About this file

This document is an Addendum #1 to a Request for Proposals (RFP) issued by the Port Authority of New York and New Jersey for Expert Professional Climate Resilience and Sustainable Design Services. The RFP #6000001848 seeks professional services to be performed on a task order basis over a four-year term, with proposers required to demonstrate a minimum of three relevant projects for each category they are proposing. The document contains responses to questions raised during a pre-proposal meeting held on November 28, 2023, addressing various aspects of the proposal submission, including documentation requirements, MBE/WBE participation, project qualifications, and service scope.

Key details include provisions that allow proposers flexibility in proposal preparation, such as using firm templates in addition to provided Word templates, converting documents to PDF, and including additional resumes and projects beyond minimum requirements. The Port Authority clarified that for MBE/WBE participation, a Prime Proposer that is an MBE can self-perform up to $2 million for non-construction projects, and submitting a proposal as a Prime WBE or MBE will not preclude participation in subsequent MWBE services call-in RFPs. The RFP covers multiple service categories including mechanical design, structural engineering, and vertical transportation systems, with work anticipated to include airports and other facilities within the Port District, which includes Stewart Airport.

View the file

Other files

File Type Posted
1-RFPDOC 6000001848.docx DOCX document
4-Addendum 2 6000001848.pdf PDF
5-Addendum 3 6000001848.pdf PDF
7-Addendum 5 6000001848.pdf PDF
8-Addendum 6 6000001848.pdf PDF
2-RFP 6000001848 AD.pdf PDF
6-Addendum 4 6000001848.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 World Trade Center l 150 Greenwich Street, 21st floor l New York, NY 10007

December 4, 2023

SUBJECT: REQUEST FOR PROPOSALS FOR THE PERFORMANCE OF EXPERT

PROFESSIONAL CLIMATE RESILIENCE AND SUSTAINABLE DESIGN

SERVICES AS REQUESTED ON A “TASK ORDER” BASIS DURING A

FOUR-YEAR TERM RFP #6000001848 – ADDENDUM #1: AS PER THE

QUESTIONS RECEIVED DURING THE PRE-PROPOSAL MEETING

HELD ON NOVEMBER 28, 2023

Dear Sir or Madam:

The following are questions from Request for Proposals (RFP) recipients. The questions and the corresponding Port Authority of New York and New Jersey (the Authority) answers are provided for your information and use, as appropriate.

Question #1: Is the Authority able to provide the list of the subject RFP’s attendees and presentation from the November 28, 2023, pre-proposal meeting?

Answer #1: The Authority has attached the subject pre-proposal meeting’s attendee list and presentation for your reference.

Question #2: For the resiliency and sustainability RFP, is the minimum requirement for the list of relevant projects to be demonstrated 3 or 5?

Answer #2: Proposers must demonstrate a minimum of three (3) projects for each of the categories for which they are proposing.

Question #3: Can we include any of our own firm documents, such as project descriptions and resumes in our firm templates, in addition to the Word templates?

Answer #3: Yes, however proposers should adhere to the RFP template as closely as possible.

Question #4: If the Prime Proposer is an MBE, will that count towards the MBE participation goal, or will the MBE Prime have to add another MBE to meet the goal?

Answer #4: The Prime can self-perform up to $2 million for non-construction projects.

Question #5: Will there be a limit on when past project was completed?

Answer #5: No, unless specifically requested within the proposer requirement.

Question #6: Is there a font requirement?

Answer #6: No, any legible font is acceptable.

Question #7: Under the Mechanical Design Services RFP, is vertical transportation systems its own subset?

Answer #7: Yes.

- 2 -

Question #8: Will work at airports be part of the MEP contract?

Answer #8: Yes, it is currently anticipated that airports and other facilities will be included in the make-up of the Task Order Requests.

Question #9: The due date for the Structural RFP states a different due date from the portal.

Please confirm the correct due date.

Answer #9: The Structural RFP #6000001837 is due on December 11, 2023, at 2pm ET.

Question #10: Does the “Port District” as defined or mapped in the presentation, include Stewart Airport?

Answer #10: Yes. Visit this link for more information: Learn More About the Port Authority of New York and New Jersey - Your Questions Answered (panynj.gov)

Question #11: For the Structural RFP, please clarify if the minimum of two Structural Engineers required need to be located within the Port District.

Answer #11: The two Structural Engineers shall be Professional Engineers and shall be licensed in the State of NY or NJ, but do not have to be physically located in the Port District, but should be readily available for Task Order Requests that may have a short turnaround time.

Question #12: Is there any intent to consider diversity within companies when those companies are not qualified as an MBE, WBE or DBE, etc.?

Answer #12: While this is not a factor in a firm’s evaluation, you shall note this in the MWBE portion of your Proposal, as your subconsulting plans will be reviewed and taken into consideration upon recommendation of award.

Question #13: Will submitting a proposal as a Prime who is a WBE or MBE preclude the Prime from submitting a Proposal for any subsequent MWBE services call-in RFPs that may be issued at a later date?

Answer #13: No.

Question #14: Can we include more resumes and projects than the requirements?

Answer #14: Yes.

Question #15: Should proposers include a management approach as part of the submittal? There doesn’t appear to be a requirement/request for an approach in the RFP, but there have been several mentions of an approach during the presentation.

Answer #15: This is not required, as it is not a factor that is considered in the evaluation. A management approach would appear at a task order level, where the specific Scope of Services has been defined. While not required, you may include one with your Proposal, but that is a business decision of a firm.

https://www.panynj.gov/port-authority/en/about.html https://www.panynj.gov/port-authority/en/about.html

- 3 -

Question #16: For the submission, can we convert the Word document to PDF and submit a PDF for the final document?

Answer #16: Yes.

Question #17: For Mechanical RFP, under HVAC/Plumbing/Fire Protection/CHRP, Tasks include Energy Modeling and Stress Analysis - is the stress analysis a holdover from the Structural RFP or is stress analysis a task under this category?

Answer #17: This is pipe stress/thermal stress analyses related to mechanical systems.

Question #18: If MBE is prime, can we fulfill 20% requirement?

Answer #18: See Answer #4.

If you have any questions, please contact the Solicitation Manager listed in each RFP.

- 4 -

REQUEST FOR PROPOSALS FOR THE PERFORMANCE OF EXPERT

PROFESSIONAL CLIMATE RESILIENCE AND SUSTAINABLE DESIGN SERVICES

AS REQUESTED ON A “TASK ORDER” BASIS DURING A FOUR-YEAR TERM RFP

#6000001848 – ADDENDUM #1: AS PER THE QUESTIONS RECEIVED DURING THE

PRE-PROPOSAL MEETING HELD ON NOVEMBER 28, 2023

Pre-Proposal Attendance Sheet from November 28, 2023

Email Address Email Address athomas@kcepc.com TSTGermain@infrastructure-eng.com

LINDA.ROSENBERG@stvinc.com Cherry.Xiong@exp.com theneveld@lkbinc.com Richard.Acoury@wsp.com

Scott.Jarmel@jacobs.com amy.pastor@exp.com fbuczek@arorapc.com wshute@moffattnichol.com

Alireza.Mohammadi@stvinc.com Horacio.MartinezMichel@icf.com wfall@csagroup.com Kyrillos.Meseha@kpff.com

Raqib.Caesar@wsp.com WSlade@gargengineering.com margaret.rohan@bravoinc.com sschollmeyer@csagroup.com marora@arorapc.com meldorr@ataneconsulting.com ccole@schnabel-eng.com mpatel@keriengineering.com rdrouin@burns-group.com MWagner@tandmassociates.com SLeidenheimer@jmt.com kjanik@watts-ae.com andrea.rosenthal@aecom.com ssafara@promatechinc.com nbelzer@hardestyhanover.com Ellen.Whitley@mottmac.com chris.blankson@aecom.com isabel.hernandez@aecom.com jreve@gedeongrc.com Keri.Ecker@mottmac.com asquithd@liro.com dgonzalez@kcepc.com Josef.Villa@wsp.com dkeable@csagroup.com

Sam.Nauss@jacobs.com ablackman@mcfaglobal.com LOHara@trccompanies.com Christopher.Dorman@mbakerintl.com

Jillian.Nall@nv5.com egehan@Dewberry.com Kelly.Sheehan@mottmac.com dpiselli@fxcollaborative.com kanewalt@hveapc.com Kevin.Koch@mottmac.com mtolliver@kseng.com kelley@sodensustainability.com Steve.Eget@wsp.com Angela.Ma@arc-dec.com

Christine.Dinisi@hdrinc.com cstern@HNTB.com Luchandra.Bryant@stvinc.com Jake.Oldenburger@tetratech.com

JZweback@cosentini.com GSciannantena@infrastructure-eng.com MSteinle@marinetiger.com jpristach@LaBellaPC.com michelle.ryckman@insightcivil.com BABlabac@modjeski.com Michael.Bomar@tetratech.com ggordon@panynj.gov

Tom.Rice@arup.com GHubbard@ThorntonTomasetti.com skang@HNTB.com Joe.Burden@aecom.com maldea@kseng.com lboucher@moffattnichol.com

- 5 -

AS REQUESTED ON A “TASK ORDER” BASIS DURING A FOUR-YEAR TERM RFP

Tiffany.Carter@wsp.com Eric.Ross@aecom.com

Richard.Karpinski@aecom.com Monty.Du@wsp.com pmonahan@moffattnichol.com Allison.Dewey@mottmac.com rgajer@arorapc.com carrie.villani@lera.com Brian.Henning@mottmac.com pyu@yu-associates.com jahnj@jbb.com szayas@techno-eng.com David.Powell@arup.com MiskimanAM@bv.com

SKAMILARIS@Dewberry.com CHall@THENERGISNAL.onmicrosoft.com ktenfelde@msimarinesolutions.com kaushal@shenoyengineers.com rizhar@siengineering.com Jeffrey.Bott@jacobs.com LPatrick@trccompanies.com Kelly.Lawler@mottmac.com aplair@gedeongrc.com Keith.Gaspar@mottmac.com jbrown@schnabel-eng.com mrutyunjay.vajirkar@stvinc.com

David.I.Smith@wsp.com RLee@HNTB.com Laura.Andres@jacobs.com Joely.Phenes@nv5.com rthuston@rouxinc.com RPradhan@aiengineers.com Eric.Betz@FPAengineers.com hjovani@HNTB.com Kambiz.Nassiri@stvinc.com BBeardsley@popligroup.com scharbonneau@savinengineers.com abuffa@HNTB.com Sara.Christen@landrumbrown.com ikhristidi@mpengs.com lpevzner@yu-associates.com Michal.Mrowiec@perkinswill.com dbrennan@burns-group.com Douglas.Gaffney@mottmac.com Davinder.Kaur@aecom.com tbarbagianis@edesigndynamics.com

KHolt@ThorntonTomasetti.com ssargent@hardestyhanover.com Daniel.Koh@icf.com Norris.Harvey@mottmac.com rhart@epmco.com Jessie.Lu1@aecom.com

DDelenick@jmt.com Joseph.Gale@exp.com Tori.Ellis@nv5.com Julian.Prada@mottmac.com

Mohammad.Shaikh@jacobs.com gdavis@Dewberry.com JPeck@trccompanies.com oramotar@rouxinc.com lwener@HNTB.com jarch@HNTB.com mdriegel@HNTB.com Igor.Maevski@jacobs.com ram.b@tylin.com Kwu@langan.com Emory.Lee@Ramboll.com ecovington@HNTB.com cosso@yu-associates.com Rajeev.Kumar2@wsp.com ddeluca@hardestyhanover.com beslinger@hardestyhanover.com

- 6 -

AS REQUESTED ON A “TASK ORDER” BASIS DURING A FOUR-YEAR TERM RFP

Tbiercz@vertexeng.com anigro@mpengs.com dcrnkovich@HNTB.com shila.shah-gavnoudias@aecom.com

VickiArbitrio@GMSLLP.com cioffaric@jbb.com Armin.Golkhandan@wsp.com Lijun.Shi@wsp.com

Joanna.Jenkins@perkinswill.com rsandiford@HNTB.com Gaspar.Cabrera@macegroup.com Thomas.Heller@mottmac.com

Diane.Lu@mottmac.com khussain@aiengineers.com jjsuarezjr@csagroup.com Jack.Buchsbaum@wsp.com

Simonette.White@wsp.com Cole.Bourassa@mbakerintl.com rjain@siengineering.com Shelley.Leone@wsp.com

Remon.Yussif@jacobs.com JGarcia@jmt.com ajagnanan@mpengs.com frowe@naikgroup.com Andrew.Keene@arup.com don.tone@samschwartz.com

Meghan.Timmons@stvinc.com Kelly.Finzel@arup.com jeatonernst@HNTB.com MGreer@aiengineers.com camille.perez@tylin.com jennifer.brunton@wsp.com Kate.Estler@hdrinc.com CGuder@trccompanies.com vincent.antes@wsp.com alexander.smolyar@wsp.com cassandra.wetzel@gza.com ALoCicero@burns-group.com al.meyer@samschwartz.com shrabinski@gedeongrc.com jose.rivera@samschwartz.com QPJohnson@modjeski.com TKinsella@tandmassociates.com aaugustyniak@gedeongrc.com

Breanna.Gribble@stvinc.com MFaeth@moffattnichol.com Debra.Moolin@wsp.com sizhar@siengineering.com Jason.Ojeda@stvinc.com jtan@naikgroup.com

Francisco.Ciruela-Ochoa@arup.com gsalierno@systra.com michael.dacosta@tylin.com jmizrhai@burns-group.com

Danielle.Kerkes@tetratech.com Andreia.Chankalian@FPAengineers.com OGladoun@ThorntonTomasetti.com echuang@gargengineering.com LMacKay@ThorntonTomasetti.com JAlper@severud.com

Roger.Haight@wsp.com MJSmith@modjeski.com nzeineddine@HNTB.com cballolli@langan.com

JHu@ThorntonTomasetti.com muzamil.husain@tylin.com JActon@trccompanies.com NAbboud@ThorntonTomasetti.com

EGratson@trccompanies.com Maki.Onodera@jacobs.com LBorowsky@marinetiger.com JPietrzak@ThorntonTomasetti.com mailto:TKinsella@tandmassociates.com mailto:MJSmith@modjeski.com mailto:cballolli@langan.com mailto:muzamil.husain@tylin.com

- 7 -

AS REQUESTED ON A “TASK ORDER” BASIS DURING A FOUR-YEAR TERM RFP

Songtao.Yang@jacobs.com ETCC@cowi.com kanderson@kseng.com Amy.canova@aecom.com kshahid@kseng.com Brian.Craine@jacobs.com lonnie.coplen@arc-dec.com wahid.albert@aecom.com Gerbasip@liro.com NBalseca@techno-eng.com

Jeremy.Hung@wsp.com avladu@Langan.com Meghan.Rogers@mbakerintl.com Diane@shenoyengineers.com

Jessica.Jahre@mbakerintl.com mb@jmgeng.com hpatel@naikgroup.com jcarrillo@rouxinc.com

Sydney.McGinn@arup.com jstoicescu@Langan.com ASebesta@sjheng.com leightonm@jbb.com

Andrew.Gennaro@mottmac.com rstevens@hardestyhanover.com Ernestine.Leaf@parsons.com dbosworth@Langan.com vhon@mnwe.com Erika.Moshkovich@stvinc.com Harrison.Antognioni@wsp.com Mark.Colino@wsp.com cnapolitano@langan.com edzakwasi@econdecisions.onmicrosoft.com dobr@cowi.com jmanzella@h2m.com hennis@deloitte.com LNTheobald@modjeski.com jrodger@langan.com kkelly@syska.com hirfani@GFNET.com efayfman@syska.com

Ilana.Judah@arup.com JLynn@loringengineers.com ccherebin@gedeongrc.com mnavarro@boswellengineering.com Eugen.Cela@mottmac.com spelau@syska.com

TACole@modjeski.com wcaban@techno-eng.com Tiffany.Sellinger@arup.com david.a.jones@wsp.com

Cheryl.Gnojek@wsp.com Brian.McLear@wsp.com aalzamora@Langan.com Anthony.Cerino@stvinc.com ikaratas@HNTB.com shady.elshetwy@tylin.com aguirguis@hardestyhanover.com Nat.Kasbekar@mbakerintl.com

Joseph.Tierney@FPAengineers.com JBRodriguez@ThorntonTomasetti.com gestupinan@enovateengineering.com Hazel.Lee@arup.com

Matt.Carter@arup.com isabel.lorenzo@GMSLLP.com vida.blackburn@entuitive.com Bryan.N.Jones@hdrinc.com

Teresa.Vangeli@wsp.com Joshua.Gillespie@hdrinc.com weidenb@jbb.com eblumberg@geocompanies.com

Amarjeet.Saini@jacobs.com Karen.Armfield@wsp.com

- 8 -

AS REQUESTED ON A “TASK ORDER” BASIS DURING A FOUR-YEAR TERM RFP

Sean.Yaghobi@wsp.com SMathew@jmt.com

Rachel.OGorman@arc-dec.com RIlardi@ThorntonTomasetti.com TStellato@chasolutions.com RCampbell-Watt@trccompanies.com spanayi@mpengs.com rwitte@GFNET.com lcohen@gedeongrc.com Stephen.Famularo@wsp.com

ZAlikhan@trccompanies.com SWilliams@trccompanies.com Monica.Hatcher@jacobs.com RLMiller@trccompanies.com

JDeerkoski@ThorntonTomasetti.com Seif.Chowdhury@scengineerspc.com info@keriengineering.com Gauri.Jumde@wsp.com

MEPeterson@trccompanies.com John.S.Chow@wsp.com Masjood.Jafri@atkinsrealis.com ahollweck@milhouseinc.com wmichelsen@enovateengineering.com xriva@admarble.com ndecotiis@mnwe.com strevenen@kseng.com

Matthew.McCarty@stantec.com MKim@ThorntonTomasetti.com mceselka@mnwe.com tom.pagano@samschwartz.com

File details come from the government source that posted it. Updated .