1-Prequal Evaluation Form 13AUG2026.pdf
PDF 121 KB Posted
- Attached to
- 1200 W Trunk Line Rehabilitation – 1300 South
- Solicitation number
- 525003129
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a prequalification evaluation form for the City of Salt Lake City's 1200 W Trunk Line Rehabilitation project located along 1300 South from State Street to 700 West in Utah. The project involves water-cured CIPP (Cured-in-Place Pipe) rehabilitation of approximately 6,386 linear feet of 48-inch, 54-inch, and 60-inch diameter RCP trunk line, rehabilitation of 16 manholes with epoxy coating, furnishing and maintenance of a flow control bypass pumping system, groundwater management, and reconnection of active laterals. Contractors must demonstrate experience installing a minimum of 100,000 feet of CIPP greater than 48 inches in diameter, hold a current Utah license with minimum $15 million bonding capacity, and provide documented superintendent and project manager experience exceeding 10,000 feet in the last five years. The evaluation form includes pass/fail qualification requirements and reference scoring across multiple performance categories.
The prequalification evaluation employs an 80-point scoring system distributed across four performance categories: Contractors Team and Quality of Work (40 points), Claims and Reporting (16 points), Coordination/Cooperation with Public and Other Agencies (12 points), and Schedule Adherence and Closeout (12 points). Scoring utilizes a 1-4 rating scale with varying multipliers for each criterion, with individual scores ranging from "Poor" to "Good." Contractors must provide documentation of bonding, insurance, financial institution information, acceptable work approach, schedule copies, quality control programs, safety programs, and evidence of ability to meet Salt Lake City insurance requirements. The evaluation includes assessment of public outreach experience, litigation history, bankruptcy proceedings, and overall performance rating on a 1-100 scale, though the latter does not contribute to the total score.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-Addendum 01 Prequal signed.pdf | ||
| 4-Addendum 02 03SEP2026 signed.pdf | ||
| 2-Request for Qualifications 13AUG2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Answer Additional Notes
Contractor Name
Questions with a Pass / Fail rating will not be scored, any criteria that receives a fail shall disqualify the contractor.
Questions with a Yes/No rating will not be scored.
Qualifications
3. License Number Pass / Fail
4. Bonding Pass / Fail
8. Experience Installing Min 100,000 ft of CIPP greater than 48" in Diam. (Form A) Pass / Fail
9. Total Installation Experience > 100,000 ft. (Form B) Pass / Fail
10. Superintendent Experience (>10,000 in last 5 years) (Form C) Pass / Fail
11. PM Experience (>10,000 in last 5 years) (Form D) Pass / Fail
19.i. Public Outreach Experience? Yes/ No
Legal
17. Pending Litigation? Yes / No
18. Litigation Against Company in last 5 years? Yes / No
Financial
19.e. Contractor Surety Info Provided Yes / No
19.f. Contractor Bank or Financial Instution Info Provided Yes / No
19.g. Contractor Insurance Info Provided Yes / No
19.h. Bankruptcy proceedings Yes / No
Work Approach, Scheduling Methodology, QC Program, Safety Program
20. Provided acceptable work approach. Yes / No
21.a. Copy of Schedule Yes / No
21.b. Provided Copy of QC Program Yes / No
21.c. Provided Copy of Safety Program Yes / No 21.d. Provided Statement to be able to meet the insurance requirements of Salt Lake City Yes / No
Contractor Prequal Scoring_1300 South - State Street to 700 West
Project Title Pipe size (in) Lenth (ft)
Total= 0
Total= 0
Total= 0
Responding Contractor
Holds
Current
Utah License
Min $15M
Bonding?
Experience Installing Min 100,000 ft of CIPP greater than 48"
PM Experience (>10,000 in last 5 years)
(Form D)
Application
Certification
Provided
Superintendent Experience (>10,000 in last 5 years)
(Form C)
Total Installation Experience
(Form B)
Length ft
Copy of Schedule
Provided
Copy of QC Program
Provided Approach?
Public Outreach
Experience?
Pending
Litigation?
Litigation Against Company in last 5 years?
Copy of Safety
Program Provided
Contractor Name
Reference Contact Information (Name, Organization, Phone)
For questions with a 1-4 rating, scores will be assigned as follows: 1 = Poor 2 = Unsatisfactory 3 = Satisfactory 4 = Good
Score Multiplier Total Additional Notes
Contractors Team and Quality of Work (40 points)
1. Superintentant or Project Manager Ability
(Score 1-4; multiply score x 3; Maximum of 12 points) 1-4 3 12
2. Team Consistency through Project
(Score 1-4; multiply score x 1; Maximum of 4 points) 1-4 1 4
3. Emphasis on Safety
(Score 1-4; multiply score x 2; Maximum of 8 points) 1-4 2 8
4. Work Quality
(Score 1-4; multiply score x 4; Maximum of 16 points) 1-4 4 16 Subtotal Total of 40 points available
Claims and Reporting (16 points)
5. Timely Reporting and Submittals
(Score 1-4; multiply score x 1; Maximum of 4 points) 1-4 1 4
6. Unusually High Number of Claims or Difficulty Resolving Claims
(Score 1-4; multiply score x 3; Maximum of 12 points) 1-4 3 12 Subtotal Total of 16 points available
Coordination/Cooperation with Public and Other Agencies (12 points)
7. Public Interaction and Information Management
(Score 1-4; multiply score x 2; Maximum of 8 points) 1-4 2 8
8. Permitting and Regulatory Agency Coordination
(Score 1-4; multiply score x 1; Maximum of 4 points) 1-4 1 4 Subtotal Total of 12 points available
Schedule Adherence and Closeout (12 points)
9 Was Project Completed On Time?
(Score 1-4; multiply score x 2; Maximum of 8 points) 1-4 2 8
10. Project Closeout Performance
(Score 1-4; multiply score x 1; Maximum of 4 points) 1-4 1 4 Subtotal Total of 12 points available
Overall Performance Assessment (No points)
11. Overall Performance Rating
(Score 1-100; not included in total)
GRAND TOTAL Total of 80 points available
Reference Scoring_1300 South - State Street to 700 West
| Prequal |
| Prequal SLC 1300 S_Eval Form_FINAL Submitted 8.3_v2.pdf |
| Prequal Evaluation |
| Prequal SLC 1300 S_Eval Form_FINAL Submitted 8.3_v2-.pdf |
| Reference Scoring |