1 DPL Invitaiton to Bid _ Bid Documents.pdf
PDF 540 KB Posted
- Attached to
- Dalton Public Library Reading Pavilion
- Solicitation number
- PE-75500-NONST-2025-000000048
- Issued by
- Wilcox County, Georgia
About this file
This is an Invitation to Bid (ITB) for the Dalton Whitfield County Public Library Reading Pavilion project, located in Dalton, Georgia. The project involves constructing a 2,300 square foot steel frame enclosed pavilion and a 5,700 square foot patio, including retaining walls, glass storefront, metal roofing, brick veneer walls, and site grading. The bid is managed by Felker Construction Co., Inc. as the Construction Manager, with KCP Architects as the design firm. Sealed proposals will be received on December 2, 2025, from 10:00 AM to 2:00 PM, with a mandatory pre-bid meeting scheduled for November 12th from 2:00 PM to 4:00 PM at the library location. Construction documents are available on the Whitfield County and Dalton Whitfield County Public Library websites.
The project includes multiple separate contractor components, such as kitchen equipment, furniture, data and communications equipment, audio/visual systems, security systems, and interior and exterior graphics. The Construction Manager will be responsible for coordinating these separate contractors, providing conduit and electrical boxes, and managing the overall project schedule. The bid process is subject to the Georgia Local Government Works Construction Law, and bidders must submit comprehensive documentation including a bondability letter, contractor qualification statement, and state licensing information. The project emphasizes coordination, proper sequencing of work, and adherence to the specified technical specifications across various construction divisions including site work, concrete, masonry, metals, wood, thermal protection, doors and windows, finishes, and mechanical and electrical systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2 DPL Architectural 20 Oct 25.pdf | ||
| 4 DPL Structural 20 Oct 25.pdf | ||
| 5 DPL Landscape Plans.pdf | ||
| 3 DPL Site Civil 20 Oct 25.pdf | ||
| 6 DPL MEP 20 Oct 25.pdf | ||
| 7 DPL Project Manual 22 Oct 25.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
DATE: October 22, 2025
PROJECT: Reading Pavilion
Dalton Whitfield County Public Library
310 Cappes Street
Dalton, GA 30720
OWNER: Dalton Whitfield County Public Library
310 Cappes Street
Dalton, GA 30720
ARCHITECT: KCP Architects
2729 Cloudsprings Road
Rossville, GA 30741
706-937-2900 jack.killian@kcparchitects.com
CONSTRUCTION
MANAGER: Felker Construction Co., Inc.
300 Fernwood Avenue
Dalton, GA 30721
706-226-6922 allanfelker@optilink.us
The Dalton Whitfield County Public Library will receive sealed proposals for the construction of a reading pavilion at the 310 Cappes Street location. The work is to be completed in accordance with construction documents prepared by KCP Architects and site civil drawings by Richards and Associates
Engineering Inc.
Proposals will be received at the Dalton Whitfield County Public Library, 310 Cappes Street, Dalton, GA on December 2, 2025 from 10:00 AM until 2:00 PM. Proposals turned in after 2:00 PM will not be opened or considered.
This invitation for proposal is subject to the provisions of the Georgia Local Government Works
Construction Law (“GLGWCL”), O.C.G.A. §36-91-1 et. Seq. To the extent this RFP conflicts with the
GLGWCL the provisions of the GLGWCL shall control.
All proposals are to be submitted to the Dalton Whitfield County Public Library in a sealed envelope and clearly marked Proposal for Construction Services for Dalton Whitfield County Public Library
Reading Pavilion. The envelope should also include the division and sections the contractor is bidding.
A mandatory pre-bid meeting will be held at the Dalton Whitfield County Public Library, 310 Cappes
Street, Dalton, GA, on November 12th from 2:00 PM to 4:00 PM.
Construction documents can be obtained from the Whitfield County website and the Dalton Whitfield
County Public Library website.
Dalton – Whitfield County Public Library
Reading Pavilion Dalton , GA
Table of Contents 20 October 25
DIVISION 0 CONTRACT REQUIREMENTS
SECTION 00010 – Summary of Work
00011 – Evaluation Criteria 00800 - Form of Agreement - General & Supplementary Conditions
00840 - Sample Forms
DIVISION 1 GENERAL REQUIREMENTS
SECTION 01020 - Allowances
01200 - Project Meetings
01310 - Progress Schedule
01340 - Shop Drawing Product Data & Samples
01510 - Temporary Utilities, Facilities, and Controls
01561 - Cleaning
01700 - Contract Close-Out
01720 - Project Record Documents
01741 - Contractor Warranty Form
DIVISION 2 SITE WORK
02282 Termite Control
Earthwork See Civil Drawings
DIVISION 3 CONCRETE
SECTION 03420 – Architectural Precast Concrete
See Structural Drawings for Cast in Place Concrete
DIVISION 4 MASONRY
SECTION 04200 – Unit Masonry
Reading Pavilion - Table of Contents 20 October 25 2
DIVISION 5 METALS
SECTION Structural Metal See Structural Drawings
Light gage Framing See Structural Drawings
DIVISION 6 WOOD AND PLASTICS
SECTION 06200 - Finish Carpentry
DIVISION 7 THERMAL AND MOISTURE PROTECTION
SECTION 07140 – Cold Fluid-Applied Waterproofing
07200 - Building Insulation
07240 – EIFS
07411 – Metal Roofing (By Owner/ Construction Manager)
07421- Composite Metal Panel
07530 – Flexible Sheet Roofing System (By Owner/ Construction Manager)
07600 - Flashing and Sheet Metal (By Owner/ Construction Manager)
07900 - Caulking and Sealants
07950 – Expansion Control Systems
DIVISION 8 DOORS AND WINDOWS
SECTION 08100 - Hollow Metal Door & Frames
08400 - Entrances and Storefronts
08500 – Windows
08710 - Finish Hardware
08800 - Glass & Glazing
DIVISION 9 FINISHES
SECTION 09250 - Gypsum Drywall
09311 - Ceramic Tile
09500 - Acoustical Ceiling Systems
09900 - Painting
DIVISION 10 SPECIALTIES
SECTION 10200 – Louvers see Mechanical Drawings
10522 - Firefighting Devices (By Owner/ Construction Manager)
Reading Pavilion - Table of Contents 20 October 25 3
DIVISION 11 EQUIPMENT Gallery Device for Display Walls
Audio / Visual Equipment provided by Separate Contract
DIVISION 12 FURNISHINGS Tables & Chairs in the Pavilion and on the Patio provided by Separate Contract
DIVISION 13 SPECIAL CONSTRUCTION
Access Control Separate Contract DSI Systems, DIVISION 14 CONVEYING SYSTEMS Not Used
DIVISION 15 MECHANICAL
Plumbing See Drawings Plumbing
Fire Protection (By Owner/ Construction Manager) See Drawings Fire Protection
HVAC See Drawings HVAC
DIVISION 16 ELECTRICAL See Drawings Electrical
00300 (1)
BID FORM
Project Name: Dalton Whitfield County Public Library - Reading Pavilion
Felker Construction Co., Inc. , Construction Manager (CM) Owner: Dalton Whitfield County Public Library
In compliance with your Invitation to Bid and the Bidding Documents, the undersigned Bidder, [legal name of Bidder]
[address of Bidder]
[telephone number & email address of Bidder] having carefully examined the site and Bidding Documents, including the proposed contract documents and any Addenda thereto proposes and agrees, if this bid is accepted, to enter into a contract with the CM in the exact form provided in the Bidding Documents and to perform the Work including all services, supervision, labor, equipment and material in conformance with the Contract Documents, in the time stated, for the lump sum of:
___________________________________________________________________ dollars [written in words]
(Amount shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern) which sum shall constitute the Base Bid.
Complete Schedule of Values to be submitted AFTER the Bid Opening as part of the Bid Evaluation.
The undersigned Bidder agrees that if it is notified in writing within thirty (30) days after the date of the Bid opening, the undersigned Bidder will execute, within ten (10) days of the date of the notice, a contract for the Work in accordance with the Bidding Documents in the exact form provided therein for the amount stated above, and at that time will furnish and deliver to the CM a bondability letter. The Bidder further agrees to furnish other documents or information as required by the Bidding Documents in accordance therewith.
The undersigned Bidder hereby acknowledges receipt of the following Addenda [insert the number and date of each Addendum; if none, insert "None"]:
The undersigned Bidder is duly organized and existing under the laws of the State of __________________________ as a:
(1) ___ Sole Proprietorship;
(2) ___ Partnership;
(3) ___ Corporation; or
(4) ___ Other legal entity (specify) _____________________.
The Bidder’s Federal I.D. number, or Social Security number if the Bidder is an individual, is as follows: _________________________________.
In accordance with the Bidding Documents, the following are attached hereto or enclosed herewith:
(1) Original and two (2) duplicates of this Bid, appropriately marked;
(2) Bondability Letter
(3) Contractor’s Qualification Statement., State Licensing as applicable
The Bidder understands that the CM/ Owner reserves the right to reject any or all Bids, and to waive informalities in the bidding.
The Bidder understands that all anticipated federal, state and local permits required for the Project have been obtained.
The Bidder understands that all rights of way and easements anticipated for the Project have been obtained.
The Bidder agrees that this Bid may not be revoked or withdrawn for a period of thirty (30) days after the date and time of Bid opening, but shall remain open for acceptance for a period of thirty (30) days following Bid opening.
By submission of this Bid, the Bidder certifies that this Bid has been derived independently, without consultation, communication or agreement as to any matter relating to this Bid with any other Bidder or with any competitor. The Bidder hereby certifies that this Bid is made without prior understanding, agreement or connection with any corporation, firm or person submitting a bid for the same Work and is in all respects fair and without collusion or fraud. The Bidder understands that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. The Bidder agrees to abide by all conditions of the Bid.
The full names, titles and addresses of persons and firms interested in the foregoing Bid as principals are as follows:
NAME TITLE ADDRESS
Respectfully submitted, [typed name of Bidder]
By: __________________________________[seal] [signature]
[typed name and title]
[address of Bidder]
[business telephone number]
[date of execution]
STATE OF _______________________
COUNTY OF _____________________
Came before me, ________________________________________, and after being [typed name of individual signing Bid] duly sworn, deposes and says that he/she is _____________________________________ of
[title]
________________________________ and that all of the foregoing is true and correct to the
[Bidder] best of his/her information and belief.
[signature of individual signing Bid]
Subscribed and sworn to before me this _____ day of ______________, 20____.
(seal)
Notary Public
My Commission Expires:
00010
SUMMARY OF THE WORK
PART 1 GENERAL
1.01 PROJECT OVERVIEW
A. Project consists of Addition to the Existing Library of Enclosed Pavilion and & Open Patio performed under direction of Construction Manager, Felker Construction (CM). Project includes 2,300 SF Steel Frame Enclosure and 5,700 SF of Patio, Retaining Walls, Glass Storefront, Metal Roof to match existing, Brick Veneer Walls & Site Grading.
B. Related Documents. List of Drawings on sheet A0.1, the Project Manual inclusive of Table of Contents, and general provisions of the Contract.
1.02 EXECUTION, CORRELATION AND INTENT
A. SCOPE OF WORK
1. Construction Manager will assign personnel as required to provide appropriate management and control of the Project.
2. Construction Manager is responsible for scheduling and coordinating activities as specifically indicated in Separate Contractors section below.
B. SEPARATE CONTRACTORS
1. The Owner’s Separate Contractors on this project will include equipment selection, procurement, installation of the following, except as noted:
a. Kitchen Equipment , Furniture
b. Data & Communications Equipment & Cabling
c. Audio / Visual System
d. Security - Access Control, Security Cameras, Intrusion Monitoring
e. Interior Graphics for Room identification and wayfinding
f. Exterior Graphics, ground mounted or building mounted,
2. Construction Manager is responsible for Conduit and Boxes for the electrical systems above as indicated on the drawings.
3. Construction Manager is responsible for including all Separate Contractor Activities on the Project
Schedule.
C. COORDINATION BY CONTRACTOR
1. Coordination of Work. This Construction Manager shall assume full responsibility for complete coordination of the various other Contractors, in order that all Work of the respective trades, including his own, shall be done in proper sequence and at the proper time so as not to cause any delay in the progress of any trade or of the entire Project.
D. BIDDER EVALUATION CRITERIA
1. Ref Section 00011 Bidder Evaluation Criteria for use by Construction Manager in Bidding and Selecting Sub-Contractors and Suppliers under the CM Contract
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION