3-Attachment A- Bid Schedule.docx
DOCX document 39 KB Posted
- Attached to
- 7000 South Entrance Improvement Project
- Solicitation number
- WJPS26042301
- Issued by
- Salt Lake County, Utah
About this file
This is a Bid Schedule attachment for the 7000 South Entrance Improvement Project issued by the City of West Jordan, Utah. The project solicits proposals from qualified S330 licensed contractors to construct improvements along the 70th South Entrance corridor, including landscape enhancements adjacent to the roadway and retaining wall construction. The work encompasses fourteen bid line items spanning from progress schedule and mobilization through various site preparation, construction, and landscaping activities. A primary component of the project involves the installation of a Verti-Block Retaining Wall covering 12,114 square feet. The project requires coordination with the public, utility providers, and City staff, as well as implementation of traffic control measures throughout construction to enhance the visual character, functionality, and long-term maintainability of this primary gateway into the City.
The Bid Schedule presents pricing as lump-sum (LS) amounts for most line items, with the exception of the retaining wall installation, which is priced on a per-square-foot unit basis. Bidders are required to complete the schedule by entering unit prices and extended amounts for each line item, with the total Base Bid amount to be calculated and submitted. The document does not contain information regarding set-asides, incumbent contractors, contract term, renewal options, or specific funding sources and amounts, as those details are contained in other solicitation documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A-BID SCHEDULE
Schedule of Prices for Construction of
7000 S. ENTRANCE IMPROVEMENT PROJECT
In West Jordan, Utah
BASE BID SCHEDULE
Location: The Base Bid, Schedule A, covers work on 7000 S. Entrance Improvement Project within the City. Bid includes:
| Item No. |
| Specification Reference Number Classification of Unit Price Work |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 1 |
| Progress Schedule |
| 1 |
| LS |
| $ |
| 2 |
| Mobilization / Demobilization |
| 1 |
| LS |
| $ |
| 3 |
| Traffic Control |
| 1 |
| LS |
| $ |
| 4 |
| Quality Control |
| 1 |
| LS |
| $ |
| 5 |
| Construction Surveying |
| 1 |
| LS |
| $ |
| 6 |
| Erosion Control/SWPPP Measures |
| 1 |
| LS |
| $ |
| 7 |
| Project Management and Coordination |
| 1 |
| LS |
| $ |
| 8 |
| Site Preparation |
| 1 |
| LS |
| $ |
| 9 |
| Entrance Sign preparation and landscaping |
| 1 |
| LS |
| $ |
| 10 |
| Install Verti-Block Retaining Wall |
| 12,114 |
| Sq/Ft |
| $ |
| 11 |
| Concrete Work |
| 1 |
| LS |
| $ |
| 12 |
| North Side Landscaping |
| 1 |
| LS |
| $ |
| 13 |
| Median Landscaping |
| 1 |
| LS |
| $ |
| 14 |
| South Side Landscaping |
| 1 |
| LS |
| $ |
Base Bid = $____________________
File details come from the government source that posted it. Updated .