3-Attachment B-Scope of Work.docx
DOCX document 3 MB Posted
- Attached to
- AM27-105 SEPTIC TANK AND VAULT TOILET WASTE PUMPING AT HUNTINGTON, MILLSITE, AND SCOFIELD STATE PARKS
- Solicitation number
- AM27-105
- Issued by
- Utah
About this file
This is a Scope of Work attachment for an Invitation for Bid (IFB) issued by the State of Utah Division of Purchasing in conjunction with the Division of State Parks for septic tank and vault toilet waste pumping services at three state parks: Huntington, Millsite, and Scofield. The contractor shall provide all labor, equipment, supervision, transportation, and disposal services necessary to pump, clean, disinfect, and dispose of waste from septic tanks, vault toilets, dump stations, and lift stations at these locations. Services are provided on an as-needed basis with an estimated annual volume of approximately 9,000 gallons combined across all three parks. The contractor must confirm receipt of standard service requests within one business day and complete service within one week during standard hours of 7:00 AM to 5:00 PM. Emergency services must be completed within 24 hours of notification. The contract term is five years with guaranteed pricing for a minimum of two years, and award will be made to the lowest cost responsive and responsible vendor.
The contractor is responsible for all aspects of waste removal and disposal, including obtaining proper licensing, arranging waste transportation in watertight containers, and paying all applicable municipal and landfill tipping fees. The contractor must immediately clean and disinfect any spills or contamination resulting from pumping operations and must repair any damage to park property at its own expense. Invoices must be submitted within seven days of service completion and itemized strictly by the volume of sewage and waste pumped at the established per-gallon contract unit rate. On-site water will not be provided by the parks, and park staff will recharge vault toilets with clean water following service. No mandatory site visit is required for bidding purposes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6-Huntington State Park Map.png | PNG image | |
| 9-Award Memo.pdf | ||
| 8-AM27-105 Bid Results(UNOFFICIAL).xlsx | XLSX spreadsheet | |
| 10-AM27-105 Bid Results.xlsx | XLSX spreadsheet | |
| 1-Vendor Prerequisites - IFB Agency.pdf | ||
| 4-Attachment A-Agency Terms and Conditions GS.docx | DOCX document | |
| 2-Attachment C-Pricing Table.docx | DOCX document | |
| 5-Scofield State Park Map.png | PNG image | |
| 7-Millsite State Park Map.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B: SCOPE OF WORK: AM27-105 SEPTIC TANK AND VAULT TOILET WASTE PUMPING AT HUNTINGTON, MILLSITE, AND SCOFIELD STATE PARKS General Overview Contractor shall furnish all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to pump, wash down, clean up, disinfect, and dispose of all waste products removed from septic tanks, vault toilets, dump stations, and lift stations at Huntington, Millsite, and Scofield State Parks. All work shall be performed in accordance with the specifications below and in full compliance with all applicable local, state, and federal laws and health regulations.
Park Locations The locations of the vault toilets and septic tanks are at three different parks:
· Huntington: 1385 W. Mohrland Road, Huntington, UT 84528
· Millsite: Ferron Canyon Road, Ferron, UT 84523
· Scofield: State Route 96, Scofield, UT 84526
Quantity & Locations of Facilities Services are required on an as-needed ("at will") basis upon request from park management. The estimated annual volume across all three parks combined is approximately 9,000 gallons per year. (Note: This is an estimate only for bidding purposes and is not a guaranteed minimum or maximum.)
| Park: |
| Location: |
| Estimated Size (Gallons) |
| Anticipated Frequency |
Scofield
| Madsen Bay, New CXT Bathroom |
| 2,000 |
| At will |
| Madsen Bay, Old CXT Bathroom |
| 2,000 |
| At will |
| Madsen Bay, Dump Station |
| 2,500 |
| At will |
| Madsen Bay, Vault Toilet at Launch Ramp |
| 2,000 |
| At will |
| Mountain View, Lift Station at Campground Restroom |
| 2,500 |
| At will |
| Mountain View, Dump Station |
| 2,000 |
| At will |
| Mountain View, Vault Toilet at Overflow Parking |
| 1,000 |
| At will |
| Mountain View, Vault Toilet at Boat Parking |
| 2,000 |
| At will |
Huntington
| Administrative Office |
| 1,000 |
| At will |
| Day-Use Bathroom |
| 1,000 |
| At will |
| Campground Bathroom |
| 2,500 |
| At will |
| Sites 22-24 |
| 1,000 |
| At will |
| Maintenance Shop |
| 1,000 |
| At will |
| Dump Station |
| 2,500 |
| At will |
Millsite
| Vault Toilets at Boat Parking |
| 2,000 |
| At will |
| Campground Lift Station |
| 2,500 |
| At will |
| Dump Station |
| 2,000 |
| At will |
Operational Performance & Requirements
· Solid & Debris Removal: All solids must be completely removed during service. Manual or mechanical methods may be required to break down solids for removal. Pumping services include handling and removing all trash and foreign debris found in vaults/tanks (e.g., cans, bottles, rocks, sticks, clothing, plastic containers, tools, diapers, paper products). All removed debris must be placed in watertight, leak-proof containers to prevent ground contamination.
· Disposal & Licensing: Contractor must be properly licensed and responsible for all disposal arrangements, including hauling effluent, debris, and trash in watertight containers and paying all applicable municipal/landfill tipping fees.
· Response Times:
· Standard Requests: State Park staff will notify the Contractor by phone or email. Contractor must confirm receipt within one (1) business day and complete the service within one (1) week (excluding weekends). Standard service hours are between 7:00 AM and 5:00 PM.
· Emergency Service: Emergency pumping outside standard hours may be required. Response time for emergency requests must be within 24 hours of notification.
· Sanitation & Cleanup: Any spills or contamination resulting from the pumping process must be cleaned and disinfected immediately. All equipment and chemicals used must comply with health regulations. Toilet paper dispensers and toilet risers must be protected from damage.
· Water & Recharging: On-site water will not be provided to the Contractor for tank pumping or cleanup. Park staff will recharge vault toilets with clean water following service.
· Property Damage & Conduct: Contractor shall repair any damage caused to park roads, structures, or grounds at their own expense. Contractor personnel and vehicles must present a clean, professional appearance and minimize disruption to park visitors.
Invoicing & Service Adjustments
· Contractor shall submit invoices within seven (7) days of completed service.
· Invoices must be itemized strictly by the volume of sewage/waste pumped at the established per-gallon contract unit rate.
· State Parks reserves the right to increase or decrease pumping frequency or volume based on operational needs.
File details come from the government source that posted it. Updated .