2_BW As-Builts 2009 HVAC B 1082.pdf

PDF 2 MB Posted

Attached to
Vertical Construction Multiple Award Contract (MAC)
Solicitation number
FA4626-26-R-0007
Issued by

About this file

This document is a comprehensive set of architectural and engineering drawings for the repair of the HVAC system in Building 1082 at Malmstrom Air Force Base, Montana, under project NZAS 09-1032 issued by Global Strike Command.

The drawings include detailed construction documents covering structural steel, concrete, mechanical systems, electrical systems, and plumbing work required for the HVAC building repair project. The set encompasses floor plans, roof plans, reflected ceiling plans, mechanical equipment schedules, ductwork layouts, piping schematics, electrical distribution plans, lighting fixture schedules, and detailed construction sections and details. Materials specifications address structural steel requirements, concrete notes for foundations and structural elements, reinforcing steel schedules, light gauge metal framing, anchor bolt details, and standard abbreviations and graphic symbols. The mechanical systems documentation includes HVAC balance device schedules, miscellaneous equipment schedules, and duct sizing and cooling unit schedules. Electrical systems are detailed through one-line diagrams, panelboard schedules, and mechanical equipment connection schedules. The documents contain comprehensive notes addressing construction methodology, quality standards, and coordination requirements between trades. All drawings are marked as draft status and indicate this is preliminary construction documentation for the HVAC system rehabilitation project at the Montana Air Force installation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

File details come from the government source that posted it. Updated .