This specification document details a construction contract for Springville City to restore approximately 85 feet of the Hobble Creek bank and armor it with riprap. The project, designated as 2608-082, is located in Springville, Utah, and involves a single contract award. Bids are due by Monday, November 30, 2026 at 2:00 p.m. local time, with public opening and reading to follow immediately. Bidders may submit electronically to Tyler Wilkins at Twilkins@springvilleutah.gov. A non-mandatory pre-bid conference is scheduled for Monday, November 23, 2026 at 10:00 a.m. at the Springville City Civic Center. Written questions must be submitted to Mike Rasmussen, P.E. at Jones & DeMille Engineering by 5:00 p.m. on Tuesday, November 24, 2026. The work encompasses nine bid items including mobilization, dewatering, excavation (230 cubic yards), imported fill (10 cubic yards, contingency), riprap placement (215 cubic yards with D50 = 18"), geotextile filter fabric (2,100 square feet), and seeding (1,150 square feet, contingency). The anticipated project duration is 30 days from notice to proceed, with substantial completion required within 30 days and final completion within 45 days. The owner anticipates a total bid price of approximately $65,000.
Contractor qualifications must include successful completion of at least one similar streambank, riprap, or channel restoration project involving in-stream work within the five years preceding the bid, with experience demonstrating 85 percent or greater completion or significant progress in accordance with contract documents. Bidders must be headquartered or maintain a significant regional business office in Utah and be registered to conduct business in the state. The successful bidder must provide a payment bond equal to the contract price and maintain commercial general liability insurance of not less than $2,000,000 per occurrence and $4,000,000 aggregate, naming Springville City as an additional insured. The contract is unit-price based, with final payment determined by actual quantities used. Retainage of five percent applies to all progress payments until final payment. Liquidated damages are assessed at $1,000 per day for delays beyond substantial completion and $250 per day for delays beyond final completion. Contract execution must occur within 14 days of notice of award, contingent upon delivery of required bonds and insurance documentation within that timeframe.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Addendum No 1.pdf | ||
| 1-2608-082 2650E Dwgs forBidding NOV-05-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPRINGVILLE CITY
2650 EAST HOBBLE CREEK BANK
RESTORATION
PROJECT MANUAL
NOVEMBER 9, 2026
FOR BIDDING ONLY
Project #: 2608-082
Springville City 00 01 10 Table of Contents 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 1
DOCUMENT 00 01 10
TABLE OF CONTENTS
NUMBER TITLE
PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP
Division 00 - Procurement and Contracting Requirements
Introductory Information 00 01 10 Table of Contents
Procurement Requirements 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 15 Bid Form 00 45 13 Bidder’s Qualifications Exhibit A – Bidder’s Qualifications Statement Exhibit B – Certification of Bidder’s Experience and Qualifications
Contracting Requirements 00 51 00 Notice of Award 00 52 15 Contract for Construction of a Small Project 00 55 00 Notice to Proceed 00 61 13.16 Payment Bond Form 00 63 36 Field Order Form 00 63 49 Work Change Directive Form 00 63 63 Change Order Form 00 65 16 Certificate of Substantial Completion Form 00 65 19.21 Notice of Acceptability of Work
SPECIFICATIONS GROUP
GENERAL REQUIREMENTS SUBGROUP (Division 01)
Division 01 – General Requirements 01 10 00 Summary 01 20 00 Price and Payment Procedures 01 22 19 Unit Price Measurement and Payment 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 57 13 Temporary Erosion and Sediment Control 01 70 00 Execution and Closeout Requirements 01 71 13 Mobilization
Technical Specifications See Drawings (sheet specs) for technical specifications.
NOV-9-2026
Springville City 00 11 13 Advertisement for Bids 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 1
DOCUMENT 00 11 13
ADVERTISEMENT FOR BIDS
SPRINGVILLE CITY, 110 SOUTH MAIN STREET, SPRINGVILLE, UTAH 84663
General Notice:
Springville City (Owner) is requesting Bids for the construction of the following Project: 2650 East Hobble
Creek Bank Restoration Project.
Bids for the construction of the Project will be received at the Springville City Civic Center located at 110
South Main Street, Springville, Utah 84663, until Monday, November 30, 2026 at 2:00 p.m. local time.
Immediately after that time, the Bids received will be publicly opened and read. Bids may also be submitted by email to Tyler Wilkins at Twilkins@springvilleutah.gov. Emailed Bids must be received before the date and time stated above.
The Project includes the following Work: Restore approximately 85 feet of the Hobble Creek bank and armor the bank with riprap. Bids will be received for a single contract.
Owner anticipates that the Project’s total bid price will be approximately $65,000. The Project has an expected duration of 30 days.
Obtaining Bidding Documents:
Information and Bidding Documents for the Project can be found at Springville City’s Bonfire portal.
The designated website will be updated with addenda, plan holders list, reports, and other information relevant to submitting a Bid for the Project. Official notifications, addenda, and other Bidding Documents will be offered through the designated website.
The Issuing Office for the Bidding Documents is: Springville City, 110 South Main Street, Springville, Utah
84663. Only electronic copies of Bidding Documents will be issued.
Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
Questions are due in writing to Mike Rasmussen, P.E., Jones & DeMille Engineering, at mike.r@jonesanddemille.com by 5:00 p.m. local time on Tuesday, November 24, 2026.
Pre-bid Conference:
A pre-bid conference for the Project will be held on Monday, November 23, 2026 at 10:00 a.m. local time at the Springville City Civic Center, 110 South Main Street, Springville, Utah 84663. Attendance at the pre-bid conference is encouraged but not required.
Instructions to Bidders:
For further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. The Owner may reject any or all bids submitted.
Issued by:
Owner: Springville City
By: Stacey Child
Title: Parks and Recreation Director
Date: November 9, 2026
Springville City 00 21 13 Instructions to Bidders 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 5
DOCUMENT 00 21 13
INSTRUCTIONS TO BIDDERS
ARTICLE 1 - DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the Contract
Documents. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Issuing Office – The office from which the Bidding Documents are to be issued.
ARTICLE 2 – COPIES OF BIDDING DOCUMENTS
2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.
2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.
ARTICLE 3 – QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within 5 days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) additional information as requested by Owner. Use Document 00 45 13 Bidder’s Qualifications to provide information to Owner.
3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE
4.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
4.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions:
1. No reports of explorations or tests of subsurface conditions at or adjacent to the Site, or drawings of physical conditions relating to existing surface or subsurface structures at the Site, are known to Owner.
2650 East Hobble Creek Bank Restoration (2608-082) Page 2 of 5
2. No reports or drawings related to Hazardous Environmental Conditions at the Site are known to Owner.
B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and
Engineer by owners of such Underground Facilities, including Owner, or others.
4.03 Site Visit and Testing by Bidders
A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.
B. A Site visit is scheduled with the pre-bid conference or Bidders shall schedule a Site visit at their own convenience. All access to the Site must be coordinated through the following
Owner contact: Tyler Wilkins, Springville City, Twilkins@springvilleutah.gov. Contact the
Owner before visiting so the adjacent property owner can be notified.
C. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
D. On request, and to the extent Owner has control over the Site, and schedule permitting, the
Owner will provide Bidder access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on
Owner’s authority regarding the Site.
E. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
F. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
ARTICLE 5 – PRE-BID CONFERENCE
5.01 A non-mandatory pre-bid conference will be held at the time and location stated in the invitation or advertisement to bid. Representatives of Owner and Engineer will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference; however, attendance at this conference is not required to submit a Bid. Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
5.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner or Engineer will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 6 – INTERPRETATIONS AND ADDENDA
6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
Engineer in writing. Submit questions to Mike Rasmussen, P.E., Jones & DeMille Engineering, at
2650 East Hobble Creek Bank Restoration (2608-082) Page 3 of 5 mike.r@jonesanddemille.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
6.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.
ARTICLE 7 – BID SECURITY
7.01 Bid security is not required for this Project.
ARTICLE 8 – SUBSTITUTE AND “OR-EQUAL” ITEMS
8.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by
Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall include sufficient information to allow Engineer to determine if proposed material or equipment is acceptable. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders.
Bidders shall not rely upon approvals made in any other manner.
8.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of
“or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 9 – BASIS OF BID
9.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined based on actual quantities used for the Work.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
ARTICLE 10 – SUBMITTAL OF BID
10.01 An unbound copy of the Bid Form is to be completed and submitted with the other documents required to be submitted under the terms of the Bid Form.
2650 East Hobble Creek Bank Restoration (2608-082) Page 4 of 5
10.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the
Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the other required documents.
A. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to Springville City, 110 South Main Street, Springville, Utah 84663.
B. If a Bid is sent by email or other electronic delivery system, the electronic Bid shall be received, not just sent, before the date and time prescribed in the advertisement or invitation to bid. An emailed Bid shall be sent to Tyler Wilkins at
Twilkins@springvilleutah.gov.
10.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the
Bidder unopened.
ARTICLE 11 – MODIFICATION AND WITHDRAWAL OF BID
11.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a
Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
11.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in the Paragraph above and submit a new Bid prior to the date and time for the opening of Bids.
11.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.
ARTICLE 12 – OPENING OF BIDS
12.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 13 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE
13.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid prior to the end of this period.
ARTICLE 14 – EVALUATION OF BIDS AND AWARD OF CONTRACT
14.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that
Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to
2650 East Hobble Creek Bank Restoration (2608-082) Page 5 of 5 add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.
14.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.
14.03 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the
Bid Form or prior to the Notice of Award.
B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
14.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
A. In order to be considered qualified for the Project, the Bidder shall meet the requirements indicated in Document 00 45 13 – Bidder’s Qualifications. Submit Document 00 45 13 –
Bidder’s Qualifications as required by Paragraph 3.01.
14.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 15 – SIGNING OF CONTRACT
15.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted Contract Documents. Within 14 days thereafter, Successful Bidder shall execute and deliver the required bonds, insurance and other required documentation to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Contract to Successful
Bidder, together with one printed and one portable document format (PDF) electronic copies of the Contract Documents.
15.02 The effective date of the Contract will be the date indicated on the Contract.
15.03 It is intended that the Contract Time will commence to run as soon as possible after the Contract
Documents have been executed. The Contractor, Owner and Engineer will determine a mutually agreed upon date for the Contract Times to commence to run and that date will be indicated on the Notice to Proceed issued by the Owner.
END OF DOCUMENT
Springville City 00 41 15 Bid Form 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 4
DOCUMENT 00 41 15
BID FORM
2650 East Hobble Creek Bank Restoration
Springville City
2608-082
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to: Springville City, 110 South Main Street, Springville, Utah 84663.
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into a Contract with
Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders. This Bid will remain subject to acceptance for 60 days after the Bid opening, or for such longer period of time that
Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following Addenda:
Addendum No. Addendum, Date
B. Bidder has visited the Site, conducted a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfied itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
C. Bidder is familiar with and has satisfied itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
D. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or adjacent to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Bidding Documents.
E. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations
2650 East Hobble Creek Bank Restoration (2608-082) Page 2 of 4 obtained from visits to the Site; the Bidding Documents; and any Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs.
F. Bidder agrees, based on the information and observations referred to in the preceding paragraph, that no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price bid and within the times required, and in accordance with the other terms and conditions of the
Bidding Documents.
G. Bidder is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Bidding Documents.
H. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and confirms that the written resolution thereof by Engineer is acceptable to Bidder.
I. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work.
J. The submission of this Bid constitutes an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article, and that without exception the
Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
2650 East Hobble Creek Bank Restoration (2608-082) Page 3 of 4
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
BID SCHEDULE
Item Item Description Unit
Estimated Bid Unit Bid Price
No. Quantity Price
1-1 Mobilization L.S. 1 XXX
1-2 Temporary Dewatering L.S. 1 XXX
1-3 Excavation (Plan Quantity) C.Y. 230
1-4 Imported Fill (Contingency Item) C.Y. 10
1-5 Riprap (D50 = 18") C.Y. 215
1-6 Stockpile and Place Existing Rock/Boulders
L.S. 1 XXX
1-7 Geotextile Filter Fabric S.F. 2,100
1-8 Trim Trees for Construction Access (Contingency Item)
L.S. 1 XXX
1-9 Seeding (Contingency Item) S.F. 1,150
Total Bid Price
Bidder acknowledges that (1) each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment on or before the dates or within the number of calendar days indicated in the
Contract.
6.02 Bidder accepts the provisions of the Contract as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
A. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids.
B. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids.
2650 East Hobble Creek Bank Restoration (2608-082) Page 4 of 4
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders and the Contract.
ARTICLE 9 – BID SUBMITTAL
BIDDER: [Indicate correct name of bidding entity]
By:
[Signature]
[Printed name]
(If Bidder is a corporation, a limited liability company, a partnership, or a joint venture, attach evidence of authority to sign.)
Attest:
[Signature]
[Printed name]
Title:
Submittal Date:
Address for giving notices:
Telephone Number:
Fax Number:
Contact Name and e-mail address:
Bidder’s License No.:
Springville City 00 45 13 Bidder’s Qualifications 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 2
DOCUMENT 00 45 13
BIDDER’S QUALIFICATIONS
1.1 SUMMARY
A. The Owner intends to award the Contract for the Work described by the Contract Documents to a sufficiently experienced, responsible, financially capable and qualified Bidder in consideration of all factors judged to be in the best interest of the Owner.
B. To be considered for Award, Bidders must complete and submit an accurate Bidder’s Qualifications Statement within five (5) days of the Owner’s request, as required by the Instructions to Bidders, using the form attached to this Document as Exhibit A.
C. Minimum bidder qualifications requirements are specified herein.
D. The Owner and Engineer will evaluate the submitted Bidder’s Qualifications Statement using their best judgment, as well as other information as may be discovered by the Owner or Engineer pertaining to the Bidder’s qualifications to determine if Bidder meets the minimum qualification requirements.
1.2 BIDDER ACKNOWLEDGEMENT
A. In the event a Bidder challenges the Award decision made by the Owner, or any recommendation made by the Engineer, and the Owner’s decision is upheld upon review by an appropriate review agency or court, the protesting Bidder shall be liable for all costs and expenses incurred by the Owner and Engineer, including attorney’s fees, as well as the costs and expenses associated with any delay in Contract Award. Furthermore, Owner or Engineer will not be liable to Bidder for costs or damages of any kind, including consequential damages related to Engineer’s recommendation or Owner’s decisions regarding Bidder’s Qualifications.
B. Bidder’s submission of a Bid for this Contract shall indicate Bidder’s acceptance of the foregoing provision.
1.3 MINIMUM QUALIFICATIONS
A. To be considered qualified, Bidder must submit satisfactory responses prior to Award, all items listed in paragraph B and C below.
B. General Requirements:
1. Construction experience with demonstrated excellence and quality in the construction of similar streambank, riprap, or channel restoration projects.
Springville City 00 45 13 Bidder’s Qualifications 2650 East Hobble Creek Bank Restoration (2608-082) Page 2 of 2
2. Respondent and sub-contractor(s) companies are headquartered or have a significant regional business office located in the State of Utah, and are registered to conduct business in the State of Utah.
3. That firm has the resources, including personnel and equipment to manage, perform and finally complete the Work in the identified Contract Time.
4. Project organization structure.
5. Key personnel experience.
C. Specifically, in addition to the general requirements noted above, the following minimum Bidder qualification requirements are required to be considered for Contract Award.
1. Experience successfully constructing at least one (1) similar streambank, riprap, or channel restoration project involving in-stream work within the last five (5) years.
D. The determination of what constitutes a similar project will be at the sole discretion of the Engineer based on their professional judgment. In general, the term “similar” as used above describes streambank restoration project experience with similar contract dollar value, in-stream work and/or a similar level of complexity.
E. The term successful as used above refers to satisfactory completion or significant progress of at least 85 percent towards completion of a project in accordance with the project’s Contract Documents, with quality work, in a timely fashion and without excessive and unjustified claims and or Change Orders. References and opinions of the owner and engineer for reference projects, or any project completed or currently in progress by Bidder will also be considered when determining if the project was successfully completed or in the process of being successfully completed.
F. Complete the certification form attached to this Document as Exhibit B.
1.4 ATTACHMENTS
A. Attachments:
1. Exhibit A – Bidder’s Qualifications Statement, consisting of 7 pages.
2. Exhibit B – Certification of Bidder’s Experience and Qualifications, consisting of one page.
Springville City 00 45 13 Exhibit A 2650 East Hobble Creek Bank Restoration (2608-082) Page A1 of A7 Bidder’s Qualifications Statement
EXHIBIT A
BIDDER’S QUALIFICATIONS STATEMENT
The undersigned certifies under oath the truth and correctness of all statements and of all answers to questions made hereinafter.
SUBMITTED TO: Springville City, 110 South Main Street, Springville, Utah 84663
SUBMITTED BY:
CHECK ONE: Corporation
Partnership
Individual
Joint Venture
Other
1. How many years has your organization been in business as a General Contractor?
2. How many years has your organization been in business under its present business name?
3. If a Corporation, answer the following:
a. Date of Incorporation
b. State of Incorporation
c. President
d. Vice President(s)
e. Secretary
f. Treasurer
4. If a Partnership, answer the following:
a. Date of Organization
b. Type of Partnership
c. Name and Address of all partners:
2650 East Hobble Creek Bank Restoration (2608-082) Page A2 of A7 Bidder’s Qualifications Statement
5. If other than a Corporation or Partnership, describe the organization and name principals:
6. What percent of work do you normally perform with your own forces:
List trades:
7. Have you ever failed to complete any work awarded to you? If so, indicated when, where and why.
8. Has any officer or partner of your organization ever been an officer or partner of another organization that failed to complete a construction contract?
If so, what were the circumstances?
2650 East Hobble Creek Bank Restoration (2608-082) Page A3 of A7 Bidder’s Qualifications Statement
9. List major construction projects your organization has under contract on this date:
Project
Name
Owner A/E Contract
Amount
Contract
Date
Percent
Complete
Scheduled
Completion
10. List major construction projects your organization has completed in the past 5 years:
Project
Name
Owner A/E Contract
Amount
Date
Awarded
Date
Completed
% of Own
Forces
11. List the construction experience of the principal individuals in your organization:
Individual’s Name Construction
Experience (years)
Present Position &
Years of Experience
Dollar Volume
Responsibility
Previous Position &
Years of Experience
12. List states and categories in which your organization is legally qualified to do business:
2650 East Hobble Creek Bank Restoration (2608-082) Page A4 of A7 Bidder’s Qualifications Statement
13. Project references and performance information:
List and provide company Project References and performance information for at least one (1) similar streambank, riprap, or channel restoration project involving in-stream work completed within the last five (5) years. List the project references below and provide additional information by completing a
Project Reference Form at the end of this Exhibit for each listed reference project.
Project Name and Location Owner Engineer Contract Value
Year Completed
14. Name of bonding and insurance companies, and name and address of agents:
Name of Company Name of Agent Address of Agent Maximum Bonding
Capacity
15. The undersigned agrees to furnish, upon request by the Owner, within 48 hours after bid proposal opening, a current Statement of Financial Conditions, including the Contractor’s latest regular dated financial statement of balance sheet which must contain the following items:
Current assets: Cash, joint venture accounts, accounts receivable, notes receivable, accrued interest on notes, deposits, and materials, and prepaid expenses, next fixed assets and other assets.
Current liabilities: Accounts payable, notes payable, accrued interest on notes, provision for income taxes, advances received from owners, accrued salaries, accrued payroll taxes, other liabilities, and capital (capital stock, authorized and outstanding shares par values, earned surplus).
Date of statement of balance sheet:
Name of firm preparing statement:
2650 East Hobble Creek Bank Restoration (2608-082) Page A5 of A7 Bidder’s Qualifications Statement
By (Agent and Capacity):
16. Dated at , this day of 20 .
(Day) (Month) (Year)
Name of Organization:
By:
Title:
17. NOTARIZATION:
State of:
County of:
M being duly sworn deposes and say that (he/she) is the of Contractor(s) and that the answers to the foregoing questions and all statements and information contained on attachments herein contained are true and correct.
Subscribed and sworn before me this day of 20 .
(Day) (Month) (Year)
Notary Public:
My commission expires:
2650 East Hobble Creek Bank Restoration (2608-082) Page A6 of A7 Bidder’s Qualifications Statement
SIMILAR PROJECT REFERENCE FORM
(Complete for at least one (1) project)
Project No:_______
Project Name and Location: __________________________________________________
Bid Amount: __________________________________________________
Final Contract Amount: ________________________ Year Completed: ____________
Contract Completion Time: ________________________ Days
Dollar Amount and Number of Change Orders: ______________________________________
Actual Completion Time: ________________________ Days
Description of Work:
General Overview: __________________________________________________________
New Facility or Retrofit/ Expansion? ____________________________________________
Length of Streambank Restored or Armored (feet):
Riprap Size (D50) and Quantity:
Other Information? (Attach as needed) __________________________________________
Names Key Contractor Personnel:
Project Manager ___________________________________________________________
Project Engineer ___________________________________________________________
Superintendent ____________________________________________________________
Are all of these persons still employed by your organization ________________________
If no, name those employee(s) not currently employed ____________________________
Name and phone number of currently employed individual at your organization who is familiar with this Project. ________________________________________________________
Name, Address, and Telephone Number of Owner (including name and telephone number of contact person):
2650 East Hobble Creek Bank Restoration (2608-082) Page A7 of A7 Bidder’s Qualifications Statement
Name, Address, and Telephone Number of Engineer if applicable (including name and telephone number of contact person):
Name, Address, and Telephone Number of Construction Manager employed by Owner
Amount and number of claims resulting in arbitration or litigation:
Amount of Settlement: _________________________________________________________
Further Information of Claims: ____________________________________________________
(Repeat for other projects)
Springville City 00 45 13 Exhibit B - Certification of Bidder’s 2650 East Hobble Creek Bank Restoration (2608-082) Page B1 of B1 Experience and Qualifications
EXHIBIT B
CERTIFICATION OF BIDDER’S EXPERIENCE AND QUALIFICATIONS
The undersigned Bidder certifies that Bidder is, and shall be, throughout the period of the contract, licensed by the State of Utah to do the type of work required under terms of the contract documents. Bidder further certifies that Bidder is skilled and regularly engaged in the general class and type of work called for in the Contract Documents.
The Bidder warrants that Bidder is competent, knowledgeable and has special skills on the nature, extent and inherent conditions of the work to be performed.
Bidder further acknowledges that there are certain peculiar and inherent conditions existent in the construction of the particular facilities which may create, during the construction program, unusual or peculiar unsafe conditions hazardous to persons and property. Bidder expressly acknowledges that Bidder is aware of such peculiar risks and that Bidder has the skill and experience to foresee and to adopt protective measures to adequately and safely perform the construction work with respect to such hazards.
Signed this ________ day of ____________________, 20______.
Name of Bidder
Contractor’s License No.
Signature of Bidder
Title of Signator
Springville City 00 51 00 Notice of Award 2650 East Hobble Creek Bank Restoration (2608-082) Page 1 of 1
DOCUMENT 00 51 00
NOTICE OF AWARD
Date of Issuance:
Owner: Springville City Owner's Contract No.: RFP #2026-12
Engineer: Jones & DeMille Engineering Engineer's Project No.: 2608-082
Project: 2650 East Hobble Creek Bank
Restoration Contract Name: 2650 East Hobble Creek Bank
Restoration Project
Bidder:
Bidder’s Address:
TO BIDDER:
You are notified that Owner has accepted your Bid for the above Contract, and that you are the Successful
Bidder and are awarded a Contract for the following: All Work shown in the Bid Schedule for the 2650 East Hobble
Creek Bank Restoration Project.
The Contract Price of the awarded Contract is: $ _______ Contract Price is subject to adjustment based on actual quantities of Unit Price Work completed.
Contract Documents will be made available to Bidder.
You must comply with the following conditions precedent within 14 days of the date of receipt of this Notice of Award:
1. Deliver payment bond.
2. Deliver insurance documentation.
Failure to comply with these conditions within the time specified will entitle Owner to consider you in default and annul this Notice of Award.
Within ten days after you comply with the above conditions, Owner will return to you one fully executed counterpart of the Contract, together with any additional copies of the Contract Documents.
Owner: Springville City
Authorized Signature
By: ____________________________
Title: ____________________________
EJCDC® C-522, Contract for Construction of a Small Project.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
DOCUMENT 00 52 15
CONTRACT FOR CONSTRUCTION OF A SMALL PROJECT
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 19
CONTRACT FOR CONSTRUCTION OF A SMALL PROJECT
This Contract is by and between Springville City (Owner) and
(Contractor).
Owner and Contractor hereby agree as follows:
ARTICLE 1 - THE WORK
1.01 Work
A. Work includes all labor, materials, equipment, services, and documentation necessary to construct the Project defined herein. The Work may include related services such as testing, start-up, and commissioning, all as required by the Contract Documents.
B. The Contractor shall complete all Work as specified or indicated in the Contract Documents.
The Project is generally described as follows:
1. 2650 East Hobble Creek Bank Restoration Project, which includes restoring approximately 85 feet of the Hobble Creek bank and armoring the bank with riprap.
2. The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located along
Hobble Creek in Springville, Utah, as shown on the Drawings.
ARTICLE 2 - CONTRACT DOCUMENTS
2.01 Intent of Contract Documents
A. It is the intent of the Contract Documents to describe a functionally complete project. The
Contract Documents do not indicate or describe all of the Work required to complete the
Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Owner and Engineer. This Contract supersedes prior negotiations, representations, and agreements, whether written or oral.
The Contract Documents are complementary; what is required by one part of the Contract
Documents is as binding as if required by other parts of the Contract Documents.
B. During the performance of the Work and until final payment, Contractor and Owner shall submit all matters in question concerning the requirements of the Contract Documents, or relating to the acceptability of the Work under the Contract Documents to the Engineer.
Engineer will be the initial interpreter of the requirements of the Contract Documents, and judge of the acceptability of the Work thereunder.
C. Engineer will render a written clarification, interpretation, or decision on the issue submitted, or initiate a modification to the Contract Documents.
D. Contractor, and its subcontractors and suppliers, shall not have or acquire any title to or ownership rights to any of the Drawings, Specifications, or other documents (including copies or electronic media editions) prepared by Engineer or its consultants.
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 of 19
2.02 Contract Documents Defined
A. The Contract Documents consist of the following documents:
1. This Contract.
2. Payment bond.
3. Specifications listed in the Table of Contents, including technical specifications shown on the Drawings (sheet specs).
4. Drawings as listed on the Drawing Sheet Index.
5. Addenda.
6. Exhibits to this Contract (enumerated as follows):
a. Exhibit 1 – Contractor’s Bid.
7. The following which may be delivered or issued on or after the Effective Date of the
Contract:
a. Notice to Proceed.
b. Work Change Directives (EJCDC C-940).
c. Change Orders (EJCDC C-941).
d. Field Orders.
ARTICLE 3 - ENGINEER
3.01 Engineer
A. The Engineer for this Project is Jones & DeMille Engineering, Inc.
ARTICLE 4 - CONTRACT TIMES
4.01 Contract Times
A. The Work will be substantially completed within 30 days after the date when the Contract
Times commence to run, as indicated in the Notice to Proceed, and completed and ready for final payment within 45 days after the date when the Contract Times commence to run.
4.02 Liquidated Damages
A. Contractor and Owner recognize that time is of the essence in the performance of the
Contract, and that Owner will incur damages if Contractor does not complete the Work according to the requirements of Paragraph 4.01. Because such damages for delay would be difficult and costly to determine, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty):
1. Substantial Completion: Contractor shall pay Owner $1,000 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial
Completion, until the Work is substantially complete.
2. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 of 19
Contractor shall pay Owner $250 for each day that expires after such time until the Work is completed and ready for final payment.
4.03 Delays in Contractor’s Progress
A. If Owner, Engineer, or anyone for whom Owner is responsible, delays, disrupts, or interferes with the performance or progress of the Work, then Contractor shall be entitled to an equitable adjustment in the Contract Times and Contract Price. Contractor’s entitlement to an adjustment of the Contract Times is conditioned on such adjustment being essential to
Contractor’s ability to complete the Work within the Contract Times.
B. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of Contractor or their subcontractors or suppliers.
C. If Contractor’s performance or progress is delayed, disrupted, or interfered with by unanticipated causes not the fault of and beyond the control of Owner, Contractor, and those for which they are responsible, then Contractor shall be entitled to an equitable adjustment in Contract Times.
D. Contractor shall not be entitled to an adjustment in Contract Price or Contract Times for any delay, disruption, or interference if such delay is concurrent with a delay, disruption, or interference caused by or within the control of Contractor or Contractor’s subcontractors or suppliers.
4.04 Progress Schedules
A. Contractor shall develop a progress schedule and submit to the Engineer for review and comment before starting Work on the Site. The Contractor shall modify the schedule in accordance with the comments provided by the Engineer.
B. The Contractor shall update and submit the progress schedule to the Engineer each month.
The Owner may withhold payment if the Contractor fails to submit the schedule.
ARTICLE 5 - CONTRACT PRICE
5.01 Payment
A. Owner shall pay Contractor in accordance with the Contract Documents at the unit prices for each unit of Work completed at the unit prices stated in the Contractor’s Bid, attached here to as an exhibit. Payment will be made in an amount equal to the total of all extended prices for actual Work completed. The extended price is determined by multiplying the unit price times the actual quantity of that Work item completed. Actual quantities installed will be determined by the Engineer.
ARTICLE 6 - BONDS AND INSURANCE
6.01 Bonds
A. Before starting Work, Contractor shall furnish a payment bond from a surety company that is duly licensed or authorized to issue bonds in the required amounts in the jurisdiction in which the Project is located. The payment bond shall be in an amount equal to the Contract
Price, as security for the protection of each person supplying labor, service, equipment, or material for the performance of the Work. The payment bond shall remain in effect until the
Copyright © 2016 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4 of 19 completion of the correction period specified in Paragraph 7.12 but, in any case, not less than one year after the date when final payment becomes due.
6.02 Insurance
A. Before starting Work, Contractor shall furnish evidence of insurance from companies that are duly licensed or authorized in the jurisdiction in which the Project is located with a minimum AM Best rating of A-VII or better. Contractor shall provide insurance in accordance with the following:
1. Contractor shall provide coverage for not less than the following amounts, or greater where required by Laws and Regulations:
a. Workers’ Compensation:
State: Statutory
Employer’s Liability:
Bodily Injury, each Accident $ 1,000,000
Bodily Injury By Disease, each Employee $ 1,000,000
Bodily Injury/Disease Aggregate $ 1,000,000
b. Commercial General Liability:
General Aggregate $ 4,000,000
Products - Completed Operations Aggregate $ 4,000,000
Personal and Advertising Injury $ 2,000,000
Each…