3. Maps and Drawings.pdf
PDF 3 MB Posted
- Attached to
- Sage Hen Reservoir Road Improvements
- Solicitation number
- 1240LT24Q0045
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be a set of plans and estimated quantities for the Sage Hen Reservoir Road Improvements project in the Boise National Forest. The project consists of crack sealing, asphalt patching, and chip sealing approximately 4.65 miles of roadway. Key details include the estimated quantities for various construction activities such as fog seal, asphalt surface treatment, and asphalt concrete pavement patching. The project plans also provide notes on traffic control, removal of materials, and requirements for staging and camping areas. The related federal contract opportunity solicitation indicates this is a competitive procurement with a scope of work that includes furnishing all labor, materials, equipment, and supplies to complete the road improvements in compliance with the contract documents. The solicitation specifies that the work must be in accordance with FP-14 and supplemental project specifications, and the contractor is responsible for providing third-party inspection and testing for the chip seal work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Answers 001.pdf | ||
| 4. Fire Precaution Standard Langauge.pdf | ||
| 1. Schedule of Items.pdf | ||
| 6. Davis-Bacon Act WD # ID20240099 - Gem.pdf | ||
| 0. 1240LT24Q0045 - Solicitation.pdf | ||
| 5. Experience Questionnaire.doc | DOC document | |
| 2. FSSS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To Smith's Ferry
To Cascade
To Ola
NFSR 626
NFSR 614
(0.15 miles)
(4.5 miles)
Sage Hen Reservoir
BOISE
NATIONAL
FOREST
614A
D
614C
4E
9A
626T
4E
6U
614A
A1
614K
4F
614G
626U
626Y1
614B
614L
626T
4E614C
6T
6Y
4I
614J
Sources: Esri, Airbus DS, USGS, NGA, NASA, CGIAR, N Robinson, NCEAS, NLS, OS, NMA, Geodatastyrelsen, Rijkswaterstaat, GSA, Geoland, FEMA, Intermap and the GIS user community
0 0.50.25 Miles
±Road With Attributes
614 Road Improvements
Perennial Lake/ Reservoir
626 Road Improvements
Dam")
Legend
PROJECT ESTIMATED QUANTITIES
Road
Number M o b i l i z a t i o n
L
S
F o g
S e a l
B i t u m i n o u s
F l u s h
C o a t
G a l S
Q Y
D
C S
S H
S
Q Y
D
A s p h a l t
S u r f a c e
T r e a t m e n t
½
C h i p s
S
Q Y
D
A s p h a l t
S u r f a c e
T r e a t m e n t
E m u l s i f i e d
A s p h a l t
C
R S
P g a l S
Q Y
D
T
O N
A s p h a l t
P a v e m e n t
C r a c k
S e a l i n g a n d
F i l l i n g
L
S
A s p h a l t
C o n c r e t e
P a v e m e n t
P a t c h i n g
T y p e
C o l d
P a t c h
L
S
15101 40601* 40701* 40702 41401 41801
TOTAL
NOTES:
1.TRAFFIC CONTROL IS THE RESPONSIBILITY OF THE
CONTRACTOR, ALL CLOSURES AND DELAYS MUST MEET
THE REQUIREMENTS IN THE PROJECT SPECIFICATIONS.
2. ALL REMOVED MATERIALS BECOME THE PROPERTY OF
THE CONTRACTOR AND MUST BE REMOVED FROM FOREST
SERVICE LANDS.
3. STOCK PILE, STAGING, AND CAMPING LOCATIONS WILL
BE APPROVED BY COR BEFORE BEGINNING WORK.
4.FOR ALL WORK, MATCH EXISTING ROAD TEMPLATE IN
BOTH PLAN AND PROFILE.
5. AREAS REQUIRING ASPHALT PATCHING WILL BE MARKED
WITH PAINT BY THE FOREST SERVICE.
6. CLEAN POTHOLES AND COLD PATCH ACCORDING TO
MANUFACTURES RECOMMENDATIONS.
7. ALL ASPHALT SPILLS TO BE CLEANED OFF ROADWAY AND
DISPOSED OF OFF OF FOREST LANDS.
8. CHIPSEAL TO BE ACCOMPLISHED AFTER ALL OTHER
WORK IS COMPLETE.
* NEXT TO AN ITEM NUMBER INDICATES THAT THE
QUANTITY SHOWN IS A CONTRACT QUANTITY PER FP-14
SPECIFICATION 109.02.
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 2/2
4 1 0:
D
OU
GL
AS
MO
NT
IN
I C :\U
SE
RS
\D
OU
GL
AS
MO
NT
IN
I\B
OX
\77
TR
AV
EL
MG
MT
\77
DE
VE
LO
PM
EN
T\
D6 E
MM
ET
T\
4 A
SP
HA
LT
\P
RE
-C
ON
ST
RU
CT
IO
N\
DW
GS
\P
LA
N
SH
EE
TS
_6
.D
W G;
(R4)
INTERMOUNTAIN REGION
SAGEHEN
RESERVOIR
(NFSR #614)
ROAD
IMPROVEMENTS
BOISE NATIONAL
FOREST
EMMETT RANGER DISTRICT
ESTIMATED QUANTITIES
2/5/2024
D. MONTINI
D. MONTINI
R. STONE
FS090523_R102013_L1-002.dwg
3 3
AutoCAD SHX Text
AutoCAD SHX Text 36.1
AutoCAD SHX Text 57288
AutoCAD SHX Text
AutoCAD SHX Text 14425
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 36.1
AutoCAD SHX Text 57288
AutoCAD SHX Text
AutoCAD SHX Text 14425
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| 01-Title Sheet1 |
| 02-Vicinity Map |
| Sheets and Views |
| Vicinity Map |
| 03-Estimated Quantities |
| Sheets and Views |
| Estimated Quantities |
| 03-Estimated Quantities.pdf |
| Sheets and Views |
| Estimated Quantities |
| 03-Estimated Quantities.pdf |
| Sheets and Views |
| Estimated Quantities |
| 2024-03-22T11:47:03-0600 | |
| RYAN BARRY |
| 2024-03-25T07:41:23-0600 | |
| CHAD BACONRIND |
File details come from the government source that posted it. Updated .