This file comprises bidding documents for the 2650 East Hobble Creek Bank Restoration project in Springville City, Utah, prepared by Jones & DeMille Engineering, Inc. The project involves the restoration of approximately 85 feet of Hobble Creek bank and the installation of riprap armor to stabilize the eroded bank. The work is located at 2650 East in Springville City and includes site preparation, placement of geotextile filter fabric, and installation of riprap revetment with a D50 size of 18 inches. Construction access is from Whitney Lane, with a designated staging area and coordination required to maintain traffic on Whitney Lane during construction. The drawings are dated November 5, 2026, and marked "FOR BIDDING ONLY," indicating these are finalized design documents for bid solicitation. The site plan shows the project location adjacent to Hobble Creek with notation that work must maintain a minimum 14-foot clearance between the top of the riprap slope and Springville City property line to accommodate a future walking path.

The specifications require that all riprap meet defined durability standards, including ASTM C535 wear testing with maximum 40 percent wear loss and AASHTO T104 sodium sulfate testing with maximum 16 percent weight loss. Geotextile filter fabric must conform to AASHTO M288, Class II, non-woven, minimum 8 ounces per square yard. Contractors must field-verify existing conditions, obtain utility locating services through Blue Stakes at least 48 hours in advance of construction, and comply with the project Stream Alteration Permit and Utah Pollution Discharge Elimination System (UPDES) regulations. All disturbed areas must be reseeded with a certified, weed-free turf grass mix of 70 percent Kentucky bluegrass and 30 percent perennial ryegrass. The contractor is responsible for all safety, erosion control, dust suppression, and materials testing. A pre-construction meeting is required prior to starting work, and construction staking will be completed by Jones & DeMille Engineering.

View the file

Other files

File Type Posted
2-2650E Specs ForBid NOV-9-2026.pdf PDF
3-Addendum No 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPRINGVILLE CITY

2650 EAST HOBBLE CREEK BANK RESTORATION

DESIGN DRAWINGS

NOVEMBER 5, 2026

FOR BIDDING ONLY

Project #: 2608-082 h:

\2

8-

2\ dw g\ cd s\ c-

- t itl e_ ne w

2608-082

VICINITY MAP

SHEET NO.PROJECT NO.

APPROVAL

RECOMMENDED FOR APPROVAL:

DATE

APPROVED:

DATE

Jones & DeMille Engineering, Inc.

1.800.748.5275 www.jonesanddemille.com

GIS - ENVIRONMENTAL - MATERIALS TESTING

CIVIL & STRUCTURAL ENGINEERING - SURVEYING

- shaping the quality of life -

PROJECT LOCATION

SUBMITTAL: FOR BIDDING

C-001

SPRINGVILLE CITY, UTAH

SPRINGVILLE CITY

SPRINGVILLE CITY

2650 EAST HOBBLE CREEK BANK RESTORATION

SPRINGVILLE CITY

SAN JUAN

KANEWASHINGTON

IRON GARFIELD

WAYNEPIUTEBEAVER

MILLARD

SEVIER

EMERY GRAND

SANPETE

CARBON

JUAB

UTAH

WASATCH

DUCHESNE

UINTAH

DAGGETTSUMMIT

SALT LAKE

TOOELE

DAVIS

MORGAN

WEBER

RICH

CACHE

BOX ELDER

IDAHO

WYOMING

C O

LO

R

AD

O

N

EV

AD

A

ARIZONA

UTAH LAKE

HOBBLE CREEK

SPRINGVILLE CITY

SHEET INDEX

SHEET NUMBER SHEET TITLE

C-001 TITLE

C-002 LEGEND

C-003 NOTES

C-004 SUMMARY

C-005 PROJECT LOCATION

C-101 SITE PLAN

C-501 TYPICAL SECTION

NOV-5-2026

LEGEND

EDGE OF ASPHALT

EDGE OF CONCRETE

EDGE OF GRAVEL SURFACING

EDGE OF DIRT SURFACING

EDGE OF ASPHALT SURFACING

TOP BACK OF CURB

LIP OF CURB

TOP OF SIDEWALK

TOP OF CONCRETE

TOP OF GRATE

EDGE OF ASPHALT

FLOW LINE OF GUTTER

FLOW LINE OF CULVERT

SIDEWALK

FINISHED GRADE

TOP OF ASPHALT

CONCRETE SURFACING

ASPHALT SURFACING

STREET SIGN

TBC

LOC

TSW

TOC

TOG

EOA

FLG

FLC

SW

FG

TOA

SANITARY SEWER LINE

CULINARY WATER LINE

BURIED POWER LINE

FENCE LINE (BARBED OR STOCKTIGHT)

DRAINAGE CULVERT

FLOW LINE OF DITCH

BURIED TELEPHONE LINE

NATURAL GAS LINE

BURIED CABLE TV LINE

CULINARY WATER VALVE

SANITARY SEWER MANHOLE

TREE

CONCRETE SURFACING

DELINEATOR POST

PROPERTY LINE

IRRIGATION LINE

EXISTING RIGHT OF WAY LINE

SANITARY SEWER MANHOLE

CULINARY WATER VALVE

DRAINAGE CULVERT

CULINARY WATER LINE

SANITARY SEWER LINE

SECTION LINE

PROPOSED RIGHT-OF-WAY LINE

SUBDIVISION BOUNDARY LINE

LOT LINES

QUARTER SECTION LINE

(P.U.E.) PUBLIC UTILITY EASEMENT

DEED LINE

FIRE HYDRANT

FIRE HYDRANT

STRUCTURE

DELINEATOR POST

STREET SIGN

TOP OF CUT LIMITS

TOE OF FILL LIMITS

CULINARY WATER METER

WATER METER

POWER POLE & GUY WIRE

STORM DRAIN

SANITARY SEWER SERVICE

POWER POLE

EXISTING FEATURES PROPOSED FEATURESMISC. FEATURES

(SIDEWALK, CURB, GUTTER, ETC.)

FENCE LINE (CHAIN LINK)

TELEPHONE PEDESTAL

OVERHEAD CABLE TV LINE

OVERHEAD POWER LINE

OVERHEAD TELEPHONE LINE

BURIED POWER LINE

OVERHEAD POWER LINE

BURIED TELEPHONE LINE

OVERHEAD TELEPHONE LINE

BURIED CABLE TV LINE

OVERHEAD CABLE TV LINE

NATURAL GAS LINE

IRRIGATION LINE

STORM DRAIN

FENCE LINE (BARBED OR STOCKTIGHT)

FENCE LINE (CHAIN LINK)

FIBER OPTIC LINE

FIBER OPTIC LINE

MAILBOX

MAILBOX

ABBREVIATIONS

POWER POLE

COMMUNICATION MANHOLE

RIGHT-OF-WAY

SEWER MANHOLE

LEFT

RIGHT

EPP

CMH

R/W

SMH

L / LT

R / RT

TEMPORARY T.C.E.

PUBLIC UTILITY EASEMENTP.U.E.

CONSTRUCTION EASEMENT

STATIONSTA

EXISTING CITY BLOCK LINES

BLOCK LINE

EXISTING N/A LINE

/5

/2

C-002

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

LE

G

EN

D

-0

/5 /2

H :\2

8-

2\ dw g\

C D s\ C

-0

TI

TL

E_

N ew

.d w gR

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

N O

N E

WATER MANHOLE

LIGHT POLE

LIGHT POLE

FO

R

B

ID

D

IN

G

GAS METER

GAS METER

SMH

M

EPP

G.W.

T

CABLE TV PEDESTAL

SMH

SCO

M

EPP

SCO SANITARY SEWER CLEAN OUT

M

WMH

M

IRRIGATION MANHOLE

IM IRRIGATION METER

SDM STORM DRAIN MANHOLE

IMH

EXISTING GROUNDEG

/5

/2

C-003

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

NO

TE

S

-0

/5

/2

H

:\2

8-

2\ dw g\ C

D s\

C -0

TI

TL

E_ N ew .d w g

R

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

N O

N E

FO

R

B

ID

D

IN

G

GENERAL NOTES

1. REQUEST ACCEPTANCE FROM ENGINEER PRIOR TO DEVIATING FROM DRAWINGS, SPECIFICATIONS, OR CONSTRUCTION SCHEDULE.

2. PERFORM CONSTRUCTION IN ACCORDANCE WITH APPLICABLE AUTHORITY HAVING JURISDICTION (AHJ) AND/OR OWNER STANDARDS AND SPECIFICATIONS.

3. LOCATE AND PROTECT EXISTING UTILITIES AND ANY OBSTRUCTIONS DURING COURSE OF CONSTRUCTION. NOTIFY BLUE STAKES (811) AT LEAST 48 HOURS IN ADVANCE OF ANY CONSTRUCTION ACTIVITIES ON SITE. RESTORE UTILITIES DAMAGED DURING CONSTRUCTION TO CONDITION EQUAL TO OR BETTER THAN EXISTING CONDITION.

4. NOTIFY ENGINEER OR PROJECT REPRESENTATIVE OF ANY CONFLICTS BETWEEN EXISTING FEATURES AND NEW CONSTRUCTION.

5. UNLESS DETAILED, SPECIFIED OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS INDICATED IN APPLICABLE TYPICAL DETAILS AND GENERAL NOTES.

6. THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL AND SECURITY.

7. MEET UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY AND U.S. EPA REQUIREMENTS, RULES, AND REGULATIONS AS OUTLINED IN THE PROJECT STREAM ALTERATION PERMIT.

8. KEEP A COPY OF THE PROJECT STREAM ALTERATION PERMIT ONSITE AT ALL TIMES CONSTRUCTION IS IN PROGRESS

9. CONDUCT CONSTRUCTION OPERATIONS WITH NECESSARY SIGNS, BARRICADES, AND FLASHERS PLACED TO COMPLY WITH OSHA, UTAH STATE INDUSTRIAL COMMISSION, LOCAL

SAFETY STANDARDS, AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.

10. NO FULL ROAD CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVAL OF THE OWNER. MAINTAIN TRAFFIC IN TWO DIRECTIONS AT ALL TIMES FOR ROADS AND ROAD CROSSINGS, UNLESS EXTENUATING CIRCUMSTANCES PROHIBIT. MAKE ROAD CLOSURE REQUESTS 1 WEEK BEFORE NEEDING TO CLOSE ROAD.

11. PROVIDE WRITTEN NOTIFICATION INCLUDING CONTACT INFORMATION TO RESIDENTS AND BUSINESSES IMPACTED BY CONSTRUCTION. PROVIDE NOTICE MINIMUM OF 48 HOURS IN ADVANCE OF WORK BEING PERFORMED. MAINTAIN DRIVEWAY ACCESS TO RESIDENCES AND BUSINESSES AT ALL TIMES UNLESS PARKING ARRANGEMENTS HAVE BEEN MADE WITH RESIDENTS AND BUSINESSES WHILE WORK IS COMPLETED ADJACENT TO OR ON THEIR PROPERTIES.

12. SECURE RIGHT OF INGRESS AND EGRESS IF WORK OR PERSONNEL NEED TO VENTURE ONTO PRIVATE PROPERTY NOT INCLUDED IN OWNER ACQUIRED RIGHTS-OF-WAY AND

EASEMENTS.

13. ACQUIRE A COUNTY PERMIT PRIOR TO STARTING CONSTRUCTION FOR WORK LOCATED WITHIN 30 FEET OF A GOVERNMENT SURVEY MONUMENT OR PUBLIC LAND SURVEY

GOVERNMENT CORNER.

SURVEY NOTES

1. SUBJECT SITE WAS FIELD SURVEYED NOVEMBER 2024 BY JONES AND DEMILLE ENGINEERING.

2. UNLESS OTHERWISE NOTED, ANY BOUNDARY LINES SHOWN ARE TO BE CONSIDERED DEED RECORD LINES. JDE HAS NOT PERFORMED AN OFFICIAL BOUNDARY SURVEY AND NO

RECORD OF SURVEY WILL BE FILED.

3. ANY COORDINATES AND ELEVATIONS, IF SHOWN, ARE LOCAL COORDINATES UNLESS OTHERWISE INDICATED.

4. DISTANCES REFLECT GROUND MEASUREMENTS.

5. CONSTRUCTION STAKING WILL BE COMPLETED BY JONES AND DEMILLE ENGINEERING PRIOR TO CONSTRUCTION.

CONSTRUCTION NOTES

1. NOTIFY OWNER AT LEAST TWO BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION.

2. SCHEDULE AND ATTEND PRE-CONSTRUCTION MEETING PRIOR TO STARTING CONSTRUCTION ACTIVITIES THROUGH OWNER OR OWNER'S REPRESENTATIVE.

3. PROVIDE CONSTRUCTION SCHEDULE TO ENGINEER AND OWNER.

4. FIELD VERIFY EXISTING CONDITIONS. QUANTITIES, LENGTHS, VOLUMES, AND AREAS INDICATED ARE APPROXIMATE (EXCEPT PLAN QUANTITY ITEMS) AND ARE PROVIDED TO

ASSIST CONTRACTOR. VERIFY QUANTITIES AND DETERMINE MEASUREMENTS AS NECESSARY.

5. VERIFY DIMENSIONS BEFORE STARTING WORK AND IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES.

6. OBTAIN APPROVAL FROM OWNER PRIOR TO CONSTRUCTION FOR USE OF STAGING AREAS (IF ANY) NOT SHOWN ON DRAWINGS. COORDINATE WITH OWNER TO IDENTIFY POTENTIAL USABLE STAGING AREAS. RESTORE STAGING AREA TO PRECONSTRUCTION CONDITION.

7. PROTECT EXISTING IMPROVEMENTS DURING CONSTRUCTION AND REPLACE OR RESTORE IMPROVEMENTS DAMAGED AS RESULT OF CONSTRUCTION ACTIVITY. RESTORE IMPROVEMENTS TO AS-GOOD-AS OR BETTER-THAN CONDITION THAT EXISTED PRIOR TO CONSTRUCTION. REPAIR IRRIGATION/SPRINKLERS WITHIN 24 HOURS FOLLOWING

PLACEMENT OF IMPROVEMENTS.

8. DISPOSE WASTE OFF SITE AT LANDFILL OR OTHER LEGAL DISPOSAL FACILITY.

9. REMOVE SURPLUS EXCAVATION FROM SITE. USE TOPSOIL OR OTHER NATIVE MATERIAL IN LANDSCAPE OR NATIVE GRADING. STOCKPILE TOPSOIL SEPARATELY FROM OTHER EXCAVATED MATERIALS. PLACE TOPSOIL IN LANDSCAPED AREAS IN 4 INCHES THICK MINIMUM AND GRADE TO DRAIN.

10. PERFORM CONSTRUCTION QUALITY CONTROL TESTING FOR RIPRAP AND IMPORTED FILL MATERIAL. COMPACTION TESTING IS NOT REQUIRED.

11. PERFORM MATERIALS TESTING AND SUBMIT COPIES OF TEST RESULTS TO ENGINEER AND/OR OWNER AS REQUIRED PER SPECIFICATIONS. COORDINATE TESTING WITH

INSPECTORS AND/OR ENGINEER.

12. PROVIDE SITE DUST CONTROL AND SUPPRESSION FOR DURATION OF PROJECT, INCLUDING WEEKENDS.

13. IF A COFFERDAM IS USED DURING CONSTRUCTION, IT MUST BE BUILT WITH NON-ERODABLE MATERIAL (SEE STREAM ALTERATION PERMIT).

EROSION CONTROL NOTES

1. PREPARE AND SUBMIT STORM WATER POLLUTION PREVENTION PLAN (SWPPP). FILE NOTICE OF INTENT (NOI) PRIOR TO STARTING CONSTRUCTION AND FILE NOTICE OF

TERMINATION (NOT) AT END OF CONSTRUCTION.

2. ADHERE TO UTAH POLLUTION DISCHARGE ELIMINATION SYSTEM (UPDES) REGULATIONS DURING CONSTRUCTION WORK.

3. PREVENT AND CONTROL EROSION DUE TO WIND AND WATER DURING CONSTRUCTION. FOLLOW PROCEDURES AND BEST MANAGEMENT PRACTICES IN SWPPP AND INSTALL EROSION CONTROL MEASURES AS INDICATED IN SWPPP. MAINTAIN A COPY OF THE SWPPP ON SITE AT ALL TIMES.

4. PROVIDE ADDITIONAL EROSION CONTROL MEASURES WHEN UNFORESEEN PROBLEMS OCCUR OR IF SWPPP DOES NOT FUNCTION AS INTENDED. ADJUST EROSION CONTROL MEASURES (SILT FENCES, STRAW BALES, ETC.) AS NEEDED DUE TO GRADE CHANGES DURING CONSTRUCTION. BE AWARE THAT OWNER MAY REQUIRE ADDITIONAL CONTROL

DEVICES UPON INSPECTION OF PROPOSED FACILITIES.

5. KEEP STREETS CLEAN AND FREE FROM SOIL AND DEBRIS DURING CONSTRUCTION.

6. SEED DISTURBED AREAS WITH A CERTIFIED, WEED-FREE TURF GRASS MIX OF 70% KENTUCKY BLUEGRASS AND 30% PERENNIAL RYEGRASS (BY WEIGHT), APPLIED AT 5 LBS OF PURE LIVE SEED PER 1,000 SF. RAKE SEED INTO THE TOP 1/4 INCH OF TOPSOIL, LIGHTLY ROLL, AND KEEP MOIST UNTIL GERMINATION

7. DISPOSE OF WASH WATER (E.G., VEHICLE CLEANING) IN A MANNER THAT PREVENTS CONTACT WITH STORM WATER DISCHARGES FROM SITE.

8. STABILIZE CONSTRUCTION AREAS AT END OF EACH WORKING DAY.

9. APPLY WATER FOR FUGITIVE DUST CONTROL BY MEANS OF TRUCKS, HOSES AND/OR SPRINKLERS AT SUFFICIENT FREQUENCY AND QUANTITY ACCORDINGLY:

9.1. PRIOR TO, CONCURRENTLY AND AFTER EARTHMOVING ACTIVITIES

9.2. TO DEPTH OF PROPOSED CUTS OR EQUIPMENT PENETRATIONS

9.3. PRIOR TO EXPECTED WIND EVENTS

9.4. TO DEVELOP A SURFACE CRUST FOR ALL INACTIVE SITES

10. MINIMIZE FUGITIVE DUST WITH APPROPRIATE VEHICLE HANDLING AND LOADING OPERATIONS.

MATERIALS NOTES

1. ALL MATERIALS WILL CONFORM TO AUTHORITY(IES) HAVING JURISDICTION (AHJ) SPECIFICATIONS AND STANDARDS UNLESS OTHERWISE INDICATED.

2. WHERE INDICATED, SUBMIT CONSTRUCTION DOCUMENTS TO ENGINEER OR OWNER AS CONSTRUCTION RECORD. SUBMIT ALL CONSTRUCTION DOCUMENTS TO AHJ FOR ALL WORK DONE WITH PUBLIC RIGHT-OF-WAY, INCLUDING FIELD AND LAB TEST REPORTS. ALL SUBMITTALS MUST BE COMPLETED AND SUBMITTED TO ENGINEER PRIOR TO PROJECT

TERMINATION.

3. SUBMIT TEST REPORTS AND PRODUCT DATA TO INDICATE RIPRAP AND GEOTEXTILE MEET MATERIAL REQUIREMENTS.

4. EARTHWORK

4.1. USE EXISTING ONSITE EXCAVATED BANK MATERIAL FREE OF RUBBISH, DEBRIS, ORGANIC MATERIAL, OR OTHER OBJECTIONABLE MATERIAL.

4.2. IF USED, SUBMIT TEST REPORTS TO SHOW IMPORT FILL MATERIAL MEETS MATERIAL REQUIREMENTS.

4.3. IF EXCAVATED MATERIAL IS NOT SUFFICIENT FOR REQUIRED FILL AND BACKFILL, PROVIDE IMPORT FILL MATERIAL.

4.4. PLACE AND COMPACT FILL AND BACKFILL MATERIAL IN CONTINUOUS LAYERS NOT EXCEEDING 12 INCHES NON-COMPACTED DEPTH.

4.5. COMPACT FILL AND BACKFILL MATERIALS TO DENSITY EQUAL TO OR GREATER THAN EXISTING UNDISTURBED SOIL. COMPACT IN 12-INCH LIFTS UNTIL NO MOVEMENT UNDER

THE EQUIPMENT, AS OBSERVED BY THE ENGINEER.

4.6. USE IMPORT FILL MATERIAL ACCORDING TO THE FOLLOWING SPECIFICATIONS.

5. RIPRAP

5.1. RIPRAP SHALL BE DURABLE ,ANGULAR , SOUND AND HARD, FIELD OR QUARRY ROCK WITH CHARACTERISTICS AS FOLLOWS: FREE OF SEAMS, CRACKS, OR OTHER STRUCTURAL DEFECTS.FREE OF CLAY, SILT,SAND AND ROCK FINES. WEAR: ASTM C535, MAXIMUM 40 PERCENT. WEIGHT LOSS: AASHTO T104, MAXIMUM 16 PERCENT WHEN SUBJECT TO 5 CYCLES OF SODIUM SULFATE. SPECIFIC WEIGHT: 2.5 TO 2.82. ABSORPTION: MAXIMUM 2 PERCENT BY WEIGHT. GRADATION: IN ACCORDANCE WITH THE TABLE

BELOW.

5.2. END DUMPING OR DOZER PLACEMENT OF ROCK RIPRAP IS NOT PERMITTED. PLACE RIPRAP USING MECHANICAL EQUIPMENT SUCH AS TRACK HOE WITH THUMB, AND HAND

PLACE TO THICKNESS INDICATED ON DRAWINGS.

5.3. IN-PLACE ROCKS SHALL BE SECURELY INTERLOCKED ONE TO ANOTHER WITH SMALLER ROCKS AND SPALLS FILLING THE VOIDS BETWEEN LARGER ROCKS. FORM UNIFORM, HOMOGENEOUS, STABLE SURFACE USING ROCKS OF GRADED SIZES. PLACE ROCK TO FULL COURSE THICKNESS AND WIDTH IN ONE OPERATION AND MANNER TO AVOID

DISPLACEMENT OF UNDERLYING BASE MATERIALS AND GEOTEXTILE FILTER FABRIC.

5.4. PLACE ROCK SUCH THAT LARGER ROCKS ARE EVENLY DISTRIBUTED AND FIRMLY IN CONTACT WITH ADJACENT ROCKS. DO NOT GROUT SMALL STONES AS A SUBSTITUTE FOR LARGER STONES. HAND PLACE SMALLER ROCKS AS NECESSARY TO PROVIDE INTERLOCKED ROCK SURFACE.

6. GEOTEXTILE FILTER FABRIC: AASHTO M288, CLASS II, NON-WOVEN WITH MINIMUM 8 OUNCES PER SQUARE YARD WEIGHT. MIRAFI 180N OR EQUAL.

6.1. PLACE AND ANCHOR GEOTEXTILE ON SMOOTH, DE-WATERED, PREPARED SUBGRADE SURFACE. PLACE GEOTEXTILE IN SUCH MANNER THAT PLACEMENT OF OVERLYING MATERIALS WILL NOT EXCESSIVELY STRETCH OR TEAR GEOTEXTILE. ANCHORING SHALL BE BY CONTRACTOR SELECTED METHOD THAT DOES NOT TEAR OR EXCESSIVELY STRETCH GEOTEXTILE AND SHALL BE IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

6.2. PLACE RIPRAP ON GEOTEXTILE IN A MANNER THAT GEOTEXTILE IS NOT TORN, PUNCTURED OR SHIFTED. DO NOT DROP ROCK FROM A HEIGHT GREATER THAN 2-FEET ON TO

GEOTEXTILE.

6.3. JOIN GEOTEXTILE BY OVERLAPPING IN DIRECTION OF WATER FLOW. OVERLAP SEAMS MINIMUM 24 INCHES OR PER MANUFACTURER'S WRITTEN RECOMMENDATIONS, WHICHEVER IS GREATER.

7. SEEDING: MINIMIZE DAMAGE TO GRASS LAWN AREAS ADJACENT TO BANK RESTORATION SITE.

7.1. SEED GRASS AREAS DESTROYED DURING CONSTRUCTION ACTIVITY.

/5

/2

C-004

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

SU

M M

AR

Y

-0

/5

/2

H

:\2

8-

2\ dw g\ C

D s\

C -0

TI

TL

E_ N ew .d w g

R

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

N O

N E

FO

R

B

ID

D

IN

G

CANYON ROAD

RIVER BOTTOM ROAD

CO

VE

D

RI

VE

S

OUTH

2650 EASTW

ITNEY LANE

2750 EAST

1100 SOUTH

CONSTRUCTION ACCESS

POINT FROM WITNEY LANE

HOBBLE CREEK

HOBBLE CREEK

CONSTRUCTION STAGING AREA

MAINTAIN TRAFFIC USE OF WITNEY

LANE DURING CONSTRUCTION

BANK PROTECTION SITE

PRIVATE

PARCEL

MOBILIZE TO PROJECT SITE THROUGH

SPRINGVILLE CITY PROPERTY BETWEEN

PRIVATE PARCEL AND HOBBLE CREEK

/2

7/

C-005

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

PR

O

JE

CT

L

O

CA

TI

O

N 26

-0

/5

/2

H

:\2

8-

2\ dw g\ C

D s\

C -1

SI

TE

PL

AN

.d w g

R

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

1"

R

EV

IE

W

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

Blue Stakes of

Bluestakes.org 1-800-662-4111

CALL BEFORE YOU DIG.

IT'S FREE AND IT'S THE LAW.

0+

0+50 1+00

1+23

SPRINGVILLE CITY

PROPERTY

PRIVATE

PROPERTY

/2

7/

C-101

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

SI

TE

P

LA

N

-0

/5

/2

H

:\2

8-

2\ dw g\ C

D s\

C -1

SI

TE

PL

AN

.d w g

R

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

1"

0'

R

EV

IE

W

N

O T

FO

R

C O

N

ST

R U

C

TI

O N

Blue Stakes of

Bluestakes.org 1-800-662-4111

CALL BEFORE YOU DIG.

IT'S FREE AND IT'S THE LAW.

WORK FROM TOP OF BANK

RESEED DISTURBED AREAS ACCORDING

TO STREAM ALTERATION PERMIT

SPRINGVILLE CITY

PROPERTY LINE

COMPACTED FILL AS NEEDED

BELOW/BEHIND RIPRAP LAYER RIPRAP REVETMENT

SEE SHEET C-501

D50 = 18" REQ'D

MINIMIZE DISTURBANCE TO EXISTING BANK AT

REVETMENT ENDS

INSTALL RIPRAP ARMOR TO ANY BANK AREA

DAMAGED DURING CONSTRUCTION

2:1 (H:V) FINISHED BANK GRADE

SEE TYPICAL SECTION ON SHEET C-501

HOBBLE CREEK

FLOW DIRECTION

MINIMIZE DISTURBANCE TO EXISTING

BANK AT REVETMENT ENDS

PROTECT EXISTING TREES

AND TREE ROOTS IN PLACE

14' MIN

BETWEEN PROP. LINE AND

TOP OF 2H:1V SLOPE

CONSTRUCTION ACCESS POINT

FROM WITNEY LANE

APPROXIMATE SPRINGVILLE CITY

PROPERTY BOUNDARY

NOTES:

1. MAINTAIN 14.0' MIN BETWEEN TOP OF

RIPRAP 2:1 SLOPE AND SPRINGVILLE

CITY PROPERTY LINE FOR FUTURE

WALKING PATH.

2. WORK FROM TOP OF BANK AND

WITHIN SPRINGVILLE PROPERTY

WHERE POSSIBLE. COORDINATE WITH

ADJACENT LANDOWNERS IF

DISTURBANCE TO PRIVATE PROPERTY

IS UNAVOIDABLE.

3. RESEED DISTURBED AREAS.

EXISTING SPRINKLER TAP

LOCATE BEFORE BEGINNING WORK

TO PREVENT DAMAGE

/2

7/

C-501

E

AS

T

HO

BB

LE

C

RE

EK

B

AN

K

RE

ST

O

RA

TI

O

N

TY

PI

CA

L

SE

CT

IO

N

-0

/5 /2

H :\2

8-

2\ dw g\

C D s\ C

-5

D

ET

AI

LS

.d w g

R

EV

IS

IO

N S

N O

D

AT

E

R

EM

AR

KS

SC

AL

E:

U

PD

AT

ED

N U

M

BE

R

PR

O

JE

C

T

COUNTY

SHEET NO.

D W

G N

AM

E:

PL

O

TT

ED

1 2 3 4 5 6 7 8

1 2 3 4 5 6 7 8

F

E

D

C

B

A

G

IS

EN

VI

R

O N

M

EN

TA

L

- M

AT

ER

IA

LS

T

ES

TI

N G

1.

0.

8.

w .jo ne sa nd de m ille

.c om

Jo ne s

D eM ille E ng in ee rin g, In c.

C

IV

IL

S

TR

U

C

TU

R

AL

E N

G

IN

EE

R

IN

G

SU

R

VE

YI

N

G

SU

BM

IT

TA

L:

UTAH

SP

RI

NG

VI

LL

E

CI

TY

R

EV

IE

W

N O

T

FO

R C

O N

ST

R

U C

TI

O

N

Blue Stakes of

Bluestakes.org 1-800-662-4111

CALL BEFORE YOU DIG.

IT'S FREE AND IT'S THE LAW.

NOTES:

1. INSTALL FILTER FABRIC ACCORDING TO

MANUFACTURER'S INSTRUCTIONS.

2. GENTLY PLACE RIPRAP TO PREVENT TEARING

OR OTHERWISE DAMAGE TO THE FILTER

FABRIC. REMOVE AND REPLACE ANY DAMAGED

OR TORN FILTER FABRIC DURING

CONSTRUCTION.

REVETMENT TYPICAL SECTION

COMPACTED FILL

AS NEEDED BELOW

RIPRAP LAYER

EG

FG

GEOTEXTILE FILTER FABRIC

REQ'D

7.00'

3.

3.00'

RIPRAP D50 = 18"

REQ'D

LAYER THICKNESS = 2XD50

2H:1V

1H:1V

HOBBLE CREEK

TOP OF 2H:1V SLOPE

TO BE STAKED BY SURVEYOR

6.

Sheets and Views
C-001 TITLE
C-002 LEGEND
C-003 NOTES
C-004 SUMMARY
C-005 PROJECT LOCATION
C-101 SITE PLAN
C-501 TYPICAL SECTION