'
WIDE FOR VALLEY
GUTTER
SAW-CUT AND REMOVE
CURB & GUTTER AND
ASPHALT FOR STORM
SEWER. CONTRACTOR
TO FIELD DETERMINE
TRENCH WIDTH.
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
DEMOLITION NOTES
1. THE SITE IS OCCUPIED BY EXISTING BUILDINGS, STORM LINES, PAVEMENT,
POWER POLES AND UTILITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO
CONTACT ALL UTILITY COMPANIES THAT MAY HAVE UTILITIES ON THE SITE TO GET
A DETERMINATION IF ANY UTILITIES EXIST THAT WILL BE IMPACTED AND DETERMINE
THE REQUIRED PROCEDURE FOR ABANDONMENT OF THE EXISTING UTILITIES.
2. EXISTING PAVEMENT, BUILDING SLABS AND FOOTINGS SHALL BE REMOVED
FROM THE SITE AND DISPOSED IN A WASTE DISPOSAL AREA AS APPROVED BY
LOCAL AND STATE ORDINANCE.
3. STORM SEWER AND SANITARY SEWER LINES IN ALL PROPOSED BUILDING AND
PAVEMENT AREAS SHALL BE DEMOLISHED AND REMOVED FROM SITE.
4. UTILITY LINES SHALL BE DEMOLISHED AND REMOVED FROM THE SITE.
5. THE ENTIRE "BUILDING AREA" SHALL BE CLEANED OF ALL EXISTING PAVEMENT,
BUILDING SLABS, FOOTINGS AND FOUNDATIONS, UTILITIES AND SEWERS. NO
EXISTING FACILITIES SHALL BE LEFT UNDER BUILDING AREA.
6. ALL AREAS WHERE PAVEMENT, BUILDING SLABS, FOUNDATIONS, UTILITIES,
CONDUITS, AND/OR UTILITY STRUCTURES HAVE BEEN REMOVED SHALL BE
BACKFILLED WITH SELECT BACKFILL MATERIAL. ALL SELECT BACKFILL MATERIAL
SHALL BE PLACED AND COMPACTED PER THE REQUIREMENTS OF THE
SPECIFICATIONS AND THE ON-SITE GEOTECHNICAL ENGINEER.
7. EXISTING SEPTIC TANKS SHALL BE PUMPED BY A LICENSED CONTRACTOR. ALL
SEPTIC TANKS AND DRAIN FIELD LINES SHALL BE REMOVED AND THE AREAS
BACKFILLED WITH SELECT MATERIALS PER THE ON-SITE GEOTECHNICAL ENGINEER
PER HEALTH DEPARTMENT AND STATE REGULATIONS.
8. EXISTING WELLS SHALL BE BACKFILLED PER GA ENVIRONMENTAL PROTECTION
DIVISION REQUIREMENTS AND INSPECTED BY LOCAL COUNTY JURISDICTION
ENVIRONMENTAL HEALTH.
9. ALL EXISTING FENCES LOCATED ON-SITE SHALL BE DEMOLISHED AND REMOVED.
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
EXISTING
CONDITIONS
AND
DEMOLITION
PLAN
C8
10/20/25
FLAGPOLE
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
TWO STORY BUILDING
HANDICAP
HANDICAP
HANDICAP
HANDICAP
F
O
N
T
T
B
A
C
K
B
V
R
I
A
N
C
E
F
O
N
T
T
B
A
C
K
NEW 24" VALLEY
GUTTER
N
I
T
A
W
S
E
M
E
N
T
NEW SIGN
PROPOSED PATIO ADDITION
(SEE ARCHITECTURAL PLAN)
SITE NOTES
1. ALL WORK WILL COMPLY WITH APPLICABLE STATE, FEDERAL, AND LOCAL
CODES, SPECIFICATIONS AND REQUIREMENTS. ALL NECESSARY LICENSES AND
PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE.
2. DEVIATIONS FROM THESE PLANS AND NOTES WITHOUT PRIOR CONSENT OF
THE OWNER, HIS REPRESENTATIVE, OR THE ENGINEER MAY CAUSE THE WORK
TO BE UNACCEPTABLE.
3. THIS SET OF DRAWINGS IS INTENDED TO COVER A COMPLETE PROJECT, READY
TO USE. ALL ITEMS NECESSARY FOR A COMPLETE AND WORKABLE JOB
SHALL BE FURNISHED AND INSTALLED. THIS WILL INCLUDE ALL STRIPING AND
PARKING LOT SIGNAGE.
4. CONTRACTOR SHALL FURNISH AND MAINTAIN ANY AND ALL NECESSARY
BARRICADES AROUND THE WORK FOR THE PROTECTION OF THE PUBLIC AND
CONSTRUCTION EMPLOYEES AND PROVIDE PROTECTION AGAINST WATER
DAMAGE AND SOIL EROSION.
5. ALL BUILDING DIMENSIONS SHALL BE CHECKED AND COORDINATED WITH THE
ARCHITECTURAL PLANS.
6. FOR OTHER CONSTRUCTION DETAILS, SEE DETAIL SHEETS.
7. ALL SITE DIMENSIONS ARE TO THE FACE OF CURB OR EDGE OF PAVEMENT,
EXCEPT WHERE NOTED.
8. ALL ON SITE CURB SHALL BE 24" CURB & GUTTER OR 18" VERTICAL CURB.
9. ALL WORK ON-SITE MUST CONFORM TO LOCAL COUNTY JURISDICTION
STANDARDS.
10. SEE DETAILS FOR PAVING SECTIONS.
11. PAVEMENT MARKING, INCLUDING STANDARD HANDICAP SYMBOLS, PARKING
STRIPING AND TRAFFIC ARROWS, SHALL BE PAINTED ON PAVEMENT AT
LOCATIONS SHOWN. SEE PAVEMENT MARKING DETAIL.
12. SITE CONTRACTOR TO VERIFY EXISTING TOPOGRAPHIC AND UTILITY DATA
PRIOR TO ANY CONSTRUCTION.
13. PROVIDE BOLLARDS AT LOCATIONS SHOWN, AND AROUND TRANSFORMERS,
GAS METERS, AND OTHER UTILITIES IN VULNERABLE TRUCK AREAS.
14. WARRANTY:THIS SUBCONTRACTOR SHALL WARRANT ALL ASPHALT AGAINST
ALL DEFECTS IN MATERIALS AND WORKMANSHIP FOR A PERIOD OF TWO(2)
YEARS.
15. CONTRACTOR MUST OBTAIN ENCROACHMENT PERMIT FROM LOCAL COUNTY
JURISDICTION PUBLIC WORKS PRIOR TO BEGINNING ANY WORK IN THE
RIGHT-OF-WAY.
CONCRETE
HEAVY DUTY PAVING
EXISTING FEATURES SCREENED
PARKING BAY COUNT
TRAFFIC FLOW
PROPOSED PROPERTY LINE
EXISTING PROPERTY LINE
STRIPING
SITE LEGEND
ADJOINING LOT LINE
CHAIN LINK FENCING
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
24" VALLEY GUTTER
SCALE:NTS
(VLYGTR)
6"
24"
4"
AGGREGATE BASE
BITUMINOUS CONCRETE PAVEMENT
CONCRETE VALLEY GUTTER TYP.
EXPANSION JOINT
SECTION
SHEET NO.
DRAWING TITLE
10/20/25
JOB NO.
REVISIONS
DRAWN BY
DATE
RAE 24-018
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
SITE PLAN
C9
FF
SSMH
SWMH
SSMH
FLAGPOLE
SSMH
TOP= 777.3
2.
TOP=797.3
3.
TOP=782.6
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
FF
6.
SSMH
TOP 802.27SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
IN 796.27
OUT 796.17
INV= 758.65
OUT 768.5
IN= 773.5
IN= 768.6
INV= 790.65
SS
SS
SS
SS
SS
C.C. FLUME
8" S
AN
S
EW
ER
L
IN
E
8" SAN SEWER LINE
SS
SS
SS
IN= 805.8
OUT 805.7
TOP= 782.2
INV= 780.15
TOP= 783.3
INV= 780.0
TOP= 781.2
INV= 776.8
TOP=792.9
OUT 775.9
36" RCP
24" RCP
18" RCP
" R
C P
" R
C P
42" RCP
" R
C P
18" RCP
" R
CP
G
UI
DE
W
IR
E
BOOK
RETURN
BOX
WAUGH STREET 84' R/W
C
AP
PE
S
ST
R
EE
T
' R
/W
WATER VALVE
WATER VALVE
WW
W
W W
WWWW
W W
AP
PR
O X.
L O
C
AT
IO
N
W
AT
ER
L
IN
ES
WATER VALVE
WATER VALVE
APPROX. LOCATION WATER LINES
W
ATER
VALVE
W
ATER
M
ETER
W W
C.C. FLUME
RIP RAP DITCH
24" RCP
APPROX. LOCATION WATER LINES
TOP= 800.0
OUT 790.25
IN= 790.4
18" RCP
TOP= 791.0
OUT 768.85
IN= 769
O
VE
RH
EA
D
PO
W
ER
OVERHEAD POWER
TWO STORY BUILDING
5 80
RETAINER WALLS
R
ET
AI
N
ER
W
AL
L
1.
794.67 79 4.
0.
8.
8.
5.
2.
1.
H
Y
D
W
PP
PP
PP
PP
CONTECH CS-4 WATER
QUALITY TREATMENT
UNIT WITH GRATE
TOP=793.85
UNDERGROUND
CHAMBERS
(SEE DETAIL)
24" VALLEY
GUTTER
BYPASS
SWALE
N
I
T
A
W
S
E
M
E
N
T
A1
MANHOLE OVER
EXISTING PIPE
TOP=±783.8
INV=MATCH
EISTING PIPE
A2
MANHOLE
TOP=±789.4
INV(IN)=785.00
INV(OUT)=782.40
A3
OUTLET STRUCTURE
MANHOLE
TOP=±794.0
INV=788.00
45LF-15"HDPE
@6.67%
48LF-15"HDPE
@5.00%
790.00
790.00
B1
18" HDPE
CONNECT TO CATCH BASIN
INV=777.24
B5
WEIR INLET
THR=794.00
INV=790.00
FIELD LOCATE
DROP INLET AND
REMOVE DEBRIS
13LF-18"HDPE
@2.00%
B2
MANHOLE
TOP=781.50
INV=777.50
63LF-18"HDPE
@3.50%
182LF-18"HDPE
@5.00%
B3
MANHOLE
TOP=787.50
INV=779.70
TOP=779.7
OUT= 774.0
TOP=776.7
OUT= 772.7
TOP=780.2
INV = 775
CONNECT
DOWNSPOUTS TO
THIS MANHOLE
SEE EROSION CONTROL PLANS
FOR CONSTRUCTION PHASING
FF=±796.0
795.50
795.50
B4
WEIR INLET
THR=795.25
INV=788.80
24LF-18"HDPE
@4.17%
EXISTING CONTOUR
GRADING & DRAINAGE LEGEND
RIP-RAP
PROPOSED CONTOUR
PROPOSED STORM INLET
PROPOSED STORM SEWER
PROPOSED CURB
PROPERTY LINE
PROPOSED SPOT ELEVATION
EXISTING SPOT ELEVATION
EXISTING STORM SEWER
700.00
715.92
DROP INLET DI
SAFETY END SECTION
HEADWALL HDWL
REINFORCED CONCRETE PIPE RCP
CORRUGATED METAL PIPE CMP
SES
JUNCTION BOX JB
EXISTING FEATURES ARE SCREENED
SOIL BOUNDARY
1. AT THE COMPLETION OF CONSTRUCTION, ALL SEDIMENT AND
DEBRIS SHOULD BE REMOVED FROM THE POND & STRUCTURES AND
ALL TEMPORARY STRUCTURES REMOVED. THE UNDERCUT AREA
SHOULD BE BACKFILLED WITH ACCEPTABLE MATERIAL AND A LAYER OF
TOP SOIL, AND GRASSED WITH PERMANENT VEGETATION.
2. A VISUAL INSPECTION SHOULD BE PERFORMED AFTER THE FIRST
QUALIFYING RAINFALL EVENT TO ENSURE THAT THE ACCUMULATED
WATER IN THE POND HAS DRAWN DOWN OVER A 24-48 HOUR PERIOD.
THE POND SHOULD BE MONITORED REGULARLY TO ENSURE THAT THE
POND AND STRUCTURES CONTINUE TO OPERATE PROPERLY.
3. THE SIDES AND BOTTOM OF THE POND SHOULD BE MOWED
MONTHLY TO LIMIT UNWANTED VEGETATION AND IMPROVE AESTHETICS.
4. THE DEVELOPER ASSUMES ALL RESPONSIBILITY FOR OPERATIONS
AND MAINTENANCE OF THE POND AND ASSOCIATED STRUCTURES.
5. SEE DETAIL ON SHEET C3 FOR MICROPOOL. REMOVE SEDIMENT
FROM MICROPOOL AND FOREBAY WHEN IT REACHES 4 INCHES DEEP.
6. A MAINTENANCE AGREEMENT IS REQUIRED BETWEEN LOCAL
COUNTY JURISDICTION AND THE OWNER.
POND OPERATIONS & MAINTENANCE
GRADING AND DRAINAGE NOTES
1. CONTRACTOR SHALL VERIFY EXISTING TOPOGRAPHIC DATA, LOCATIONS OF
EXISTING UTILITIES, AND ALL OTHER SITE CONDITIONS PRIOR TO BEGINNING
CONSTRUCTION.
2. ALL CUT AND FILL SLOPES SHALL BE 4:1 OR FLATTER (SEE PLANS).
3. THE MICROPOOL AND ALL POND SLOPES SHALL BE STABILIZED WITH CONTECH
TRM C-45 TURF REINFORCEMENT MATTING OR APPROVED EQUAL. ALL OTHER
CUT AND FILL SLOPES STEEPER THAN 3:1 AND GREATER THAN 10 FEET IN
HEIGHT, AND ALL DRAINAGE CHANNELS SHALL BE STABILIZED WITH THE SAME.
4. PLACE 4" OF TOPSOIL OVER THE ENTIRE POND AREA TO SUPPORT
VEGETATION.
5. ALL CONSTRUCTION WITHIN STREET RIGHT-OF-WAY SHALL CONFORM TO
WHITFIELD COUNTY REQUIREMENTS.
6. ALL FINISHED GRADES SHOWN ARE TO THE TOP OF THE PAVEMENT SECTION
OR BOTTOM OF CURB UNLESS OTHERWISE NOTED.
7. CONTRACTOR SHALL CONFINE HIS OFF-SITE ACTIVITIES TO EXISTING RIGHTS OF
WAY AND EASEMENTS.
8. ALL HIGH DENSITY POLYETHYLENE (HDPE) PIPE SHALL BE SMOOTH-LINED AND
MANUFACTURED IN ACCORDANCE WITH AASHTO M-294, TYPE S. ALL JOINTS
SHALL BE WATERTIGHT PER ASTM-D3212. JOINT GASKETS SHALL MEET THE
REQUIREMENTS OF ASTM-F477. INSTALLATION SHALL BE IN ACCORDANCE
WITH SECTION 550 OF THE GEORGIA DOT STANDARD SPECIFICATIONS,
CONSTRUCTION OF ROADS AND BRIDGES.
9. ALL RCP PIPE JOINTS SHALL BE BELL & SPIGOT TYPES WITH A RUBBER
GASKET CONFORMING TO ASTM C-443. THE PIPE SHALL BE MANUFACTURED
IN ACCORDANCE WITH AASHTO M-170 AND/OR ASTM C-76. CLASS OF PIPE
AN WALL THICKNESS SHALL BE IN ACCORDANCE WITH 1030-D, GEORGIA DOT
SPECIFICATION, TABLE NO. 1. INSTALLATION SHALL BE IN ACCORDANCE WITH
SECTION 550 OF THE GEORGIA DOT STANDARD SPECIFICATIONS, CONSTRUCTION
OF ROADS AND BRIDGES.
10. PER LOCAL JURISDICTION DESIGN MANUAL, MINIMUM BEDDING STANDARDS FOR
HDPE AND CMP; STONE BEDDING SHALL BE PLACED TO HALF OF THE PIPE
DIAMETER FOR ALL DEPTHS GREATER THAN 4 FEET, OR IN ACCORDANCE WITH
THE MANUFACTURER'S SPECIFICATIONS, WHICHEVER IS GREATER.
11. FOR THE DOWNSPOUT COLLECTION PIPING, HDPE FITTINGS MAY BE USED IN
PLACE OF MANHOLES IF A METHOD OF CLEANOUT IS PROVIDED AT EACH
BEND. PROVIDE A METHOD OF CLEANOUT AT EACH DOWNSPOUT CONNECTION.
12. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL IMPROVEMENTS PER
LOCAL COUNTY JURISDICTION SPECIFICATIONS AND REQUIREMENTS. THE
CONTRACTOR MUST OBTAIN A COPY OF THE LOCAL STANDARDS PRIOR TO
BIDDING THIS PROJECT. IF THESE PLANS ARE FOUND TO BE OUT OF SPEC,
THE CONTRACTOR SHALL CEASE WORK IMMEDIATELY AND SHALL NOTIFY THE
OWNER WITHIN 24 HOURS.
13. ALL PIPE LENGTHS AND SLOPES ARE SHOWN TO THE CENTER OF THE STORM
STRUCTURE AND ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE EXACT PIPE LENGTHS BASED ON THE TYPE AND SIZE OF
STRUCTURE USED AND THE INLET TOP REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF THE STORM
STRUCTURE BASED ON THE INLET TOP REQUIRED.
14. CONTRACTOR MUST ENSURE THAT ALL DOWNSTREAM DRAINAGE WAYS ARE
CLEAR OF DEBRIS PRIOR TO FINAL INSPECTION BY THE ENGINEER.
COORDINATE WITH NEIGHBORS OR APPROPRIATE RIGHT-OF-WAY AUTHORITY
PRIOR TO BEGINNING WORK OUTSIDE THE BOUNDARY OF THIS SITE.
CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO OFF-SITE PROPERTIES.
15. AN AS-BUILT SURVEY MUST BE PREPARED AND CERTIFIED BY RICHARDS &
ASSOCIATES AND LOCAL COUNTY JURISDICTION APPROVAL WILL BE REQUIRED
AFTER COMPLETION OF THE DETENTION POND. THE POND MUST BE BUILT AS
DESIGNED. ANY DEVIATION FROM THE DESIGN MUST HAVE PRIOR APPROVAL
FROM RICHARDS & ASSOCIATES AND MAY REQUIRE APPROVAL BY LOCAL
COUNTY JURISDICTION.
UG STORAGE:
100YR WATER EL=791.96
100YR WATER STORAGE VOL=3,707cf
1 inch = 30 ft.
( IN FEET )
GRAPHIC SCALE
30 0 15 30 60
(VLYGTR)
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL ENGINEER NO.
26730
LEVEL II CERTIFIED DESIGN
PROFESSIONAL NO. 8688
GRADING
AND
DRAINAGE
PLAN
C10
10/20/25
(VLYGTR)
SHEET NO.
DRAWING TITLE
JOB NO.
REVISIONS
DRAWN BY
DATE
CA
PP
ES
S
TR
O N, G A
6.
7.
R
EA
D
IN
G P
AV
IL
IO
N
D
AL
TO
N
W H
IT
FI
EL
D
C O
U N
TY
P
U
BL
IC
L
IB
R
AR
Y
PH
AS
E #3
CIVIL ENGINEERING + LAND PLANNING
P.O. BOX 220, CHATSWORTH, GA 30705
(706) 616-5906
RICHARDS & ASSOCIATES ENGINEERING, INC.
RAE
RICHARDS & ASSOC. ENGINEERING, INC.
C
GA PROFESSIONAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .