3_Bldg. 1082 HVAC Submittal Schedule - DRAFT.pdf
PDF 572 KB Posted
- Solicitation number
- FA4626-26-R-0007
About this file
This is an AF Form 66 Schedule of Materials Submittals for a federal construction contract at Malmstrom Air Force Base, Montana.
The document outlines required technical submittals for Project NZAS 21-0056, "Repair HVAC Systems Communication Facility Bldg. 1082" under Solicitation/Contract No. FA4626-26-R-0007. The schedule identifies five Division 01 submittals that the contractor must provide to the project engineer and contracting office: (1) Start of Work notification due 10 days prior to starting work; (2) Pre-Final and Final Inspections documentation due 14 days prior to final inspection; (3) AF Form 103 due 5 days prior to starting work; (4) Environmental Assessment List (EAL) due 14 days prior to starting work; and (5) asbestos and lead paint test results due 10 days prior to starting work. The form includes columns for the project engineer to specify the number of copies required, submittal type (certification of compliance, shop drawings, samples, manufacturer data, etc.), required submission dates by contractor, dates received in contracting, dates forwarded to Civil Engineering, return suspense dates, submittal numbers, and approval/disapproval status. The document includes a comprehensive schedule of abbreviations defining submission timing requirements relative to contract milestones and project phases.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MALMSTROM AFB, MONTANA
Solicitation/Contract No.
FA4626-26-R-0007
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C
ER
TI
FI
C A
TI
O
N O
F C
O M
PL
IA
N C
E
SH
O
P D
R A
W
IN
G S
C D
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M A
N U
FA
C
TU
R
ER
'S
R
EC
O
M M
EN
D
A
TI
O N
S
M A
N U
FA
C
TU
R
ER
'S
W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O
PE
R A
TI
N
G
IN
ST
R U
C
TI
O N
S
N O
TI
FI
C A
TI
O
N
O
TH
ER
R
EQ
U
IR
ED
SU
BM
IS
SI
O N
D
TE
(B Y
C
O N
TR
A
C
TO
R
D A
TE
R
EC
EI
V
ED
IN
C O
N
TR
A C
TI
N
G
D A
TE
T
O C
IV
IL
EN
G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
TE
SU
BM
IT
TA
L N
U M
BE
R
S
C O
N
TR
A C
TO
ES
U
BM
IT
TA
L
FI
N
A L
A
PP
R O
V A
L
REMARKS
Division 01 APPROVED DIS-
APPROVED
1 01 00 00 - 3.1 Start of Work X 10 Days
PTW
2 01 00 00 - 3.2 Pre Final and Final Inspections X 14 Days
PTI
3 01 00 00 - 3.13 AF Form 103 X 5 Day
PTSW
4 01 00 10 - 1.1 EAL X 14 Day
PTW
5 Provide asbestos and lead paint test results X 10 Days
PTW
ACA = After Contract Award PTFI = Prior to Final Inspection
AFA = After Final Acceptance PTFP = Prior to Final Payment
AFI = After Final Inspection PTNT = Prior to Notice to Proceed
ANTP = After Notice to Proceed PTO = Prior to Outage
AWC = After Work Completed PTSA = Prior To Start of Action
BMF = Before Material Delivery PTSW = Prior to Starting Work
EWD = Each work day AF Form 3000 not required SN = Advance Notification
PTCW = Prior to Completing Work SRO = After Each Occurrence
PTFA = Prior to Final Acceptance PSS
Project Title: Project Number
SCHEDULE OF MATERIALS SUBMITTALS
= Per Submittal Schedule
NZAS 21-0056 Repair HVAC Systems Communication Facility Bldg. 1082
Schedule of Abbreviations:
Number of Copies Required
DATE CONTRACTOR NOTIFIED
AF Form 66 Submittal Schedule-3/2/2026
01330a-1
REQUIRED TECHNICAL SUBMITTALS
DRAFT
File details come from the government source that posted it. Updated .