0.2 1240LT25R0023 Amendment 0002.pdf
PDF 1022 KB Posted
- Attached to
- GAOA Big Smoky Admin Site Improvements Project Federal contract opportunity
- Solicitation number
- 1240LT25R0023
- Issued by
- Department of Agriculture Forest Service
About this file
This document is an Amendment (Amendment #2) for the GAOA Big Smoky Admin Site Improvements Project for the Sawtooth National Forest, issued by the USDA Forest Service. The amendment modifies two key sections of the Forest Service Supplemental Specifications: Section 108 (Prosecution and Progress) and Section 207 (Earthwork Geosynthetics). Key changes include extending the work hours to Monday-Friday, 7:00 AM to 7:00 PM, and detailed specifications for geomembrane liner installation, which requires a 40 mil seamless double scrim reinforced polyethylene liner with specific technical performance characteristics. The response date is extended to 9/05/2025 at 12:00 noon MT, and the Period of Performance is changed to 10/01/2025 - 10/30/2026. The geomembrane liner installation requires precise surface preparation, careful placement, and mandatory seepage testing with strict leakage standards (not exceeding 0.125 inches/day), with testing to be performed by an independent third-party contractor under Idaho DEQ oversight.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0.1 1240LT25R0023 Amendment 0001.pdf | ||
| Big Smoky Admin Site - Q and A - Sign in Sheet.pdf | ||
| 3. CSI_SupplementalSpecs.pdf | ||
| 5. FirePrecautions&Plan.pdf | ||
| 6. Davis-Bacon Act WD ID20250022 - Camas Co..pdf | ||
| 0. 1240LT25R0023 - Solicitation.pdf | ||
| 7. Pictures.pdf | ||
| Quote-Proposal Checklist.docx | DOCX document | |
| 1. Schedule of Items.pdf | ||
| 2. FP14 Supplemental Specs.pdf | ||
| 4. Drawings.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT25R0023
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
08/22/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/18/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Sawtooth National Forest
GAOA Big Smoky Admin Site Improvements Project
Amendment 0002 makes the following changes to the solicitation:
1. The FP14-Supplimental Specs are amended as shown on pages three through six below.
2. The response date is extended to 9/05/2025, at 12:00 noon MT.
3. The Period of Performance is changed to 10/1/2025 - 10/30/2026.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRIAN J. WHARTON
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
08/24/2025
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT25R0023/0002
All other Terms and Conditions remain unchanged.
Period of Performance: 10/01/2025 to 10/30/2026
Contract Specialist - Tony Taylor -tony.taylor@usda.gov
Contracting Officers Representative (COR) -
Braidy Richins - braidy.richins@usda.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AMENDMENT #2
Big Smoky Admin Site Improvements
The following changes have been made to the specifications for the above-named project. Please incorporate the following information into your bid.
Part III – List of Documents, Exhibits, and other Attachments Section J – List of Attachments
2. FP14 – Supplemental Specs – 74 pages Forest Service Supplemental Specifications
Section 108 – Prosecution and Progress Subsection 108.01 Commencement, Prosecution and Completion of Work
Pages 17 of 74
Delete this Subsection in its entirety and replace it with the following:
108.01 Commencement, Prosecution, and Completion of Work.
Perform work under this contract according to the following:
For construction operations in general, Contractor can work Monday – Friday, 7:00 AM to 7:00 PM, unless otherwise approved in writing by the Contracting Officer.
Part III – List of Documents, Exhibits, and other Attachments Section J – List of Attachments
2. FP14 – Supplemental Specs – 74 pages Forest Service Supplemental Specifications
Section 207 – Earthwork Geosynthetics Pages 38-40 of 74
Delete this Section in its entirety and replace it with the following:
207 – Earthwork Geosynthetics
Description
207.01 This work consists of furnishing and installing seamless geomembrane liners for wastewater moisture barrier applications. Work also includes removing/salvaging existing drain rock cover over the existing asphaltic liners, reinstallation of this salvaged drain rock following the new geomembrane liner installations, and furnishing/installing additional supplemental drain rock as required.
Materials
207.02 Conform to the following:
(a) Geomembrane Liner. Geomembrane liner shall be a seamless double scrim reinforced polyethylene type having a 40 mil minimum thickness (+/- 10%), be watertight, and demonstrate at least a 20-year exposed (25-year covered) service life. It shall meet or exceed the following salient characteristics for approval:
PROPERTY TEST METHOD REQUIREMENT
Coating thickness - 2.5 mil each (+/- 5%)
Breaking strength-fabric, minimum Elongation at yield, %
ASTM D-751 Method A 300 lbs, 20%
Tensile strength, minimum ASTM D7004 600 lbs Tear strength, minimum ASTM D5884 120 lbs
Bursting strength, minimum ASTM D3786 1250 psi Puncture resistance, minimum ASTM D4833 325 lbs
Hydrostatic resistance, minimum ASTM D-751 Method A Procedure 1 400 psi
Dimensional stability, maximum, % change ASTM 1204 1 hr. @ 180°F (82°C)
.5
Low temperature flexibility ASTM D-2136 1/8" Mandrel 4
hr. pass
-65°F
Ply adhesion, minimum ASTM D-413 Machine Method Modified
30 lbs/in.
Water absorption maximum, % wt. change ASTM D-471 30 days @ 70°F (21°C)
<1.0
Environmental stress crack resistance ASTM D-1693 Unaffected (min. hours w/out failure) 3000 hrs. by ESC
UV resistance ASTM G26 Pass Xenon Arc 4000 hrs. @80°C
Geomembrane liner shall be an Aqua Armor BTL – 40s Double Scrim RPE as manufactured/supplied by BTL Liners, www.btlliners.com , an ArmorLiner 40L as manufactured/supplied by IPG, www.itape.com , an AgTec RPE Pond and Containment Liner 40 mil as manufactured/supplied by AgTec, www.agtec.com , or an approved equal.
(b) Drain Rock. Drain rock shall be clean, sound 3-inch minus, free of any deleterious material.
Construction Requirements
207.03 General. Identify, store, and handle geosynthetics according to ASTM D4873 and the manufacturer’s recommendations. Elevate and protect geosynthetics with a waterproof cover if stored outdoors. Limit geosynthetics exposure to less than 10 days of ultraviolet radiation.
207.04 Geomembrane Installation.
(a) Surface Preparation. Provide a smooth, flat, firm, unyielding foundation for the geomembrane with no sudden, sharp, or abrupt changes or break in grade. Remove rocks, stones, sticks, sharp object, and debris protruding more than ½ inch above the prepared surface.
(b) Geomembrane Placement. Install seamless geomembrane liner per the manufacturer’s recommendations. Use sandbags or piles of cover material to hold the geomembrane in place prior to covering slopes with drain rock. Do not drive equipment on geomembrane.
Replace or repair geomembrane that is torn or punctured, per the manufacturer’s recommendations and as approved by the Contracting Officer.
(c) Intake/Outlet Structures. Install manufacturer’s specified seamless product at intake/outlet structures that connects integrally to the new seamless geomembrane liner to achieve an impervious system as required. Submit details and installation procedures for each respective structure prior to construction for Contracting Officer review/approval.
207.05 Backfilling. Use extreme care when placing drainrock material back on geomembrane slopes and top to prevent any damage. Do not push material along the geomembrane which can result in damage or wrinkling.
207.06 Seepage Testing. Following completion of the new geomembrane liner installations, including drainrock placement/finishing, a seepage leak test shall be performed on each lagoon cell, as required by the Idaho DEQ. Seepage leak testing shall be performed by an independent third-party contractor specializing in performing this testing and having direct oversight by an engineer licensed in the State of Idaho. Testing duration shall occur over a minimum five (5) day period using appropriate equipment and electronic data collection devices. Test results exceeding 0.125 inches/day averaged over the test period duration will result in non-acceptance of the installed geomembrane liner system and will require correction and re-testing until satisfactory results are achieved.
http://www.btlliners.com/ http://www.itape.com/ http://www.agtec.com/
Contractor shall submit seepage testing procedure for Contracting Officer and subsequent Idaho DEQ review/approval prior to beginning construction. Following completion of seepage testing, Contractor shall submit written report summarizing test results for Contracting Officer review/approval prior to putting system back in service.
207.07 Acceptance. Geosynthetics will be evaluated under Subsection 106.03. Submit a production certification with each shipment of geosynthetics.
Geosynthetic installation will be evaluated under Subsections 106.02 and 106.04.
Measurement
207.08 When measuring geosynthetics for payment, measure the nominal plan view liner extent reflective of a liner that extends 2’ beyond the proposed lagoon inner top in all directions. For sake of simplicity this results in each cell having a liner with a plan view extent of 100’ wide by 180’ long. Contractor shall verify exact dimensions needed that covers the entire lagoon cell footprint, including adequate lagoon top length for proper anchorage as required, prior to ordering, which will exceed this nominal 100’ x 180’ footprint. No separate measurement will be made for inlet/outlet structure waterproof connections to each respective lagoon cell liner system.
When measuring Supplemental Drain Rock, measure by the cubic yard volume in the haul-vehicle.
Payment
207.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 207 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.