This document outlines the scope of work for a National Blanket Purchase Agreement to provide various professional services and natural resource work for the U.S. Forest Service. The BPA will have a period of performance from early 2023 through early 2033 and can be utilized by all federal agencies. Services include project management, inspection, cultural resource management, communications, data management, engineering, forestry, restoration work including road decommissioning and stream restoration, invasive species control, and more. Responses to the open continuous solicitation are required to ensure vendors are registered in SAM and thoroughly review the solicitation requirements. Individual task orders will have defined periods of performance and specify project details, deliverables, and pricing on a task order basis.

View the file

Other files

File Type Posted
12363N23Q4023-Amendment 07.pdf PDF
12363N23Q4023 Solicitation - Amendment 6.pdf PDF
Amendments 1-5 Combined.pdf PDF
Amendment 6 - Pricing List.pdf PDF
Amendment 6 - List of Changes and Instructions for Contractors.pdf PDF
Amendment 6 - Locations and Scopes.xlsx XLSX spreadsheet
Amendment 6 - All Scopes LMIR BPA.pdf PDF
Amendment 6 - SF-30.pdf PDF
12363N23Q4023 Amend 5-Final.pdf PDF
12363N23Q4023Solicitation-Final_Class Deviation Amendment.pdf PDF
Awardee List as of 6-3-24.xlsx XLSX spreadsheet
Amendment 4-12363N23Q4023_SF30.pdf PDF
Amendment 4- UpdatedLocationSpreadsheet_April2024.xlsx XLSX spreadsheet
Amendment 4- Instructions for LMIR BPA.pdf PDF
Amendment 4-NewScopes.pdf PDF
Amendment 4-AdditionalScopePricing.pdf PDF
LMIR Awardees as of 10_02_23.pdf PDF
12363N23Q4023-Amendment3.pdf PDF
12363N23Q4023-Amend2.pdf PDF
LMIR-QandA1-26.pdf PDF
12363N23Q4023Solicitation.pdf PDF
9. National Forest Locations.xlsx XLSX spreadsheet
12363N23Q4023-amendment1.pdf PDF
12363N23Q4023Solicitation.pdf PDF
9. National Forest Locations.xlsx XLSX spreadsheet
3. ProfessionalServicesScope.pdf PDF
3. ProfessionalServicesScope.pdf PDF
12363N23Q4023Solicitation.pdf PDF
12363N23Q4023Solicitation.pdf PDF
2. Cultural ResourceScope.pdf PDF
5. Tech-DataScope.pdf PDF
7. NEPA-SCOPE.pdf PDF
3. WildlifeSurveysScope.pdf PDF
1. ProjectManagementScope.pdf PDF
3. ProfessionalServicesScope.pdf PDF
3. LandSurveyScope.pdf PDF
4. CommunicationsTribalLiaisonScope.pdf PDF
6. ArchitectEngScope.pdf PDF
8. NaturalResourcesRestorationScope.pdf PDF
9. National Forest Locations.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Land Management Integrated Resources National BPA 12363N23Q4023

ATTACHMENT 3: BOTANICAL SURVEYS SCOPE

All requirements and specifications may vary based on location and agency utilizing the BPA.

Includes, but not limited to:

3. SCOPE OF WORK

The purpose of this contract is to provide a pool of contractors available to accomplish botanical surveys to determine the presence or absence of target species, document and map locations and populations of target species, and provide an ecological description of the areas surveyed. Work can be on lands managed by federal agencies anywhere in the United States. Botanical surveys may include vascular plants (including rare and invasive plants), non-vascular plants (bryophytes [mosses and liverworts] and lichens), and/or fungi, for an assortment of projects in diverse ecological settings over a broad geographic area. This is a Blanket Purchase Agreement (BPA) that spans multiple years (10 years – will be reviewed every year for relevancy). This contract requires surveys and documentation to be in compliance with its terms, specifications, clauses and provisions.

Over the duration of the contract, individual BPA calls with actual quantities will be issued and price competed.

Only vendors in the initial contract award pool will be allowed to submit a quote on the work offered, but are not required to quote on all orders. No restrictions have been set regarding the number of vendors in the award pool;

however, sufficient awards will be made to provide for adequate competition for BPA calls.

The products of this contract will be:

1. Conduct botanical surveys according to protocol(s) for target botanical species.

2. Document and map target species when located by surveys, using GPS and field forms. Fill out appropriate forms legibly so they are able to be printed or copied.

3. Document and map areas surveyed whether or not target species were found, on appropriate forms filled out legibly and able to be printed or copied.

4. Provide habitat information for target species populations and areas surveyed.

5. Provide maps delineating survey routes and populations of target plant species, or GPS Tracks of survey routes with locations of target plant species.

6. Appropriately collected and annotated voucher specimens of target plant species.

7. Monumenting of verified or potential target species.

8. Provide photos of each target species showing the entire plant as well as photos showing diagnostic characteristics (see each species protocol for additional requirements), and the habitat it occurs in.

9. Written report summarizing areas surveyed and target species located/mapped. If surveys span more than one season, then annual reports will be provided. If one-season surveys, then a final report will be provided. Reports include associated species, habitat descriptions, and habitat threats/disturbances.

10. Provide GIS mapping files and include a complete list of target species per unit and their location coordinates in an excel spreadsheet. Each BPA call will specify which mapping coordinates are to be used (e.g. UTM in Datum NAD 1983, Zones 10 North or 11 North, or latitude and longitude in decimal degrees).

4. LOCATION

Project sites would be located on Federal lands within the United States. All Federal agencies may utilize this contract, but it is not required. The main federal agencies using this contract will likely be the U.S. Forest Service (USFS) and U.S. Bureau of Land Management (BLM).

5. BPA CALLS

Over the duration of the contract, individual BPA calls with actual quantities will be issued and price competed.

Only vendors in the initial contract award pool will be allowed to submit a quote on the work offered, but are not required to quote on all orders. BPA calls will include site-specific work, maps, reporting requirements and deliverable information.

6. ACCESS

Survey area maps will be provided with each BPA call Request for Quotes. Work areas may be reached by Forest Service roads that are accessible by a standard two-wheel drive or four-wheel drive vehicle during normal operating seasons, unless otherwise indicated on Project Maps or Federal Travel Management maps. The cost of standard access described above should be included in the unit pricing on any BPA call. Some areas may require a walk-in distance to reach the survey site. If access is limited, the individual BPA call may request the Quoter to reflect access cost in their quotes. Vehicles shall not operate off system roads without prior written approval of the Contracting Officer.

In case of inaccessibility due to snow, mud, washouts, rock, slides, or fallen trees, the Government may, (1) clear the blockage or (2) provide an alternative route or (3) delete the inaccessible unit(s) or (4) substitute similar unit(s).

No vehicle shall by-pass any officially blocked road (barriers, locked gates, posted signs, rock/log/dirt, etc.)

without approval of the Contracting Officer. If approval is granted to go past locked gates, then a Government-furnished key will be made available to the Contractor.

7. DEFINITIONS

Bryophytes – A division of non-vascular plants composed of mosses, hornworts, and liverworts.

GPS – Global Positioning System – a network of orbiting satellites that use geometry to triangulate the position of the users ground position on the earth’s surface.

Intuitive Controlled Survey Method – Survey effort covers a representative (80%) cross section of all major habitats and topographic features within unit areas including slopes, draws, benches, ridges, riparian or wet areas, rock outcrops and meadows and is concentrated in areas of highly suitable habitat for the target species.

Invasive Plant Species – A species that does not naturally occur in a specific area and whose introduction does or is likely to cause economic or environmental harm or harm to human health.

Latitude, Longitude (lat/long) – A geographic coordinate system. A point referenced by its latitude and longitude values. Decimal degrees will be used when latitude and longitude is specified in the BPA call.

Non-Vascular Plants – Term used in this contract that refers to bryophytes and lichens.

NRM – The U.S. Forest Service Natural Resource Manager (previously known as NRIS and may be referenced as such on forms) is a set of corporate databases and computer applications designed to support field-level users. It houses the Threatened, Endangered, and Sensitive Plants – Invasive Species (TESP-IS) database.

Population – Multiple sites of a target species within a survey area. The BPA call may specify how to define sites for the target species. For example, for vascular plant species, the BPA call may define sites as being greater than 100 meters between individuals.

Site(s) – Locations of target plant species. Sites are individuals or groups of target species. A sighting form should be filled out and a voucher may need to be collected for each site, depending on the target botanical species.

Special Status Plant Species – For the purpose of this contract, this term will refer to vascular, non-vascular (bryophytes [mosses and liverworts] and lichens) plant species and fungi that meet the following requirements.

These are species which are proposed for listing, officially listed as threatened or endangered, or are candidates for listing as threatened or endangered under the provisions of the Endangered Species Act (ESA); those listed by a State in a category such as threatened or endangered implying potential endangerment or extinction; and those designated by the USFS Regional Forester/State BLM Director as sensitive or strategic; Survey & Manage plant species, and those species of local importance determined by an agency Botanist.

Survey Area – The entire area where target species are searched for even if no target species are found.

Target Plant Species – Species that are required to be surveyed on a BPA Call.

TESP – Threatened, Endangered, and Sensitive Plants

Unique Identifier or Collection Number – Use a numbering system that includes your initials and the sequential number that falls in line with your field collection notebook numbering system. For example: SCL8515 or A.G.

45038 or Emerson 1203. Do not include species codes in your collection number, if you’re identification is not correct; then the code makes no sense.

Universal Transverse Mercator (UTM) - A projected coordinate grid system based upon one of many different mapping projections. The projected coordinate system for UTMs is Datum NAD 1983, Zones 10 North or 11 North when specified on the individual BPA call. The data is displayed in meters Easting (X coordinate) and Northing (Y coordinate).

8. CONTRACTOR OBLIGATIONS

The contractor shall furnish everything necessary to perform this contract including, but not limited to, all labor, equipment, supervision, materials/supplies (except those materials designated as Government furnished; see section #20) and incidentals necessary to perform vascular and nonvascular plant surveys in accordance with the enclosed specifications, terms and conditions. All federal and state rules and regulations will be followed as well as appropriate federal agency jurisdictional guidelines unique to each agency.

Follow Federal and state rules and regulations which include but are not limited to:

• Transportation

• Equipment Operation

• Licensing

• Permitting

• Safety

• Labor Laws

• Federal Travel Regulations

The Contractor shall be liable for all loss or damage of such Government-furnished property until completion and final acceptance of work required under this contract.

The Contractor shall provide field personnel who have experience and knowledge of the following:

a. Are proficient in the identification of target species which pertain to the type of survey being conducted.

b. Experience in proper collection techniques for voucher specimens.

c. Experience in field techniques including aerial photo, map interpretation, and floristic field observation skills. This includes the identification of vascular plant species and plant communities for the geographical area of interest (to be able to make a list of associated species).

d. Ability to document location, ecological condition, habitat, and survey routes for areas occupied by target species.

Specifically, but not necessarily all inclusive, the Contractor shall furnish:

a. Compass with azimuth and the appropriate declination setting for the geographic area.

b. Clinometer

c. Hand Lens (minimum magnification 10X).

d. GPS receiver unit, recreational grade (e.g. Garmin E-Trex at a minimum) that will be used to map each site for each target species. The GPS unit must be capable of allowing the user to select the correct coordinate system (UTM and datum or lat/long) as specified in the BPA call. Mapping accuracy shall be 30 meters or better.

e. Protective covering for original aerial photos (large “Ziploc” freezer bags).

f. As specified in the BPA call, wide-lined permanent markers for marking flagging and fine-lined permanent marking pens for marking topographical maps and/or aerial photos.

g. Appropriate technical references (i.e., plant keys and monographs) to accurately identify botanical species encountered during the inventory. Examples include:

1. Vascular Plants – Flora of the Pacific Northwest (Hitchcock and Cronquist, et. al. Second Edition, 2018); Jepson Manual (Baldwin et al. 2012); Field Guide to the Sedges of the Pacific Northwest (Wilson et al. 2014); Flora of Oregon volume 1: Pteridophytes, Gymnosperms, and Monocots (Meyers et al. 2015).

2. Bryophytes – California Mosses (Malcom, Shevock, and Norris 2009); Keys to the Liverworts and Mosses of California (Norris 2004); Moss Flora of the Pacific Northwest (Lawton 1971).

3. Lichens – Macrolichens of the Pacific Northwest (McCune and Geiser 2009)

4. Fungi – Mushrooms of the Pacific Northwest (Trudell and Ammirati 2009); Phaeocollybia of

Pacific Northwest North America (Norvell and Exeter, 2009); Field Guide to North American Truffles (Trappe et al., 2007); Mushrooms Demystified (Arora 1986); Ramaria of the Pacific Northwestern United States (Exeter et al., 2006); Handbook to Strategy 1 Fungal Species in the Northwest Forest Plan (Castellano et al., 1999), Handbook to Additional Fungal Species of Special Concern in the Northwest Forest Plan (Castellano et al., 2003). On-line keys can be found at the Pacific Northwest Key Council: http://www.svims.ca/council/

h. A digital camera with a minimum resolution of 5 mega-pixels, JPEG format.

i. Compound and dissecting microscopes and chemicals required for proper identification of target species, and packets or other appropriate containers for vouchering specimens (see http://www.fs.fed.us/r6/sfpnw/issssp/inventories/identification.shtml)

j. Blank CDs or USB/thumb drive, for submitting electronic forms, maps, photos, summary report, and electronic data files.

k. Contractors must have access to a computer with an internet connection, email, and Microsoft Word and Excel programs and GIS mapping software if specified in BPA call.

http://www.svims.ca/council/ http://www.fs.fed.us/r6/sfpnw/issssp/inventories/identification.shtml

9. INSPECTION

The Government will conduct inspections of random survey units and all paperwork to determine work quality.

Each BPA call will specify what percent or how often inspections will occur of field forms, voucher specimens, and inspections of field surveys.

Table 1 provides an example of a scenario for inspecting work on this contract.

Table 1. Example of Government Quality Assurance Surveillance Plan for Vascular, Non-Vascular, and Fungi Surveys.

Performance Requirement

Performance Standard

Performance Measurement Penalties and Incentives

Adhere to all survey protocols See Section #15

The procedures and documentation of the survey protocols are completed as described.

• Inspect 100% of survey and site forms to ensure compliance to protocols.

• Inspection of the survey procedures may be ongoing while survey is in progress.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

Documentation forms and maps See Section #15

All forms (survey form, population site forms) and maps are filled out completely and legibly according to contract specifications and survey protocols. Able to relocate site from map. There is a linking identifier to all maps and voucher specimens. All forms are turned in on the agreed upon schedule.

Forms and maps must be legible and copy-able.

Inspect 100% of survey and site forms to ensure compliance to protocols.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

Monument Field Sites for each target species population See Section #15

Able to relocate sites.

Flagging and tags according to specifications.

Inspect a % (to be determined with each BPA call) of target species populations to determine that contract specifications are followed.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

Voucher Specimens See Section #15

Entire specimen is collected.

Field tag is completed and legible, and has a linking identifier to survey and sighting forms and maps.

All identifying features are described. If applicable, specimen is dried. Photo(s) are provided. All vouchers are turned in on the agreed upon schedule.

Inspect 100% of voucher specimens for quality of preparation and timeliness of submission.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

Performance Requirement

Performance Standard

Performance Measurement Penalties and Incentives

Field Procedures See Section #15

Survey maps or GPS tracks show that each unit area was surveyed so that a representative cross section (at least 80%) of all major topographic features and special habitat features were surveyed.

Inspect a % (to be determined with each BPA call) of survey units and target species site locations to determine that contract specifications are followed and performance standards met.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

Final Report See Section #16

Contractor provides (1) hard copy and (1) electronic copy of a Final Report. Also, for those taxa in which surveys span multiple years (fungi), Annual Reports are provided.

Inspect the annual and/or final survey report for quality of preparation and completeness of information.

See Sections #10 (Inspection of Services); #11 (Rework) and #14 (Payment)

10. FAR 52.246-4 INSPECTION OF SERVICES—FIXED-PRICE (AUG 1996)

(a) Definition. “Services,” as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the

Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

11. REWORK

The Contractor will be required to rework any area or portion thereof that does not meet the terms of the contract.

If the inspection reveals the need for rework, the COR will notify the Contractor immediately in writing. All rework must be completed prior to proceeding with new areas, unless otherwise specified in the BPA call.

The following deficiencies will require rework:

1. Populations or habitats not identified;

2. Survey and/or Sighting forms not filled out completely and correctly, or do not have linking identifier to any voucher specimen and map;

3. Voucher specimen field tags not completely filled out or do not have linking identifier to any sighting form or map, or missing photos of target species and habitat.

4. Maps that do not thoroughly or accurately portray the survey route, have target species incorrectly located, are not legible, and do not have a linking identifier to any sighting forms, and voucher specimens;

5. Sites that cannot be relocated by flagging or do not have a linking identifier to any sighting forms, voucher specimens and maps

6. GIS data that is the wrong datum, not digitized correctly, unique identifier does not match data form or is missing a required attribute and;

7. Final reports that are not complete.

Unless otherwise specified in the BPA call, if work falls below minimum standards for field work (e.g., inaccurate GPS coordinates, monumenting) and documentation (e.g., maps, sighting forms, vouchers, and report), the Government will immediately notify the Contractor in writing and order improvement of the quality of future work. Reinspection after rework will be made in the same manner as the first inspection but in a different area. If the quality of future work is not raised to a satisfactory level within three consecutive workdays after receipt of notice in writing of unsatisfactory work, the Contractor’s right to proceed may be terminated and the contract considered in default. Repeated failure to perform work at an acceptable performance shall also be considered reason for contract termination and default action.

12. CONTRACTOR’S QUALITY CONTROL PLAN

For contract evaluation purposes only, the Contractor shall provide a detailed Quality Control Plan (QCP) in their proposals specific to the Technical Approach requirements. In general, the Quality Control Plan must demonstrate how the contractor will assure quality, and meet the requirements and specifications of the contract.

It shall describe: how quality will be monitored to assure the performance standards are met; the supervision of the work; and personnel that will be performing the quality control. In addition, the Contractor should address industry standard guidelines, and any applicable State or Federal specifications, protection to the environment and wildlife habitat, and public safety in constructing a Quality Control Plan.

The Government may or may not require a specific quality control plan for each BPA call competed. If required it will be described in the BPA call. The Government may ask for additional information in the Quality Control Plan prior to acceptance.

When required and after the Contractor’s Quality Control Plan has been accepted by the Government, it will be incorporated into the Government’s Quality Assurance Surveillance Plan.

13. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN - See #10 Inspection

The Contracting Officer or the Contracting Officer’s duly authorized representative COR will inspect and accept the supplies and/or services to be provided under this contract.

Monitoring may consist of:

a. Field operations by visiting job site(s).

b. Compliance to Quality Control Plan.

c. Compliance to any requirements listed on individual BPA calls, including adherence to performance period and time table for subitems.

The Government will incorporate a mutually agreed upon Contractor Quality Control Plan into a Government Quality Assurance Surveillance Plan.

14. PAYMENTS

Payment will be made at the unit price offered in the schedule of items in each BPA call, for the unit of measure completed and accepted. A mutually agreed upon schedule for periodic payments will be arranged at the post award conference. When inspection results are not at a satisfactory level and the deficiency is correctable, payment will not be made until the deficiency has been corrected. Final payment under the contract will not be made until all Government-furnished property utilized during performance of the contract has been returned as directed by the COR.

The following is an example, as the Payment schedule will be determined by the CO for each BPA call. FULL PAYMENT meets all of the following 4 conditions:

1. If >95% of the field forms turned in for payment meet the performance standards and

Contractor has corrected the deficiencies within three days of notification by the COR.

2. If >95% of the inspected mapped target species locations meet the performance standards.

3. If > 95% of voucher specimens are submitted are properly prepared with the required forms attached.

4. If >95% of the inspected units meet the performance standards for field procedures and species identification.

PARTIAL PAYMENT is based on the average percentage of the above 4 conditions when at least one condition falls below the threshold. The conditions are evenly weighted.

Example: Contractor meets conditions 1, 2 and 4 above for 100% but meets condition 3 at

60%. Partial payment would be calculated as follows:

100% condition 1 completed x 25% weighted average = 25 (100 x .25 = 25) 100% condition 2 completed x 25% weighted average = 25 (100 x .25 = 25)

60% condition 3 completed x 25% weighted average = 15 (60 x .25 = 15) 100% condition 4 completed x 25% weighted average = 25 (100 x .25 = 25)

For a total of: 90 % of quote price

15. DELIVERABLES/TASKS

Field Work and Documentation

BPA calls may be issued for field work between the contract award date and when the BPA’s are terminated. The period of performance for BPA calls will be indicated in each BPA call.

The Contractor shall conduct surveys following the most current, established written protocols for target species. Potential survey protocols to be used in the BPA calls are available by request from the COR.

If there is no survey protocol for the target species, surveys would be conducted using the Intuitive Controlled Survey Method. The Contractor shall survey units by walking routes that cover a representative cross section (at least 80%) of all major topographic features (slopes, draws, benches, ridges, etc.) and special habitat features (wet areas, rock outcrops, ridges, riparian areas, etc.) of each unit.

In areas of high potential habitat, a more thorough and intensive survey shall be made. Two or more entries into portions of units may be needed in order to identify the target plant or fungal species likely to occur during its flowering/fruiting period.

All field work shall be fully documented using forms provided by the government agency (see examples in Attachments 2-5 and 7-10). In order to receive full payment, all required fields must be properly and legibly completed.

Units where boundaries are not clearly identified on the ground shall be surveyed by approximating the boundary location from maps and photos provided by the Federal Agency.

For every survey unit, the Contractor shall:

a. Complete the appropriate Survey Field Form(s) (see Survey Field Form example, Attachment 2) as specified in the BPA call. Survey Field Form(s) must be completed whether or not target species were found and shall have a map attached that shows the approximate location of the survey routes traveled. All required fields on the form must be completed and legible. Forms will be filled out electronically or hardcopy, depending on what is specified in each BPA call.

b. Complete a list of all plant species encountered during the survey that are either in flower/fruit at the time of the survey, or are readily identifiable vegetatively. Lists will be provided in an Excel spreadsheet or hard copy field form, depending on the BPA call specifications.

c. Delineate survey routes with flagging (Government-provided) or GPS tracks, depending on the BPA call specifications. If routes are to be flagged, each BPA call will specify how to hang the flagging.

The following is an example of what may be required. Double strands of route flagging shall be labeled/dated and hung at the beginning and end of each route. Single strands shall be hung approximately every 100 feet along the survey line to show the survey route. When contours of the land and/or dense vegetation reduce easy visibility, flagging shall be hung at whatever intervals are needed to follow the survey lines. The survey route shall be accurately depicted on a separate topographic section map. Writing on all flagging shall be with a wide-tipped permanent black marker, and note the project for which the survey is being completed, date, and surveyor’s initials.

The Federal Agency for which the task order is being accomplished shall select the appropriate color of flagging to be used to denote the survey route. If GPS tracks are used, then the tracks shall be turned “on” to record the survey routes taken.

d. Depending on the individual BPA call, the contractor may be required to provide a typed Word-compatible summary report, whether or not target species are found.

When a target species is found, each population will be given a unique identifier number, documented on the appropriate form(s), and may require collection of a voucher specimen, depending on the BPA call specifications. Target plant populations shall be mapped and must be re-locatable using flagging and coordinates as specified in BPA call.

For every site, the following shall be completed by the Contractor:

a. Collect location coordinates at the site for populations of all target species and record the coordinates on the appropriate field form (e.g., see example of Element Occurrence Form, Attachment 3). The type of GPS equipment and the Datum and Zone if using UTMs shall be indicated on the site form (e.g., Trimble GeoExplorer 3, NAD83 Zone 10), as well as the accuracy level if provided on the GPS unit (e.g., accurate within 10 meters). Mapping accuracy shall be 30 meters or better. Coordinates are to be in NAD83.

Depending on the BPA call, GPS the center of each target species population and/or the boundary.

Shapefiles with data attribute tables and coordinates of the GPSed populations may need to be provided to the COR along with the required forms once every two weeks, depending on the BPA call specifications.

All GPS point locations will be submitted to the COR in a shapefile as polygons. Minimum polygon size is 0.1 acre.

b. Each BPA call will define how to flag a site so it can be relocated. Depending on the BPA call, the

Contractor may be required to monument sites for voucher specimens whose taxonomic identity is not yet determined. The following is an example of how a site may be required to be flagged:

1. Sites will be flagged so they can be relocated. Reference trees may need to be documented on the target species sighting form. For sites less than 30 feet in diameter, place 2 long flags as close to the center of the site as possible, but in a location where they can be easily seen from a distance.

If no trees or shrubs are close to the species occurrence to attach the flags to, hang them on the closest trees or shrubs within 50 feet and indicate on the flagging the azimuth and distance to the actual species location. Hang single strands of flagging close to the actual location(s) of the target plants. Perimeter flags around the occurrence boundary are not required for these small sites. GPS the center of the population.

2. For occurrences greater than 30 feet and less than 100 feet in diameter, place 2 long flags in the approximate center of the site and clearly flag the perimeter of the polygon with single strands.

Also hang single strands of flagging close to the actual location(s) of the target plants. Draw the population boundary on both the topographical map and the aerial photo. GPS the center of the population and map these sites as polygons.

3. If the occurrence is greater than 100 feet in diameter, mark the approximate center of the population with 2 long flags and hang single strands of flagging close to the actual location(s) of the target plants. Map the boundary of the population on both the topographical map and the aerial photo as a polygon, but no perimeter flagging is needed. GPS each sub-population and show their locations on the topographical map. Indicate on the site form how any sub-populations were flagged within the polygon.

4. The central flagging at each target plant site shall be labeled with the plant code, date, site number, and surveyor’s initials. Writing shall be from the knot down on the upper end of the flag, using a wide-tipped permanent black marker. Multiple sightings of the same species with a survey unit shall be clearly labeled in sequence, for example, “species, population 1, date, surveyor’s initials,” “species, population 2, date, surveyor’s initials,” etc. The single strands of flagging marking the actual location of the species occurrence and at least some of the perimeter flagging should be marked with the species code and site number to help distinguish it from adjacent populations. Plant species codes are found in the PLANTS Database at:

http://plants.usda.gov/java/.

If a PLANTS Database species code does not exist for a non-vascular or fungal species, write enough of the scientific name for the species to be properly identified on the flagging.

c. The location of the sites shall be accurately marked on an aerial photo and on a topographical map as a point or polygon, as appropriate. The species code and site number shall be used. If the site is a polygon that contains multiple patches of plants, number these sub-populations and show their locations on the map. The site number on the flagging shall match that on the site forms and the maps.

d. All required data fields must be completed on the appropriate site forms. Electronic or hardcopy forms shall have a map attached that shows the location of the site.

e. At least one photograph of the target species itself and one of the general habitat where it is located shall be taken after hanging the identifying flagging. Each photograph shall be labeled with an Image ID number and the number recorded on the appropriate field form. Photos may be submitted electronically or hardcopy once every two weeks for the corresponding site forms. Any data, photos, findings, survey results etc.…are the property of the Government. The Government will retain the rights to use this intellectual property as needed.

f. Voucher collections, if required, will be appropriately collected and annotated according to protocols for these species. Each BPA call will describe the vouchers that need to be collected. Depending on the http://plants.usda.gov/java/ individual BPA call, the Contractor may be required to submit vouchers to the Regional Inventory Coordinator Assistant.

Resource Protection – The Contractor shall take all practical precautions while working to minimize soil damage, and damage or destruction of sensitive status plants and animals, and archeological resources. The work is limited as follows:

a. Utilize existing roads to fullest extent without creating new roads.

b. Utilize foot or ATV travel, when permitted, keeping in mind fire precaution levels, as the main mode of travel to survey areas where off-road travel is necessary.

c. All roads (public and private) damaged by the Contractor shall be restored (at no cost to the

Government) to their condition prior to commencement of work.

16. REPORTS

The contractor shall provide one (1) hard copy and one (1) electronic copy (Microsoft Word-compatible document on a CD or USB/thumb drive) of a Report for each fungi survey season or a Final Report for one-season botanical surveys. Reports must include color copies of a map of the project area, designating the survey routes and element occurrences, areas of populations of known or potential target species, list of vouchers completed, including the dates, acres surveyed, and element occurrences found, and a summary of habitats found in the different units, including information on elevation ranges, topography (including relationship to watershed), soil types, plant communities, dominant trees, shrubs, and forbs, special habitats, apparent history (e.g., burned), and observations (e.g., presence of invasive plants, OHV impacts, etc.).

In addition to the written report(s), the Contractor will also provide:

a. An Excel spreadsheet summarizing target species locations by unit with 5 columns of information:

1. Genus

2. Species specific epithet

3. Species code (using the PLANTS database as a source for the code names; If the PLANTS database does not list the species, then a code will be entered that is the first 3 letters of the genus plus the first 3 letters of the species)

4. Unique identifier (collector’s numbering system discussed earlier)

5. Location coordinates as specified in BPA call (x,y coordinates)

b. An Excel spreadsheet summarizing associated species.

Depending on the BPA call, the Contractor may be required to present survey results in person to Agency Botanists, using a Powerpoint presentation to show photos of habitats surveyed and photos of target plants and the habitat these populations occurred in. Presentation would be one hour or less and the Contractor would respond to questions and interact with Agency Botanists.

The specific BPA call may require additional data such as:

i. Tables and/or charts indicating target species occurrences, habitat, abundance and plant communities or plant associations.

ii. If more than 10 specimens of one species are found, summarize the habitat, substrate, site types and other relevant ecological information.

17. TIMEFRAMES FOR SUBMITTING DOCUMENTATION

Each unit issuing a BPA call will determine timelines for submitting documents.

Table 2. Forest Service example of potential timeframes for submitting documentation. Each BPA call will determine the timeframes.

Process Who When NRIS TESP and/or Invasives Survey Forms

Contractor Every two weeks

NRIS TESP Element Occurrence Forms

Voucher specimens, required forms, data and photos

Inspect documents, vouchers and electronic shapefiles/data files to ensure all information provided

Government Within 5 calendar days from receiving the documentation.

Notify Contractor of any documents that need to be redone, maps/photos that are missing, mis-identified or incomplete voucher specimen(s), or incomplete shapefile/data files

Government Within 3 calendar days after Government’s inspection.

Resubmit documents, missing or inaccurate maps/photos, incomplete voucher specimens, or electronic data files.

Contractor Within 7 calendar days of notification.

Conduct random inspections of surveyed units Government Within two weeks of receiving Survey Forms, Element Occurrence Forms, and maps and/or GPS tracks.

Notify Contractor of units requiring resurvey Government Within 3 calendar days after Government’s inspection.

Resurvey Units Contractor Within 7 calendar days of notification.

For one season surveys (vascular plants, nonvascular plants): Electronic Final Report, final batch (not already submitted) of forms, maps, photos, electronic data files, and aerial photos (if requested) for task order

Contractor Within 14 calendar days after all work completed on task order

For fungi surveys (two year surveys): After each season (i.e., spring, fall): Electronic Interim Report, forms, maps, photos, electronic data files, and aerial photographs (if requested) for task order

Contractor Within 14 calendar days after all work completed (each season) on task order.

Final Report Contractor No later than 30 days after field work is completed.

Process Who When Invoice submitted Contractor Within 14 calendar days of

Government acceptance date of document and field inspections.

Invoice processed Government Within 7 working days of invoice receipt date – per Prompt Payment Act.

22. LANDSCAPE PRESERVATION

The Contractor shall give attention to the effect of contract operations upon the landscape, shall take care to maintain natural surroundings undamaged, and shall conduct the work at all times in compliance with the following requirements.

a. Prevention of Landscape Defacement: The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other natural features or any other improvements in the work area unless specifically authorized by the Government. Unless otherwise provided herein, the Contractor shall confine contract operations to within the area designated in contract documents.

b. Protection of Streams, Lakes and Reservoirs: The Contractor shall take sufficient precautions to prevent pollution of streams, lakes, small ponds, and reservoirs with fuels, oils, bitumens, calcium chloride, silt or other harmful materials. Mechanical equipment shall not be operated in live streams without written approval of the Government.

23. PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

EQUIPMENT CLEANING INSPECTION/VERIFICATION FORM

Date: Contract #:

Contract Name:

Contractor Representative:

USFS COR/Inspector:

Type of Equipment:

How was the Equipment Cleaned?

Where was the Equipment Cleaned?

LOCATION OF LAST OPERATIONS:

State:

Federal Location:

Non-Federal Location:

I certify that all requirements as outlined in the equipment cleaning contract provisions have been met, and that all equipment has been thoroughly cleaned of soil, seeds and vegetative material. I also certify that the above information is true to the best of my knowledge.

Contractor Signature Date

ATTACHMENT #14

BPA CALL SAMPLE

Contract No. Project Name:

Requisition No.:Issue Date:

BPA Call No.

Contractor:

Telephone:__________ DUNS No.________

Issuing and Billing Office:

Item No.

Description Quantity Order

Unit

Unit Price

Amount

Remarks: See Attachments for additional terms and conditions. The Period of Performance for this Task Order is from the Date of Award through .

Total Price:

Contractor: (Name and Signature)

Requested By: (Name and Signature)

COR:

Fund Authorization (Name and Signature)

Line Officer Ordered By: (Name and Signature)

Contracting Officer

File details come from the government source that posted it. Updated .