This document is a compilation of supplemental technical specifications for the USDA Forest Service's FY 25 GAOA Big Smoky Admin Site Improvements project. The specifications cover multiple technical sections including submittal procedures, manufactured masonry for sign bases, exterior powder coatings, administrative identification signs, water distribution systems, curb valves and boxes, onsite wastewater treatment systems, and sanitary dump station installation.

Key technical requirements include detailed installation guidelines for water and sewer infrastructure, specific materials specifications (such as HDPE and PVC piping, galvanized steel components), installation procedures for water towers and dump stations, surface preparation and coating requirements, and stringent testing and disinfection protocols for water and sewer systems. The specifications provide comprehensive technical guidance for contractors, including material standards, installation methods, quality assurance requirements, and performance testing procedures for various components of the site infrastructure improvements.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Big Smoky Admin Site Improvements Project, newest first.
File Type Posted
0.2 1240LT25R0023 Amendment 0002.pdf PDF
0.1 1240LT25R0023 Amendment 0001.pdf PDF
Big Smoky Admin Site - Q and A - Sign in Sheet.pdf PDF
5. FirePrecautions&Plan.pdf PDF
6. Davis-Bacon Act WD ID20250022 - Camas Co..pdf PDF
0. 1240LT25R0023 - Solicitation.pdf PDF
7. Pictures.pdf PDF
Quote-Proposal Checklist.docx DOCX document
1. Schedule of Items.pdf PDF
2. FP14 Supplemental Specs.pdf PDF
4. Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL PROCEDURES 013300-1

USDA FOREST SERVICE, R4

FY 25 GAOA BIG SMOKY ADMIN SITE IMPROVEMENTS

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.

B. See other specification section within this package for additional requirements on submittal.

1.2 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow 14 days for processing each re-submittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

SUBMITTAL PROCEDURES 013300-2

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. If more than one item is shown on submittal sheet, identify item.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

PART 2 - PRODUCTS

2.1 ACTION SUBMITTALS – (Submittals requiring CO approval)

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document. Coordinate with CO on which submittals may be able to be submitted electronically as opposed to hard copy. Typically color submittals are hardcopy only.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

SUBMITTAL PROCEDURES 013300-3

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.

E. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

2.2 INFORMATIONAL SUBMITTALS – (Submittals NOT requiring CO approval)

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."

B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.

E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

SUBMITTAL PROCEDURES 013300-4

PART 3 - EXECUTION

3.1 GENERAL

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

E. Substitutions – Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.

F. Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution.

Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.

4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

END OF SECTION 013300

March 2025

MANUFACTURED MASONRY FOR SIGN BASES 047000-1

FY 25 GAOA BIG SMOKY ADMIN SITE IMPROVEMENTS

SECTION 047000 - MANUFACTURED MASONRY FOR SIGN BASES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes: Manufactured stone masonry veneer and application materials.

1.2 REFERENCES

A. American Concrete Institute (ACI).

B. American Society for Testing and Materials (ASTM):

1. ASTM C 39, Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.

2. ASTM C 67, Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile.

3. ASTM C 177, Standard Test Method for Steady-State Heat Flux Measurements and Thermal Transmission Properties by Means of the Guarded-Hot-Plate Apparatus.

4. ASTM C 192, Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory.

5. ASTM C 270, Standard Specification for Mortar for Unit Masonry.

6. ASTM C 482, Standard Test Method for Bond Strength of Ceramic Tile to Portland

Cement.

7. ASTM D 226, Standard Specification for Asphalt-Saturated Organic Felt Used in

Roofing and Waterproofing.

C. Building Materials Evaluation Commission.

D. International Code Council (ICC):

1. ES Report.

2. UBC Standard No. 14-1, Kraft Waterproof Building Paper.

E. Masonry Standards Joint Committee (MSJC) of The Masonry Society.

1.3 SUBMITTALS

A. Reference Section 013300 “Submittal Procedures”. Submit following items:

1. Product Data: Manufactured masonry and application materials including mortar color charts, and weather resistant barrier.

2. Samples: Panel containing full-size samples of specified manufactured masonry showing full range of colors and textures complete with specified mortar.

a. Actual size of masonry sample approximately 12 by 12 inches (300 by 300 mm).

MANUFACTURED MASONRY FOR SIGN BASES 047000-2

3. Quality Assurance/Control Submittals:

a. Qualifications:

1) Proof of manufacturer qualifications.

2) Proof of installer qualifications.

b. Certificates: ICC-ES Report.

c. Test Reports for physical properties.

d. Manufacturer’s Installation Instructions.

1.4 QUALITY ASSURANCE

A. Qualifications:

1. Manufacturer Qualifications:

a. Minimum five years experience in producing manufactured masonry.

b. Member of following organizations:

1) MSJC.

2) ACI.

3) ASTM.

2. Installer Qualifications: Company with documented experience in installation of manufactured masonry including minimum 5 projects within 400 mile radius of this Project.

3. Current ICC-ES Report.

4. UL: Listing in Material Approval Guide.

5. Building Materials Evaluation Commission.

6. Reference Section 01 45 00 − Quality Control.

7. Approved field samples may remain as part of completed Work.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Follow manufacturer’s instructions.

B. Store moisture-sensitive materials in weather protected enclosures.

1.6 PROJECT/SITE CONDITIONS

A. Environmental Requirements: Maintain materials and ambient temperature in area of installation at minimum 40 degrees F (4 degrees C) prior to, during, and for 48 hours following installation.

1.7 WARRANTY

A. Special Warranty: Provide manufacturer's standard limited warranty against defects in manufacturing for a period of 50 years following date of Final Acceptance.

1.8 MAINTENANCE

MANUFACTURED MASONRY FOR SIGN BASES 047000-3

A. Extra Materials: Furnish extra manufactured stone material in a variety of shapes and sizes in quantity equal to three percent of the installed stone.

PART 2 - PRODUCTS

2.1 MANUFACTURER

A. Owens Corning Tel: (800) 255-1727 One Owens Corning Parkway Fax: (866) 213-3037 Toledo, OH 43659 Website: www.culturedstone.com

B. Approved equal.

2.2 MANUFACTURED MASONRY MATERIALS

A. Cultured Stone® Textures: Country Ledgestone

B. Manufactured Masonry Physical Properties:

1. Compressive Strength: ASTM C 192 and ASTM C39, 1800 psi (12.4 MPa), 5 specimen average, 1500 psi (10.3 MPa) minimum for individual unit.

2. Bond Between Stone Unit, Type S Mortar, and Backing: ASTM C 482, 50 psi (345 kPa).

3. Thermal Resistance: ASTM C 177, R-factor, 0.355 per inch (25.4 mm) of thickness.

4. Freeze/Thaw: ASTM C 67, no disintegration and less than 3 percent weight loss.

5. Fire Hazard Test, UL 723:

a. Flame spread: 0.

b. Smoke Development: 0.

6. Maximum Veneer Unit Weight: 15 psf (73 kg/m2).

2.3 RELATED MATERIALS

A. Mortar: Premixed Type N or mortar mixed using components and proportions following manufactured masonry manufacturer's installation instructions. Comply with ASTM C 270.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates upon which manufactured masonry will be installed.

B. Coordinate with responsible entity to correct unsatisfactory conditions.

C. Commencement of work by installer is acceptance of substrate conditions.

3.2 PREPARATION

http://www.culturedstone.com/

MANUFACTURED MASONRY FOR SIGN BASES 047000-4

A. Protection: Prevent work from occurring on the opposite of walls to which manufactured masonry is applied during and for 48 hours following installation of the manufactured masonry.

B. Surface Preparation: Follow manufacturer's instructions designated below for the appropriate type of manufactured masonry and substrate.

3.3 INSTALLATION

A. Install Cultured Stone® products in accordance with manufacturer's Cultured Stone® installation instructions using, grouted, mortarless joints.

B. Install Cultured Brick® products in accordance with manufacturer's Cultured Brick® installation instructions.

C. Install/Apply Related Materials specified above in accordance with type of substrate and manufactured masonry manufacturer's installation instructions.

3.4 CLEANING

A. Clean manufactured masonry in accordance with manufacturer's installation instructions.

3.5 PROTECTION

A. Protect finished work from rain during and for 48 hours following installation.

B. Protect finished work from damage during remainder of construction period.

3.6 FINISH GRADING

A. All surfaces and slopes shall be shaped to blend with the original ground line, mounded over or smoothed off, hand raked, and left in a uniform and neat condition. Surface drainage shall be diverted so that it will not enter into the area. See drawings for details.

3.7 CLEANUP

A. After backfilling and grading has been completed, the disturbed area shall be finished to present as near a natural appearance as possible and cleaned up by removing all debris and materials not utilized. Cleanup shall include disposal of waste materials in accordance with Section 024100. Stockpiled topsoil shall be smoothly distributed over disturbed areas and hand raked to blend with ground line.

END OF SECTION 047000

EXTERIOR POWDER COATINGS 099114-1

FY 25 GAOA BIG SMOKY ADMIN SITE IMPROVEMENTS

SECTION 099114 - EXTERIOR POWDER COATINGS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Exterior powder coating systems - Work shall include supplying and installing powder coating to tubular steel posts/columns that support the sign panel(s).

1.2 SUBMITTALS

A. Product Data: Project specific powder coating plan including product data. Plan shall include:

1. Product characteristics.

2. Surface preparation instructions and recommendations.

3. Plan for pre-heating, powder coating application, curing, and shop and field coating repair.

4. Storage and handling requirements and recommendations.

5. Application methods.

6. Cautions.

B. Application Firm: Name, location, and contact information (mail address, phone, and e-mail) for the firm performing the powder coating application.

C. Quality control: (QC) programs established and followed by the firm performing the powder coating operation. Forms to document inspection and testing of the coatings as part of the QC program shall be included in the submittal.

D. Selection Samples: Submit a complete set of color chips that represent the full range of manufacturer's color samples available.

E. Assembly plan: Plan that will minimize the amount of field repairs.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Coating Protection for Shipping, Storage and Field Erection: After curing and final acceptance, coated assemblies shall be protected with multiple layers of bubble wrap, or other protective wrapping materials specified in the project specific powder coating plan as approved by the Contracting Officer.

B. Storage and Shipping: Each assembly shall be separated from other assemblies by expanded polystyrene spacers and other spacing materials as specified in the project specific powder coating plan as approved by the Contracting Officer.

C. Handling: After erection, all coating damage due to the Contractor’s shipping, storage, handling, and erection operations shall be repaired by the Contractor, at no additional

EXTERIOR POWDER COATINGS 099114-2

expense to the Contracting Agency, in accordance with the project specific powder coating plan as approved by the Contracting Officer.

1.4 PROJECT CONDITIONS

A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not apply coatings under environmental conditions outside manufacturer's absolute limits.

PART 2 - PRODUCTS

2.1 APPLICATIONS

A. Surfaces To Be Coated:

1. Metal: Galvanized, Ferrous Metal, Tubular Steel

2.2 POWDER COATING MATERIALS FOR COATING GALVANIZED SURFACES

A. Two component system with epoxy primer coat and polyester finish coat from the same manufacturer.

1. Epoxy primer coat shall conform to the following requirements:

Property Specification Performance Requirement Adhesion ASTM D 3359 Method B 5B (no failure) Flexibility ASTM D 522 Method B Pass 1/8” mandrel bend Pencil Hardness ASTM D 3363 H Plus Specific Gravity ASTM D 792 1.25 minimum

2. Polyester Finish Coat: Conform to American Architectural Manufacturers Association (AAMA) Specification 2604.

B. Degassing additives may be added as necessary to prevent pin holes in the finish coat.

The degassing additives shall be added in accordance with manufacturer’s recommendation.

2.3 MATERIALS - GENERAL REQUIREMENTS

A. Galvanized:

1. All metal shall be galvanized prior to priming. Prior to the galvanizing operation, the Contractor shall identify to the galvanizer the specific assemblies and surfaces receiving the powder coating after galvanizing, to ensure that the galvanizing method used on the assemblies is compatible with subsequent application of a powder coating system. Specifically, such assemblies shall neither be water-quenched, nor receive a chromate conversion coating, as part of the galvanizing operation.

EXTERIOR POWDER COATINGS 099114-3

2. All metal shall be powder coat finished. Color: “Forest Service Brown” #20059 as in manual EM 7100-15 or similar as approved by the contracting officer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Do not begin application of coatings until substrates have been properly prepared.

3.2 SURFACE PREPARATION:

A. Galvanized surfaces receiving the powder coating shall be cleaned and prepared for coating in accordance with ASTM D 6386, and the project specific powder coating plan as approved by the Contracting Officer.

B. Assemblies conforming to the ASTM D 6386 definition for newly galvanized steel shall receive surface smoothing and surface cleaning in accordance with AST D 6386 Section 5, and surface preparation in accordance with ASTM D 6386 Section 5.4.1.

C. Contractor shall notify the Contracting Officer of all surface cleaning and preparation activities and shall provide the Contracting Officer opportunity to perform quality assurance inspection, at the completion of surface cleaning and preparation activities prior to beginning powder coating application.

3.3 APPLICATION AND CURING

A. After surface preparation, the two-component powder coating shall be applied in accordance with the powder coating manufacturer’s recommendations, the project specific powder coating manufacturer’s recommendations, the project specific approved powder coating plan, and as follows:

1. Pre-heat: The pre-heat shall be sufficient to prevent pin holes from forming in the finished coating system.

2. Apply the epoxy primer coat, followed by a partial cure.

3. Apply coat of polyester finish coat, followed by partial cure.

4. Apply second coat of polyester finish coat, followed by a finish cure.

3.4 TESTING

A. The firm performing the powder coating operation shall conduct, or make arrangements for, QC testing on all assemblies receiving powder coating for this project, in accordance with the powder coating firm’s QC program. Testing may be performed on coated surfaces of production fabricated items, or on a representative test panel coated alongside the production fabricated items being coated. There shall be a minimum of one set of tests representing each cycle of production fabricated items coated and cured. Repair of damaged coatings on production fabricated items shall be the responsibility of the firm applying the powder coating, and shall be in accordance with the project specific powder coating plan as approved by the Engineer. At a minimum, the QC testing shall test for the following requirements:

EXTERIOR POWDER COATINGS 099114-4

1. Visual inspection for the presence of coating holidays, and other unacceptable surface imperfections.

2. Coating thickness measurement in accordance with Section 6-07.3(5). The minimum thickness of the epoxy primer coating, initial polyester coat, and polyester finish coating shall be 3 mils each.

3. Hardness testing in accordance with ASTM D 3363, with the finish coat providing a minimum hardness value of H.

4. Adhesion testing in accordance with ASTM D 4541 for 400 psi minimum adhesion for the complete two component coating system.

5. Powder Coating Institute (PCI) #8 recommended procedure for solvent cure test.

B. Documentation- The results of the QC testing shall be documented in a QC report and submitted to the Contracting Officer for approval.

C. Access - The Contracting Officer shall be provided notice and access to all assemblies at the powder coating facility for the purposes of Contracting Agency acceptance inspection, including notice and access to witness all hardness and adhesion testing performed by the firm conducting the QC testing.

D. Rejection - Assemblies not meeting the specification requirements will be subject to rejection by the Contracting Officer. Rejected assemblies shall be repaired or re-coated by the Contractor, at no additional expense to the Contracting Agency, in accordance with the project specific powder coating plan as approved by the Engineer until the assemblies satisfy the acceptance testing requirements.

E. Approval - Assemblies shall not be shipped from the powder coating firm’s facility to the project site until the Contractor receives the Contracting Officer’s approval of the QC Report and assembly inspection performed by the Contracting Officer.

END OF SECTION 099114

ADMINISTRATIVE IDENTIFICATION SIGN 101420 – -5

FY 25 GAOA BIG SMOKY ADMIN SITE IMPROVEMENTS

SECTION 101420 – ADMINISTRATIVE IDENTIFICATION SIGN

PART 1 - GENERAL

1.1 SUMMARY

A. This item shall consist of fabricating and installing the Site Identification sign with tubular steel posts and manufactured masonry stone faced support base.

1.2 RELATED WORK

A. The work shall be in accordance with the following subsidiary specifications. The subsidiary specifications are referred to in the text by the Section designation only.

1. Section 047000 “Manufactured Masonry for Sign Bases”

2. Section 099114 “Exterior Powder Coatings”

1.3 REFERENCE SPECIFICATIONS

A. The publication listed below form a part of this specification to the extent referenced.

The publication is referred to in the text by the basic designation only.

B. EM 7100-15 Standards for Forest Service Signs, Chapters 7, 8,10 and 14

1.4 SUBMITTAL

A. Sample Sign Mock-Up: The contractor shall submit detailed drawings showing the size of the sign, size of letters, colors, materials, sign texts, and location for installation for the Contracting Officer’s review/approval prior to prior to the Contractor ordering and fabricating the signs.

1.5 QUALITY ASSURANCE

A. The Fabricator shall have sufficient covered shop space, tooling and equipment to properly fabricate, inspect and handle the signs. Raw materials shall be stored in a covered warehouse or similar cool, dry storage area so that it protects the raw materials from environmental factors.

B. The fabricator shall be regularly engaged in the design and manufacture of plastic signs and shall have at least 5 years experience. References with contacts shall be provided if requested by the Contracting Officer.

PART 2 - PRODUCTS

ADMINISTRATIVE IDENTIFICATION SIGN 101420 – -6

2.1 REQUIREMENTS

A. Sign design shall follow the procedures and methods, utilize the equations and formulas, and incorporate the factors of safety and allowable design stresses and strains as set forth in ASTM D 4097, ASTM D 3299 and ASME RTP-1. Where design conflicts arise between the various standards, the most stringent design shall be used.

B. The design shall allow for the most severe combination of conditions which may include any or all of the following:

1. Superimposed loads such as those due to wind and seismic forces.

2. Loads applied during transportation and erection.

3. Thermal expansion and contraction.

C. Prior to construction, the Contractor shall submit a sample sign and Logo mock-up. This sample must include enough detail, including materials, layout, font, color, size and shape to show consistency with the drawings and be in accordance with EM 7100-15. The submittal shall be combined into a single, neatly organized, complete package and submitted to the Contracting Officer for review and approval. Fabrication of the signs shall not begin until the complete submittal package has been approved by the government.

D. Types of signs to be fabricated and installed include two of each of the following:

1. Single sided wood sign panel

2. Forest Service Logo

3. USDA Credit Plaque

E. A known manufacturer that meets this specification is Wood Products, 4890 Country Road 76, Parlin, CO 81239, Phone 970-641-1675.

2.2 SIGN PANELS

A. General:

1. Signs shall conform to current editions of the Manual of Uniform Traffic Control Devices (MUTCD) and the Forest Service Manual - EM 7100-15, Standards for Forest Service Signs.

2. Cedar Panel – Western Red Cedar, rough sawn, 2", as graded by The Western Wood Products Association and West Coast Lumber Inspection Bureau, or approved equal.

B. Cedar Panel: Primer, Paint, and Stain

1. Primer – Primer shall be top-quality and oil-based conforming to Federal Specification TT-P-25.

2. Paint – Paint shall be top-quality exterior acrylic (high-acrylic) latex enamel conforming to Federal Specification TT-P-19. Unless shown otherwise in drawings, colors shall be Federal Standard 595B.

ADMINISTRATIVE IDENTIFICATION SIGN 101420 – -7

3. Stain – Stain shall be semitransparent, oil based. The final product shall match the following colors:

A. Brown 20059 B. Yellow-cream 23695

2.3 COLOR

A. Color for sign panel, Forest Service logo and USDA credit plaque shall be according to the standards found in EM 7100-15.

2.4 STEEL AND IRON

A. Tubular Steel Posts and Post Caps: 4” x 4” O.D., .25” wall thickness, furnished, installed and powder coat finished as shown on the drawings.

PART 3 - EXECUTION

3.1 SIGN FABRICATION

A. Work shall be pre-formed by a high speed, computer-controlled electric router with the sheets in a horizontal position so that the routed surfaces are uniform in depth and finish.

3.2 ROUTING LETTERS AND LOGO’S

A. Sign (not Logo’s) shall be routed to a depth of 1/4” to 1/2” using Gothic type “D” letters.

Do not route through material.

3.3 SIGN INSTALLATION

A. Sign locations will be approved on the ground by the Contracting Officer, prior to commencement of work. The longitudinal axis of the sign will be perpendicular to the centerline of the main road, plus or minus 5 degrees.

B. Base and sign supports shall be constructed plumb and at the angles show on the drawings.

C. Mount signs with zinc coated hardware. Paint bolt heads, washers, nuts and other hardware to match sign material or powder coated finish depending on where the fastener is located.

D. Care shall be taken when drilling holes that locations avoid routed letters on signs and logos.

E. Sign base shall be fabricated as shown on the drawings.

END OF SECTION 101420

WATER DISTRIBUTION SYSTEMS 221100-1

FY 25 GAOA BIG SMOKY ADMIN SITE IMPROVEMENTS

SECTION 221100 - WATER DISTRIBUTION SYSTEMS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section shall consist of furnishing and installing the following:

1. Potable water distribution pipe and fittings.

B. This Section shall also include the flushing, testing and disinfection of waterlines.

1.2 DEFINITIONS

A. GSP: Galvanized Steel Pipe.

B. HDPE: High Density Polyethylene plastic.

C. NPWL: Non-potable waterline (includes sewerline).

D. PVC: Polyvinyl chloride plastic.

1.3 SUBMITTALS

A. Product Data: For the following:

1. Pipe and fittings.

1.4 QUALITY ASSURANCE

A. All work is to be completed according to applicable Federal, State and Local codes. This work includes, but is not limited to, materials, installation, testing and disinfection

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. NSF Compliance:

1. Comply with NSF 14 for plastic potable-water-service piping. Include marking "NSF-pw" on piping.

2. Comply with NSF 61 Annex G for materials for water-service piping and specialties for domestic water. All pipes, fittings, fixtures, solder and flux shall meet the 0.25% maximum lead content rules for all wetted components.

1.5 MINIMUM SYSTEM REQUIREMENTS

A. Unless otherwise noted, the minimum working pressure for piping and specialties shall be 200 psig.

1.6 DELIVERY, STORAGE AND HANDLING

WATER DISTRIBUTION SYSTEMS 221100-2

A. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

B. Protect stored piping from moisture and dirt. Elevate above grade.

C. Protect flanges, fittings, and specialties from moisture and dirt.

D. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

1.7 PROJECT CONDITIONS

A. Existing Utilities: Do not interrupt utilities serving facilities occupied by the Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify the Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without the Contracting Officer’s written permission.

1.8 COORDINATION

A. Coordinate connection to existing waterlines with Contracting Officer.

B. Verify piping materials, sizes, entry locations and pressure requirements are compatible with connection point.

C. Coordinate other utility impacts.

PART 2 - PRODUCTS

2.1 GENERAL

A. All waterlines, pipes, and fittings shall be new and unused, of the type, pressure rating or class, and size specified and as shown on the Drawings.

2.2 PIPES AND FITTINGS

A. HDPE:

1. Pipe, AWWA C901:

a. Material Designation: PE 4710 resin

b. Material Classification: ASTM D1248

c. Minimum Cell Classification: ASTM D 3350, 345434C

d. Dimension Ratio and Minimum Pressure Rating: DR11, 200 psig.

2. Fittings:

WATER DISTRIBUTION SYSTEMS 221100-3

a. Molded HDPE Fittings: ASTM D 3350, PE 4710 resin, butt-fusion type, made to match HDPE pipe dimensions and class.

b. Insert Fittings: Not allowed.

c. Transition Fittings to non-HDPE Pipe: Approved by HDPE pipe manufacturer. Compression-type fittings are not allowed.

3. Pipe Larger than 2-inch Diameter: Provide in 40-foot lengths rather than in rolls.

B. Galvanized Steel: ASTM A53, Schedule 40, threaded ends meeting ASME B1.20.1.

1. Fittings: Threaded, ASTM A 338.

2.3 END SEALS FOR SLEEVES

A. Design: With ASTM C443 compliant gaskets.

B. Model: Link-Seal, as manufactured by Pipeline Seal & Insulator, Inc. or an approved equal.

PART 3 - EXECUTION

3.1 PIPING INSTALLATION

A. Construct the water system to the lines and grades shown or established in the field.

B. Stake locations of waterlines as shown on the Drawings. Waterline location shall be approved by the Contracting Officer before installation.

C. All waterline shall be graded to drain.

D. All pipe, fittings, and appurtenances shall be handled and installed in strict conformance to the manufacturer’s recommendations.

E. Drains, valves, and other regulating and controlling devices shall be installed in the line where called for on the drawings.

F. The interior of all pipe, fittings, and other accessories shall be kept as free as possible from dirt and foreign matter at all times. Each piece of line as it is laid shall be cleaned of all debris. When the pipeline has become dirty on the inside during shipment or storage, it shall be swabbed out by drawing a damp swab through the line before placing in trench. Care shall be exercised to keep all joining surfaces clean. Any pipe with contaminated or damaged joining surfaces, which cannot be satisfactorily cleaned or repaired, shall be discarded. Under no circumstances shall pipe be installed in water, and no pipe shall be installed when trench conditions or the weather is unsuitable for such work. At all times when work is not in progress, all open ends of the pipe and fittings shall be securely closed to the satisfaction of the Contracting Officer so that no trench water, rodents, earth, or other substance will enter the pipe or fittings.

G. Any section of pipe already installed and found to be defective shall be removed and replaced with new pipe at the Contractor’s expense.

WATER DISTRIBUTION SYSTEMS 221100-4

H. Water and Non-Potable/Sewer Line Crossings

1. Potable and NPWL lines shall never be installed in the same trench.

2. If a new line crosses below an existing line, the existing line shall be supported to prevent settling.

3. Where waterlines intersect NPWLs or are within 10 horizontal feet of NPWLs, the following applies:

a. At least one of the pipes (either the waterline or NPWL) shall be constructed or reconstructed with 200 psi pipe or encased in a continuous sleeve with same rating. At crossing, extend 200 psi pipe or sleeve for a distance of 10 feet perpendicular distance from each side of the waterline. The waterline and NPWL pipes or sleeves shall be centered at the crossing so that the joints will be an equal distance and as far as possible from the crossing.

1) Sleeves: Nominal sleeve diameter to be at least 3 inches larger than nominal diameter of pipe to be encased. Install end seals in annular space at each end of sleeves.

b. Construct according to applicable federal, state and local regulations, including Idaho Department of Environmental Quality, “Idaho Rules for Public Drinking Water Systems, IDAPA 58.01.08. The Contractor is responsible for obtaining and following these regulations.

c. Where applicable, state and local regulations supersede the above requirements.

I. Culvert Crossings: Where waterline crosses a road culvert, adjust grade of waterline to provide a minimum of 12 inches of separation between the waterline and culvert, unless otherwise noted on the Plans, maintaining slope of waterline to drain.

J. A minimum of one-foot separation shall be maintained between electric and waterlines in the same trench. Unless the electric conductors are in conduit the waterline shall be a minimum of one foot below the electric conductors.

K. Bury piping with depth of cover over top of at least 30 inches, unless otherwise shown on the Plans.

L. Cutting and Handling of Pipe

1. Cutting of pipe for closure pieces or for other reasons shall be done in a neat manner by methods, which will not damage the pipe. The pipe and fittings shall be handled in such a manner as to ensure delivery and final placement in good, undamaged condition. Particular care shall be exercised not to injure the pipe surfaces or coatings. Damaged pipe shall not be used in the work.

M. Laying Pipe

1. No pipe shall be placed in the trench until the Contracting Officer has approved the trench and bedding.

WATER DISTRIBUTION SYSTEMS 221100-5

2. Do not drop pipe into trench. If HDPE pipe is fusion welded above ground outside of the trench, gently lay pipe into the trench. Ensure installation procedures meet the manufacturer’s requirements.

3. Pipes shall be placed true to the lines and grades shown on the Drawings and as specified. Complete water system shall be constructed to drain by gravity to drains for seasonal shutdown. Waterlines shall be constructed to drain at a minimum grade of 0.50%. Waterlines not meeting this requirement shall be removed by the Contactor and replaced at no cost to the Government.

4. Each section of the pipe shall rest upon the pipe bed for the full length of its barrel.

5. Backfill the pipe within 24 hours after installing the pipe in the trench, leaving the joints and one foot of pipe on each side of each joint exposed until testing is complete.

6. When work is not in progress, securely close open ends of pipe and fittings.

7. When high density polyethylene or solvent weld joint pipe is used, it shall be weaved in the trench to provide horizontal slack in the line for expansion and contraction.

8. High density polyethylene pipe shall be allowed to cool to within 20ºF of the shaded trench bottom temperature before backfilling.

9. When pipes are installed in a structure or utility box, they shall be adequately supported.

10. Use proper fittings in order to follow the required line and grades and to avoid excessive curvature. Deflections from a straight line or grade, as required by vertical curves, horizontal curves, or offsets, shall not exceed the manufacturer's recommended maximum joint deflection or curvature for their pipe.

11. When more than one pipeline is in the same trench, the pipes shall be separated by at least eight horizontal inches, or as shown on the Drawings.

12. Bends that result in joint tension or permanent pipe deformation are prohibited.

13. Pipelines may be relocated slightly, if necessary, to avoid existing obstacles.

However, the required slopes must be maintained.

N. Branch Connections

1. Branch connections to the main shall be made with tees.

2. Horizontal tees for waterline laterals shall not be permitted. The branch side of tees shall be up when drainage is toward the tee, and down when drainage is away from the tee.

3. Waterline tees shall be the same diameter as the largest pipe connected to the tee.

O. Pipe Joints

1. Joints shall be made, using jointing materials and applied with the proper accessories, in accordance with the manufacturer's instructions. Completed joints shall be watertight, and capable of passing the required hydrostatic testing. If pipe and fittings are assembled with a lubricant, it must be nontoxic.

2. Dissimilar Joints: Connections between two dissimilar pipes or fittings shall be installed in manner recommended by the pipe manufacturer and approved by the Contracting Officer. Use adapters compatible with both piping materials, outer diameters and system working pressure.

WATER DISTRIBUTION SYSTEMS 221100-6

a. For HDPE pipelines:

1) Use HDPE/GSP transition fittings for connections to galvanized steel pipe.

2) Use HDPE/PVC transition fittings for connections to PVC pipe.

b. For other situations, use fittings to suit the actual conditions.

c. Compression-type fittings are not allowed.

3. Threaded Metal Joints:

a. Thread pipes with tapered pipe threads according to ASME B1.20.1, apply tape or joint compound, and apply wrench to fitting and valve ends into which pipes are being threaded.

b. Exposed threaded pipe joints on galvanized steel pipe shall be painted with mastic following the manufacturer’s application procedures.

c. Field cut ends shall be squared off by grinding or filing; ends shall be reamed with all chips and flakes removed.

d. Field cut threads or machined joints shall be made with sharp tools to sharp finished ends.

4. HDPE Heat-Fusion Joints

a. According to ASTM D 2657 and piping manufacturer's written instructions.

b. The joining method shall be butt fusion method and shall be performed in accordance with the pipe manufacturer's recommendations. Butt fusion equipment used in the joining procedures shall be capable of meeting all conditions recommended by the pipe manufacturer, including but not limited to, temperature requirements, alignment, and fusion pressures.

c. Personnel trained in butt fusion techniques by the manufacturer of the pipe, shall supervise or perform butt fusion operations.

d. Butt fusion shall be performed between pipe ends or pipe ends and fitting and valve outlets, of like outside diameter and wall thickness, SDR or DR. Butt fusion joining between same diameters but unlike wall thickness shall not be permitted. Transitions between unlike wall thickness shall be made with a transition nipple (a short length of the heavier wall pipe with one end machined to the lighter wall) or by mechanical means.

e. Branch connections to the main shall be made with polyethylene fittings, and butt fused.

f. Bent Strap Test: On each day that butt fusions are to be made, perform a “Bent Strap Test.” The first fusion of the day shall be a trial fusion. The trial fusion shall be allowed to cool completely, and then fusion test straps shall be cut out. The test strap shall be 12" (min) or 30 times the wall thickness in length with the fusion in the center, and 1" (min) or 1.5 times the wall thickness in width. Bend the test strap until the ends of the strap touch. If the fusion fails at the joint, a new trial fusion shall be made, cooled completely and tested. Butt fusion of pipe to be installed shall not commence until a trial fusion has passed the bent strap test.

WATER DISTRIBUTION SYSTEMS 221100-7

5. Plastic Piping Solvent-Cemented Joints: Clean and dry joining surfaces. Join pipe and fittings according to the following:

a. PVC Pressure Piping: Join schedule number ASTM D 1785, PVC pipe and PVC socket fittings according to ASTM D 2672. Join other-than-schedule-number PVC pipe and socket fittings according to ASTM D 2855.

P. Install piping by directional boring, tunneling, jacking, or combination, under streets and other obstructions that cannot be disturbed.

3.2 IDENTIFICATION

A. Wrap all buried, non-metallic, nonperforated piping with tracer wire.

B. Use detectable warning tape over piping and at outside edges of underground structures.

3.3 HYDROSTATIC TESTING

A. General

1. The Contractor shall conduct pressure and leakage tests on all newly constructed portions of the water system, including water mains, service lines, fittings, valves, and hydrants. New waterlines that are extensions or modifications of an existing water system shall be tested at the test pressure specified here unless the Contracting Officer specifies another pressure. Pneumatic testing will not be allowed.

2. The contractor shall ensure that any appurtenance attached to the pipeline at the time of testing is rated to withstand the pressures that will exist during testing.

3. Conduct piping tests before joints are covered and after thrust blocks, if required, have hardened sufficiently. Joints shall remain uncovered until testing is completed satisfactorily.

4. The Contractor shall furnish the pump, pipe, gauge, measuring device, connections, and all other necessary equipment, and shall furnish the necessary personnel to conduct the tests. All equipment, gauges, and attachments shall be subject to approval by the Contracting Officer.

5. The Contracting Officer shall be present during the testing period.

6. Waterlines shall be tested in sections not to exceed 2,000 ft in length or a maximum pressure differential of 30 psi in the test section.

7. No paints, asphalts, tars, enamels, or other types of pipe compounds shall be used to eliminate leaks.

B. Pressure and Leakage Test

1. The test pressure shall:

a. Equal at least 125% of the normal working pressure at the highest elevation of the test, but not less than 100 psi and not exceed 200 psi at any point being tested.

b. Not vary by more than +/- 5 psi from the established test pressure.

WATER DISTRIBUTION SYSTEMS 221100-8

c. Not exceed twice the rated pressure of valves when the test section includes closed valves.

2. Pressure Test Procedure

a. Equipment: The test pressure shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Contracting Officer.

b. Preparation: Fill pipeline 24 hours before testing. Use only potable water.

Each valved section of pipeline shall be slowly filled with water and all air shall be expelled from the pipeline. Apply test pressure to stabilize system.

c. Pressurization:

1) Increase pressure in 50-psig increments and inspect each joint between increments.

2) Hold at test pressure for 1 hour.

3) Decrease to 0 psig.

4) Slowly increase again to test pressure and hold for 1 more hour. If the test pressure cannot be sustained within +/- 5 psi during this time, then the system will be determined to have leakage.

5) Leakage shall be verified by the Contractor and the Contracting Officer.

6) Locate and repair leaking joints with new materials and repeat test until leakage is within allowed limits. All visible leaks are to be repaired regardless of the amount of leakage.

d. Examination: All exposed pipe, fittings, valves, and joints shall be carefully examined. Any cracked or defective pipe, fitting, or valve discovered shall be repaired or replaced by the Contractor at his own expense with new material and the test repeated until satisfactory to the Contracting Officer.

3. Results

a. The Contractor shall furnish a written report to the Contracting Officer describing the results of each test. The report must identify the specific portions of the pipeline tested, the pressure, the duration of the tests, and the amount of leakage.

3.4 CLEANING AND DISINFECTION

A. Clean and disinfect water-distribution piping as follows:

1. Purge new water-distribution piping systems and parts of existing systems that have been altered, extended, or repaired before use.

2. Use purging and disinfecting procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described in AWWA C651 or as described below:

a. Flushing Pipelines

1) After the pressure and leakage testing has been completed, all water pipes shall be thoroughly flushed.

WATER DISTRIBUTION SYSTEMS 221100-9

2) Flushing shall remove all debris from the pipeline, including HDPE pipe shavings, gravel and any other material that may have accidentally entered the pipeline during construction.

3) Remove all self-closing faucets and drinking fountains from hydrants before flushing lines. Failure to do so will likely clog the internal parts of the faucet.

4) If no hydrants or other outlets are installed at the end of the waterline, an outlet at the end of each lateral shall be provided. Outlets shall be large enough to develop a velocity in the waterlines of at least 2.5 feet per second (see Table l for necessary flows). If necessary, use a booster pump or other method to obtain the necessary flows.

5) Minimum velocities must be obtained in all mainlines, laterals and drainlines.

6) Ensure flushing outlets have adequate drainage and no damage or erosion will occur from the flushing process. Install hoses and/or pipe extensions if necessary.

TABLE 1

Required Flow in Gallons per Minute (GPM) to provide 2.5 feet per second

Flushing Velocity

Type of Pipe

Nominal Pipe Size (inches)

HDPE

(SDR 11)

PVC

(160 psi)

Galv. Steel (Schedule 40)

1 7 9 7 1 ¼ 11 15 12 1 ½ 14 19 16 2 22 30 27

2 ½ - 44 38 3 49 64 58

3 ½ - 84 77 4 81 106 100 5 - 162 156 6 175 229 225 8 274 388 390 10 461 603 615 12 648 848 872

b. Requirement of Chlorination

1) Pipelines: After flushing, all new waterlines and repaired portions of, or extensions to, existing waterlines shall be disinfected by chlorination. Chlorination shall provide a minimum of 25 mg/l residual after 24 hours contact in the system. This may be expected with an application of 50 mg/l, although some conditions may require more.

WATER DISTRIBUTION SYSTEMS 221100-10

The entire system including the storage tank or spring box shall be filled with the disinfecting solution. All taps, hydrants, and other outlets shall be opened and left open until chlorine is noticeable by odor or testing in the water coming from each. Immediately close taps, hydrants, and other outlets. The chlorinated water shall be retained in the waterlines for at least 24 hours. An alternative of introducing a chlorine solution of 300 mg/l for a period of 3 hours is also approved.

2) Reservoirs Only: For large reservoirs where water is not going to be reused to disinfect connecting distribution lines, or where it is not economical to treat the entire contents with 50 mg/l of chlorine, disinfection can be accomplished by swabbing or spraying the walls, floor, and ceiling with a chlorine solution containing 300 mg/l of available chlorine. A minimum of 3 hours shall elapse before the structure is flushed and returned to service.

c. Preparation of Disinfecting Mixture: Chlorine-bearing compounds used for disinfection shall comply with ANSI/NSF 60.

1) Calcium hypochlorite must be prepared as a water mixture for introduction into the waterlines.