1. Schedule of Items.pdf
PDF 149 KB Posted
- Attached to
- Sage Hen Reservoir Road Improvements
- Solicitation number
- 1240LT24Q0045
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for the Sage Hen Reservoir Road Improvements project, which is a federal contract opportunity solicitation.
The Schedule of Items includes a list of 7 line items for the road improvement work, such as fog sealing, asphalt surface treatment, crack sealing, and asphalt pavement patching. The contract will be awarded as a single Firm Fixed Price contract, and contractors must submit pricing for all items. Offerors must provide a quote expiration date of at least 30 calendar days. Payment for bond premiums is to be included in the Base Item 15101 - Mobilization, not as an additional cost. The estimated quantities are provided for each item.
The related federal contract opportunity is for approximately 4.65 miles of roadway crack sealing, patching, and chip sealing. The work must comply with the FP-14 specifications and supplemental project specifications. The contractor is responsible for providing 3rd party inspection and testing for the chip seal work. The site is commonly accessible between May 15th and October 30th, and limited on-site camping and staging is allowed with COR approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Answers 001.pdf | ||
| 4. Fire Precaution Standard Langauge.pdf | ||
| 6. Davis-Bacon Act WD # ID20240099 - Gem.pdf | ||
| 0. 1240LT24Q0045 - Solicitation.pdf | ||
| 3. Maps and Drawings.pdf | ||
| 5. Experience Questionnaire.doc | DOC document | |
| 2. FSSS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule for 614 Road Improvements
Note: * Next to an Item Number indicates that the quantity shown is a Contract Quantity per FP-14 Specification 109.02.
SCHEDULE NOTES
a) One Firm Fixed Price contract will be awarded from this solicitation; contractors must submit pricing for all items.
b) Please provide a quote expiration date with your quote. Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
c) Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
Include bond payments under Base Item 15101 – Mobilization.
Contractor Name:__________________________________________ UEI:______________________
Email:____________________________________________________ Phone:____________________
Date offer will be honored through:____________________________
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101 Mobilization Lump Sum 1 -------------------
40601* Fog Seal – Bituminous Flush Coat (0.15 Gal/SQYD) CSS- 1H
SQYD 57,288 $ $
40701* Asphalt Surface Treatment, ½” Chips
SQYD 57,288 $ $
40702 Asphalt Surface Treatment, Emulsified Asphalt, CRS- 2P, (0.5gal/SQYD)
Ton 120 $ $
41401 Asphalt Pavement Crack Sealing and Filling
Lump Sum 1 -------------------
41801 Asphalt Concrete Pavement Patching, Type 3, Cold Patch
Lump Sum 1
TOTAL: $
SCHEDULE NOTES