10-Appendix F -Montco -Prevailing Wage Determination - Sep Solar.pdf
PDF 30 KB Posted
- Attached to
- Solar Procurement and Installation for projects identified by the Sustainable Energy Partnership (“SEP”)
- Solicitation number
- 6599
- Issued by
- Montgomery County, Pennsylvania
About this file
This is a Prevailing Wage Determination document issued by the Commonwealth of Pennsylvania Department of Labor & Industry for the SEPSPA Solar Initiative project located at 60 Eagleville Road, Eagleville, Pennsylvania, administered by Montgomery County. The project, assigned serial number 26-03995, was awarded on April 16, 2026, with the wage determination effective as of April 22, 2026. The document establishes prevailing wage rates for both building and heavy/highway construction classifications applicable to the solar installation project serving the four-county Sustainable Energy Partnership region encompassing Bucks, Chester, Delaware, and Montgomery Counties.
The prevailing wage determination specifies hourly rates and fringe benefit amounts for approximately 80 distinct trade classifications, with rates varying based on effective dates ranging primarily from May 1, 2025, through May 1, 2026. Trade classifications covered include electricians, carpenters, laborers (with multiple classes), operators (multiple building classes), sheet metal workers, plumbers, steamfitters, roofers, and numerous other skilled trades. Rates for identical classifications often differ between building and heavy/highway work categories, with total compensation (hourly rate plus fringe benefits) ranging from approximately $41.20 to $121.72 per hour depending on the trade and effective date. All contractors and subcontractors performing work on this project must comply with these prevailing wage rates as determined by the Pennsylvania Department of Labor & Industry.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: SEPSPA Solar Initiative
General Description: 60 Eagleville Road, Eagleville PA 19403
Project Locality Eagleville
Awarding Agency: County of Montgomery
Contract Award Date: 4/16/2026
Serial Number: 26-03995
Project Classification: Building/Highway
Determination Date: 4/22/2026
Assigned Field Office: Philadelphia
Field Office Phone Number: (215)560-1858
Toll Free Phone Number:
Project County: Montgomery County
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 4/22/2026 Page 1 of 7
Project: 26-03995 - Building Effective Date
Expiration Date
Hourly Rate Fringe Benefits
Total
Asbestos & Insulation Workers 5/1/2025 $60.84 $48.71 $109.55
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2024 $36.71 $19.13 $55.84
Boilermaker (Commercial, Institutional, and Minor Repair Work)
3/1/2026 $41.34 $19.23 $60.57
Boilermakers 1/1/2024 $52.10 $35.72 $87.82
Boilermakers 1/1/2026 $58.00 $36.57 $94.57
Bricklayer 5/1/2023 $47.50 $31.42 $78.92
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $54.59 $29.02 $83.61
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $47.47 $29.02 $76.49
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $23.74 $20.62 $44.36
Carpenters 5/1/2024 $45.72 $29.02 $74.74
Carpenters 5/1/2025 $47.47 $29.02 $76.49
Cement Finishers & Plasterers 5/1/2022 $38.57 $32.39 $70.96
Cement Masons 5/1/2024 $46.70 $32.46 $79.16
Cement Masons 5/1/2025 $48.70 $32.46 $81.16
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Drywall Finisher 5/1/2025 $40.14 $32.35 $72.49
Electricians 4/29/2024 $56.67 $46.24 $102.91
Electricians 5/1/2025 $58.63 $47.28 $105.91
Elevator Constructor 1/1/2025 $71.85 $45.77 $117.62
Elevator Constructor 1/1/2026 $74.86 $46.86 $121.72
Floor Coverer 5/1/2025 $51.67 $31.69 $83.36
Floor Coverer 5/1/2026 $52.84 $32.86 $85.70
Glazier 5/1/2024 $48.00 $37.50 $85.50
Glazier 5/1/2025 $49.96 $38.34 $88.30
Interior Finish 5/1/2023 $34.60 $25.80 $60.40
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2024 $44.64 $34.39 $79.03
Iron Workers (Riggers) 7/1/2025 $44.77 $36.27 $81.04
Iron Workers (Rodman/Reinforcing) 7/1/2024 $47.70 $34.77 $82.47
Iron Workers (Rodman/Reinforcing) 7/1/2025 $47.80 $36.65 $84.45
Laborers (Class 01 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Laborers (Class 02 - See notes) 5/1/2025 $41.00 $27.70 $68.70
Laborers (Class 03 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 04 - See notes) 5/1/2025 $37.67 $26.28 $63.95
Laborers (Class 05 - See notes) 5/1/2025 $37.25 $26.10 $63.35
Landscape Laborer 5/1/2024 $30.70 $24.23 $54.93
Landscape Laborer 5/1/2025 $32.15 $24.30 $56.45
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 2 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Marble Finisher 5/1/2023 $39.52 $29.30 $68.82
Marble Finisher 5/1/2025 $41.17 $30.75 $71.92
Marble Mason 5/1/2023 $47.20 $31.95 $79.15
Mason Tender, Cement 5/1/2023 $35.02 $25.98 $61.00
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
Operators (Building, Class 01 - See Notes) 5/1/2025 $54.52 $34.49 $89.01
Operators (Building, Class 01 - See Notes) 5/1/2026 $55.67 $35.34 $91.01
Operators (Building, Class 01A - See Notes) 5/1/2025 $57.52 $35.38 $92.90
Operators (Building, Class 01A - See Notes) 5/1/2026 $58.68 $36.22 $94.90
Operators (Building, Class 02 - See Notes) 5/1/2025 $54.27 $34.42 $88.69
Operators (Building, Class 02 - See Notes) 5/1/2026 $55.43 $35.26 $90.69
Operators (Building, Class 02A - See Notes) 5/1/2025 $57.29 $35.29 $92.58
Operators (Building, Class 02A - See Notes) 5/1/2026 $58.44 $36.14 $94.58
Operators (Building, Class 03 - See Notes) 5/1/2025 $50.18 $33.22 $83.40
Operators (Building, Class 03 - See Notes) 5/1/2026 $51.34 $34.06 $85.40
Operators (Building, Class 04 - See Notes) 5/1/2025 $49.88 $33.13 $83.01
Operators (Building, Class 04 - See Notes) 5/1/2026 $51.04 $33.97 $85.01
Operators (Building, Class 05 - See Notes) 5/1/2025 $48.16 $32.62 $80.78
Operators (Building, Class 05 - See Notes) 5/1/2026 $49.32 $33.46 $82.78
Operators (Building, Class 06 - See Notes) 5/1/2025 $47.17 $32.33 $79.50
Operators (Building, Class 06 - See Notes) 5/1/2026 $48.34 $33.16 $81.50
Operators (Building, Class 07A- See Notes) 5/1/2025 $66.26 $39.55 $105.81
Operators (Building, Class 07A- See Notes) 5/1/2026 $67.73 $40.48 $108.21
Operators (Building, Class 07B- See Notes) 5/1/2025 $65.97 $39.46 $105.43
Operators (Building, Class 07B- See Notes) 5/1/2026 $67.44 $40.39 $107.83
Painters Class 1 (see notes) 5/1/2024 $42.97 $34.11 $77.08
Painters Class 1 (see notes) 5/1/2025 $44.38 $34.55 $78.93
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 4 (see notes) 5/1/2024 $45.06 $34.11 $79.17
Painters Class 4 (see notes) 5/1/2025 $46.47 $34.55 $81.02
Plasterers 5/1/2024 $39.88 $33.08 $72.96 plumber 5/1/2024 $67.53 $38.31 $105.84 plumber 5/1/2025 $70.53 $39.46 $109.99
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Roofers (Composition) 5/1/2024 $44.13 $34.77 $78.90
Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80
Roofers (Shingle) 5/1/2023 $32.85 $22.10 $54.95
Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55
Roofers (Slate & Tile) 5/1/2023 $35.85 $22.10 $57.95
Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55
Sheet Metal Workers 5/1/2024 $59.22 $50.56 $109.78
Sheet Metal Workers 5/1/2025 $62.62 $52.17 $114.79
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 3 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Sign Makers and Hangars 7/15/2024 $32.32 $25.82 $58.14
Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89
Sprinklerfitters 1/1/2023 $62.23 $31.99 $94.22
Sprinklerfitters 5/1/2025 $70.37 $34.85 $105.22
Steamfitters 5/1/2024 $70.32 $43.09 $113.41
Steamfitters 5/1/2025 $72.52 $44.89 $117.41
Stone Masons 5/1/2023 $47.20 $31.95 $79.15
Stone Masons 5/1/2025 $50.00 $32.80 $82.80
Terrazzo Finisher 5/1/2023 $43.75 $27.86 $71.61
Terrazzo Finisher 5/1/2025 $45.61 $29.41 $75.02
Terrazzo Grinder 5/1/2023 $44.02 $27.86 $71.88
Terrazzo Grinder 5/1/2025 $45.88 $29.41 $75.29
Terrazzo Mechanics 5/1/2023 $50.26 $29.56 $79.82
Terrazzo Mechanics 5/1/2025 $52.21 $31.26 $83.47
Tile Finisher 5/1/2023 $39.52 $29.30 $68.82
Tile Finisher 5/1/2025 $41.17 $30.75 $71.92
Tile Setter 5/1/2023 $50.26 $29.56 $79.82
Tile Setter 5/1/2025 $52.21 $31.26 $83.47
Truckdriver class 1(see notes) 5/1/2024 $36.79 $22.54 $59.33
Truckdriver class 1(see notes) 5/1/2026 $38.57 $23.87 $62.44
Truckdriver class 2 (see notes) 5/1/2024 $36.89 $22.54 $59.43
Truckdriver class 2 (see notes) 5/1/2026 $38.67 $23.87 $62.54
Truckdriver class 3 (see notes) 5/1/2026 $38.92 $23.87 $62.79
Window Film / Tint Installer 6/1/2024 $26.37 $14.83 $41.20
Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 4 of 7
Project: 26-03995 - Heavy/Highway Effective
Expiration Date
Hourly Rate Fringe Benefits
Total
Bricklayer 5/1/2025 $50.00 $32.57 $82.57
Carpenter - Chief of Party (Surveying & Layout) 5/1/2025 $65.96 $30.09 $96.05
Carpenter - Chief of Party (Surveying & Layout) 5/1/2026 $67.52 $30.44 $97.96
Carpenter - Instrument Person (Surveying & Layout) 5/1/2025 $58.39 $29.06 $87.45
Carpenter - Instrument Person (Surveying & Layout) 5/1/2026 $60.09 $29.06 $89.15
Carpenter - Rodman (Surveying & Layout) 5/1/2025 $45.88 $23.19 $69.07
Carpenter - Rodman (Surveying & Layout) 5/1/2026 $46.97 $23.54 $70.51
Carpenter 5/1/2025 $57.36 $30.09 $87.45
Carpenter 5/1/2026 $58.71 $30.44 $89.15
Cement Masons 5/1/2023 $43.20 $32.91 $76.11
Cement Masons 5/1/2025 $46.55 $32.66 $79.21
Dockbuilder, Pile Drivers 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder, Pile Drivers 5/1/2026 $56.98 $37.99 $94.97
Dockbuilder/ Pile driver diver 5/1/2025 $60.31 $44.97 $105.28
Dockbuilder/ Pile driver diver 5/1/2026 $61.88 $45.47 $107.35
Dockbuilder/Pile Driver Diver 5/1/2025 $64.35 $41.74 $106.09
Dockbuilder/Pile Driver Diver 5/1/2026 $66.54 $41.74 $108.28
Dockbuilder/pile driver tender 5/1/2025 $55.23 $37.99 $93.22
Dockbuilder/pile driver tender 5/1/2026 $56.98 $37.99 $94.97
Electric Lineman 6/3/2024 $62.07 $33.96 $96.03
Electric Lineman 6/2/2025 $65.10 $34.45 $99.55
Iron Workers (Bridge, Structural, Ornamental, Precast) 7/1/2024 $53.20 $45.01 $98.21
Iron Workers (Riggers) 7/1/2023 $42.53 $34.14 $76.67
Iron Workers (Rodman/Reinforcing) 7/1/2023 $45.70 $34.77 $80.47
Laborers (Class 01 - See notes) 5/1/2025 $40.20 $27.80 $68.00
Laborers (Class 02 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 03 - See notes) 5/1/2025 $40.40 $27.80 $68.20
Laborers (Class 04 - See notes) 5/1/2025 $35.00 $27.80 $62.80
Laborers (Class 05 - See notes) 5/1/2025 $41.05 $27.80 $68.85
Laborers (Class 06 - See notes) 5/1/2025 $41.10 $27.80 $68.90
Laborers (Class 07 - See notes) 5/1/2025 $40.95 $27.80 $68.75
Laborers (Class 08 - See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 09 - See notes) 5/1/2025 $40.55 $27.80 $68.35
Laborers (Class 10- See notes) 5/1/2025 $40.70 $27.80 $68.50
Laborers (Class 11 -See Notes) 5/1/2025 $40.60 $27.80 $68.40
Laborers (Class 12 -See Notes) 5/1/2025 $42.30 $27.80 $70.10
Laborers (Class 13 -See Notes) 5/1/2025 $44.33 $27.80 $72.13
Laborers (Class 14 -See Notes) 5/1/2025 $40.90 $27.80 $68.70
Laborers Utility (PGW ONLY) (Flagperson) 5/1/2025 $34.07 $19.73 $53.80
Laborers Utility (PGW ONLY) 5/1/2025 $41.10 $19.73 $60.83
Landscape Laborer 5/1/2024 $30.28 $24.05 $54.33
Landscape Laborer 5/1/2025 $31.73 $24.15 $55.88
Millwright 5/1/2025 $57.39 $35.81 $93.20
Millwright 5/1/2026 $60.20 $35.81 $96.01
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 5 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.52 $34.49 $89.01
Operators Class 01 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.67 $35.34 $91.01
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.52 $35.38 $92.90
Operators Class 01a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.68 $36.22 $94.90
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2025 $54.27 $34.42 $88.69
Operators Class 02 - See Notes (Building, Heavy, Highway)
5/1/2026 $55.43 $35.26 $90.69
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2025 $57.29 $35.29 $92.58
Operators Class 02a - See Notes (Building, Heavy, Highway)
5/1/2026 $58.44 $36.14 $94.58
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2025 $50.18 $33.22 $83.40
Operators Class 03 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.34 $34.06 $85.40
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2025 $49.88 $33.13 $83.01
Operators Class 04 - See Notes (Building, Heavy, Highway)
5/1/2026 $51.04 $33.97 $85.01
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2025 $48.16 $32.62 $80.78
Operators Class 05 - See Notes (Building, Heavy, Highway)
5/1/2026 $49.32 $33.46 $82.78
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2025 $47.17 $32.33 $79.50
Operators Class 06 - See Notes (Building, Heavy, Highway)
5/1/2026 $48.34 $33.16 $81.50
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2025 $66.26 $39.55 $105.81
Operators Class 07 (A) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.73 $40.48 $108.21
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2025 $65.97 $39.46 $105.43
Operators Class 07 (B) - See Notes (Building, Heavy, Highway)
5/1/2026 $67.44 $40.39 $107.83
Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03
Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53
Painters Class 2 (see notes) 2/1/2025 $50.85 $33.91 $84.76
Painters Class 2 (see notes) 2/1/2026 $51.61 $35.00 $86.61
Painters Class 3 (see notes) 2/1/2025 $61.81 $33.95 $95.76
Painters Class 3 (see notes) 2/1/2026 $62.57 $35.04 $97.61
Pointers, Caulkers, Cleaners 5/1/2025 $51.35 $31.80 $83.15
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2024 $66.80 $42.93 $109.73
Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2025 $68.89 $44.73 $113.62
Truckdriver class 1(see notes) 5/1/2024 $36.64 $22.54 $59.18
Truckdriver class 1(see notes) 5/1/2026 $38.42 $23.87 $62.29
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 6 of 7
Expiration Date
Hourly Rate Fringe Benefits
Total
Truckdriver class 2 (see notes) 5/1/2024 $36.74 $22.54 $59.28
Truckdriver class 2 (see notes) 5/1/2026 $38.52 $23.87 $62.39
Truckdriver class 3 (see notes) 5/1/2026 $38.77 $23.87 $62.64
BUREAU OF LABOR LAW COMPLIANCE
PREVAILING WAGES PROJECT RATES
Report Date: 4/22/2026 Page 7 of 7
File details come from the government source that posted it. Updated .