This is Addendum No. 1 to the solicitation for the 2650 East Hobble Creek Bank Restoration project issued by Springville City in Utah. The project scope includes the restoration of approximately 85 feet of Hobble Creek bank and armor placement with riprap. The work consists of nine bid items: mobilization, dewatering, 230 cubic yards of excavation, 215 cubic yards of riprap (D50 of 18 inches), 2,100 square feet of geotextile filter fabric, and 1,150 square feet of seeding, with 10 cubic yards of imported fill and additional seeding as contingency items. A non-mandatory pre-bid conference was scheduled for November 23, 2026 at 10:00 a.m. at the Springville City Civic Center. Bids were due November 30, 2026 at 2:00 p.m., with electronic submission to Tyler Wilkins at Twilkins@springvilleutah.gov. Written questions were due to Mike Rasmussen, P.E. at Jones & DeMille Engineering by 5:00 p.m. on November 24, 2026. The contract duration is 30 days from notice to proceed, with substantial completion required within 30 days and final completion within 45 days.
Bidders must be headquartered or maintain a significant regional business office in Utah and be registered to conduct business in the state. Qualifying bidders must have successfully completed at least one similar streambank, riprap, or channel restoration project involving in-stream work within the five years preceding the bid. The owner anticipated a total bid price of approximately $65,000 on a unit-price basis. Riprap must meet ASTM C535 and AASHTO T104 durability standards, and geotextile must conform to AASHTO M288, Class II. The successful bidder must provide a payment bond equal to the contract price and commercial general liability insurance of not less than $2,000,000 per occurrence and $4,000,000 aggregate, naming Springville City as additional insured. Five percent retainage applies to progress payments. Liquidated damages are $1,000 per day beyond substantial completion and $250 per day beyond final completion. Contract execution must occur within 14 days of the award notice. The contractor must hold the Stream Alteration Permit, comply with UPDES regulations, maintain a 14-foot clearance between the riprap slope and the city property line for a future walking path, and obtain Blue Stakes locates at least 48 hours before construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-2650E Specs ForBid NOV-9-2026.pdf | ||
| 1-2608-082 2650E Dwgs forBidding NOV-05-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Springville City 00 91 13.01 Addendum No. 1 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 2
DOCUMENT 00 91 13.01
ADDENDUM NO. 1
November 13, 2026
RE: Springville City – 2650 East Hobble Creek Bank Restoration Project No. 2608-082 Springville City RFP #2026-12
FROM: Jones & DeMille Engineering, Inc.
1535 South 100 West Richfield, UT 84701
TO: Prospective Bidders
This addendum forms a part of the Contract Documents and modifies the original Procurement Documents, dated November 5, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification.
This Addendum consists of 2 pages and 1 attachment.
CHANGES TO PROCUREMENT REQUIREMENTS:
1. Document 00 21 13 – Instructions to Bidders, Paragraph 4.03.B, delete paragraph and replace with the following:
A Site visit will be held immediately following the pre-bid conference. This is the only scheduled Site visit. Bidders who do not attend may visit the Site on their own. The adjacent property owner is aware that Bidders will be visiting the Site.
2. Document 00 21 13 – Instructions to Bidders, Paragraph 6.01, delete the sentence “Questions received less than seven days prior to the date for opening of Bids may not be answered.” and replace with the following:
Questions received after the deadline for questions stated in the advertisement or invitation to bid may not be answered.
3. Document 00 45 13 – Bidder’s Qualifications, Paragraph 1.3.C, delete Subparagraph 1 and replace with the following:
1. Experience successfully constructing at least one (1) similar streambank, riprap, or channel restoration project involving in-stream work within the last five (5) years. This requirement may be met by the Bidder or by the individual who will lead the Work at the Site full-time, based on that individual’s experience leading the on-site work on a similar project, whether with the Bidder or with a previous employer.
2. If the requirement in Paragraph 1.3.C.1 is met by an individual, name the individual in the Bidder’s Qualifications Statement and complete the Similar Project Reference Form for the individual’s project. The individual shall be present at the Site at all times during execution of the Work and shall not be replaced without written approval of Owner and Engineer.
3. The individual may be employed by a Subcontractor. Document 00 52 15, Paragraph 7.04.B prohibits Contractor from awarding work valued at more than 50 percent of the Contract Price to Subcontractors without prior written approval of Owner.
Springville City 00 91 13.01 Addendum No. 1 2650 East Hobble Creek Bank Restoration (2608-082) Page 2 of 2
4. Document 00 45 13, Exhibit A – Bidder’s Qualifications Statement, delete current document and replace with attached revised document. Revisions are as follows:
a. Project references and performance information: Project references may be those of the Bidder or of the individual who will lead the Work at the Site full-time.
b. Similar Project Reference Form: Add entries titled “Experience of Individual Leading the Work at the Site.”
RESPONSES TO BIDDER QUESTIONS:
5. Question: Must the similar project experience required by Document 00 45 13, Paragraph 1.3.C.1 be that of the Bidder, or may it be met by a Subcontractor or by a key employee whose experience was gained with another company?
Response: See Items 3 and 4. The experience may be that of the Bidder or of the individual who will lead the Work at the Site full-time, including experience gained with a previous employer. The individual may be employed by a Subcontractor, subject to the limit on subcontracted work in Document 00 52 15, Paragraph 7.04.B.
6. Question: Is a B100 contractor’s license acceptable for the prime contractor?
Response: The Bidding Documents do not specify a license classification. Bidder shall be licensed by the State of Utah to perform the type of work required by the Contract Documents (see Document 00 41 15, Paragraph 7.01.B and Document 00 45 13, Exhibit B). Bidder is responsible for confirming with the Utah Division of Professional Licensing that its license classification covers streambank restoration and riprap work.
7. Question: Will the pre-bid conference include the required Site visit?
Response: Yes. See Item 1. A Site visit will be held immediately following the pre-bid conference on Monday, November 23, 2026 at 10:00 a.m. at the Springville City Civic Center. This is the only scheduled Site visit. Attendance at the pre-bid conference is encouraged but not required; however, each Bidder shall visit the Site before submitting a Bid (see Document 00 21 13, Paragraph 4.03 and Document 00 41 15, Paragraph 3.01.B).
Bidders who do not attend may visit the Site on their own; scheduling the visit with Owner is not required.
Signed: Michael Rasmussen, P.E.
END OF ADDENDUM
11-13-2026