This Transportation Facility Relocation Feasibility Study was prepared by Rimrock Engineering and Development, LLC for the South Summit School District. The study evaluates four potential alternative locations for relocating the district's transportation facility, all currently owned by the school district: three sites in Kamas (300 South and 200 East, 400 South and 500 East, and 100 North and 200 West) and one site in Francis (140 West and Frontier Lane). The primary objective is to identify a new location that can accommodate the district's transportation needs, including enclosed parking for all vehicles, bus staging areas, and a maintenance shop, while providing the same or better overall facilities.
The feasibility study conducts a comprehensive analysis of the alternative sites using two major evaluation components: transportation aspects and physical site attributes. Transportation analysis factors include access, neighborhood impact, potential to disperse bus routes, and deadheading impacts. Site analysis evaluates the ability to accommodate the facility and employee parking, potential for future growth, infrastructure requirements, subsurface improvement needs, and ability to support above-ground fuel tanks. The study utilizes a weighted scoring system from 1-5 for each factor to objectively compare the sites, with critical factors like deadheading receiving higher weight due to impacts on vehicle maintenance and residential traffic. Conceptual site plans were generated using AutoTurn® software to analyze bus turning capabilities, with the intent of providing a comprehensive comparison to guide the district's relocation decision.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-Exist HighSchool-site Studies 10 2024 (2).pdf | ||
| 6-SSSD RFP Facility Master Plan.docx | DOCX document | |
| 4-FOOTHILL OPTION 3.pdf | ||
| 2-SSSD 20 yr faciliites master plan informational flyer.pdf | ||
| 5-FRANCIS CHURCH SITE (1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Transportation Facility Relocation Feasibility Study
South Summit School District
Rimrock Engineering and Development, LLC
Enhancing Educational Experiences through top notch transportation
Transportation Facility Relocation Feasibility Study TOC
Table of Contents 1 Feasibility Study
1.1 Introduction of Feasibility Study
1.2 Background / Existing Information
1.2.1 School District Boundary
1.2.2 Alternative Site Locations
1.2.3 District Schools
1.2.4 Bus Routes
2 CONCEPTUAL SITE PLANS
2.1 Generation of Conceptual Site Plans
3 EVALUATION
3.1 Key Components of Evaluation
3.2 Transportation Analysis
3.2.1 Access
3.2.2 Impact on Nearby Neighborhood
3.2.3 Potential to Disperse Bus Routes
3.2.4 Deadheading Impacts
3.3 Site Analysis
3.3.1 Accommodate Facility including Employee Parking plus Potential Growth
3.3.2 Does Not Limit Other Potential Uses
3.3.3 Requires Less Improvements to Facility
3.3.4 Requires Less Subsurface Improvements
3.3.5 Accommodate Above Ground Fuel Tanks
4 Evaluation
4.1 Comparison
5 Summary and Conclusions
Transportation Facility Relocation Feasibility Study Page 1 of 9
1 FEASIBILITY STUDY
1.1 INTRODUCTION OF FEASIBILITY STUDY
This feasibility study reviews the potential of relocating the District’s transportation facility to a different location. This facility would replace the existing facility and would be required to provide the same or better overall facilities to the District. The new facility would need to provide enclosed parking spaces for all of the district’s vehicles (buses, vans, cars, etc), room to stage the school buses during the school day and a shop in order to maintain the fleet.
1.2 BACKGROUND / EXISTING INFORMATION
To conduct the feasibility study there are existing components that need to be outlined including but not limited to the School District boundary, potential relocation sites, school locations, and bus routes.
1.2.1 School District Boundary
The extent of the South Summit School District is shown in Figure One.
Figure One – South Summit School District Boundaries
Transportation Facility Relocation Feasibility Study Page 2 of 9
1.2.2 Alternative Site Locations
This feasibility study addresses four alternative locations for potential Transportation Facility relocation, all of which are currently owned by the school district:
1. 300 South and 200 East in Kamas
2. 400 South and 500 East in Kamas
3. 140 West and Frontier Lane in Francis
4. 100 North and 200 West in Kamas
Figure Two on the following page shows potential transportation facility properties in black.
Transportation Facility Relocation Feasibility Study Page 3 of 9
Figure Two – Alternative Site Locations
Transportation Facilities Potential Alternative Locations
1. 300 S/200 E - Kamas
2. 400 S/500 E - Kamas
3. 140 W/Frontier L. - Francis
4. 100 N/200 W - Kamas
Figure Two
South Summit School District Transportation Facility Relocation Feasibility Study
Transportation Facility Relocation Feasibility Study Page 4 of 9
1.2.3 District Schools
The three schools that currently are serviced daily by the Transportation Services Department are listed below with the grades and general session times:
• South Summit High School o 45 South 300 East, Kamas, UT 84036 o Grades 9-12 o General Sessions 7:35 am to 2:20 pm (Friday to 1:25 pm)
• South Summit Middle School o 355 East 300 South o Grades 5-8 o General Sessions 7:40 am to 2:16 pm (Friday to 1:25 pm)
• South Summit Elementary School o 535 East 300 South o Grades K-4 o General Sessions 8:50 am to 3:20 pm (Friday to 2:20 pm)
1.2.4 Bus Routes
The three schools are supported by seven elementary as well as seven middle/high school bus routes – three from north, three from south and one more east/west. The drivers start at 6:40 am and end at 4:20 pm. Middle/High School are together with earlier routes that allow the drivers to return in time to follow up with elementary school routes. The afternoon routes are a reverse repeat of the morning routes.
Figure Two shows the Middle/High School Bus Routes (AM Pickups). Figure Three shows the Elementary School Bus Routes. (AM Pickups). The afternoon routes are not shown for brevity.
In reviewing the bus route maps, there are the following observations:
• Both Elementary and Middle/High School: Three of the north routes overlap along SR-32 from Center Street in Kamas, to 3700 North. The routes then diverge and cover different parts of Oakley, north on SR-32 past Peoa and northeast on Weber Canyon Road.
• Both Elementary and Middle/High School: Three of the south routes overlap along SR-32 from Center Street in Kamas, to 1700 North. The routes then diverge and cover different parts of Francis, Woodland and Samak. Two of the routes return along Foothill Drive.
Transportation Facility Relocation Feasibility Study Page 5 of 9
Figure Three – Middle/High School Bus Routes
Transportation Facility Relocation Feasibility Study
Middle/HS Bus Routes Legend (AM Pickups) S9-Bus 20 S14-Bus 14 S16-Bus 15 S13-Bus 19 S12-Bus 17
S15-Bus 18
Figure Three
Transportation Facility Relocation Feasibility Study Page 6 of 9
Figure Four – Elementary School Bus Routes
Transportation Facility Relocation Feasibility Study
Elementary Bus Routes Legend (AM Pickups) E6-Bus 20 E1-Bus 15 E7-Bus 14 E5-Bus 19 E4-Bus 17
E3-Bus 18
Figure Four
Transportation Facility Relocation Feasibility Study Page 7 of 9
2 CONCEPTUAL SITE PLANS
2.1 GENERATION OF CONCEPTUAL SITE PLANS
Conceptual site plans have been generated to aid in evaluating all aspects of the alternative sites.
To assist in comprehending the scale of the sites, the buildings shown on the site plans, even though some are different configurations, are essential the same size of the existing building located at the current transportation facility. Each site includes a depiction of drive routes patterns using the AutoTurn® software analyzing a bus that is 40’ in length replicating the larger buses within the district’s fleet. The site plans can be found in Appendix A.
3 EVALUATION
3.1 KEY COMPONENTS OF EVALUATION
In considering the key components to evaluate the feasibility of the four sites it was determined that the two major components were the transportation aspects along with the physical attributes and the of the individual sites. The transportation analysis compares the different alternatives with respect to transportation efficiency. While the physical attributes are addressed in the site analysis determining if the site is suitable for a transportation facility.
3.2 TRANSPORTATION ANALYSIS
The purpose of this section will be to compare the different alternatives with respect to transportation efficiency. The factors in this analysis are access, impact to nearby neighborhood, potential to disperse bus routes, and deadheading impacts.
3.2.1 Access
One of the factors to consider is access to the site. The access evaluation will consider the general characteristics of the roadway to be accessed: volumes of opposing traffic, speeds and ability of a bus to access the site (bus turning limitations mean that buses will need to use the opposite side of narrow roads to make turns).
3.2.2 Impact on Nearby Neighborhood
The District wishes to minimize impacts to the neighborhoods where possible. This includes minimizing the number of buses using a street along with minimizing bus travel on subdivision roads.
3.2.3 Potential to Disperse Bus Routes
The location of a bus facility may necessitate that all the routes enter and exit on the same residential street. Based on either the location of the facility or the location of access to a facility, there may be potential for naturally dispersing bus routes and thereby minimizing neighborhood impacts. Dispersing the routes through out-of-direction routing or inefficient routing is not recommended.
Transportation Facility Relocation Feasibility Study Page 8 of 9
3.2.4 Deadheading Impacts
Deadheading is when a bus is out of service bus and is running without passengers. Deadheading can occur for one or more of the following reasons:
• buses leaving or returning to the vehicle yard
• buses changing routes
• buses driving to a break location
3.3 SITE ANALYSIS
The purpose of this section will be to evaluate the physical attributes of the different alternatives and compare them to each other. The factors in this analysis to be considered are if the site can accommodate the facility, limits using the site for other potential more beneficial uses, improvement needed to service and access the facility, extent of subsurface improvements needed to stabilize the site for construction, and if the site can accommodate above ground fuel tanks.
3.3.1 Accommodate Facility including Employee Parking plus Potential Growth
The major factor in the analysis is how the site can accommodate the transportation facility and all if it’s needs including employee parking along with the potential for future growth.
3.3.2 Does Not Limit Other Potential Uses
It needs to be considered if the site would be better suited for other potential uses or if placing the transportation facilities on the site will not limit the other potential uses from being located in the vicinity.
3.3.3 Requires Less Improvements to Facility
It is assumed for this evaluation that the facility itself will not deviate significantly from one site to the next therefore, the extent of improvements to each site is a factor to be considered. Each site has been evaluated to compare the infrastructure needed to provide services (power, culinary water, sanitary sewer, road access, etc) to the site.
3.3.4 Requires Less Subsurface Improvements
Subsurface improvements for the facility including building and site stabilization is another factor to be included in the analysis. The cost to build in unstable areas can be significant.
3.3.5 Accommodate Above Ground Fuel Tanks
Fueling the fleet is a significant operational factor to include in the evaluation of sites.
Transportation Facility Relocation Feasibility Study Page 9 of 9
4 EVALUATION
4.1 COMPARISON
To complete an overall comparison of the alternative sites the sites along with the factors from the transportation analysis and site analysis have been inserted into a comparison table. In the comparison table each of the factors discussed above are being evaluated with a range of 1 – 5 with one being a low or poor score and 5 being the best score. Each factor also has a weighting for how critical it is to the analysis. For example, deadheading is a problem that increases vehicle maintenance, miles of non-essential travel and traffic on residential streets. Therefore, in this evaluation it is weighted with a high percentage. The weights add up to 100 percent and by multiplying the score for each factor by its weight as a whole number, a weighted scoring is developed (in red) that makes the analysis more objective.
“COMPLETED TABLE TO BE INSERTED HERE”
The table above shows that Alternatives… TO BE COMPLETED UPON COMPLITION OF
COMPARISON
5 SUMMARY AND CONCLUSIONS
TO BE GENERATED UPON COMPLITION OF EVALUATION