This is a Request for Information (RFI) information package from Brookhaven National Laboratory for the procurement of nine helium-water shell-and-tube heat exchangers to replace aging equipment in the RHIC Central Helium Plant. The project involves four primary intercoolers operating at 4.5 bar inlet pressure cooling helium from 405 K to 305 K at 1.13 kg/s mass flow rate each; four primary aftercoolers operating at 16.7 bar inlet pressure with identical temperature and flow specifications; and one smaller utility compressor aftercooler operating at 17 bar inlet pressure cooling helium from 350 K to 308 K at 0.096 kg/s. All units must be engineered and fabricated to ASME BPVC Section VIII with U-stamping, fitted with helium on the tube-side and water on the shell-side to match existing plumbing interfaces, and mass-spec leak checked to 10⁻⁹ Torr-L/s for water-to-helium leakage. The procurement encompasses fabrication and delivery, preliminary and final design reviews with engineering calculations, detailed fabrication drawings and material certifications, test procedure review and compliance testing results, vendor inspection visits to BNL to examine existing equipment, and BNL visits to vendor facilities for fabrication and testing progress hold points. Design specifications are detailed in Tech Spec SPEC-CAD-1372, with quality and management requirements to be included in a future Request for Proposal. The RFI goals are to identify qualified vendors capable of fabricating similar water-cooled gas-process heat exchangers, collect budgetary cost and fabrication schedule estimates, and familiarize potential vendors with BNL procurement requirements and timelines. BNL is a Department of Energy national laboratory located in Upton, New York, managed by Brookhaven Science Associates in partnership with Stony Brook University. The RHIC facility is shutting down in 2026 for upgrade to the Electron-Ion Collider, with the central helium plant undergoing repairs and upgrades to support EIC operations beginning in the early 2030s.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5.c 31025042_drw.pdf | ||
| 4. SPEC_CAD-1372.pdf | ||
| 5.b 31025041_drw.pdf | ||
| 5.d 31025043_drw.pdf | ||
| 5.e 31025046_Utility_HX.pdf | ||
| 2. RFI Document 475215.pdf | ||
| 1. RFI Letter 475215.pdf | ||
| 5.a 31025040_drw.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RHIC Central Helium Plant Helium-Water Heat Exchanger Replacement Project
Intercooler and Aftercooler Replacement Project RFI Information Package Roberto Than, Pratik Patel, and Russell Feder Brookhaven National Lab Collider-Accelerator Division Cryo Group January 20, 2026
IntercoolersAftercoolers
Intercoolers Aftercoolers Typical "floating head" three-flange construction of current heat exchangers
This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
Outline
I. Project Introduction and Goals of the RFI
II. Introduction to Brookhaven National Lab
III. Intercooler and Aftercooler Mechanical Design
IV.Intercooler and Aftercooler Process Diagrams
Nine new helium-water shell-and-tube heat exchangers
Director’s Review of Injector Operations and RHIC R&R July 8-10, 2025
• The purpose of this project is to procure quantity nine (9) new helium-water shell-and-tube heat exchangers. The old heat exchangers currently cool compressed helium in the Relativistic Heavy Ion Collider (RHIC) central helium refrigeration plant at Brookhaven National Lab (BNL).
• Starting in 2026, the RHIC is shutting down to undergo a major upgrade. The machine will become the Electron- Ion Collider (EIC), coming back online in the mid 2030s. The RHIC central helium plant will become the EIC central helium plant, and these new replacement heat exchangers will be part of the helium refrigeration system for EIC.
• Four of the heat exchangers, the primary intercoolers, will operate at a helium inlet pressure of 4.5 bar and cool the helium from 405 K to 305 K at a mass flow rate of 1.13 kg/s each.
• Four of the heat exchangers, the primary aftercoolers, will operate at a helium inlet pressure of 16.7 bar and cool helium from 405 K to 305 K at a at a mass flow rate of 1.13 kg/s each.
• There is a single smaller aftercooler on the utility compressor skid. This aftercooler will operate at a helium inlet pressure of 17 bar and cool helium from 350 K to 308 K at a at a mass flow rate of .096 kg/s each.
• See Tech Spec "SPEC-CAD-1372" for all other design and fabrication parameters.
Nine new helium-water shell-and-tube heat exchangers
July 8-10, 2025
• There are additional important design requirements:
• The overall design should minimize helium leakage to outside air.
• Because the helium flow is part of a cryogenic plant cycle, the cross-stream leak rate must be zero. Delivered units will be required to be mass-spec leak checked to 10-9 Torr-L/s for the water to helium side leak rate.
• The heat exchangers must be engineered and fabricated to ASME BPVC Section VIII, and be U-stamped.
• The new units must fit into the same location and mate with the same water and helium plumbing as the original units. This requires helium to be on the tube-side and water to be on the shell-side of the heat exchanger units.
• Tech Spec "SPEC-CAD-1372" is the primary document for all design and fabrication requirements. A statement of work (SOW) that includes quality and management requirements will be included with the future Request For Proposal.
• The complete procurement will involve
• Fabrication and delivery of nine heat exchangers
• Preliminary and final design reviews and final design documentation, including all required engineering calculations.
• Final detailed fabrication drawings and material certs
• Test procedures review and a complete set of compliance testing results
• Vendor visit(s) to BNL to inspect the old heat exchangers in place
• BNL visits to the vendor for fabrication and testing progress hold points
Goals of the Request for Information (RFI)
July 8-10, 2025
The goals of this RFI are
1. Identify vendors that are qualified to participate in the future RFP and evaluate vendor capabilities and experience fabricating similar water-cooled gas-process heat exchanger
2. Collect budgetary cost and fabrication schedule estimates from potential vendors
3. Help potential vendors understand BNL procurement requirements, typical procurement timelines, and to answer questions about working with BNL
Introduction to BNL and the RHIC Helium Refrigeration Plant
Department of Energy National Labs
• The U.S. Department of Energy funds and directs the operations of 17 national labs
• Brookhaven National Lab (BNL) is part of the DOE Office of Science (the red labeled labs on this map)
• BNL is managed by Brookhaven Science Associates (BSA) which is a partnership between the DOE and Stony Brook University
• Office of Science | Department of Energy
• Brookhaven National Laboratory — a passion for discovery (bnl.gov)
• Stony Brook University, New York
This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
https://www.energy.gov/science/office-science https://www.energy.gov/science/office-science https://www.bnl.gov/world/ https://www.bnl.gov/world/ https://www.bnl.gov/world/ https://www.bnl.gov/world/ https://www.bnl.gov/world/ https://www.stonybrook.edu/ https://www.stonybrook.edu/
Brookhaven National Lab BNL is located in Upton, NY about 1.5 hours drive east of NYC on Long Island.
New York City
Brookhaven National Lab
JFK airport
Newark airport RHIC Cryo Central Plant
East 1005 office building
LHe storage
Compression Expansion
Cooling towers
Oil separation
NSLS-II
AGS
BNL
New York City RHIC Cryo Central plant Bldg 1005
RHIC Cryo Central plant Bldg 1005
Building 1005H
• Helium gas compression
• Oil processing and separation systems
• Helium purification system
Building 1005R
• Helium refrigeration and liquefaction
• Cold box vacuum systems
Building 1005S
• Cryo control room (CCR)
• Central computer control systems
• Operations offices and shops
Helium gas storage
• 47 tanks storing 26,000 LHe gallons equivalent
Building 1006B
• Typical cryo service building at 2, 4, 6, 8, 10, and 12
• EIC Project Warm and cold gas distribution
• Central Plant Upgrades Local PLC control systems
Cooling Tower #7
The Central Helium Processing Plant The heart of RHIC/EIC helium processing and pumping is at building 1005
From 1006B helium is divided and circulated through the blue and yellow RHIC rings
Helium is pumped to and from 1006B and 1005R through long cryogenic distribution system.
Director’s Review of Injector Operations and RHIC R&R July 8-10, 2025 This information is controlled by the U.S. Department of Commerce Export
Relativistic Heavy Ion Collider (RHIC) Cryo-plant
This information is controlled by the U.S.
Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
The Electron-Ion Collider Project
• In 2026 RHIC will shut down and BNL will start a project to transform RHIC in to the Electron-Ion Collider (EIC).
• The Central Helium Plant that cooled RHIC for 25 years will undergo repairs and upgrades to service EIC.
• EIC will start operations in the early 2030s.
• Electron-Ion Collider (EIC)
The RHIC central helium plant at the 5:00 position becomes the EIC central helium plant.
This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
https://www.bnl.gov/eic/ https://www.bnl.gov/eic/ https://www.bnl.gov/eic/ https://www.bnl.gov/eic/
Intercooler and Aftercooler Layout and Design
Photographs of the Intercooler and Aftercooler Stacks
Intercoolers
Intercoolers
Aftercoolers
Aftercoolers
Typical Flange Configuration
IntercoolersAftercoolers
IntercoolersAftercoolers
3D CAD Models of the Intercooler and Aftercooler Stacks The project involves removing the eight old heat exchangers and installing eight new units in the same place using the same supply and return piping interfaces.
Viewing the intercoolers and aftercoolers from above
3D CAD Models of the Intercoolers and Aftercoolers In Building 1005
1st Stage Compressors
2nd Stage Compressors
Utility Compressor Intercooler and Aftercooler Units
Intercooler Shell and Port Design Dimensions
Intercooler Stack Assy Design Dimensions
Aftercooler Shell and Port Design Dimensions
Aftercooler Stack Assy Design Dimensions
Process Diagrams
1005H Helium Compressor System Diagram 1st Stage
Compression Helium
Intercoolers 2nd Stage
Compression Helium
Aftercoolers Oil Removal Equipment
Flow to Refrigerator• This process flow diagram shows helium flow only in building 1005H. The primary helium flow is from left (A) to right (B) in the diagram.
• The intercooler and aftercooler stacks are shown as simple boxes in this diagram
This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
1005H Gas Management Control Screen Diagram
• This is a snapshot of the Gas Management control screen in our control room.
• Typical helium pressure (blue), temperature (green), and flow (olive) data from RHIC are shown. Helium and cooling water flow rates for EIC will be higher.
• Cooling water parameters and heat exchanger performance details for the intercooler and aftercooler are not shown.
This information is controlled by the U.S. Department of Commerce Export Administration
Simplified T-s diagram for the RHIC helium process
July 8-10, 2025
Simplified T-s diagram for the RHIC Central Helium Plant
Aftercooler Temperature Step
Intercooler Temperature Step
1st Stage Compression
Helium Intercoolers
2nd Stage Compression
Helium Aftercoolers
Oil Removal Equipment
Flow to Refrigerator
This information is controlled by the U.S. Department of Commerce Export Administration Regulations 15 CFR Parts 730-774 as EAR99 Technology.
Intercoolers P&ID There are three flows
1. Helium
2. Water
3. Oil Drainage
This information is controlled by the U.S. Department of Commerce Export Administration
Aftercoolers P&ID There are three flows
1. Helium
2. Water
3. Oil Drainage
This information is controlled by the U.S. Department of Commerce Export Administration
Utility Compressor
Aftercooler HX Information
Utility Compressor Skid P&ID Diagram
Helium-Water Aftercooler
This information is controlled by the U.S. Department of Commerce Export Administration
Utility Compressor Aftercooler Heat-exchanger Drawing
UT skid and UT skid aftercooler photos here BOS-HATTEN INC.
BUFFALO, N.Y.
SERIAL 821 696 83
NATL. BD. 2965
{U}
S/W SHELL TUBES
DES.PRESS: 150 FV & 400
TEST PRESS. 225 600
DES. TEMP 250F 250F
KOCH PROCESS SYSTEM
CUST. PO 516602
ITEM AC2394
UT HX Aftercooler
UT HX Aftercooler Head
Creo CAD model view of UT Skid
UT HX Aftercooler 6 5/8" OD X 13' 4" long
| RHIC Central Helium Plant�Helium-Water Heat Exchanger Replacement Project |
| Outline |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Department of Energy National Labs |
| Brookhaven National Lab�BNL is located in Upton, NY about 1.5 hours drive east of NYC on Long Island. |
| Slide Number 9 |
| Relativistic Heavy Ion Collider (RHIC) Cryo-plant |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Slide Number 27 |
| Slide Number 28 |
| Slide Number 29 |
| Slide Number 30 |
File details come from the government source that posted it. Updated .