3. Price Breakdown Worksheet.docx

DOCX document 23 KB Posted

Attached to
Z2DZ--Replace Generator Control Systems | 570-25-502| Fresno VA Medical Center
Solicitation number
36C26125R0069
Issued by

About this file

This document is a Price Breakdown Worksheet for Solicitation No. 36C26125R0069, detailing cost allocations for a generator control systems replacement project at the Fresno VA Medical Center. The worksheet provides a detailed cost breakdown across four construction divisions: General Requirements, Existing Conditions, Thermal and Moisture Protection, and Electrical, with line items for material, labor, equipment, and other costs. The template includes sections for calculating subtotal, overhead, profit, and bonds/insurance, culminating in a total proposal price.

The related federal contract opportunity is specifically for replacing generator control systems at the Fresno VA Medical Center (Project Number 570-25-502), restricted to Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) with a VISN 21 Multiple-Award Construction Contract. The project is valued between $100,000 and $250,000, with a small business size standard of $45.0 million under NAICS Code 236220. Potential contractors must be registered in SAM.gov, verified by the SBA DSBS portal, and meet specific eligibility requirements for the NCO 21 MACC GROUP 2 IDIQ contract holders.

View the file

Other files

File Type Posted
WD CA202500018 dtd 8 22 2025.pdf PDF
36C26125R0069 0001.docx DOCX document
6. DBA WD CA20250018 dated 8 15 2025_.pdf PDF
4. Pre-Proposal Site Visit Information.pptx PPTX presentation
2. Brand Name JA Generator Controls - FRE__.pdf PDF
1. Specifications_ Replace Generator System_.pdf PDF
36C26125R0069_2.docx DOCX document
5. Request for Information Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 36C26125R0069 Attachment - Price Breakdown Worksheet

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 02 – Existing Conditions
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 07 – Thermal and Moisture Protection
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
Division 26 – Electrical
MATERIAL
LABOR
EQUIPMENT
OTHER
TOTAL
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Division Total
$
$
$
$
$
SUB TOTAL
$
$
$
$
$
Overhead
$
$
$
$
$
Profit
$
$
$
$
$
Bonds and Insurance
$
$
$
$
$
$
$
$
$
$
TOTAL PROPOSAL
$
$
$
$
$

NOTE: All other costs may be included as a separate item and must be specified in this breakdown.