3-Addendum 01 Prequal signed.pdf
PDF 105 KB Posted
- Attached to
- 1200 W Trunk Line Rehabilitation – 1300 South
- Solicitation number
- 525003129
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is Addendum No. 1 to the prequalification documents for the 1200 West Trunk Line Rehabilitation project issued by Salt Lake City Public Utilities on August 31, 2026. The project, identified as Project No. 525003129, involves water-cured CIPP (cured-in-place pipe) rehabilitation of approximately 6,386 linear feet of 48-inch, 54-inch, and 60-inch diameter reinforced concrete pipe trunk line located along 1300 South from State Street to 700 West in Salt Lake City, Utah. The scope of work includes furnishing and maintaining a flow control bypass pumping system with odor control, groundwater management and treatment, rehabilitation of 16 manholes using epoxy coating, cleaning and video inspection of the existing trunk line, reconnection of active laterals and disconnection of inactive laterals, post-construction testing and video inspection, and coordination with other agencies for permitting and public relations activities. The addendum was revised on December 11, 2023, and all prequalification applications submitted without signed acknowledgment of this addendum will be rejected.
The primary change in Addendum No. 1 modifies the contractor prequalification requirements by replacing the previous CIPP experience criterion with a requirement that contractors demonstrate significant experience installing large diameter CIPP on sewer rehabilitation projects, specifically a minimum of 100,000 linear feet of installed CIPP of 48-inch diameter and larger pipe completed within the last ten years. No changes were made to the agreement forms, contract conditions, specifications, or drawings. Acknowledgment of receipt of this addendum must be made in paragraph 5 of the Application Certification Form (Appendix B), and failure to provide this signed acknowledgment will result in automatic rejection of the prequalification application.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4-Addendum 02 03SEP2026 signed.pdf | ||
| 1-Prequal Evaluation Form 13AUG2026.pdf | ||
| 2-Request for Qualifications 13AUG2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised December 11, 2023 Addendum No. 1
00 91 13. 1 - 0
NOTICE
TO: All document holders
DATE: 8/31/2026
FROM: Jason Draper, P.E.
Chief Engineer
Salt Lake City Public Utilities
1805 West 500 South, Salt Lake City, Utah 84104
(801) 483-6840 FAX (801) 483-6818
SUBJECT: Addendum No. 1 to the Prequalification Documents for the 1200 West Trunk Line
Rehabilitation - 1300 South – State Street to 700 West Project, Project No.
525003129
Transmitted herewith is ADDENDUM No.1 to the prequalification documents for the above-mentioned project.
All applications submitted without the signed acknowledgment of this Addendum will be rejected.
00 91 13. 1 - 1
DOCUMENT 00 91 13. 1
ADDENDUM No. 1
PART 1 GENERAL
1.1 DOCUMENT INCLUDES
A. Changes to the Contractor Prequalification Documents.
1.2 CONSTRUCTION CONTRACT
A. 1200 West Trunk Line Rehabilitation, 1300 South-State Street to 700 West
B. Project No. 525003129
C. Date: 8/31/2026
PART 2 CHANGES
2.1 CHANGES TO PRIOR ADDENDA
A. NONE
2.2 CHANGES TO BIDDING REQUIREMENTS (PREQUALIFICATION DOCUMENTS)
A. Replace last bullet point on page 2 of the EVALUATION OF STATEMENT OF
QUALIFICATIONS paragraph in CONTRACTOR PREQUALIFICATION
REQUIREMENTS with the following:
• “Contractor shall have significant experience installing large diameter cured-in-place pipe (CIPP) on sewer rehabilitation projects (a minimum of 100,000 linear feet of installed CIPP of 48-inch diameter and larger pipe and completed within the last ten (10) years).
2.3 CHANGES TO AGREEMENT AND OTHER CONTRACT FORMS
A. NONE
2.4 CHANGES TO CONDITIONS OF THE CONTRACT
A. NONE
2.5 CHANGES TO SPECIFICATIONS
A. NONE
2.6 CHANGE TO DRAWINGS
A. NONE
PART 3 ACKNOWLEDGEMENT
3.1 Acknowledgement of receipt of this addendum is made in paragraph 5 of APPLICATION
CERTIFICATION FORM – APPENDIX B
00 91 13. 1 - 2
3.2 All Applications for Bidder Prequalification submitted without the signed acknowledgment of this Addendum will be rejected.
END OF ADDENDUM