1. Schedule of Items.pdf

PDF 162 KB Posted

Attached to
GAOA Big Smoky Admin Site Improvements Project Federal contract opportunity
Solicitation number
1240LT25R0023
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items for the FY25 GAOA Big Smoky Administrative Site Improvements Project located in the Sawtooth National Forest, Fairfield Ranger District, Camas County, Idaho. The document provides a comprehensive base bid breakdown with 35 line items covering various construction and infrastructure improvement tasks, including mobilization, erosion control, sewage lagoon remediation, roadway work, concrete and pipe installations, water and sewer system improvements, fencing, and site restoration.

Key project elements include removing sewage sludge from two lagoons, installing new geomembrane liners, reconstructing an RV dump station, performing roadway excavation and embankment, installing water distribution systems, constructing a barbed wire laydown fence, and completing permanent seeding and signing. The solicitation requires contractors to submit pricing for all items under a single Firm Fixed Price contract, with a requirement to provide a quote valid for at least 60 calendar days. A bid guarantee is mandatory, and bond premium payments must be included under the mobilization line item.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA Big Smoky Admin Site Improvements Project, newest first.
File Type Posted
0.2 1240LT25R0023 Amendment 0002.pdf PDF
0.1 1240LT25R0023 Amendment 0001.pdf PDF
Big Smoky Admin Site - Q and A - Sign in Sheet.pdf PDF
6. Davis-Bacon Act WD ID20250022 - Camas Co..pdf PDF
3. CSI_SupplementalSpecs.pdf PDF
5. FirePrecautions&Plan.pdf PDF
0. 1240LT25R0023 - Solicitation.pdf PDF
7. Pictures.pdf PDF
Quote-Proposal Checklist.docx DOCX document
2. FP14 Supplemental Specs.pdf PDF
4. Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

FY25 GAOA Big Smoky Administrative Site Improvements Project

Sawtooth National Forest Fairfield Ranger District

Camas County, Idaho

B.1 Schedule of Items

Base Bid

Item No. Description Qty Unit of Measure

Method of Measure Unit Price Total Price

15101 Mobilization 1 Lump Sum LSQ $___________ $______________

15201 Construction Staking 1 Lump Sum LSQ $___________ $______________

15401 Contractor Testing 1 Lump Sum LSQ $___________ $______________

15701 Erosion Control 1 Lump Sum LSQ $___________ $______________

20101 Clearing and Grubbing 1 Lump Sum LSQ $___________ $______________

20301 Removal of Structures and Obstructions 1 Lump

Sum LSQ $___________ $______________

20302 Removal of Lagoon Cell Solid Sewage Sludge 162 Cubic

Yard AQ $___________ $______________

20303 Removal of Lagoon Cell Liquid Sewage Sludge 258,325 Gallon AQ $___________ $______________

20304 Remove Existing RV Dump Station Complete 1 Lump

Sum LSQ $___________ $______________

20401

Roadway Excavation & Embankment Including Haul, Subgrade Preparation, Scarification, Watering, and Compaction

1 Lump Sum LSQ $___________ $______________

20402 Select Borrow Including Haul, Watering, and Compaction 100 Cubic

Yard AQ $___________ $______________

20403 Waste, Haul and Disposal of Unsuitable or Excess Material 50 Cubic

Yard AQ $___________ $______________

20701 Wastewater Lagoon Cell Geomembrane Liner Installation

36,000 Square Foot CQ $___________ $______________

20702 Supplemental Drainrock Including Haul 200 Cubic

Yard AQ $___________ $______________

25101 Placed Riprap, Class 3 20 Cubic Yard AQ $___________ $______________

30101

1/2"-0” Crushed Aggregate Surfacing, Including Haul, Watering, and Compaction Method ‘E’

300 Cubic Yard CQ $___________ $______________

30401 Full Depth Reclamation, Including Haul and Stockpiling 5000 Square

Yard CQ $___________ $______________

30402 Supplemental 3/4"-0” Crushed Aggregate Base Including Haul 50 Cubic

Yard AQ $___________ $______________

30403 Reclaimed Aggregate Base, Including Haul, Watering & Compaction

5110 Square Yard CQ $___________ $______________

50101

Dump Station Cement Concrete Pavement Including Impact Slabs, Curbing, Islands & Basin Complete

1 Lump Sum LSQ $___________ $______________

60201

15-Inch Corrugated Steel Pipe, 0.079-Inch Thickness, Including Pre-Fab Flared End Sections, Bedding, Backfill and Compaction

132 Lineal Foot CQ $___________ $______________

60401 Adjust Manhole to Finished Grade 5 Each CQ $___________ $______________

60402 Concrete Structure Reconditioning/Rehabilitation 12 Each AQ

61101 Dump Station Water Distribution System Complete 1 Lump

Sum LSQ $___________ $______________

61102 Water Tower Unit Complete 2 Each CQ $___________ $______________

61201 Sanitary Sewer Lateral Inside Drop Manhole Connection Complete

1 Each CQ $___________ $______________

61202 Drain Hatch & Sanitary Sewer Service Connection Complete 1 Lump

Sum LSQ $___________ $______________

61203 Pump Truck Vault & Sanitary Sewer Service Connection Complete

1 Lump Sum LSQ $___________ $______________

61901 Fee Tube 1 Each CQ $___________ $______________

61902 Barb Wire Laydown Fence Including Wire Gate 1270 Lineal

Foot CQ $___________ $______________

62501 Permanent Seeding 1 Acre CQ $___________ $______________

63301 Permanent Signing Complete 1 Lump Sum LSQ $___________ $______________

63302 Guard Station Sign Installation 1 Lump

63501 Temporary Traffic Control 1 Lump

TOTAL BASE BID $_____________________

* Designated Method of Measurement:

AQ - Actual Quantities CQ – Contract Quantities LSQ - Lump Sum Quantities

B.2 SCHEDULE NOTES

a) One Firm Fixed Price contract will be awarded from this solicitation; contractors must submit pricing for all items.

b) Please provide a quote expiration date with your quote. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

c) Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Include bond payments under Base Item 15101 – Mobilization.

d) A bid guarantee is required for this solicitation. See FAR 52.228-1 Bid Guarantee (SEP 1996) in Section L.

B.2 SCHEDULE NOTES

File details come from the government source that posted it. Updated .