3-Appendix B Bid Form Containing Itemized and Total Pricing 4.19.26.xlsx
XLSX spreadsheet 220 KB Posted
- Attached to
- Solar Procurement and Installation for projects identified by the Sustainable Energy Partnership (“SEP”)
- Solicitation number
- 6599
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a bid form template for solar installation projects issued by the Sustainable Energy Partnership (SEP), a consortium of four Pennsylvania counties: Bucks, Chester, Delaware, and Montgomery. The document requests qualified Engineering, Procurement, and Construction (EPC) firms to submit itemized and total pricing for thirteen solar photovoltaic installation projects across the four counties. Projects include installations at government facilities such as correctional facilities, courthouses, fire academies, libraries, community centers, and administrative buildings. The bid form requires EPC firms to complete project-specific pricing tabs for each site they choose to bid, with all bids remaining valid for 120 days from submission. Respondents must provide detailed timeline information including expected completion dates for permitting and interconnection, procurement, substantial completion, final completion, and permission to operate phases. EPC firms are responsible for full compliance with all applicable regulations and codes, and any scope or schedule changes require written approval.
Pricing terms require all bids to include sales tax and explicitly exclude the value of the Investment Tax Credit. The form itemizes costs for microinverters, string inverters, PV modules, racking systems, balance of systems equipment, permitting and structural engineering, construction and installation labor (with prevailing wage requirements), and year-one operation and maintenance agreements. For most projects, EPCs must provide both Power Purchase Agreement (PPA) and Direct Pay pricing options, with the exception of Bucks County projects which require PPA pricing only. Annual escalation for operation and maintenance agreements is limited to 1.5% plus one-half of the Consumer Price Index for the Philadelphia Metro Area. Pricing is presented on a per-kilowatt basis ($/kW AC), with projects ranging from approximately 1.3 kW to 1.1 MW in system capacity. The form includes separate summary sheets for PPA offerings that request additional financial analysis including year-one rates, escalators, term length, electricity bill savings, utility rebates, and estimated 25-year savings projections both with and without Solar Renewable Energy Credit (S-REC) valuations.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overview and Instructions Appendix B: Bid Form Containing Itemized and Total Pricing
All proposals must include itemized costs to complete the tasks described in the project scope. Additionally, SEP requests a summarized project cost for each location in the format below:
This bid form is for a solar installation projects located in Bucks, Chester, Delaware, and/or Montomery Counties, Pennsylvania and identified in this worksheet. Each project is to be completed by a qualified Engineering, Procurement, and Construction (EPC) firm. Please complete all sections accurately and attach any supporting documentation as required by the Invitation to Bid.
| Terms and Conditions | |
| 1 | All bids must be valid for 120 days from the submission date. |
| 2 | The EPC firm is responsible for compliance with all applicable regulations and codes. |
| 3 | Any changes to the scope or schedule must be approved in writing. |
| Instructions | |
| 1 | Enter answers to all questions in the "Bidder Information and Bidder Certification " Tab |
| 2 | The Contact Person identified on the "Bidder Information and Bidder Certification " tab should be the management contact within the responding EPC firm that is authorized to make and manage the commitments associated with this response. |
| 3 | The Bid Price Forms are provided as separate tabs within this spreadsheet. There is one tab for each of the 13 projects included in this ITB. Respondents must complete the tab for each project that the EPC is bidding. EPCs do not need to bid all projects for all Counties. With the exception of Bucks County, all bidded projects must include responses for both PPA and Direct Pay itemized costs, as noted in the tabs. |
| 4 | In each tab, EPCs must populate the green cells only with their reponses. The rest of the sheet is protected. |
Bid Info & Certification
| Bidder Information | ||
| Number | Question | Bidder Response |
| 1 | Firm Name | [Insert EPC Firm Name] |
| 2 | Contact Person | [Insert Name] |
| 3 | Phone Number | [Insert Phone] |
| 4 | Email Address | [Insert Email] |
| 5 | Business Address | [Insert Address] |
| Bidder Certification | ||
| The bidder certifies that this proposal complies with the specifications and conditions described in the Invitation to Bid | ||
| Number | Question | Bidder Response |
| 6 | Bidder Name | [Insert EPC Firm Name] |
| 7 | Authorized Representative | [Insert Name] |
| 8 | Title | [Insert Phone] |
| 10 | Date | [Insert Address] |
Bucks Brownfield
| Lower Bucks Brownfield 7311 New Falls Rd, Levittown, PA 19055 | ||
| 40°09'29.86"N, 74°51'23.80"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Insert Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 458 | |
| System Size (AC Nameplate kW) | 334 | |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 611,300 | |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 783 | |
| Total cost of microinverters | $99,183 | |
| Number of Installer-supplied inverters SE100KUS (SolarEdge) or FEOC-compliant equivalent | ||
| Installer-supplied inverters (SE100KUS (SolarEdge)) or FEOC-compliant equivalent | ||
| Price per inverter | ||
| Total cost of inverters | ||
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 783 | |
| Installer equvalent PV module | Insert specification here if using equvalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include descrption of racking here including make and model along with domestic content eligibility. | |
| PV Racking Cost | $0 | |
| $0 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0 | |
| $0 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commmissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0 | |
| $0 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0 | |
| $0 | ||
| Total Price | $99,183 | |
| $/AC | $297 |
Chester County Library
| Chester County Library 450 Exton Square Pkwy, Exton, PA 19341 | ||
| 40°01'55.22"N, 75°37'14.35"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 328.19 kW | |
| System Size (AC Nameplate kW) | 239.6 | 266.4 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 424,300 | 425,400 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 561 | |
| Total cost of microinverters | $71,061.87 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | 4 | |
| Installer-supplied inverters (SE66.6KUS (SolarEdge) or FEOC-compliant equivalent) | Insert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (If Used) | 281 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 561 | |
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0.00 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | |
| PV Racking Cost | $0.00 | |
| $0.00 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | |
| $0.00 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | |
| $0.00 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | |
| $0.00 | ||
| Total Price | $71,061.87 | $0.00 |
| $/kW (AC) | $296.59 | 0 |
Chester County Public Safety
| Chester County Public Safety Campus 137 Modena Rd, Coatesville, PA 19320 | ||
| 39°58'22.95"N, 75°48'48.58"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Insert Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 694.40 | |
| System Size (AC Nameplate kW) | 506.85 | 600 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 970,400 | 988,500 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 1,187 | |
| Total cost of microinverters | $150,357 | |
| Number of Installer-supplied inverters SE120KUS (SolarEdge) or FEOC-compliant equivalent | 5 | |
| Installer-supplied inverters SE120KUS (SolarEdge) or FEOC-compliant equivalent) | Inspert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 599 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 1,187 | |
| Installer equvalent PV module | Insert specification here if using equvalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include descrption of racking here including make and model along with domestic content eligibility. | |
| PV Racking Cost | $0 | |
| $0 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0 | |
| $0 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commmissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0 | |
| $0 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0 | |
| $0 | ||
| Total Price | $150,357 | $0 |
| $/AC | 296.65 | $0 |
Chester County CCP East
| Chester County Prison - East 501 S. Wawaset Rd., West Chester, PA 19382 | ||
| 39°54'29.02"N, 75°39'35.68"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Insert Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 1,530,000 | |
| System Size (AC Nameplate kW) | 1,110,000 | 1,300,000 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 2,087,000 | 2,134,000 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 2,608 | |
| Total cost of microinverters | $330,355 | |
| Number of Installer-supplied inverters SE100KUS (SolarEdge) or FEOC-compliant equivalent | 13 | |
| Installer-supplied inverters (SE100KUS (SolarEdge)) or FEOC-compliant equivalent | Inspert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 1,348 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 2,608 | |
| Installer equvalent PV module | Insert specification here if using equvalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include descrption of racking here including make and model along with domestic content eligibility. | |
| PV Racking Cost | $0 | |
| $0 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0 | |
| $0 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commmissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0 | |
| $0 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0 | |
| $0 | ||
| Total Price | $330,355 | $0 |
| $/AC | 0.30 | 0 |
Chester County CCP West
| Chester County Prison - West 501 S. Wawaset Rd., West Chester, PA 19382 | ||
| 39°54'29.02"N 75°39'35.68"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Final Completion | [Insert Expected Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 1,500,000 | |
| System Size (AC Nameplate kW) | 1,090,000 | |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 2,057,000 | |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 2,560 | |
| Total cost of microinverters | $324,275 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | ||
| Installer-supplied inverters (SE66.6KUS (SolarEdge) or FEOC-compliant equivalent) | ||
| Price per inverter | ||
| Total cost of inverters | ||
| Number of Optimizers (if used) | ||
| Price per optimizer | ||
| Total cost of optimizers | ||
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 2,560 | |
| Installer equvalent PV module | Insert specification here if using equvalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include descrption of racking here including make and model along with domestic content eligibility. | |
| PV Racking Cost | $0 | |
| $0 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0 | |
| $0 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commmissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0 | |
| $0 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0 | |
| $0 | ||
| Total Price | $324,275 | $0 |
| $/AC | 0.2975001835 | 0 |
Delaware George Hill
| Delaware County George Hill Correctional Facility 500 Cheyney Rd, Thornton, PA 19373 | ||
| 39°54'10.70"N, 75°30'51.04"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. Prices shall not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 1,010 | |
| System Size (AC Nameplate kW) | 739.56 | 799.20 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 1,366,000 | 1,400,000 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 1,732 | |
| Total cost of microinverters | $219,392.44 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | 12 | |
| Installer-supplied inverters (SE66.6KUS (SolarEdge) or FEOC-compliant equivalent) | Insert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 891 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 1,732 | |
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0.00 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | |
| PV Racking Cost | $0.00 | |
| $0.00 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | |
| $0.00 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | |
| $0.00 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | |
| $0.00 | ||
| Total Price | $219,392.44 | $0.00 |
| $/kW (AC) | $296.65 | $0.00 |
Delaware Government Center
| Delaware County Government Center 201 W Front St, Media, PA 19063 | ||
| 39°55'12.79"N, 75°23'29.48"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 343.40 | |
| System Size (AC Nameplate kW) | 250.65 | 275.00 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 459,700 | 460,100 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 587 | |
| Total cost of microinverters | $74,355.29 | |
| Number of Installer-supplied inverters SE55K (SolarEdge) or FEOC-compliant equivalent | 5 | |
| Installer-supplied inverters (SE55K (SolarEdge) or FEOC-compliant equivalent) | Insert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 299 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 587 | |
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0.00 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | |
| PV Racking Cost | $0.00 | |
| $0.00 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | |
| $0.00 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | |
| $0.00 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | |
| $0.00 | ||
| Total Price | $74,355.29 | $0.00 |
| $/kW (AC) | $296.65 | $0.00 |
Delaware Machine Warehouse
| Delaware County Machine Warehouse 403 E 24th St, Chester, PA 19013 | ||
| 39°52'05.05"N, 75°21'51.15"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 148.01 | |
| System Size (AC Nameplate kW) | 108.03 | 120.00 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 194,200 | 197,300 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 253 | |
| Total cost of microinverters | $32,047.51 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | 1 | |
| Installer-supplied inverters (SE120KUS (SE-TRI-US00IBNS4) |
- Domestic Content
| (SolarEdge) or equivalent | Insert specification for Installer-supplied inverters | ||
| Price per inverter | $0.00 | ||
| Total cost of inverters | $0.00 | ||
| Number of Optimizers (if used) | 127 | ||
| Price per optimizer | $0.00 | ||
| Total cost of optimizers | $0.00 | ||
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 253 | ||
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | ||
| Price per module | $0.00 | ||
| Total cost of modules | $0.00 | ||
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | ||
| PV Racking Cost | $0.00 | ||
| $0.00 | |||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | ||
| $0.00 | |||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | ||
| $0.00 | |||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | ||
| $0.00 | |||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | ||
| $0.00 | |||
| Total Price | $32,047.51 | $0.00 | |
| $/kW (AC) | $296.65 | $0.00 |
Delaware Redwood Cmty Ctr
| Delaware Redwood Community Center 280 6th St, Brookhaven, PA 19015 | ||
| 39°51'17.68"N, 75°23'23.06"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 40.95 | |
| System Size (AC Nameplate kW) | 33.25 | 33.30 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 55,780 | 54,780 |
| Number of Enphase IQ8P-3P-72-E-DOM-US microinverters included in the design | 70 | |
| Total cost of microinverters | $9,334.50 | |
| Number of Installer-supplied inverters SE33.3KUS (2020) (SolarEdge)or FEOC-compliant equivalent | 1 | |
| Installer-supplied inverters SE33.3KUS (2020) (SolarEdge)or FEOC-compliant equivalent | Insert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 36 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 70 | |
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0.00 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | |
| PV Racking Cost | $0.00 | |
| $0.00 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | |
| $0.00 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | |
| $0.00 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | |
| $0.00 | ||
| Total Price | $9,334.50 | $0.00 |
| $/kW (AC) | $280.74 | $0.00 |
Montgomery Courthouse Annex
| Montgomery County Courthouse Annex 102 N York Rd, Willow Grove, PA 19090 | |||
| 40°08'34.64"N, 75°06'54.59"W | |||
| Proposed Timeline | |||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | ||
| Procurement | [Insert Expected Completion Date] | ||
| Substantial Completion | [Insert Expected Completion Date] | ||
| Completion Date | [Completion Date] | ||
| Permission to Operate | [Insert Expected Completion Date] | ||
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | |||
| PPA | Direct Pay | ||
| System Size (DC Nameplate kW) | 39.29 | ||
| System Size (AC Nameplate kW) | 38.48 | 36.00 | |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 52,190 | 49,080 | |
| Number of Enphase IQ8P-3P-72-E-DOM-US microinverters included in the design | 81 | ||
| Total cost of microinverters | $10,801.35 | ||
| Number of Installer-supplied inverters CPS SCA 36KTL-DO (US) | |||
| (Chint Power Systems) or FEOC-compliant equivalent | 1 | ||
| Installer-supplied inverters CPS SCA 36KTL-DO (US) | |||
| (Chint Power Systems) or FEOC-compliant equivalent | Insert specification for Installer-supplied inverters | ||
| Price per inverter | $0.00 | ||
| Total cost of inverters | $0.00 | ||
| Number of Optimizers (if used) | |||
| Price per optimizer | |||
| Total cost of optimizers | |||
| PV ModulesQCELLS, Q.PEAK DUO XLG10.d/BFG 485W (485W) or equivalent | 81 | ||
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | ||
| Price per module | $0.00 | ||
| Total cost of modules | $0.00 | ||
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | ||
| PV Racking Cost | $0.00 | ||
| $0.00 | |||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | ||
| $0.00 | |||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | ||
| $0.00 | |||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | ||
| $0.00 | |||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | ||
| $0.00 | |||
| Total Price | $10,801.35 | $0.00 | |
| $/kW (AC) | $280.70 | $0.00 |
Montgomery Fire Academy
| Montgomery County Fire Academy 1175 Academy Dr, Conshohocken, PA 19428 | ||
| 40°05'51.95"N, 75°18'57.98"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 127.07 | |
| System Size (AC Nameplate kW) | 111.87 | 133.20 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 168,800 | 169,100 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 262 | |
| Total cost of microinverters | $33,187.54 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | 2 | |
| Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | Insert specification for Installer-supplied inverters | |
| Price per inverter | $0.00 | |
| Total cost of inverters | $0.00 | |
| Number of Optimizers (if used) | 134 | |
| Price per optimizer | $0.00 | |
| Total cost of optimizers | $0.00 | |
| PV Modules (QCELLS, Q.PEAK DUO XLG10.d/BFG 485W (485W)) or equivalent | 262 | |
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | |
| Price per module | $0.00 | |
| Total cost of modules | $0.00 | |
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | |
| PV Racking Cost | $0.00 | |
| $0.00 | ||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | |
| $0.00 | ||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | |
| $0.00 | ||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | |
| $0.00 | ||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | |
| $0.00 | ||
| Total Price | $33,187.54 | $0.00 |
| $/kW (AC) | $296.66 | $0.00 |
Montgomery Trail Center
| Montgomery County Trail Center 75 East Lafayette St., Norristown, PA | |||
| 40°06'45.40"N, 75°20'33.73"W | |||
| Proposed Timeline | |||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | ||
| Procurement | [Insert Expected Completion Date] | ||
| Substantial Completion | [Insert Expected Completion Date] | ||
| Completion Date | [Completion Date] | ||
| Permission to Operate | [Insert Expected Completion Date] | ||
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | |||
| PPA | Direct Pay | ||
| System Size (DC Nameplate kW) | 22.82 | ||
| System Size (AC Nameplate kW) | 18.53 | 25.00 | |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 30,670 | 29,290 | |
| Number of Enphase IQ8P-3P-72-E-DOM-US microinverters included in the design | 39 | ||
| Total cost of microinverters | $5,200.65 | ||
| Number of Installer-supplied inverters CPS SCA25KTL-DO/US-208 | |||
| (Chint Power Systems) or FEOC-compliant equivalent | 1 | ||
| Installer-supplied inverters CPS SCA25KTL-DO/US-208 | |||
| (Chint Power Systems) or FEOC-compliant equivalent | Insert specification for Installer-supplied inverters | ||
| Price per inverter | $0.00 | ||
| Total cost of inverters | $0.00 | ||
| Number of Optimizers (if used) | |||
| Price per optimizer | |||
| Total cost of optimizers | |||
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W) or equivalent | 39 | ||
| Installer equivalent PV module | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | ||
| Price per module | $0.00 | ||
| Total cost of modules | $0.00 | ||
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | ||
| PV Racking Cost | $0.00 | ||
| $0.00 | |||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | ||
| $0.00 | |||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | ||
| $0.00 | |||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | ||
| $0.00 | |||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | ||
| $0.00 | |||
| Total Price | $5,200.65 | $0.00 | |
| $/kW (AC) | $280.66 | $0.00 |
Montgomery Youth Center
| Montgomery County Youth Center 540 Port Indian Rd, Eagleville, PA 19403 | ||
| 40°07'43.97"N, 75°23'23.07"W | ||
| Proposed Timeline | ||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | |
| Procurement | [Insert Expected Completion Date] | |
| Substantial Completion | [Insert Expected Completion Date] | |
| Completion Date | [Completion Date] | |
| Permission to Operate | [Insert Expected Completion Date] | |
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | ||
| PPA | Direct Pay | |
| System Size (DC Nameplate kW) | 350.17 | |
| System Size (AC Nameplate kW) | 308.29 | 399.60 |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 436,200 | 435,800 |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 722 | |
| Total cost of microinverters | $91,455.74 | |
| Number of Installer-supplied inverters SE66.6KUS (SolarEdge) or FEOC-compliant equivalent | 6 | |
| Installer-supplied inverters (SE120KUS (SE-TRI-US00IBNS4) |
- Domestic Content
| (SolarEdge) or equivalent | Insert specification for Installer-supplied inverters | ||
| Price per inverter | $0.00 | ||
| Total cost of inverters | $0.00 | ||
| Number of Optimizers (if used) | 368 | ||
| Price per optimizer | $0.00 | ||
| Total cost of optimizers | $0.00 | ||
| PV Modules (QCELLS, Q.PEAK DUO XLG10.d/BFG 485W (485W)) or equivalent | 722 | ||
| Installer equivalent PV module (485W) | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | ||
| Price per module (485W) | $0.00 | ||
| Total cost of modules | $0.00 | ||
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | ||
| PV Racking Cost | $0.00 | ||
| $0.00 | |||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | ||
| $0.00 | |||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | ||
| $0.00 | |||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | ||
| $0.00 | |||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | ||
| $0.00 | |||
| Total Price | $91,455.74 | $0.00 | |
| $/kW (AC) | $296.65 | $0.00 |
Montgomery Eagleville
| Montgomery County Eagleville Campus 60 Eagleville Rd, Eagleville, PA 19403 | |||
| 40°09'28.82"N, 75°25'04.30"W | |||
| Proposed Timeline | |||
| Location Permitting and Interconnection | [Insert Expected Completion Date] | ||
| Procurement | [Insert Expected Completion Date] | ||
| Substantial Completion | [Insert Expected Completion Date] | ||
| Completion Date | [Completion Date] | ||
| Permission to Operate | [Insert Expected Completion Date] | ||
| Itemized Bid Price (All prices must include sales tax. All prices must not include the value of the Investment Tax Credit.) | |||
| PPA | Direct Pay | ||
| System Size (DC Nameplate kW) | 1.78 | ||
| System Size (AC Nameplate kW) | 1.30 | 1.26 | |
| Electricity Production (year one expressed in kilowatt hours (kWh)) | 2,375,000 | 2,252,000 | |
| Number of Enphase IQ9N-3P-277-A-DOM-US microinverters included in the design | 3047 | ||
| Total cost of microinverters | $385,963.49 | ||
| Number of Installer-supplied inverters CPS SCA 36KTL-DO (US) (Chint) or FEOC-compliant equivalent | 35 | ||
| Installer-supplied inverters (CPS SCA 36KTL-DO (US) | |||
| (Chint) or equivalent | Insert specification for Installer-supplied inverters | ||
| Price per inverter | $0.00 | ||
| Total cost of inverters | $0.00 | ||
| Number of Optimizers (if used) | |||
| Price per optimizer | |||
| Total cost of optimizers | |||
| PV Modules (QCells, Q.PEAK DUO XL-G11S 585W (585W)) or equivalent | 3,047 | ||
| Installer equivalent PV module (585W) | Insert specification here if using equivalent panels. Include wattage, make and model along with domestic content eligibility) | ||
| Price per module (585W) | $0.00 | ||
| Total cost of modules | $0.00 | ||
| PV Racking Description | Include description of racking here including make and model along with domestic content eligibility. The mounting and racking system shall be designed in accordance with all applicable state and local codes and standards. | ||
| PV Racking Cost | $0.00 | ||
| $0.00 | |||
| Total BOS Equipment Cost (If the facility service voltage is 208 VAC and the solar system consists of 480 VAC string inverters or microinverters (not 208 VAC), then a stepdown transformer will be needed.) | $0.00 | ||
| $0.00 | |||
| Cost of Permitting, Structural Engineering and Interconnection Requirements. | $0.00 | ||
| $0.00 | |||
| Cost of Construction & Installation (Labor, site work, electrical installation, Commissioning). Prevailing Wage is Required. Thermal imaging of the site must be included as part of commissioning. | $0.00 | ||
| $0.00 | |||
| Operation and Maintenance (O&M) Agreement: Year 1 price. Include annual fee that represents what is reflected in the Operation and Maintenance Agreement that is provided as part of the response. O&M beyond year 1 of operation will be considered as an alternate option by each county for Direct Pay Projects. Annual escalation shall be limited to 1.5% plus one-half of the Consumer Price Index (Philadelphia Metro Area). | $0.00 | ||
| $0.00 | |||
| Total Price | $385,963.49 | $0.00 | |
| $/kW (AC) | $296,894.99 | $0.00 |
PPA Summary Sheet
| Please indicate which project sites are included as part of the PPA or indicate multiple PPA offerings. | ||||||
| System Cost and Production Fields | Cost and Production Decriptions | Site A | Site B | Site C | Site D | |
| Standalone or Multiple Sites Included | If this site is part of a multi-site PPA please indicate here (using common descriptor for convenience). | |||||
| Year One PPA Rate | Starting rate for first active year | |||||
| PPA Escalator | Increase in PPA rate annually | |||||
| Term Length | Length of Power Purchase Agreement in years | |||||
| Electricity Bill Savings Year One | The value of electricity produced against electricity consumed through the utility or supplier, NOT INCLUDING S-RECS | |||||
| Cost Reduction vs Existing Utility/Supplier Rate (Year One) | Percent reduction of electricity cost from current utility/supplier rate | Please use a 3% annual increase when making utility or 3rd-party supplier assumptions and an annual defactor rate of 0.5% on your solar modules. | ||||
| Estimated 25 Year Savings | Total savings ($) provided over 25 years factoring in up-front costs, NOT INCLUDING S-RECS | |||||
| Act 129 Rebate | Projected rebate value through utility program | |||||
| System Size | DC Nameplate in kW | |||||
| Electricity Production | The total electricity expected to be produced by this installation in year one expressed in kilowatt hours (kWh). | |||||
| Electricity Usage Offset by Solar | The percentage of current electricity usage offset by the installed solar. | |||||
| Electricity and Distribution Charges Used for Offset | Current electricity supply rate (default utility service or 3rd-party supplier) and associated distribution charges offset by solar | |||||
| Discount Rate | Rate of return to discount future cash flows to present value | |||||
| Levelized Cost of Energy | Average net present cost of PV system per kWh | |||||
| S-REC Ownership | Who owns S-RECs through this agreement | |||||
| If S-RECS are owned by host organization | ||||||
| S-RECs Generated Year One | Solar installations produce Solar Renewable Energy Credits (S-RECS) | |||||
| Estimated Value of S-RECS Year One | The total cash value S-REC produced year one based on current market value. | |||||
| Total Estimated Savings | Total savings ($) provided over 25 years factoring in up-front costs and INCLUDING S-REC VALUES. |
image1.jpg